This is a request for proposal from the United States Coast Guard for the detail design and production of up to 11 Offshore Patrol Cutters, associated long lead time materials, logistics support, training, and life cycle engineering support. Key details include the Coast Guard intends to award a fixed price incentive firm contract for these goods and services. Proposals are due by May 28, 2021 and questions are due by February 26, 2021. Offerors must be registered in the System for Award Management. The Coast Guard plans to acquire these cutters to perform homeland security, law enforcement, marine environmental protection, and search and rescue missions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OPC_Stage_2_RFP_Questions_A0005.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_A00005.pdf | ||
| Section L - Instructions to Offerors_A0005.pdf | ||
| OPC_Stage_2_RFP_Change_Log_A0005.xlsx | XLSX spreadsheet | |
| Attachment L-2 -Pricing Worksheet_A0004.xlsx | XLSX spreadsheet | |
| Section L - Instructions to Offerors_A0004.pdf | ||
| 70Z02321RAPC00000_A0004.pdf | ||
| 70Z02321RAPC00000_A00003.pdf | ||
| Attachment L-2 -Pricing Worksheet_A0003.xlsx | XLSX spreadsheet | |
| Attachment L-3 - Unit Price Analysis Worksheet_A0002.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_A00002.pdf | ||
| OPC_Stage_2_RFP_Questions_A0002.xlsx | XLSX spreadsheet | |
| Attachment L-2 -Pricing Worksheet_A0002.xlsx | XLSX spreadsheet | |
| OPC_Stage_2_RFP_Change_Log_A0002.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_A00001.pdf | ||
| OPC_Stage_2_RFP_Change_Log_A0001.xlsx | XLSX spreadsheet | |
| Attachment L-2 -Pricing Worksheet_A0001.xlsx | XLSX spreadsheet | |
| 70Z02321RAPC00000_OPC Stage 2.pdf | ||
| Redacted JAs.zip | ZIP file | |
| L Attachments.zip | ZIP file |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Questions and Answers
| Question # | RFP Reference | RFP Question | Answer |
| 1 | Table-1, Entrance Criteria Labeled Pages J2-1 thru J2-11, but should be J2-15 thru J2-25. | The right hand columns of the table are cut off. Request that the Government issue a revised Attachment J2 with a complete and legible Table-1. | J-2 Table-1 edited for readabilty. |
| 2 | L-29, 1st paragraph | Will the Government provide the referenced questionnaire form? Thank you. | No questionnaire form is required, reference to questionnaire form has been removed |
| 3 | Section H.34, Page H-64, Paragrpah 1 and subparagraphs (A), (B), and (C) | Request that the Government delete the subparagraphs (A), (B), and (C), make it clear in the intro that the rights to purchase technical data are limited to the types of data described in subparagraphs (A), (B), and (C), or otherwise revise thie section to clarify the intent. |
H.34 has been updated; subparagpahs (A), (B), and (C) are deleted.
| 4 | Section M.6.2, Page M-7, Paragraph 2 and Subparagraph 1) | Section M states that proposals asserting less than GPR will be negatively impacted, but follows with language stating the Offeror may not be required as a condition for award to relinquish to the Government any right in technical data developed at private expense except for the items identified at FAR Part 27.407. | |
| Is it correct to understand that an offerer who asserts limited rights on elements of their response in acordance with Section H.36, for items developed at private expense, will not be precluded from award? | Yes, an offeror will not be precluded from award for not proposing rights beyond what the Government is entitled to by law. However, for any tech data or computer software where the Government has identified a desire for greater rights and the offeror does not propose those greater rights, the proposal will be evaluated for the adverse impacts. | ||
| 5 | M.6.2 Design Soundness and Maturity and L.12.4 .2 (c) | Two related questions: |
1. Is it correct to understand that offerors are required to dicuss Configuration Management in both Factor 2 Design Approach and in Factor 4 Program Management?
2. Is it correct to understand that Configuration Management is evaluated in both of those two factors?
Suggest consolidating the discussion and evaluation into one factor. Section L.12.2 Design Soundness and Maturity states, "The Offeror shalldescribethe processes, including configuration management in integrating retained OPC baseline elements from the J attachment, J-20, “Matrix of OPC Stage 1 Design Artifacts,” with the proposed design; decisions; and tradeoffs associated with its proposed design."
The Offeror shall describe the Offeror's configuration management considerations in integrating retained OPC baseline elements, from J-20 Matrix of OPC Stage 1 Design Artifacts, that the Offeror proposes along with the other elements of the Offeror's proposed design to ensure the complete proposed OPC design is balanced, feasible, and executable.
Section L.12.4 Technical and Organizational Management states, "The Offeror shall provide a narrative to describe its configuration management approach."
The Offeror shall provide a narrative of the configuration management approach to be applied throughout design and production.
6 70.3.11 Flight Operations The USCG H60T is now listed as the required aircraft. Will the Coast Guard be providing a list of aircraft support equipment and associated desired storage space (e.g. extra engine, rotor blades, tail-rotor blades)? OPC Stage 2 Specification (J-1 Part 6), 588.2.2, states “The aviation facilities shall be installed and will be certified in accordance with NAVAIR Air Capable Ship Aviation Facilities Bulletin No. 1 and shall meet the levels and classes of operation for the helicopters listed below:” NAVAIR Air Capable Ship Aviation Facilities Bulletin No. 1P, 22.4, states “Space shall be designated for the stowage of one engine and one main rotor blade container for each type of aircraft for which Class 1 certification is required.[…] The spaces shall be functionally accessible to handling equipment and shall be large enough to accommodate the applicable containers and components specified in Table 8 and reference (q).” NAVAIR Air Capable Ship Aviation Facilities Bulletin No. 1P, Table 8, provides the Engine and Main Rotor Blade Shipping Container Data for the H-60.
OPC Stage 2 Specification (J-1 Part 6), 588.3.7.12, states "The cutter shall be provided with a minimum of 450 square feet of Aviation storage space for aviation support kits and other aviation repair parts." OPC Stage 2 Specification (J-1 Part 6), 588.2.3, states “The aviation facility shall be in accordance with COMDTINST M3710.2, Shipboard-Helicopter Operational Procedures Manual.” COMDTINST M3710.2E, Chapter 12, Paragraph D states “A Helicopter Support Kit (HSK), tailored to the specific maintenance requirements of the model of helicopter deployed and the length of the deployment, shall be provided on the cutter.” The details of the Helicopter Support Kit for the H-60T shipboard configuration has not been determined and will be provided as GFI when it is available.
7 70.3.11 Flight Operations The USCG H60T is now listed as the required aircraft. Will the Coast Guard be providing a weapons and ammunition storage needs? OPC Stage 2 Specification (J-1 Part 8), 763.2.3.3, states “Rack(s) sized to accommodate the small arms for the aviation detachment as listed in Table 763-3 shall be provided in the Law Enforcement Armory.”
OPC Stage 2 Specification (J-1 Part 8), 763.2.3.4, states “Lockable Stowage locker(s) shall be provided for stowage of ten M1A2 ammo containers.” These Lockable Stowage locker(s) in the Law Enforcement Armory provide ammunition storage for the aircraft. Please note that a typo has been identified and that “M1A2” should be “M2A1”.
| 8 | 70.3.11 Flight Operations | The USCG H60T is now listed as the required aircraft. Will the Coast Guard be providing the manning size of Aviation Detachment intended for USCG H60T? | The USCG does not have a historical H-60 AVDET but estimates approximately an AVDET of 10. |
| 9 | 70.3.11 Flight Operations | The USCG H60T is now listed as the required aircraft. Will the H60T deploy with or without external drop tank (standard configuration for land based operations)? | OPC Stage 2 Specification (J-1 Part 6), 588.2.2.2 states “The dimensions for H-60T shipboard configuration shall be in accordance with USCG drawing FL-588-1.” The dimensions shown on USCG drawing FL-588-1 exclude the left outboard tank. |
| 10 | 70.3.11 Flight Operations | The USCG H60T is now listed as the required aircraft. Is there a landing assist system (like Talon) for the H60T identified? | OPC Stage 2 Specification (J-1 Part 6), 588.3.7.6 states “The cutter shall have TALON helicopter landing grid, DCN INDRET, Type 18-08, installed in accordance with manufacturer supplied installation instructions.” |
| 11 | Page I-16, FAR 52.225-8 Duty Free Entry | Please confirm that the Section 232 Tariffs will not be assessed due to the Duty Free Entry Clause and that we should not include the cost of these tariffs in our pricing. | There is no language in the Presidential Proclamation 9705 or subsequent proclamations that excludes US Government contractors purchases from the tariffs imposed pursuant to Section 232. Additionally, the USCG has not identified any items in the schedule to be accorded duty-free entry. Regardless, contractors must comply with the reporting requirements of FAR 52.225-8 (c ). |
| 12 | Section C. C.6 Detail Design (CLIN 0001) para (i) ABS Requirements Review | Please confirm that costs associated with Government initiated change orders should be included in the change order (ECP pricing) itself rather than in the FPIF Detailed Design CLIN 0001. | All costs associated with ECR/ECP review, analysis, and pricing are to be performed under the CLIN series commencing with CLIN 1007 per Section C, paragraphs C.15 (c) and (e). |
| 13 | Section C. C.8 Insurance Spares | The price for the insurance spares will vary relative to the year of execution due to escalation. Request that the J-24 be put into a matrix format that inlcudes unit pricing on an annual basis. This will allow the USCG to order insurance spares in any year at a known value. | An updated J-24 will be included with Amendment 1. |
| 14 | Section C. C.2(e) Equipment and Design Standardization. | 300-WMSW-085-001 was not in the data disk provided as part of the RFP. This is a critical drawing please advise when the drawing will be available. |
Drawing 360-WMSM-085-001 (Lines, Offsets and Hull Appendages Drawing) has been provided with the Technical Library under OPC Stage 1 Design Artifacts in folder 079-01-1193_02 (Hull Form Design Report) with the file name ESG_079-01-1193_02_Dwg1_10-05-15.
| 15 | Section C. C.11 Warranty | Please provide the level of OEM warranties required. Is the Government referring to the OEM standard commercial warranty except that it is one year in length from ship dilivery? If an offer obtains a warranty in excess of the OEM standard commercial offering is it necessary to obtain an additional commercial warranty to be transferred to the USCG? | Section C.11.(c) will be replaced with: "The Contractor shall obtain the most favorable warranties that the original equipment manufacturer (OEM) gives to any customer for commercial supplies, commercial components of supplies, or services. The Contractor shall transfer to the Coast Guard all commercial warranties. The rights and remedies provided under the Section I clause titled “Warranty of Supplies of a Complex Nature" are in addition to and do not limit any rights and remedies provided to the Coast Guard by law or by any other clause of this contract." |
| 16 | Section C. C.11 Warranty | If the contractor is maintaining a warranty item correction program for the duration of the warranty period why is it necessary to transfer the OEM commercial warranty to the USCG? | The contractor is required to tranfer all active or unexpired warranty to the USCG after the warranty period is expired. Section C.11 has been updated to clarify this requirement. |
| 17 | Section F. F.19 Weight Penalty | Are these penalties for weight and KGv cumulative, with a total risk to the contactor of $20M, or are they concurrent with the maximum risk of $10M? | The penalty is a cumulative maximum risk of $20M. |
| 18 | Attachements J-28b and the J-5 DD CDRLs | The J-28b identifies CDRLs for the Refigeration System Arrangement and Detail Drawings as 516-DD-2DD8 and Reefer Box Arrangement and Detail Drawings as 516-DD-2DD9 while the J5 idetifies these draings as 516-DD-2038 and 516-DD-2039 respectively. Please clarify. | The Government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cells A-16 and A-17. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 516-DD-2038 and 516-DD-2039 respectively. |
| 19 | Attachements J-28b and the J-5 DD CDRLs | Is this CDRL required? | OPC Stage 2 DD CDRL (J-5), CDRL 042-DD-1422 is titled Sensors, Alarms, and Safeties Database. The Government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-85. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 202-DD-1422 to 042-DD-1422. |
| 20 | Section 1.1 Initial System Categorization | The system 402 specification, Risk Management Framework (RMF) overlays, and the accompanying 040.100.002 OPC-B Cyber Security Controls spreadsheet indicate the need to integrate a UCDMO-approved cross domain solution for all cross domain data transfers. TheStage 1 CDRL 402-03-2344 utilizes a one-way optical isolator to protect the low-to-high cross domain interface. Is a one-way optical isolator still an acceptable solution for IP and Serial based transfers? | |
| The Government does not intend to address the compliance of OPC Stage 1 design artifacts with the OPC Stage 2 RFP. | |||
| 21 | J-1 para 400.2.4 and 400.2.5; J-26 Para 1.13, 1.14, 1.15 | See attached word document. The video and internal communications systems (and their components) are an integral part of the C5I suite. They are subject to the same performance and cyber security requirements as any other sub system. Additionally, they process and record operationally sensitive and classified information. In accordance with Part 1194 D1194.3 General Exceptions and Section 508 Para 1.15, we request that requirement 400.2.5 be deleted from SYSTEM SPECIFICATION FOR SECTIONS 400 – 499 ATTACHMENT J-1 (PART 5). | OPC Stage 2 Section 508 of the Rehabilitation Act of 1973 Compliance Requirements (J-26), states “Any request for additional exceptions shall be sent to the Contracting Officer and a determination will be made[…]”. The government does not intend to consider additional exceptions to Section 508 requirements until after contract award. |
| 22 | Page B-1, Paragraph B.2 0001 Detail Design | The Draft RFP implied Production Facilities (PF) are included within Detail Design where the Final RFP implies only C5I Production Facilities are included in Detail Design. Is it the Coast Guard’s intent to exclude non-C5I Production Facilities from Detail Design? | Section B.1(a) states “Detail Design price includes: […] Command, Control, Communications, Computers, Cyber, and Intelligence (C5I) Production Facility (PF)” Section C.6(h) states “The Contractor shall develop a C5I Production Facility (PF) in accordance with Attachment J-4, Statement of Work for Detail Design. The PF shall be used by the Contractor for initial installation and integration testing of C5I and specified Combat System equipment, prior to final C5I installation and integration aboard the respective OPC hull.” The C5I Production Facility should be included in the Detail Design price. |
Section L.12.1, Facilities, paragraph (a) states “The Offeror shall describe its existing and planned shipbuilding facilities. The existing and planned shipbuilding facilities should not be included in the Detail Design price.
| 23 | page L-23 | Section L.12.3 Factor 3 – Schedule, section (a) (2) (i) and (ii) discuss providing Single Ship and Dual Ship Delivery Schedules. Is the intent to provide 2 schedules, one that shows the dependencies if for an entire 11 Ship production Cycle with a single ship delivery schedule and a second that shows if that were updated to a dual ship delivery schedule? Or is the CG looking for the dependencies for the first three OPC Stage 2 ships where a single ship will be delivered per year (per J-25 schedule), and how the schedule must change to account for dependencies and resources to move to a dual ship delivery schedule after delivery of the 3rd OPC Stage 2 Ship? | The Offeror shall provide a single optimal schedule with the narrative to describe the dependencies for any periods where a single ship will be delivered per year and dependencies for periods where two ships are delivered per year. |
| 24 | page I-1 | The final RFP does not include 5252.245-9105 FACILITIES TO BE GOVERNMENT-FURNISHED (FIXED-PRICE) and 5252.245-9106 FACILITIES TO BE GOVERNMENT-FURNISHED (COST- REIMBURSEMENT), which allows the Contractor to identify the Government-Owned facilities that the contractor assumes will be used during contract and program performance. The addition of these clauses provides a reduction of contractor proposed cost to execute program. Request these clauses be added to the final contract to document Government-Owned facilities to be used by the Contractor during performance. | This is a NMCARS clause not applicable to USCG contracts and the USCG has not identified any facilities that could be used by the contractor during performance. |
| 25 | Paragraphs 040.5.1 and 040.5.1.4 | Please Clarify if the IBR is 90 days or 180 days. | The Contractor shall host the Government's IBR up to 180 days after contract award and on the date mutually agreed by both the Government and the Contractor. The requirement will be revised to 180 days. |
| 26 | Section L.8 Proposal Due Date, Paper copies | Would the Coast Guard consider allowing the Detail Design Appendix to be submitted in electronic format only? | No, the USCG intends to maintain the electronic and paper/hard copy submission format requirements of the Detail Design Appendix. |
| 27 | Section L.12.2 Factor 2 - Design Approach, Technical Data Rights | Since these attachments contain pricing data, and the requirement is duplicated in the Price volume, should this requirement be moved to the Price volume? | Yes. |
| 28 | Section L, L.11.(p) | In section L.11.(p) it states that a Major Subcontractor is defined as performing design or constuction scope valued at $25M per ship. In the J-3 para 042.2.4 it discusses that EVMS shall be flowed down to any "Major Subcontractor" with more than $10M in subcontacts. Should this be revised to state more than $25M in subcontracts? if not, please clarify. | The definition of Major Subcontractor contained in section L is for the purposes of the solicitation and proposal evaluation and applies before award. The EVM requirement in J-3 para 042.2.4 is for the purpose of contract oversight and applies after award. |
| 29 | CDRL 302-DD-1468, line 122 | CDRL 302-DD-1468 - Motor Drawings is included in RFP document J-28b_Data_Rights_Tables but is not included in RFP Document J-5_DD_CDRL. Is this a required CDRL submittal? | OPC Stage 2 DD CDRL (J-5) does not include CDRL 302-DD-1468, Motor Drawings. The Government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 122, should not have been included and will be deleted. |
Note: OPC Stage 2 DD CDRL (J-5), 302-DD-1502, requires individual drawings of installed motors to be provided.
| 30 | CDRL 313-DD-1531, line 132 | CDRL 313-DD-1531 Battery Capacity Calculations is included in RFP document J-28b_Data_Rights_Tables but is not included in RFP Document J-5_DD_CDRL. Is this a required CDRL submittal? | OPC Stage 2 DD CDRL (J-5) does not include CDRL 313-DD-1531, Battery Capacity Calculations. The Government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 132, should not have been included and will be deleted. |
| 31 | CDRL 324-DD-1554, LINE 147 | CDRL 324-DD-1554 Operation Description for Electric Plant Control System is included in RFP document J-28b_Data_Rights_Tables but is not included in RFP Document J-5_DD_CDRL. Is this a required CDRL submittal? | OPC Stage 2 DD CDRL (J-5) does not include CDRL 324-DD-1554, Operation Description for Electric Plant Control System. The Government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 147, should not have been included and will be deleted. |
| 32 | CDRL 331-DD-2245 LINE 154 | CDRL 331-DD-2245 LIGHTING AND RECEPTACLE LOAD CALCULATIONS is included in RFP document J-28b_Data_Rights_Tables but is not included in RFP Document J-5_DD_CDRL. Is this a required CDRL submittal? | OPC Stage 2 DD CDRL (J-5) does not include CDRL 331-DD-2245, Lighting and Receptacle Load Calculations. The Government acknowledges that Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Row 154, should not have been included and will be deleted. |
| 33 | CDRL 580-DD-1876; LINE 328 | CDRL 580-DD-1876 Anchor, Mooring and Towing Equipment Systems Arrangements and Details Drawings is included in RFP document J-28b_Data_Rights_Tables but is not included in RFP Document J-5_DD_CDRL. Is this a required CDRL submittal? | OPC Stage 2 DD CDRL (J-5), CDRL 581-DD-1876 is titled Anchoring, Mooring, and Towing Equipment Systems Arrangements and Details Drawings. The Government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-328. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 580-DD-1876 to 581-DD-1876. |
| 34 | CDRL 050-DD-2288; LINE 346 | CDRL 050-DD-2288; CYBER SECURITY CONTROLS MATRIX is included in RFP document J-28b_Data_Rights_Tables but is not included in RFP Document J-5_DD_CDRL. Is this a required CDRL submittal? | OPC Stage 2 DD CDRL (J-5), CDRL 402-DD-2288 is titled Cyber Security Controls Matrix. The Government acknowledges a typo in Data Rights Tables (J-28b), tab “J-28b Tech Data (DD)”, Cell A-346. The CDRL Number in Data Rights Tables (J-28b) will be updated to change CDRL Number 040-DD-2288 to 402-DD-2288. |
| 35 | CDRL 083-CON-1229; Line 27 | CDRL 083-CON-1229; Outfitting Operations Plan is included in RFP document J-28b_Data_Rights_Tables but is not included in RFP Document J-7_CON_CDRL. Is this a required CDRL submittal? | OPC Stage 2 CON CDRL (J-7), CDRL 083-CON--1229 is titled Outfitting Operations Plan. The Government acknowledges a typo in the Sequence Number for the Outfitting Operations Plan CDRL. OPC Stage 2 CON CDRL (J-7) will be updated to change Sequence Number 083-CON--1229 to 083-CON-1229. |
| 36 | L.15 Administrative Volume Instructions | Section I does not contain this clause. Please clarify requirement. |
HSAR Clause 3052.209-72, Organizational Conflict of Interest (2006), added to Section I.
37 L.15 Administrative Volume Instructions Section L.9 deals with Period for Acceptance of Offers. We believe you mean L.10 Notification of Use of Government Support Contractors. Please clarify requirement.
This section is updated to reflect correct reference to L.10.
38 Question 368 'Please clarify how the Stage 1 Specification (J-1) is applicable to the Stage 2 RFP. The Stage 2 Specification (J-1) has no mention of Contract Guidance Drawings or "AS IS". Section 042.2.1.1 of the Stage 2 Specification is in regard to Contract Drawings. Note the Stage 2 J-1 does not reference J-20. The RFP does reference J-20 and in H.26(a), J-20 would be considered a first-tier document which by H.26(b) is mandatory for use. Section L.12.2, Detail Design Appendix, 2nd paragraph calls J-20 unwarranted artifacts. Can the Gov't please clarify the disagreements between the response to Draft RFP Question 368 as well as the disagreements within the RFP as noted above? It appears the Gov't is expecting the contractor to assume all design risk for a design that is being provided by the Government and with equipment and systems that have been standardized in support of sustainability per RFP C.2(e) and contract drawings per J-1, Table 042-2? The OPC Stage 1 Specification (J-1) is not applicable to the Stage 2 RFP. The response to Draft RFP Question 368 included a typo. The response was not intended to quote the OPC Stage 1 Specification but instead the OPC Stage 2 Specification.
OPC Stage 2 Specification (J-1) of the final RFP does not mention Contract Guidance Drawings or "AS IS." However, OPC Stage 2 Specification (J-1) of the draft RFP did. Draft RFP Question 368 and the response to Draft RFP Question 368 predated release of the final RFP.
The Matrix of Design Artifacts (J-20) is not “referenced” by the RFP but is instead part of the RFP. As such, the Matrix of Design Artifacts (J-20) is not a first-tier reference as defined by Section H.26.
| 39 | Question 371 & 372 | 'While the contractor can understand the Government's position in your response to Questions 371 & 372, can the Government please confirm that the current configuration for OPC Stage 1 meets all seakeeping requirements of the OPC Stage 2 J-1? | The Government does not intend to address the compliance of OPC Stage 1 design artifacts with the OPC Stage 2 RFP. |
| 52 | J-20 | As the Coast Guard is not warranting any of the artifacts listed in Attachment J-20, please identify the inadequacies/defects in those artifacts and any specific areas of concern that you have identified so that the offerors can be sure to address them (and the incumbent does not retain significant advantage with respect to awareness and visibility of design issues). Example: reasons for rejection of CDRLs identified in J-20 as “N = Not Accepted”. | The Government does not intend to address the compliance of OPC Stage 1 design artifacts with the OPC Stage 2 RFP. |
| 53 | J-20 | Please confirm that offerors are not required to address J-20 items unless offerors choose to incorporate them into their design appendix. | Section L.12.2, Detail Design Appendix, states “The Offeror shall create new Detail Design Elements, submit all, or submit portions of the unwarranted artifacts provided in Attachment J-20, “Matrix of OPC Stage 1 Design Artifacts” as the Offeror’s Detail Design Elements.” If the Offeror chooses to create a new Detail Design Element there is no requirement to directly address those unwarranted artifacts provided in Attachment J-20 that were not used. |
Withstanding, L.12.2. Design and Life Cycle Benefit (a) Design Overview states, “The Offeror shall present an overview of the proposed design and the engineering design elements.” Further, Section L.12, Design Soundness and Maturity states, “The Offeror shall describe the processes, including configuration management in integrating retained OPC baseline elements from the J attachment, J-20, “Matrix of OPC Stage 1 Design Artifacts,” with the proposed design; decisions; and tradeoffs associated with its proposed design.” With that, it is in the Offeror’s interest to address the inclusion, exclusion and changes of J-20 items, regardless of being a Detail Design Appendix element, to present a complete overview of their proposed design.
| 54 | L-19, L-20 | Please confirm that the only required elements of the Detail Design Appendix are the 16 numbered areas described on Page L-19 and L-20. | Yes,Section L.12.2, Detail Design Appendix, states “The Detail Design Appendix shall address the following:” and lists the required Detail Design Element. |
| 55 | J-1, page 070-6, System Specification Section 070 General Requirements for Design and Construction; para 070.3.11.2.1 | Please provide drawings of the USCG H-60T helicopter, including maintenance and clearance envelopes. The overall length, width, and height dimensions provided with the RFP lack details necessary to verify that the existing OPC design can accommodate this helicopter. | OPC Stage 2 Specification (J-1 Part 6), 588.2.2.2, states “The dimensions for H-60T shipboard configuration shall be in accordance with USCG drawing FL-588-1.” USCG drawing FL-588-1 provides more than the overall length, width, and height dimensions. |
OPC Stage 2 Specification (J-1 Part 6), 588.3.7.7 states “A hangar shall be provided for the stowage and maintenance of aircraft with the following minimum clearances:” and then lists required overhead and horizontal clearances.
| 56 | C.2 General L.12.2 Factor 2 - Design Approach | The answer to dRFP Bidder's Question 81 states, "The OPC Stage 1 Configuration Status Report (CSR) deliverable has not been accepted or approved by the USCG. As a substitute an Equipment Configuration List (ECL) under the file name [ECL Stg 2_RFP 2020-06-22] was created by the USCG. That ECL contains the current equipment data which is required in the CSR, in the correct hierarchical sequence order. If the Stage 1 CSR is accepted or approved by FINAL RFP release it will be provided in lieu of the Equipment Configuration List." | |
| The ECR is an over 12,000 record list of equipment in the ship and is a product of detail design. The only offeror in a position to provide a compliant CSR is the incumbent. The CSR has not been provided with the final RFP. The CSR deliverable is premature and offerors will not be in a position to provide until after commencing detail design. The offer request the USCG eliminate the required delivery of the CSR with the proposal. | The Detail Design Elements are not required to be at the level of detail required in the corresponding Detail Design CDRLs described in Attachment J-5, “Contract Data Requirements List for Detail Design,” but shall contain sufficient information to describe the proposed design." Offerors shall submit the data elements required to identify the offeror's proposed design configuration as defined in CDRL_ATCH_041-DD-1000, "Section L." |
57 Page 345, 5.1 & 5.2 This AutoDAM/AutoPLATE program/software does not appear to be commercially available. In lieu of using the AutoDAM/AutoPLATE program/software for the development of the Damage Control products as required in Attachment J, the offeror would like to use their own software/tool. The current software is a SQL database, Label Plate Management Systems (LPMS) that generates both the DC Book tables and CCOL and we use AutoCAD 2018 for development of the DC Diagrams. OPC Stage 2 Addendum (J-1 Part 9), 6-2-11/5.1 states, “For OPC, CCOLs shall be prepared using the AutoDAM/AutoPLATE program.” OPC Stage 2 Addendum (J-1 Part 9), 6-2-11/5.2 states, “For OPC, Damage Control Books and Diagrams shall be prepared in accordance with NTS-9090-820 using the AutoDAM/AutoPLATE program.” The government acknowledges that the AutoDAM/AutoPLATE program/software is not commercially available.
OPC Stage 2 DD CDRL (J-5), 086-DD-2113, BLK04 states that “DC Fitting lists shall be submitted in a MS Access file format in the template provided[…]”. The Contractor is not responsible for preparing the CCOL using the AutoDAM/AutoPLATE program. The Contractor is responsible for providing the Damage Control Technical Data in the format required in the CDRL.
OPC Stage 2 DD CDRL (J-5), 086-DD-2113, BLK04 states that “DC Diagrams shall be developed and submitted in an editable AutoCAD format” and “The format of surface ship DC Book Contents shall be delivered in Microsoft Word file format.” The Contractor is not responsible for preparing the Damage Control Books and Diagrams using the AutoDAM/AutoPLATE program. The Contractor is responsible for providing the Damage Control Technical Data in the format required in the CDRL.
| 58 | J-1, Part_15_PPD-324_001; para. 3.4.4.2 | Section J-1, Part_15_PPD-324_001; para. 3.4.4.2 can be interpreted two ways; 1) Load Centers shall have isolation breakers at the source (@switchboard), and at the Load Center; or 2) The source breaker shall be able to isolate upon control signals originating from either the source or the load center. The former requires an isolation circuit breaker at the Load Centers and their source switchboard, wheras the latter only requires additional controls at each location to control one breaker at the source . Please clarify which of these two interpretations is correct, or clarify otherwise. | OPC Stage 2 PPD-324-001 (J-1 Part 15), 3.4.4.2 states “Isolation. Each load center shall be capable of electrical isolation from it’s source at the load center and at the source. Isolation shall be provided by a circuit breaker.” PPD-324-001 does not require a design solution with an isolation circuit breaker at the switchboard and an isolation circuit breaker at the load center. |
| 59 | Page M-6, Section M, Clause M.6.2 Factor 2 - Design Approach, sub-paragraph "Design Soundness and Maturity" | The Government indicates that it will "use the Offeror's Detail Design to assess the Offeror's engineering approach. . ." Presumably, only the incumbent has a Detail Design at this point, and this evaluation methodology / criteria would unfairly handicap all Offerors other than the incumbent. Offeror requests the Government change the words "Detail Design" to "design artifacts" in this sentence. | Section L.12.2, Design Soundness and Maturity, states “The Offeror shall provide a narrative that describes its engineering approach to ensure the OPC design is balanced, feasible, and executable.” Section M.6.2, Design Soundness and Maturity, states “The Government will use the Offeror’s Detail Design to assess the Offeror’s engineering approach will result in a balanced, feasible, and executable OPC design.” Section M.6.2, Design Soundness and Maturity will be modified to clarify that the Government will use the Offeror’s narrative andDetail Design Elementsto assess the Offeror’s engineering approach. |
| 60 | Section F.19 | The solicitation requires the offeror to submit a Preliminary Allocated Baseline Weight Estimate (PABWE) for the construction of the OPC with their proposal. Due to the time necessary for each offeror to develop their own weight estimate from the J-20 and the offeror’s changes to the incumbent’s design, coupled with the limited proposal time, would the USCG consider adjusting the requirement down to $0 liquidated damages for both weight and KG? |
Section F.19 states “The Contractor’s proposed Preliminary Allocated Baseline Weight Estimate (PABWE) for the construction of the OPC will be incorporated into the contract following contract award for Detail Design.” OPC Stage 2 DD CDRL (J-5), 096-DD-1347, BLK12 indicates the first submittal of the Allocated Baseline Weight Estimate (ABWE) is required 30 Days After Effective Date of Contract Award. The USCG does not intend to modify the Allocated Baseline Weight Estimate Liquidated Damages.
61 Paragraph 42.4.3 I-33 HSAR Class Deviation 15-01 SAFEGUARDING OF SENSITIVE INFORMATION (MAR 2015) Offeror requests the achievement of a CMMC Level 3 certification requirement outlined in J-3 be considered sufficient to satisfy the ATO requirement in the soliciation with the inclusion of the HSAR Class Deviation 15-01 clause. Please note that the CMMC is a more recent protocol, developed by a consortium of industry and government partners, and will more closely align across different programs.
The offerer shall comply with both the Section Irequirement for an ATO for any system processing or storing Government information and the J-3 requirement to attain a CMMC level 3 certification.
| 62 | Section C.10.C.3 | The Contractor is to procure any and all material required for an OPC and issue it to the USCG within a maximum of 72 hours after Contracting Officer notification. The requirement as written is impossible to meet. Would the USCG consider a more reasonable timeframe of "within 72 hours of receipt in the warehouse from the supplier"? | USCG concurs. Section C.10.(c) will be amended to read as follows: "The lead ship will requisition maintenance and repair material via the Project Resident Office (PRO). The PRO will inform the Contractor of the requisition, and the Contractor shall provide the material and parts in accordance with COMDTINST M4400.19B. The Contractor shall process ICSS requisitions in a manner that items are delivered to the cutter within a maximum of 72 hours of receipt at the Contractor’s facility from the supplier." |
| 63 | Section C.2.e | Per the RFP "two Rolls-Royce propulsion shafts, two Rolls-Royce controllable pitch propeller systems, and two Rolls-Royce rudders" are required for the OPC as standard equipment. Kongsberg Maritime acquired Roll Royce Commercial Marine in Early 2019. Should the Rolls Royce branding now be changed to Kongsberg Maritime? | The USCG is not aware of any branding change due to the referenced 2019 acquisition. If branding changes occur the contract will be administratively modified to indicate the revised brand appropriate to the standardized equipment as described. |
| 64 | Block 1, Ratings | What will be the DPAS rating assigned to this contract? | The DHS-USCG uses FPAS not DPAS rating which FPAS is equivalent to DPAS. The USCG is in the process of getting an approval for a FPAS rating of DO-N4 for the OPC Stage 2 contract, this is the same FPAS rating approved for OPC-Stage 1 |
65 B.3 OPTIONAL CONTRACT LINE ITEMS (CLINs) Section B.3 (g) provides in part that the USCG “intends to exercise the following follow-ship construction CLINs simultaneously: […]” The list that follows appears to describe both the sequence and grouping in which the option CLINs will be exercised. Please confirm that if the USCG decides to exercise the designated CLINs in a sequence or grouping that is not as described in the RFP (or misses or skips any option) that option award/expiration and pricing will be adjusted under the CHANGES clause. Section B.3 has been updated with the following language:
"The Coast Guard intends to exercise the production CLINs sequentially (1002, 2002, 3002, 4002, 5002, 6002, 7002, 8002, 9002, 1102, and 1202). The Coast Guard forfeits the right to unilaterally exercise options for any of the follow ship production CLINs as priced if it fails to exercise any of the preceding production options in the sequence (e.g. if the Coast Guard does not order CLIN 4002, Hull #4, then the Coast Guard forfeits all rights to exercise CLINS 5002 – 1202, Hull #5 - #11, as priced)"
| 66 | F.2 CLAUSES INCORPORATED IN FULL TEXT | The RFP invokes FAR 52.217-7 with the addition of the following language re: when the options must be exercised, and when they will expire: “The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.” Please clarify that the reference point for calculating the 30 days notice is the award date proposed by the offeror in J-25(b). | Yes, the reference point for calculating the 30 day notice will be the information in attachment J-25 and incorporated into the 6th column of Table 1 of Section F at contract award. "Contract Delivery Date (To be filled-in at contract award)" |
| 67 | Section M.8 | Section M.8 provides as follows: “The Government will evaluate the proposed prices for price reasonableness to include the proposed profit. Price reasonableness will be established by competition and determined primarily by comparison with other offers submitted. The prices may also be compared with the Independent Government Cost Estimate (IGCE), as well as historical prices paid.” |
Pursuant to Section M.8, can an offered price can be evaluated as unreasonable if it is unreasonably high or unreasonably low in comparison with other offers or the IGCE?
If an offered price is determined to be unreasonably low, can that offer (a) be rejected on that basis or (b) be assessed risk relating to its understanding of the technical requirements in Factors 1, 2, 3 and/or 4? Reasonableness deals with prices being too high while the evaluation of unreasonably low prices falls under the umbrella of cost realism, which is defined in 15.404-1 (d ). As stated in Section M.8, the USCG will not perform a cost realism analysis. However, Offerors are directed to:
Factor 1 (d) Producibility which states that "The narrative and resources must align with the information provided in the price volume." and Factor 2, Design Soundness and Maturity (e) which states "The narrative and resources must align with the information provided in the price volume attachments L-2, L-3, and L-4."
An offeror can be assesed a risk under Factors 1,2,3, and 4 based on the resources proposed to execute its solution but not based on the proposed price.
68 Page M-3, Section M, Clause M.4 Source Selection Process, sub-paragraph (d) Section M, as compared to the draft RFP, indicates that there are added evaluation criteria of "significant strengths" and "significant weaknesses." However, only the first factor (in M.6.1) added those new evaluation criteria. Please confirm that the other factors (i.e., M.6.2, M.6.3, and M.6.4) will be evaluated for "significant" strengths and “significant” weaknesses? Yes, factors 1-4 will be evaluated to include consideration of significant strengths and significant weaknesses. Sections M.6.2, M.6.3, and M.6.4 has been updated to include consideration of significant strengths.
| 69 | Page 2, paragraph number 040.2.1 | Will the government provide the completed DD254 for the offeror's evaluation? | An unsigned (draft) DD-254 is provided as attachment J-8, the DD-254 will not be fully executed until contract award. |
| 70 | C.11 Warranty, F.7 , H.44 | The RFP in multiple places uses the term “warranty period” but does not state what the warranty period is applicable to ship construction. A reasonable, expected warranty would be twelve months after delivery. Request USCG clarification that the warranty period for the ships is twelve months after delivery. | Section C.11 has been updated to state the warranty period. Two years for the lead hull and 1 year for all other hulls. |
| 71 | SECTION E, FAR 52.246-20 WARRANTY OF SERVICES (MAY 2001) | FAR 52.246-20 WARRANTY OF SERVICES (MAY 2001) |
The standard clause allows for the potential fill-ins:
"____ [Contracting Officer shall insert the specific period of time in which notice shall be given to the Contractor; e.g., within 30 days from the date of acceptance by the Government,; within 1000 hours of use by the Government,; or other specified event whose occurrence will terminate the period of notice, or combination of any applicable events or period of time]."
The offereor propose revising the clause to be 30 days from the date of acceptance per the standard clause. The USCG has determined the period to be 90 days and is now stated as such in the text of the clause.
| 72 | Part IV - Representations and Instructions, Section L - Instructions, Conditions and Notices to Offerors Page L-21, Technical Data Rights | In the interest of ensuring that Offerors are able to provide comprehensive, compliant responses to the RFP instructions regarding Technical Data Rights and also in light of the indeterminate nature of the length of the required responses, will the Government deem the information required by the referenced Section L Technical Data Rights paragraph to be excluded from the 160-page count restriction for Volume I? | Yes. | |
| 73 | Section L, pg. L-13 | In the RFP, Section L, page L-13, the Technical Volume Outline asks for the inclusion of Attachment J-24 and Attachment J-28b. Attachment J-24, insurance spares tab, asks for pricing data in columns E and F. Attachment J-28b, tabs Tech Data (DD) and Tech Data (CON) asks for pricing data in Column I. | ||
| Solicitation section L.11 (f) requires that pricing data only be included in the Price proposal volume. This requirement to include Attachments J-24 and J-28b (see, L.12 (7) b. and d.) in the Technical Volume is inconsistent with the L.11(f) requirement. The offeror requests the solicitation requirement to submit these J-attachments be changed to require their submission in the Price volume, or alternately the offeror requests the USCG adjust the J-attachments to remove the cost/price data input fields. | The submission requirement for J-24 and J-28b has been moved to the price volume see L14.1. | |||
| 74 | Attachment L-2 | Attachment L-2 |
The offeror request the USCG correct the below errors in attachment L-2 and re-issue the document.
0001 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 1001 No errors noted 2001 No errors noted 3001 No errors noted 4001 No errors noted 5001 No errors noted 6001 No errors noted 7001 No errors noted 8001 No errors noted 9001 No errors noted 1101 No errors noted 1201 No errors noted 1002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 2002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 3002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 4002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 5002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 6002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 7002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 8002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 9002 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 1102 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 1202 AI92 Missing cells S92, V92, Y92, AB92, AE92 in formula 1005 No errors noted 1008AA No errors noted 1008AB No errors noted 1008AC No errors noted 1008AD No errors noted 1008AE No errors noted 1008AF No errors noted Identified errors have been corrected and Amendment 1 (A0001) to attachment L-2 has been issued.
75 Section E Tug and pilot services Should the offeror include twelve movements for each OPC or twelve movements in total for all OPCs? The offeror propose clarifying this requirement to be no more than six movements per construction CLIN.
The offeror shall include tug and pilot services for twelve movements for each OPC in their proposal per E.6(a)(5).
76 Part IV - Representations and Instructions, Section L - Instructions, Conditions, and Notices to Offerors Page L-15 Would the Government eliminate the copies of the qualifications or certifications from the 160-page count restriction for Volume 1? A compliant, comprehensie response to the Section L language entails many pages of copies of qualifications and certifications. Further, yards of varying sizes will have different numbers of certificates that would need to be included in the proposal. A qualification, certification, and resume appendix has been created and is excluded from the page count. See L.12.
77 Clause H.49, Security Deliverables This clause notes that the Contractor will be required to control and handle FOUO information during contract performance. Will all information that is FOUO be marked by the USCG as such before being provided to the Contractor, and at what point in the solicitation process will the USCG clearly identify all contract deliverables that are expected to be designated as FOUO, sensitive, or other types of controlled unclassified information? The USCG has already identified all FOUO information required for proposal preparation and marked the information appropriately. Any additional FOUO provided to the contractor after award will also be appropriately marked.
The contract deliverables are to be delivered in accordance with J-5 Section 1.0 and J-7 Section 1.0, "Per Section H of this contract, data delivered under this contract that contain technical data are subject to the restrictions of the Arms Export Control Act (Title 22, U. S. C., Section 2751), and shall be marked with the appropriate ITAR Control Statements.Unclassified/Limited Distribution documents shall include the appropriate destruction statement in accordance with COMDTINST M5260.6.All pages of each delivered electronic file shall contain these necessary markings or a notice indicating where in the electronic file the markings are located (e.g. See Restrictions on Title Page)."
| 78 | Paragraph C.12(a) | Paragraph C.12(a) states that the USCG “intends to obtain the technical data needed for the procurement of future OPCs if necessary in a ‘build to print’ environment.” Technical Data historically delivered to the Government for detail design and production contracts include, but are not limited to, all ship and ship system/subsystem design drawings, diagrams, calculations, production 3D models, production drawings, production jigs/fixtures/tooling drawings, production installation procedures, test procedures, test reports, parts lists, purchase specifications, and technical manuals. Is there any additional data not identified in the preceding sentence that the USCG expects to receive to satisfy its “build to print” requirement? There is certain information that is not necessary for a follow builder to construct the ship and would be proprietary to the prime contractor. Can the USCG confirm that the Optional Technical Data required in a “build to print” environment does not include any items that are specific to the proprietary work processes of the Contractor’s shipyard or would not otherwise be applicable to the construction of the OPC in any shipyard other than the Contractor’s shipyard? | J-28b Column J in Tabs 2 and 3 indicate which CDRLs the Government requires for a follow on competition and sustainment. For the CDRLS marked for recompete the Government desires Government Purpose Rights. J-28b Tab 4 is designated for CDRLs that are considered contract adminitration data as defined in J-28a(c)(3). |
| 79 | Section I, 52.232-16 Progress Payments | The Progress Payment clause incorporated on the FFP LLTM CLINs only allows 80% of cost to be billed until definitized. Material will be delivered well in advance of ship delivery. Please confirm that the USCG considers the FFP LLTM CLIN to be definitized at equipment delivery to the shipbuilder. | The terms, specifications, and CLIN prices for the OPC Stage 2 contract will be agreed upon before performance begins therefore the OPC Stage 2 contract to include LLTM CLINs will be fully definitized. |
| 80 | Tech Library | When does the USCG plan to provide a final technical library document drop (including but not limited to test procedures and technical library document updates)? What additional documents will be provided upon award? | The Government will provide an updated technical library of the contents identified in J-20 upon contract award. Currently, the Government does not anticipate providing additional information during the RFP phase other than those currently listed in J-20. |
| 81 | Attch J-4, DD SOW, paragraph 095-410.1.2 | When will the Government make available the SIM/STIM that is GFE? |
The Government will not be providing SIM/STIM software or hardware. The Government will consider and may approve any request submitted via contract letter for the use of SIM/STIM as part of the test process.
| 82 | Attch J-6, CON SOW, paragraph 400.2.6 | Please provide the list of INCO fixtures that will be provided and by whom? If they are GFE, please update the details in the Sked A-C and include the planned delivery dates. | CON SOW (J-6), 400.2.6 states “Utilize Installation and Checkout (INCO) kits and Installation Aid Fixtures (IAFs) provided for C5I consoles, racks, and equipment for installation of support services and equipment.” OPC Stage 2 Schedule C, List of Government Furnished Information (J-11), SKED C, lists the various installation kits that will be provided with Government furnished equipment. Additional details of Government furnished installation kits and installation aids can be found in the documents listed in the SKED C. Installation kits and installation aids for Contractor furnished equipment will need to be identified and provided by the selected manufacturer. CON SOW (J-6), 400.2.6 will be modified to clarify the requirement. |