OPC_Stage_2_RFP_Change_Log_A0005.xlsx
XLSX spreadsheet 37 KB Posted
- Solicitation number
- 70Z02321RAPC00000
About this file
This document contains a request for proposal for the Detail Design and Production of up to 11 Offshore Patrol Cutters, along with associated Long Lead Time Materials, Logistics, Training, and Life Cycle Engineering requirements. The United States Coast Guard is seeking a fixed price incentive firm contract for the design and build of these vessels, with an anticipated award of one contract. Proposals are due by May 28, 2021, with questions due by February 26, 2021. The Coast Guard plans to employ the Offshore Patrol Cutters to conduct missions beyond 12 nautical miles from shore globally. The vessels will comprise approximately 70% of the Coast Guard's offshore cutter capacity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OPC_Stage_2_RFP_Questions_A0005.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_A00005.pdf | ||
| Section L - Instructions to Offerors_A0005.pdf | ||
| Attachment L-2 -Pricing Worksheet_A0004.xlsx | XLSX spreadsheet | |
| Section L - Instructions to Offerors_A0004.pdf | ||
| 70Z02321RAPC00000_A0004.pdf | ||
| 70Z02321RAPC00000_A00003.pdf | ||
| Attachment L-2 -Pricing Worksheet_A0003.xlsx | XLSX spreadsheet | |
| Attachment L-3 - Unit Price Analysis Worksheet_A0002.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_A00002.pdf | ||
| OPC_Stage_2_RFP_Questions_A0002.xlsx | XLSX spreadsheet | |
| Attachment L-2 -Pricing Worksheet_A0002.xlsx | XLSX spreadsheet | |
| OPC_Stage_2_RFP_Change_Log_A0002.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_A00001.pdf | ||
| OPC_Stage_2_RFP_Change_Log_A0001.xlsx | XLSX spreadsheet | |
| OPC_Stage_2_Final_RFP_Questions.xlsx | XLSX spreadsheet | |
| Attachment L-2 -Pricing Worksheet_A0001.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_OPC Stage 2.pdf | ||
| Redacted JAs.zip | ZIP file | |
| L Attachments.zip | ZIP file |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Working Change Log
| # | RFP Section or J-attachment | Section | Change Description |
| 1 | RFP Section | Attachment L-2 | [RFP Q74] Attachment updated |
| 2 | Technical Library | Contract Drawings | Added a folder containing five drawings |
| 3 | J-Attachment | J-1 Part 1 | These changes will lessen constraints on watch position requirements, maximizing the number of rates and ranks that can stand certain watches, potentially reducing the manpower requirement |
| 4 | J-Attachment | J-1 Part 13 | [RFP Q105] Modification to allow the DECS-250N in lieu of DECS-200N is recommended because the Basler DECS-200N is obsolete. |
| 5 | J-Attachment | J-1 Part 15 | PPD 324-001 (J-1 Part 15) |
UL 489 Supplement SB Naval.
The test procedures and certificates of tests shall be submitted upon request by the Naval Technical Authority.
PPD 324-001 (J-1 Part 15) Isolation. Each load center shall be capable of electrical isolation from its source at the load center and at the source. Isolation shall be provided by a circuit breaker.
| 6 | J-Attachment | J-1 Part 15 | [RFP Q124] Circuit breaker requirements need to be modified in order to clarify that load centers shall have isolation circuit breakers at the source (SWBD) and at the Load Center only if the load center is equipped with casualty power terminals. |
| 7 | J-Attachment | J-1 Part 15 | [RFP Q123] These modifications are recommended to clarify the requirements for ABT and MBT monitoring. |
| 8 | J-Attachment | J-1 Part 15 | [RFP Q122] Updates Circuit Breaker Information |
| 9 | J-Attachment | J-1 Part 15 | Updates Load Centers |
| 10 | J-Attachment | J-1 Part 4 | 310.3.11.9 Fuel Service, lubricating oil and jacket water piping shall not require removal while performing organizational level maintenance. |
310.3.11.10 Interferences in way of performing organizational level maintenance on each ship service diesel generator shall be installed with mechanical fasteners or other means necessary to allow for their removal without performing hot work.
| 11 | J-Attachment | J-1 Part 4 | SDTCR148 was originally drafted to move the SSDG Set organizational level maintenance from SWBS section 502 to under SWBS section 310; however not all of the requirements were transferred and the formatting was altered. This SDTCR is to correct those issues. |
| 12 | J-Attachment | J-1 Part 4 | [RFP Q120] Modification is recommended to clarify that the necessity of a casualty power system is to be determined by the Electric Plant Survivability Analysis. |
| 13 | J-Attachment | J-1 Part 5 | Revising CUI to FOUO |
| 14 | J-Attachment | J-1 Part 8 | [RFP Q138] This change updates the SPEC to include 7.62mm ammunition in the 760 storage requirements |
| 15 | J-Attachment | J-1 Part 8 | This change updates the format for the Armament lockers |
| 16 | J-Attachment | J-1 Part 8 | [RFP Q7] 760.2.1.1.7 from the Spec and corrects M2A1 typo |
| 17 | J-Attachment | J-1 Part 8 | This change updates the SPEC to include a portable rubbermat in the weapon clearing station |
| 18 | J-Attachment | J-1 Part 9 | OPC Stage 2 Addendum (J-1 Part 9), 3-3-2/2.1 |
NVR Subsection 2.1.1 shall be modified as follows: delete in its entirety and substitute: “Generator sets shall comply with PPD-310-001 and the requirements specified herein, and shall be of the same type, design and manufacture.”
OPC Stage 2 Addendum (J-1 Part 9), 5-4-2/2.1 The system shall be a Sprinkler Equivalent System for accommodation spaces with automatic nozzles.
| 19 | J-Attachment | J-1 Part 9 | [RFP Q108] This fixes the typo that removed the requirement |
| 20 | J-Attachment | J-1 Part 9 | Balance grade quality G16 aligns with the recommended balance grade in ISO 1940-1 for crankshaft drives (including couplings), inherently balanced, rigidly mounted. |
| 21 | J-Attachment | J-1 Part 9 | Updates Testing (3.5.2) |
| 22 | J-Attachment | J-11 SKED C | [RFP Q6] This change adds Helicopter Support Kit (HSK) to schedule C, GFI. |
| 23 | J-Attachment | J-11 SKED C | Removal of Manpower Estimate Report Update |
| 24 | J-Attachment | J-12 ERL | J-12 - following documents have been added to respository and and highlighted in the J-12 |
NAVSEA Pub T9070-BH-DPC-010 1987 FOUO NAVSEA Pub S6430-AE-TED-010 Rev 6 2019 FOUO CDRL_ATCH_041-DD-1013_System_List
CDRL_ATCH_071_DD_1965_CMPT_REGISTER
Joint Publication 3-13.1 Electronic Warfare NAVAIR Bulletin 1P [RFP Q109] Naval Surface Warfare Center Report DTRC-SSPD-89-173-35 NAVSEA Dwg 804-5000994 Rev A NAVSEA Dwg 804-8436624 Rev-
NTTP 3-20 2012
Navy’s Test, Measurement, and Diagnostic Equipment TMDE Index Access 2016 V8.3 TMDE Index Access 2016 V8.3.accdb.3je875j SER-704300, Rev 1, (Pages 644 and 645) [RFP Q137]
| 25 | J-Attachment | J-12 ERL | Edited J-12 with updates and additions provided by SMEs. These updates align the ERL with other changes to the RFP. Changes are highlighted in yellow in the ERL. |
| 26 | J-Attachment | J-12 ERL | Updated Manpower Estimate Report and added OPC Baseline TDFA |
| 27 | J-Attachment | J-12 ERL | Updates DID and corrects RFP |
| 28 | J-Attachment | J-2 | [RFP Q1] Table 1 updated for readability. |
| 29 | J-Attachment | J-20 OPC Stage 1 Matrix of Design Artifacts | [RFP Q93] Added two CDRLs to the J-20 (167-03-2296 and 624-03-1980) in response to a Final RFP question. |
| 30 | Technical Library | J-20 OPC Stage 1 Matrix of Design Artifacts | [RFP Q125] Added three (3) CDRL folders to the Technical Library. One (170-03-2104) had been listed on the J-20 but mistakenly omitted from the libarary as shared in FEB 2021. Two others (167-03-2296 and 624-03-1980) were added in partial form in response to a Final RFP question. |
| 31 | J-Attachment | J-24 LLTM | [RFP Q13] Clarifies definition of insurance spares |
| 32 | J-Attachment | J-28B | [RFP Q18] The J-28b identifies CDRLs for the Refigeration System Arrangement and Detail Drawings as 516-DD-2DD8 and Reefer Box Arrangement and Detail Drawings as 516-DD-2DD9 while the J5 identifies these draings as 516-DD-2038 and 516-DD-2039 respectively. |
| 33 | J-Attachment | J-28B | [RFP Q19] OPC Stage 2 DD CDRL (J-5), CDRL 042-DD-1422 is titled Sensors, Alarms, and Safeties Database. The government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-85. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 202-DD-1422 to 042-DD-1422. |
| 34 | J-Attachment | J-28B | [RFP Q29] OPC Stage 2 DD CDRL (J-5) does not include CDRL 302-DD-1468, Motor Drawings. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 122, should not have been included and will be deleted. |
| 35 | J-Attachment | J-28B | [RFP Q30] OPC Stage 2 DD CDRL (J-5) does not include CDRL 313-DD-1531, Battery Capacity Calculations. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 132, should not have been included and will be deleted. |
| 36 | J-Attachment | J-28B | [RFP Q31] OPC Stage 2 DD CDRL (J-5) does not include CDRL 324-DD-1554, Operation Description for Electric Plant Control System. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 147, should not have been included and will be deleted. |
| 37 | J-Attachment | J-28B | [RFP Q32] OPC Stage 2 DD CDRL (J-5) does not include CDRL 331-DD-2245, Lighting and Receptacle Load Calculations. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 154, should not have been included and will be deleted. |
| 38 | J-Attachment | J-28B | [RFP Q33] OPC Stage 2 DD CDRL (J-5), CDRL 581-DD-1876 is titled Anchoring, Mooring, and Towing Equipment Systems Arrangements and Details Drawings. The government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-328. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 580-DD-1876 to 581-DD-1876 |
| 39 | J-Attachment | J-28B | [RFP Q34] OPC Stage 2 DD CDRL (J-5), CDRL 402-DD-2288 is titled Cyber Security Controls Matrix. The government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-346. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 040-DD-2288 to 402-DD-2288. |
| 40 | J-Attachment | J-3 GEN SOW | OPC-B RFP, J-3_GEN SOW 042.2.13.10.8 |
IS:
Integrated Program Management Data and Analysis Report (IPMDAR)
WAS:
Cost Performance Report (if applicable).
REDLINE:
Integrated Program Management Data and Analysis Report (IPMDAR)
41 J-Attachment J-3 GEN SOW 040.3.7.1 The CWBS shall be the structure for communication throughout the acquisition process. It shall be the common link that unifies the planning, scheduling, cost estimating, budgeting, contracting and performance reporting disciplines. The CWBS shall provide clear traceability of work efforts and end products. The CWBS shall identify all project and product elements using the guidance in MILHDBK-881. The Work Breakdown Structure (WBS) shall follow the structure identified in APPENDIX E: SEA SYSTEMS of MIL-STD-881. WBS shall be set up for each ship at level 2 as demonstrated in APPENDIX E. CWBS shall align with ship system numbering structure (SWBS) in the OPC Specifications, expanded as needed
42 J-Attachment J-3 GEN SOW OPC-B RFP, J-3 _GEN SOW, Section 42.2.11
REDLINE:
Integrated Program Management Data and Analysis Report (IPMDAR) shall be provided in both CWBS and OBS formats for labor hours, labor dollars, and material dollars
| 43 | J-Attachment | J-3 GEN SOW | [RFP Q99] Revising CUI to FOUO |
| 44 | J-Attachment | J-3 GEN SOW | resolves outstanding/unincorporated |
| 45 | J-Attachment | J-4 DD SOW | [RFP Q117] J-4, Page J4-28, Section 083.7.2.4 |
OLD: FLIS Technical Procedures, Volume 28.
NEW: FLIS Technical Procedures, Volume 2-8.
46 J-Attachment J-4 DD SOW 083.6 Provisioning Technical Documentation Schedule. The Contractor shall provide a PTD Submission Schedule (PTDSS). The PTDSS serves as both a schedule and index of the provisioning data provided by the Contractor. [083-DD-2298]
083.7 Provisioning Data and Information.
083.7.2 The PTD sets the baseline supply data and information for the lead ship. PTD consists of a Parts Provisioning List (PPL) and supporting Engineering Data for Provisioning (EDFP).
083.7.3.1 EDFP shall be provided for each item appearing on a PPL submittal, first appearance only as part of the PTD.
| 47 | J-Attachment | J-4 DD SOW | Numerous Changes/Re-Numbering |
| 48 | J-Attachment | J-4 DD SOW | Modification is recommended to clarify that the necessity of a casualty power system is to be determined by the Electric Plant Survivability Analysis. |
| 49 | J-Attachment | J-4 DD SOW | The changes outlined below add clarity to the contract requirements. |
| 50 | J-Attachment | J-4 DD SOW | Minor administrative adjustments needed to be made to clarify the RFP. |
| 51 | J-Attachment | J-4 DD SOW | these specific evolutions will ensure analysis is done on various types of boat and flight operations. Since there are different manning and position requirements for helicopter launch/recover vs. HIFR or man overboard vs. rescue and assistance, etc. |
| 52 | J-Attachment | J-4 DD SOW | 202.13.7 ended in an "and". ACS added to completethe list. |
| 53 | J-Attachment | J-5 DD CDRL | Updated CDRL 088-DD-1285 |
| 54 | J-Attachment | J-5 DD CDRL | Updates DID and corrects RFP |
| 55 | J-Attachment | J-5 DD CDRL | 083-DD-1222 (BLK04, BLK12, and BLK 16) Updates |
| 56 | J-Attachment | J-5 DD CDRL | RFP, J-5 Attachment, CDRL Index Table, section 042-DD-2341 |
REDLINE:
Integrated Program Management Data and Analysis Report (IPMDAR)
57 J-Attachment J-5 DD CDRL BLK12-DATE OF 1ST SUBM: 60 DAEDCA
BLK16-REMARKS:
First submission of IPMDAR data is due 60 Days After Effective Date of Contract Award (DAEDCA) and subsequent submissions containing Contract Performance Dataset (CPD), Schedule and Performance Narrative Report are due on the last business day of the month.
58 J-Attachment J-5 DD CDRL Contract Performance Dataset (CPD) Instructions:
Within the CPD, the Summary Performance table is used to provide multiple required values (e.g., To Date ACWP, BCWS) for the Summary Elements (e.g., G&A, COM) as indicated by the Summary Element ID and the associated enumeration table (CPD FFS 2.4.2).
59 J-Attachment J-5 DD CDRL [RFP Q111] *DD CDRL (J-5), 088-DD-1283, BLK16, BLK04, Number 1 Updates shall be made to the OPC Baseline TDFA to reflect the Contractor’s design, equipment selection, and associated operator and maintainer tasks. Contractor shall maintain OPC Baseline TDFA format. The CTR shall provide evidence in the HESAR that the TDFA and Link Analysis results are reflected in the proposal design.
*DD CDRL (J-5), 088-DD-1283, BLK16, BLK04, Number 1 Link Analysis shall use and maintain traceability to the Link Analysis Data containing operator-operator and operator-equipment pairings, criticality, and frequency inputs. Link Analysis shall compare and rank different layouts to determine optimal operator watchstation/consoles and equipment placement on the following layouts:
**OPC Stage 2 DD CDRL (J-5), 256-DD-2501 Calculations supporting individual equipment/component sizing, such as component process rates, performance curves, tank and sump capacities, etc, shall be clearly identified and demonstrated.
**OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16
BLK16:
**OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 6 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 6 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 9 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 9 **OPC Stage 2 DD CDRL (J-5), 521-DD-2511 **OPC Stage 2 DD CDRL (J-5), 529-DD-2523 **OPC Stage 2 DD CDRL (J-5), 556-DD-1805
| 60 | J-Attachment | J-5 DD CDRL | Final submissions of IPMDAR data are due after the completion of the Detail Design. Contract Performance Dataset (CPD) will be provided quarterly after completion of Detail Design through CLIN Closeout. |
| 61 | J-Attachment | J-5 DD CDRL | **Stage 2 RFP, BLK01-SEQUENCE NO.: 040-DD-1029 |
NLT 14 days prior to IBR Execution related materials shall be delivered:
| 62 | J-Attachment | J-5 DD CDRL | These proposed CDRL changes ensure requirements are clear in order to prevent confusion |
| 63 | J-Attachment | J-5 DD CDRL | Improve instuctions on CDRLs’: 2309. BLK 16. Added reference instruction MIL-STD-882 Task 207 |
| 64 | J-Attachment | J-5 DD CDRL | Modification is recommended to clarify that the necessity of a casualty power system is to be determined by the Electric Plant Survivability Analysis. |
| 65 | J-Attachment | J-5 DD CDRL | these changes will provide more clear guidelines and expectations for the Manpower Mix Analysis Report product. They also include additional mechanisms which will allow the CG to be more involved and aligned in the development of the product, reducing unexpected problems and schedule delays. |
| 66 | J-Attachment | J-6 CON SOW | [RFP Q25] **RFP, J-6_CON_SOW , 040.5.1 |
The Contractor shall host the Government’s Integrated Baseline Review (IBR) within 180 days after each option exercise on the date mutually agreed to by both the Government and the Contractor.
| 67 | J-Attachment | J-6 CON SOW | [RFP Q82] Revising install kit language in response to question from RFP respondent. |
| 68 | J-Attachment | J-6 CON SOW | Revising install kit language. |
| 69 | J-Attachment | J-7 CON CDRL | 083-DD-1222 (BLK 16, BLK 12, ) Updates |
| 70 | J-Attachment | J-7 CON CDRL | [RFP Q35] 083-CON-1229 |
| 71 | J-Attachment | J-7 CON CDRL | **RFP_J-7_ 042-CON-2341_ BLK13_ BLK13_Page 36 |
First submission of IPMDAR data is due not later than 60 days after option award and and Subsequent submissions containing Contract Performance Dataset (CPD), Schedule and Performance Narrative Report are due on the last business day of the month. Final submissions of IPMDAR data are due after delivery of each hull. Contract Performance Dataset (CPD) shall be provided quarterly after delivery through CLIN Closeout.
72 J-Attachment J-7 CON CDRL **RFP-J-7 Attachment, CDRL Index table, section 042.CON.2341 Integrated Program Management Data and Analysis Report 73 J-Attachment J-7 CON CDRL **RFP_J-7 CON-CDRL, BLK01-SEQUENCE NO.: 042-CON-2341
BLK12-DATE OF 1ST SUBM: 60 DAEDCA
| 74 | J-Attachment | J-7 CON CDRL | There is inconsistency between the IPMDAR submission due dates |
| 75 | J-Attachment | J-7 CON CDRL | [RFP Q56 & Q94] Updates DID and corrects RFP |
| 76 | RFP Section | Section B.10 | Section B.10 added, Limitation on Profit/Fee |
| 77 | RFP Section | Section B.3 | [RFP Q65] new language added as B.3 (g) |
| 78 | RFP Section | Section B.8 | LIO profit changed to 5% and 7% |
| 79 | RFP Section | Section B.9 | LCE profit changed to 6% and 10% |
| 80 | RFP Section | Section C | [RFP Q62] 083 ICSS |
| 81 | RFP Section | Section C | C.6(h) Title |
Old: Production Facility New: C5I Production Facility
| 82 | RFP Section | Section C.11 | [RFP Q70 & Q101] Warranty period state in C.11 |
| 83 | RFP Section | Section C.11.c | [RFP Q15 & Q16] Section C.11.(c) will be replaced with: "The Contractor shall obtain the most favorable warranties that the original equipment manufacturer (OEM) gives to any customer for commercial supplies, commercial components of supplies, or services. The Contractor shall transfer to the Coast Guard all commercial warranties. The rights and remedies provided under the Section I clause titled “Warranty of Supplies of a Complex Nature" are in addition to and do not limit any rights and remedies provided to the Coast Guard by law or by any other clause of this contract." |
| 84 | RFP Section | Section C.7, C8 | [RFP Q139] Clarifies definition of insurance spares |
| 85 | RFP Section | Section E.2 | Clauses 52.246-17, -18, -19, -20, -23 removed |
| 86 | RFP Section | Section G | (2) Milestone 6 - ILS deliverables: |
These milestone payments are dependent upon acceptance/approval without comment within the timeframe specified by DD CDRL [083-DD-1231], Provisioning Technical Data Documentation, of the following concurrent, co-dependent ILS CDRLs, for the systems defined by and bounded in DD CDRL [041-DD-1013], Configuration Management Plan:
a. Engineering Data for Provisioning [083-DD-1226]
a. Provisioning Technical Data Documentation [083-DD-1231]
b. Commercial Equipment Manuals, Drawings and Data (Technical Manuals) [086-DD-1273]
| 87 | RFP Section | Section H.29 | Clause H.29 Warranty of Data Updated |
| 88 | RFP Section | Section H.34 | [RFP Q3] Clause updated |
| 89 | RFP Section | Section I | Added HSAR Clause 3052.209-72. |
| 90 | RFP Section | Section I.1 | Clause 52.211-15, Defense Priority and Allocation Requirement is removed. Clause will be included in a future amendment once FPAS rating is approved |
| 91 | RFP Section | Section I.3 | Clauses 52.246-18, -19, added |
| 92 | RFP Section | Section L | L.12.1 Facilities (e) |
Old: and any physical limitations between production facilities and trial areas New: and any physical limitations between shipbuilding facilities and trial areas
| 93 | RFP Section | Section L 12.2 | [RFP Q72] Technical Data Rights: J-19, J-28a, and J-28b submissions are excluded from page count limitations. |
| 94 | RFP Section | Section L.11 | [RFP Q76 & Q102] Qualification, Certification and Resume Appendix, added to page exclusion |
| 95 | RFP Section | Section L.12 | [RFP Q73] J-24 and J-28b removed from technical submission. |
| 96 | RFP Section | Section L.12 | [RFP Q76 & Q102] Qualification, Certification and Resume Appendix added to technical submission |
| 97 | RFP Section | Section L.13 | [RFP Q2] Past Performance Volume updated |
| 98 | RFP Section | Section L.14.1 | [RFP Q27 & Q73] J-24 and J-28b added to price submission. |
| 99 | RFP Section | Section L.15 | [RFP Q37] Corrected reference from L.9 to L.10. |
| 100 | RFP Section | Section M | M.6.1 Facilities |
Old: Existing production facilities that meet or exceed the capacity required to build the proposed OPCs in accordance…
New: Existing shipbuilding facilities that meet or exceed the capacity required to build the proposed OPCs in accordance...
| 101 | RFP Section | Section M | [RFP Q59] The Government will use the Offeror’s narrative and Detail Design Elements Detail Design to assess the Offeror’s engineering approach will result in a balanced, feasible, and executable OPC design; and the proposed design approach supports the Offeror’s level of design maturity entering into Detail Design. |
| 102 | RFP Section | Section M.6.2, M.6.3, M.6.4 | [RFP Q68] Significant Strengths added |
| 103 | J-Attachment | J-1 Part 9 | This change is to update an NVR reference. |
| 104 | J-Attachment | J-1 Part 2 | This change is to remove the extra line in the Wave height probability table |
| 105 | J-Attachment | J-1 Part 9 | Additional changes to the RFP were desired above the changes proposed in SDTCR 037. The changes outlined below add clarity to the contract requirements. |
| 106 | J-Attachment | J-1 Part 9 | Update the reference called out in the NVR for dynamic hull girder bending moment equation |
| 107 | J-Attachment | J-1 Part 9 | Update the reference called out in the NVR for the GRP Ladder drawing |
| 108 | J-Attachment | J-1 Part 4 | This change consists of the Specification edits required to standardize the Ship Service Diesel Generators (SSDG). |
| 109 | J-Attachment | J-1 Part 7 | Changes recommended based review of reference for DC plate sizing |
| 110 | J-Attachment | J-5 DD CDRL | Updated DD_CDRL, 640-DD-1987, BLK16 |
| 111 | J-Attachment | J-1 Part 1 | Correct Drawing Title Discrepancy in J-1, Part 1 Table 042-2 |
| 112 | J-Attachment | J-5 DD CDRL | 202-DD-1421, BLK16 Second Submission |
400-DD-2321, BLK16 where it details BLK13, Changed YYYY to 2338 400-DD-2335, BLK16 where it details BLK13, Changed YYYY to 2338
| 113 | J-Attachment | J-1 Part 9 | This change removes incosistant requirements between ABS NVR Hydraulic System section and Anchor Windlass section. |
| 114 | J-Attachment | J-3 GEN SOW |
J-4 DD SOW
J-5 DD CDRL
| J-7 CON CDRL | AutoCAD version negotiation, and this change also makes some administrative changes to correct inconsistancies | |||
| 115 | J-Attachment | J-1 Part 9 | This change is to update a reference ID in the NVR | |
| 116 | J-Attachment | J-1 Part 9 | This change is to update an NVR reference with the superseded reference ID. | |
| 117 | J-Attachment | J-1 Part 9 | This change removes reference to NAVSEA Design Supplements that were never published. | |
| 118 | J-Attachment | J-1 Part 9 | NVR 4-4-2-/5 reference NAVSHIPS No. S6508-73869. The reference is no longer active. In addition, a global change correction has been added to DOD-STD-2003. | |
| 119 | J-Attachment | J-1 Part 15 | This change aligns PPD-324-001 with the latest version of MIL-DTL-16036. | |
| 120 | J-Attachment | J-4 DD SOW |
J-5 DD CDRL
J-6 CON SOW
| J-7 CON CDRL | These changes include DMSMS Proposed Redlines | |||
| 121 | J-Attachment | J-1 Part 7 | This change clarifies the waste storage requirements | |
| 122 | RFP Section | Section L: Instructions to Offerors | [RFP Q153] Modified SecionL.12.2(c): Change from: "... for every design element and results in improvement on" to "... for every design element that results in improvement on" | |
| 123 | J-Attachment | J-1 Part 15 |
J-5 DD CDRL
J-1 Part 7 J-1 Part 9 J-1 Part 6
J-4 DD SOW
| J-6 CON SOW | [RFP Q150] Assorted editorial changes to the TDP | |||
| 124 | J-Attachment | J-1 Part 9 | The change is recommended to clarify the expected survivability requirements. | |
| 125 | J-Attachment | J-4 DD SOW | Implement revisions from SDTCR 134 which were not properly incorporated in the last RFP release. | |
| 126 | J-Attachment | J-1 Part 6 | This change modifies the vertical pump requirements to specify the ASTM F998, US Navy Supplement, Type C-1 requirements apply to pumps larger than 10 hp. | |
| 127 | J-Attachment | J-3 GEN SOW |
J-4 DD SOW
| [RFP Q177] This change removes the requirement for the contractor to provide laptops to USCG and add a requirement to provide the 3D model in NWD format. | ||||
| 128 | J-Attachment | J-1 Part 7 | SDTCR156 revised Table 663-7 to add Qty 12 Sets of Flash Gear in the OPCEN, but was erroneously captured as 2 Sets and released in the Final RFP. This CR corrects that error. | |
| 129 | J-Attachment | J-4 DD SOW | ||
| J-6 CON SOW | Updating Stage 2 C5I Requirements. | |||
| 130 | J-Attachment | J-5 DD CDRL | ||
| J-4 DD SOW | These proposed CDRL changes ensure requirements are clear in order to prevent confusions with CDRL 331-DD-1629 | |||
| 131 | J-Attachment | J-3 GEN SOW |
J-4 DD SOW
| J-5 DD CDRL | Revised Computing Network System (CNS) to Interior Data Communications Networks (IDCN) | |||
| 132 | J-Attachment | J-1 Part 15 | [RFP Q161] The following load shedding requirement modifications are recommended to clarify the load shedding requirements in the PPD-324-001. | |
| 133 | J-Attachment | J-1 Part 5 | [RFP Q152] Revising Section 495 requirements. | |
| 134 | J-Attachment | J-1 Part 5 | Revisions to correct discrepancies in RFP release. | |
| 135 | J-Attachment | J-7 CON CDRL | This change is to add requirement of an initial submission of CDRL 045-CON-1077. | |
| 136 | J-Attachment | J-5 DD CDRL | This change aligns the submittal dates for the Hydraulic System diagrams and calculations and also removes a redundant Hydraulic System submittal. | |
| 137 | J-Attachment | J-1 Part 9 | Update and correct references called out in the initial contract which have been superceded by another reference for ease of verifying the current external reference call outs | |
| 138 | J-Attachment | J-1 Part 15 | EMI/EMC SWBD RFP CORRECTION | |
| 139 | J-Attachment | J-1 Part 4 |
J-1 Part 7
| J-1 Part 9 | Update to Lighting requirements | |||
| 140 | J-Attachment | J-5 DD CDRL | This change updates the DD CDRL submittal dates for PDR | |
| 141 | J-Attachment | J-1 Part 6 |
J-1 Part 7
J-5 DD CDRL
| J-7 CON CDRL | This change makes editorial changes to Auxiliary sections. | |||
| 142 | J-Attachment | J-3 GEN SOW | Facilities (087.1) Revision | |
| 143 | J-Attachment | J-5 DD CDRL | ||
| J-7 CON CDRL | Update to logistics related DIDs. | |||
| 144 | J-Attachment | J-4 DD SOW | System Safety- 077 Spec Edits | |
| 145 | J-Attachment | J-12 ERL | Deleted NAVSEA Design Supplement 1200 - Wastewater Management, Chapter 1203 and NAVSEA Design Supplement 1300 - Hazardous Material Control and Management, Chapter 1303. | |
| 146 | RFP Section | Section B.8 | Section B.8 updated to clarify J-23 | |
| 147 | RFP Section | Section B.9 | Section B.9 updated to clarify j-23 | |
| 148 | RFP Section | Section E.2 | FAR Clause 52.246-24 | |
| 149 | RFP Section | Section G.11 | Payment for LLTM updated | |
| 150 | RFP Section | Section H.13 | Added | |
| 151 | RFP Section | Section H.22 | Added | |
| 152 | RFP Section | Section H.21 | Typo corrected | |
| 153 | RFP Section | Section I.1 | FAR Clause 52.211-14 Added. DPAS approved for OPC Stage 2 | |
| 154 | RFP Section | Section I.2 | FAR Clause 52.225-5 and 52.225-13 removed | |
| 155 | RFP Section | Section L.11 & L.12 | IMS Excluded from page count and added to technical volume submission outline | |
| 156 | RFP Section | Section L.12.3 | IMS Excluded from page count | |
| 157 | RFP Section | Section L.14.1 | Instructions for J-23 updated | |
| 158 | RFP Section | Section M | page M-4 Typo corrected | |
| 159 | RFP Section | Section M.6.1 | "and resources" added to design soundness and maturity | |
| 160 | RFP Section | Section M.6.2 | "narrative and resource allocation for their " added to Design Soundness and Maturity | |
| 161 | J-Attachment | J-1 Part 9 | This change modifies the NVR to allow the bow submergence loads to be used as the weather deck loads. | |
| 162 | L-Atachment | L-2 | Format change to increase column width (A0003) | |
| 163 | L-Attachment | L-2 | Reference error on summary page corrected (A0004) | |
| 164 | Section L | Section L.14 | language permitting adding rows removed (A0004) | |
| 165 | Section L | Section L.11 | language added to clarify detail design appendix drawing size | |
| 166 | Section L | Section L.12 | Detail Design appendix changed to electronic only with the exception of drawings which must be submitted as electronic and hard copy. Paper drawings must be plotted at the drawing size identified in title block. | |
| 167 | Section L | Section L.8 | Eastern Time added to clarify submission time |
Hidden
| Change Type | RFP Version | Status |
| Admin | At Contract Award | Pending |
| Substantial | ECP Post Contract Award | Hold |
| Critical | Amendment 1 | In Progress |
| Amendment 2 | Complete | |
| Amendment 3 | ||
| Amendment 4 |