OPC_Stage_2_RFP_Change_Log_A0005.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Offshore Patrol Cutter (OPC) Stage 2 - Detail Design and Production
Solicitation number
70Z02321RAPC00000
Issued by

About this file

This document contains a request for proposal for the Detail Design and Production of up to 11 Offshore Patrol Cutters, along with associated Long Lead Time Materials, Logistics, Training, and Life Cycle Engineering requirements. The United States Coast Guard is seeking a fixed price incentive firm contract for the design and build of these vessels, with an anticipated award of one contract. Proposals are due by May 28, 2021, with questions due by February 26, 2021. The Coast Guard plans to employ the Offshore Patrol Cutters to conduct missions beyond 12 nautical miles from shore globally. The vessels will comprise approximately 70% of the Coast Guard's offshore cutter capacity.

View the file

Other files

File Type Posted
OPC_Stage_2_RFP_Questions_A0005.xlsx XLSX spreadsheet
70Z02321RAPC00000_A00005.pdf PDF
Section L - Instructions to Offerors_A0005.pdf PDF
Attachment L-2 -Pricing Worksheet_A0004.xlsx XLSX spreadsheet
Section L - Instructions to Offerors_A0004.pdf PDF
70Z02321RAPC00000_A0004.pdf PDF
70Z02321RAPC00000_A00003.pdf PDF
Attachment L-2 -Pricing Worksheet_A0003.xlsx XLSX spreadsheet
Attachment L-3 - Unit Price Analysis Worksheet_A0002.xlsx XLSX spreadsheet
70Z02321RAPC00000_A00002.pdf PDF
OPC_Stage_2_RFP_Questions_A0002.xlsx XLSX spreadsheet
Attachment L-2 -Pricing Worksheet_A0002.xlsx XLSX spreadsheet
OPC_Stage_2_RFP_Change_Log_A0002.xlsx XLSX spreadsheet
70Z02321RAPC00000_A00001.pdf PDF
OPC_Stage_2_RFP_Change_Log_A0001.xlsx XLSX spreadsheet
OPC_Stage_2_Final_RFP_Questions.xlsx XLSX spreadsheet
Attachment L-2 -Pricing Worksheet_A0001.xlsx XLSX spreadsheet
70Z02321RAPC00000_OPC Stage 2.pdf PDF
Redacted JAs.zip ZIP file
L Attachments.zip ZIP file
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Working Change Log

#RFP Section or J-attachmentSectionChange Description
1RFP SectionAttachment L-2[RFP Q74] Attachment updated
2Technical LibraryContract DrawingsAdded a folder containing five drawings
3J-AttachmentJ-1 Part 1These changes will lessen constraints on watch position requirements, maximizing the number of rates and ranks that can stand certain watches, potentially reducing the manpower requirement
4J-AttachmentJ-1 Part 13[RFP Q105] Modification to allow the DECS-250N in lieu of DECS-200N is recommended because the Basler DECS-200N is obsolete.
5J-AttachmentJ-1 Part 15PPD 324-001 (J-1 Part 15)

UL 489 Supplement SB Naval.

The test procedures and certificates of tests shall be submitted upon request by the Naval Technical Authority.

PPD 324-001 (J-1 Part 15) Isolation. Each load center shall be capable of electrical isolation from its source at the load center and at the source. Isolation shall be provided by a circuit breaker.

6J-AttachmentJ-1 Part 15[RFP Q124] Circuit breaker requirements need to be modified in order to clarify that load centers shall have isolation circuit breakers at the source (SWBD) and at the Load Center only if the load center is equipped with casualty power terminals.
7J-AttachmentJ-1 Part 15[RFP Q123] These modifications are recommended to clarify the requirements for ABT and MBT monitoring.
8J-AttachmentJ-1 Part 15[RFP Q122] Updates Circuit Breaker Information
9J-AttachmentJ-1 Part 15Updates Load Centers
10J-AttachmentJ-1 Part 4310.3.11.9 Fuel Service, lubricating oil and jacket water piping shall not require removal while performing organizational level maintenance.

310.3.11.10 Interferences in way of performing organizational level maintenance on each ship service diesel generator shall be installed with mechanical fasteners or other means necessary to allow for their removal without performing hot work.

11J-AttachmentJ-1 Part 4SDTCR148 was originally drafted to move the SSDG Set organizational level maintenance from SWBS section 502 to under SWBS section 310; however not all of the requirements were transferred and the formatting was altered. This SDTCR is to correct those issues.
12J-AttachmentJ-1 Part 4[RFP Q120] Modification is recommended to clarify that the necessity of a casualty power system is to be determined by the Electric Plant Survivability Analysis.
13J-AttachmentJ-1 Part 5Revising CUI to FOUO
14J-AttachmentJ-1 Part 8[RFP Q138] This change updates the SPEC to include 7.62mm ammunition in the 760 storage requirements
15J-AttachmentJ-1 Part 8This change updates the format for the Armament lockers
16J-AttachmentJ-1 Part 8[RFP Q7] 760.2.1.1.7 from the Spec and corrects M2A1 typo
17J-AttachmentJ-1 Part 8This change updates the SPEC to include a portable rubbermat in the weapon clearing station
18J-AttachmentJ-1 Part 9OPC Stage 2 Addendum (J-1 Part 9), 3-3-2/2.1

NVR Subsection 2.1.1 shall be modified as follows: delete in its entirety and substitute: “Generator sets shall comply with PPD-310-001 and the requirements specified herein, and shall be of the same type, design and manufacture.”

OPC Stage 2 Addendum (J-1 Part 9), 5-4-2/2.1 The system shall be a Sprinkler Equivalent System for accommodation spaces with automatic nozzles.

19J-AttachmentJ-1 Part 9[RFP Q108] This fixes the typo that removed the requirement
20J-AttachmentJ-1 Part 9Balance grade quality G16 aligns with the recommended balance grade in ISO 1940-1 for crankshaft drives (including couplings), inherently balanced, rigidly mounted.
21J-AttachmentJ-1 Part 9Updates Testing (3.5.2)
22J-AttachmentJ-11 SKED C[RFP Q6] This change adds Helicopter Support Kit (HSK) to schedule C, GFI.
23J-AttachmentJ-11 SKED CRemoval of Manpower Estimate Report Update
24J-AttachmentJ-12 ERLJ-12 - following documents have been added to respository and and highlighted in the J-12

NAVSEA Pub T9070-BH-DPC-010 1987 FOUO NAVSEA Pub S6430-AE-TED-010 Rev 6 2019 FOUO CDRL_ATCH_041-DD-1013_System_List

CDRL_ATCH_071_DD_1965_CMPT_REGISTER

Joint Publication 3-13.1 Electronic Warfare NAVAIR Bulletin 1P [RFP Q109] Naval Surface Warfare Center Report DTRC-SSPD-89-173-35 NAVSEA Dwg 804-5000994 Rev A NAVSEA Dwg 804-8436624 Rev-

NTTP 3-20 2012

Navy’s Test, Measurement, and Diagnostic Equipment TMDE Index Access 2016 V8.3 TMDE Index Access 2016 V8.3.accdb.3je875j SER-704300, Rev 1, (Pages 644 and 645) [RFP Q137]

25J-AttachmentJ-12 ERLEdited J-12 with updates and additions provided by SMEs. These updates align the ERL with other changes to the RFP. Changes are highlighted in yellow in the ERL.
26J-AttachmentJ-12 ERLUpdated Manpower Estimate Report and added OPC Baseline TDFA
27J-AttachmentJ-12 ERLUpdates DID and corrects RFP
28J-AttachmentJ-2[RFP Q1] Table 1 updated for readability.
29J-AttachmentJ-20 OPC Stage 1 Matrix of Design Artifacts[RFP Q93] Added two CDRLs to the J-20 (167-03-2296 and 624-03-1980) in response to a Final RFP question.
30Technical LibraryJ-20 OPC Stage 1 Matrix of Design Artifacts[RFP Q125] Added three (3) CDRL folders to the Technical Library. One (170-03-2104) had been listed on the J-20 but mistakenly omitted from the libarary as shared in FEB 2021. Two others (167-03-2296 and 624-03-1980) were added in partial form in response to a Final RFP question.
31J-AttachmentJ-24 LLTM[RFP Q13] Clarifies definition of insurance spares
32J-AttachmentJ-28B[RFP Q18] The J-28b identifies CDRLs for the Refigeration System Arrangement and Detail Drawings as 516-DD-2DD8 and Reefer Box Arrangement and Detail Drawings as 516-DD-2DD9 while the J5 identifies these draings as 516-DD-2038 and 516-DD-2039 respectively.
33J-AttachmentJ-28B[RFP Q19] OPC Stage 2 DD CDRL (J-5), CDRL 042-DD-1422 is titled Sensors, Alarms, and Safeties Database. The government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-85. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 202-DD-1422 to 042-DD-1422.
34J-AttachmentJ-28B[RFP Q29] OPC Stage 2 DD CDRL (J-5) does not include CDRL 302-DD-1468, Motor Drawings. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 122, should not have been included and will be deleted.
35J-AttachmentJ-28B[RFP Q30] OPC Stage 2 DD CDRL (J-5) does not include CDRL 313-DD-1531, Battery Capacity Calculations. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 132, should not have been included and will be deleted.
36J-AttachmentJ-28B[RFP Q31] OPC Stage 2 DD CDRL (J-5) does not include CDRL 324-DD-1554, Operation Description for Electric Plant Control System. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 147, should not have been included and will be deleted.
37J-AttachmentJ-28B[RFP Q32] OPC Stage 2 DD CDRL (J-5) does not include CDRL 331-DD-2245, Lighting and Receptacle Load Calculations. The government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 154, should not have been included and will be deleted.
38J-AttachmentJ-28B[RFP Q33] OPC Stage 2 DD CDRL (J-5), CDRL 581-DD-1876 is titled Anchoring, Mooring, and Towing Equipment Systems Arrangements and Details Drawings. The government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-328. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 580-DD-1876 to 581-DD-1876
39J-AttachmentJ-28B[RFP Q34] OPC Stage 2 DD CDRL (J-5), CDRL 402-DD-2288 is titled Cyber Security Controls Matrix. The government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-346. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 040-DD-2288 to 402-DD-2288.
40J-AttachmentJ-3 GEN SOWOPC-B RFP, J-3_GEN SOW 042.2.13.10.8

IS:

Integrated Program Management Data and Analysis Report (IPMDAR)

WAS:

Cost Performance Report (if applicable).

REDLINE:

Integrated Program Management Data and Analysis Report (IPMDAR)

41 J-Attachment J-3 GEN SOW 040.3.7.1 The CWBS shall be the structure for communication throughout the acquisition process. It shall be the common link that unifies the planning, scheduling, cost estimating, budgeting, contracting and performance reporting disciplines. The CWBS shall provide clear traceability of work efforts and end products. The CWBS shall identify all project and product elements using the guidance in MILHDBK-881. The Work Breakdown Structure (WBS) shall follow the structure identified in APPENDIX E: SEA SYSTEMS of MIL-STD-881. WBS shall be set up for each ship at level 2 as demonstrated in APPENDIX E. CWBS shall align with ship system numbering structure (SWBS) in the OPC Specifications, expanded as needed

42 J-Attachment J-3 GEN SOW OPC-B RFP, J-3 _GEN SOW, Section 42.2.11

REDLINE:

Integrated Program Management Data and Analysis Report (IPMDAR) shall be provided in both CWBS and OBS formats for labor hours, labor dollars, and material dollars

43J-AttachmentJ-3 GEN SOW[RFP Q99] Revising CUI to FOUO
44J-AttachmentJ-3 GEN SOWresolves outstanding/unincorporated
45J-AttachmentJ-4 DD SOW[RFP Q117] J-4, Page J4-28, Section 083.7.2.4

OLD: FLIS Technical Procedures, Volume 28.

NEW: FLIS Technical Procedures, Volume 2-8.

46 J-Attachment J-4 DD SOW 083.6 Provisioning Technical Documentation Schedule. The Contractor shall provide a PTD Submission Schedule (PTDSS). The PTDSS serves as both a schedule and index of the provisioning data provided by the Contractor. [083-DD-2298]

083.7 Provisioning Data and Information.

083.7.2 The PTD sets the baseline supply data and information for the lead ship. PTD consists of a Parts Provisioning List (PPL) and supporting Engineering Data for Provisioning (EDFP).

083.7.3.1 EDFP shall be provided for each item appearing on a PPL submittal, first appearance only as part of the PTD.

47J-AttachmentJ-4 DD SOWNumerous Changes/Re-Numbering
48J-AttachmentJ-4 DD SOWModification is recommended to clarify that the necessity of a casualty power system is to be determined by the Electric Plant Survivability Analysis.
49J-AttachmentJ-4 DD SOWThe changes outlined below add clarity to the contract requirements.
50J-AttachmentJ-4 DD SOWMinor administrative adjustments needed to be made to clarify the RFP.
51J-AttachmentJ-4 DD SOWthese specific evolutions will ensure analysis is done on various types of boat and flight operations. Since there are different manning and position requirements for helicopter launch/recover vs. HIFR or man overboard vs. rescue and assistance, etc.
52J-AttachmentJ-4 DD SOW202.13.7 ended in an "and". ACS added to completethe list.
53J-AttachmentJ-5 DD CDRLUpdated CDRL 088-DD-1285
54J-AttachmentJ-5 DD CDRLUpdates DID and corrects RFP
55J-AttachmentJ-5 DD CDRL083-DD-1222 (BLK04, BLK12, and BLK 16) Updates
56J-AttachmentJ-5 DD CDRLRFP, J-5 Attachment, CDRL Index Table, section 042-DD-2341

REDLINE:

Integrated Program Management Data and Analysis Report (IPMDAR)

57 J-Attachment J-5 DD CDRL BLK12-DATE OF 1ST SUBM: 60 DAEDCA

BLK16-REMARKS:

First submission of IPMDAR data is due 60 Days After Effective Date of Contract Award (DAEDCA) and subsequent submissions containing Contract Performance Dataset (CPD), Schedule and Performance Narrative Report are due on the last business day of the month.

58 J-Attachment J-5 DD CDRL Contract Performance Dataset (CPD) Instructions:

Within the CPD, the Summary Performance table is used to provide multiple required values (e.g., To Date ACWP, BCWS) for the Summary Elements (e.g., G&A, COM) as indicated by the Summary Element ID and the associated enumeration table (CPD FFS 2.4.2).

59 J-Attachment J-5 DD CDRL [RFP Q111] *DD CDRL (J-5), 088-DD-1283, BLK16, BLK04, Number 1 Updates shall be made to the OPC Baseline TDFA to reflect the Contractor’s design, equipment selection, and associated operator and maintainer tasks. Contractor shall maintain OPC Baseline TDFA format. The CTR shall provide evidence in the HESAR that the TDFA and Link Analysis results are reflected in the proposal design.

*DD CDRL (J-5), 088-DD-1283, BLK16, BLK04, Number 1 Link Analysis shall use and maintain traceability to the Link Analysis Data containing operator-operator and operator-equipment pairings, criticality, and frequency inputs. Link Analysis shall compare and rank different layouts to determine optimal operator watchstation/consoles and equipment placement on the following layouts:

**OPC Stage 2 DD CDRL (J-5), 256-DD-2501 Calculations supporting individual equipment/component sizing, such as component process rates, performance curves, tank and sump capacities, etc, shall be clearly identified and demonstrated.

**OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16

BLK16:

**OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 6 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 6 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 9 **OPC Stage 2 DD CDRL (J-5), 300-DD-1474, BLK16, Number 9 **OPC Stage 2 DD CDRL (J-5), 521-DD-2511 **OPC Stage 2 DD CDRL (J-5), 529-DD-2523 **OPC Stage 2 DD CDRL (J-5), 556-DD-1805

60J-AttachmentJ-5 DD CDRLFinal submissions of IPMDAR data are due after the completion of the Detail Design. Contract Performance Dataset (CPD) will be provided quarterly after completion of Detail Design through CLIN Closeout.
61J-AttachmentJ-5 DD CDRL**Stage 2 RFP, BLK01-SEQUENCE NO.: 040-DD-1029

NLT 14 days prior to IBR Execution related materials shall be delivered:

62J-AttachmentJ-5 DD CDRLThese proposed CDRL changes ensure requirements are clear in order to prevent confusion
63J-AttachmentJ-5 DD CDRLImprove instuctions on CDRLs’: 2309. BLK 16. Added reference instruction MIL-STD-882 Task 207
64J-AttachmentJ-5 DD CDRLModification is recommended to clarify that the necessity of a casualty power system is to be determined by the Electric Plant Survivability Analysis.
65J-AttachmentJ-5 DD CDRLthese changes will provide more clear guidelines and expectations for the Manpower Mix Analysis Report product. They also include additional mechanisms which will allow the CG to be more involved and aligned in the development of the product, reducing unexpected problems and schedule delays.
66J-AttachmentJ-6 CON SOW[RFP Q25] **RFP, J-6_CON_SOW , 040.5.1

The Contractor shall host the Government’s Integrated Baseline Review (IBR) within 180 days after each option exercise on the date mutually agreed to by both the Government and the Contractor.

67J-AttachmentJ-6 CON SOW[RFP Q82] Revising install kit language in response to question from RFP respondent.
68J-AttachmentJ-6 CON SOWRevising install kit language.
69J-AttachmentJ-7 CON CDRL083-DD-1222 (BLK 16, BLK 12, ) Updates
70J-AttachmentJ-7 CON CDRL[RFP Q35] 083-CON-1229
71J-AttachmentJ-7 CON CDRL**RFP_J-7_ 042-CON-2341_ BLK13_ BLK13_Page 36

First submission of IPMDAR data is due not later than 60 days after option award and and Subsequent submissions containing Contract Performance Dataset (CPD), Schedule and Performance Narrative Report are due on the last business day of the month. Final submissions of IPMDAR data are due after delivery of each hull. Contract Performance Dataset (CPD) shall be provided quarterly after delivery through CLIN Closeout.

72 J-Attachment J-7 CON CDRL **RFP-J-7 Attachment, CDRL Index table, section 042.CON.2341 Integrated Program Management Data and Analysis Report 73 J-Attachment J-7 CON CDRL **RFP_J-7 CON-CDRL, BLK01-SEQUENCE NO.: 042-CON-2341

BLK12-DATE OF 1ST SUBM: 60 DAEDCA

74J-AttachmentJ-7 CON CDRLThere is inconsistency between the IPMDAR submission due dates
75J-AttachmentJ-7 CON CDRL[RFP Q56 & Q94] Updates DID and corrects RFP
76RFP SectionSection B.10Section B.10 added, Limitation on Profit/Fee
77RFP SectionSection B.3[RFP Q65] new language added as B.3 (g)
78RFP SectionSection B.8LIO profit changed to 5% and 7%
79RFP SectionSection B.9LCE profit changed to 6% and 10%
80RFP SectionSection C[RFP Q62] 083 ICSS
81RFP SectionSection CC.6(h) Title

Old: Production Facility New: C5I Production Facility

82RFP SectionSection C.11[RFP Q70 & Q101] Warranty period state in C.11
83RFP SectionSection C.11.c[RFP Q15 & Q16] Section C.11.(c) will be replaced with: "The Contractor shall obtain the most favorable warranties that the original equipment manufacturer (OEM) gives to any customer for commercial supplies, commercial components of supplies, or services. The Contractor shall transfer to the Coast Guard all commercial warranties. The rights and remedies provided under the Section I clause titled “Warranty of Supplies of a Complex Nature" are in addition to and do not limit any rights and remedies provided to the Coast Guard by law or by any other clause of this contract."
84RFP SectionSection C.7, C8[RFP Q139] Clarifies definition of insurance spares
85RFP SectionSection E.2Clauses 52.246-17, -18, -19, -20, -23 removed
86RFP SectionSection G(2) Milestone 6 - ILS deliverables:

These milestone payments are dependent upon acceptance/approval without comment within the timeframe specified by DD CDRL [083-DD-1231], Provisioning Technical Data Documentation, of the following concurrent, co-dependent ILS CDRLs, for the systems defined by and bounded in DD CDRL [041-DD-1013], Configuration Management Plan:

a. Engineering Data for Provisioning [083-DD-1226]

a. Provisioning Technical Data Documentation [083-DD-1231]

b. Commercial Equipment Manuals, Drawings and Data (Technical Manuals) [086-DD-1273]

87RFP SectionSection H.29Clause H.29 Warranty of Data Updated
88RFP SectionSection H.34[RFP Q3] Clause updated
89RFP SectionSection IAdded HSAR Clause 3052.209-72.
90RFP SectionSection I.1Clause 52.211-15, Defense Priority and Allocation Requirement is removed. Clause will be included in a future amendment once FPAS rating is approved
91RFP SectionSection I.3Clauses 52.246-18, -19, added
92RFP SectionSection LL.12.1 Facilities (e)

Old: and any physical limitations between production facilities and trial areas New: and any physical limitations between shipbuilding facilities and trial areas

93RFP SectionSection L 12.2[RFP Q72] Technical Data Rights: J-19, J-28a, and J-28b submissions are excluded from page count limitations.
94RFP SectionSection L.11[RFP Q76 & Q102] Qualification, Certification and Resume Appendix, added to page exclusion
95RFP SectionSection L.12[RFP Q73] J-24 and J-28b removed from technical submission.
96RFP SectionSection L.12[RFP Q76 & Q102] Qualification, Certification and Resume Appendix added to technical submission
97RFP SectionSection L.13[RFP Q2] Past Performance Volume updated
98RFP SectionSection L.14.1[RFP Q27 & Q73] J-24 and J-28b added to price submission.
99RFP SectionSection L.15[RFP Q37] Corrected reference from L.9 to L.10.
100RFP SectionSection MM.6.1 Facilities

Old: Existing production facilities that meet or exceed the capacity required to build the proposed OPCs in accordance…

New: Existing shipbuilding facilities that meet or exceed the capacity required to build the proposed OPCs in accordance...

101RFP SectionSection M[RFP Q59] The Government will use the Offeror’s narrative and Detail Design Elements Detail Design to assess the Offeror’s engineering approach will result in a balanced, feasible, and executable OPC design; and the proposed design approach supports the Offeror’s level of design maturity entering into Detail Design.
102RFP SectionSection M.6.2, M.6.3, M.6.4[RFP Q68] Significant Strengths added
103J-AttachmentJ-1 Part 9This change is to update an NVR reference.
104J-AttachmentJ-1 Part 2This change is to remove the extra line in the Wave height probability table
105J-AttachmentJ-1 Part 9Additional changes to the RFP were desired above the changes proposed in SDTCR 037. The changes outlined below add clarity to the contract requirements.
106J-AttachmentJ-1 Part 9Update the reference called out in the NVR for dynamic hull girder bending moment equation
107J-AttachmentJ-1 Part 9Update the reference called out in the NVR for the GRP Ladder drawing
108J-AttachmentJ-1 Part 4This change consists of the Specification edits required to standardize the Ship Service Diesel Generators (SSDG).
109J-AttachmentJ-1 Part 7Changes recommended based review of reference for DC plate sizing
110J-AttachmentJ-5 DD CDRLUpdated DD_CDRL, 640-DD-1987, BLK16
111J-AttachmentJ-1 Part 1Correct Drawing Title Discrepancy in J-1, Part 1 Table 042-2
112J-AttachmentJ-5 DD CDRL202-DD-1421, BLK16 Second Submission

400-DD-2321, BLK16 where it details BLK13, Changed YYYY to 2338 400-DD-2335, BLK16 where it details BLK13, Changed YYYY to 2338

113J-AttachmentJ-1 Part 9This change removes incosistant requirements between ABS NVR Hydraulic System section and Anchor Windlass section.
114J-AttachmentJ-3 GEN SOW

J-4 DD SOW

J-5 DD CDRL

J-7 CON CDRLAutoCAD version negotiation, and this change also makes some administrative changes to correct inconsistancies
115J-AttachmentJ-1 Part 9This change is to update a reference ID in the NVR
116J-AttachmentJ-1 Part 9This change is to update an NVR reference with the superseded reference ID.
117J-AttachmentJ-1 Part 9This change removes reference to NAVSEA Design Supplements that were never published.
118J-AttachmentJ-1 Part 9NVR 4-4-2-/5 reference NAVSHIPS No. S6508-73869. The reference is no longer active. In addition, a global change correction has been added to DOD-STD-2003.
119J-AttachmentJ-1 Part 15This change aligns PPD-324-001 with the latest version of MIL-DTL-16036.
120J-AttachmentJ-4 DD SOW

J-5 DD CDRL

J-6 CON SOW

J-7 CON CDRLThese changes include DMSMS Proposed Redlines
121J-AttachmentJ-1 Part 7This change clarifies the waste storage requirements
122RFP SectionSection L: Instructions to Offerors[RFP Q153] Modified SecionL.12.2(c): Change from: "... for every design element and results in improvement on" to "... for every design element that results in improvement on"
123J-AttachmentJ-1 Part 15

J-5 DD CDRL

J-1 Part 7 J-1 Part 9 J-1 Part 6

J-4 DD SOW

J-6 CON SOW[RFP Q150] Assorted editorial changes to the TDP
124J-AttachmentJ-1 Part 9The change is recommended to clarify the expected survivability requirements.
125J-AttachmentJ-4 DD SOWImplement revisions from SDTCR 134 which were not properly incorporated in the last RFP release.
126J-AttachmentJ-1 Part 6This change modifies the vertical pump requirements to specify the ASTM F998, US Navy Supplement, Type C-1 requirements apply to pumps larger than 10 hp.
127J-AttachmentJ-3 GEN SOW

J-4 DD SOW

[RFP Q177] This change removes the requirement for the contractor to provide laptops to USCG and add a requirement to provide the 3D model in NWD format.
128J-AttachmentJ-1 Part 7SDTCR156 revised Table 663-7 to add Qty 12 Sets of Flash Gear in the OPCEN, but was erroneously captured as 2 Sets and released in the Final RFP. This CR corrects that error.
129J-AttachmentJ-4 DD SOW
J-6 CON SOWUpdating Stage 2 C5I Requirements.
130J-AttachmentJ-5 DD CDRL
J-4 DD SOWThese proposed CDRL changes ensure requirements are clear in order to prevent confusions with CDRL 331-DD-1629
131J-AttachmentJ-3 GEN SOW

J-4 DD SOW

J-5 DD CDRLRevised Computing Network System (CNS) to Interior Data Communications Networks (IDCN)
132J-AttachmentJ-1 Part 15[RFP Q161] The following load shedding requirement modifications are recommended to clarify the load shedding requirements in the PPD-324-001.
133J-AttachmentJ-1 Part 5[RFP Q152] Revising Section 495 requirements.
134J-AttachmentJ-1 Part 5Revisions to correct discrepancies in RFP release.
135J-AttachmentJ-7 CON CDRLThis change is to add requirement of an initial submission of CDRL 045-CON-1077.
136J-AttachmentJ-5 DD CDRLThis change aligns the submittal dates for the Hydraulic System diagrams and calculations and also removes a redundant Hydraulic System submittal.
137J-AttachmentJ-1 Part 9Update and correct references called out in the initial contract which have been superceded by another reference for ease of verifying the current external reference call outs
138J-AttachmentJ-1 Part 15EMI/EMC SWBD RFP CORRECTION
139J-AttachmentJ-1 Part 4

J-1 Part 7

J-1 Part 9Update to Lighting requirements
140J-AttachmentJ-5 DD CDRLThis change updates the DD CDRL submittal dates for PDR
141J-AttachmentJ-1 Part 6

J-1 Part 7

J-5 DD CDRL

J-7 CON CDRLThis change makes editorial changes to Auxiliary sections.
142J-AttachmentJ-3 GEN SOWFacilities (087.1) Revision
143J-AttachmentJ-5 DD CDRL
J-7 CON CDRLUpdate to logistics related DIDs.
144J-AttachmentJ-4 DD SOWSystem Safety- 077 Spec Edits
145J-AttachmentJ-12 ERLDeleted NAVSEA Design Supplement 1200 - Wastewater Management, Chapter 1203 and NAVSEA Design Supplement 1300 - Hazardous Material Control and Management, Chapter 1303.
146RFP SectionSection B.8Section B.8 updated to clarify J-23
147RFP SectionSection B.9Section B.9 updated to clarify j-23
148RFP SectionSection E.2FAR Clause 52.246-24
149RFP SectionSection G.11Payment for LLTM updated
150RFP SectionSection H.13Added
151RFP SectionSection H.22Added
152RFP SectionSection H.21Typo corrected
153RFP SectionSection I.1FAR Clause 52.211-14 Added. DPAS approved for OPC Stage 2
154RFP SectionSection I.2FAR Clause 52.225-5 and 52.225-13 removed
155RFP SectionSection L.11 & L.12IMS Excluded from page count and added to technical volume submission outline
156RFP SectionSection L.12.3IMS Excluded from page count
157RFP SectionSection L.14.1Instructions for J-23 updated
158RFP SectionSection Mpage M-4 Typo corrected
159RFP SectionSection M.6.1"and resources" added to design soundness and maturity
160RFP SectionSection M.6.2"narrative and resource allocation for their " added to Design Soundness and Maturity
161J-AttachmentJ-1 Part 9This change modifies the NVR to allow the bow submergence loads to be used as the weather deck loads.
162L-AtachmentL-2Format change to increase column width (A0003)
163L-AttachmentL-2Reference error on summary page corrected (A0004)
164Section LSection L.14language permitting adding rows removed (A0004)
165Section LSection L.11language added to clarify detail design appendix drawing size
166Section LSection L.12Detail Design appendix changed to electronic only with the exception of drawings which must be submitted as electronic and hard copy. Paper drawings must be plotted at the drawing size identified in title block.
167Section LSection L.8Eastern Time added to clarify submission time

Hidden

Change TypeRFP VersionStatus
AdminAt Contract AwardPending
SubstantialECP Post Contract AwardHold
CriticalAmendment 1In Progress
Amendment 2Complete
Amendment 3
Amendment 4

File details come from the government source that posted it. Updated .