2.4.1(j) Attachment J-C54 As-Bilt 3 Roof Plan 3 T&E Lab.pdf

PDF 278 KB Posted

Attached to
FEMA Region 2 Naval Weapons Station Earle Building C-54 HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse
Solicitation number
70FBR226R00000018
Issued by

About this file

This is an architectural drawing document for a Weapons Handling Facility under the Northern Division. The drawing presents a detailed roof plan with structural framing specifications for a building approximately 90 feet by 30 feet. The roof plan illustrates nine structural bays (labeled U1 through U9) with typical 30-foot spacing, featuring a truss system with specific dimensional callouts and load calculations noted throughout.

The document includes multiple detailed sections and elevation views showing vertical bracing, roof construction details, and connections. Key specifications indicate typical roof composition to be 18" to 20" duct work with roof deck noted in the details section. Additional notes specify that arrows indicate direction of metal deck, roof drains are labeled as such (R.D.), and all roof openings require specific sizing and location documentation. The drawing includes graphic scales, a north arrow, and references to sheet B0081 as the primary drawing sheet. The revisions table in the upper right corner tracks multiple revisions to the design. This appears to be a construction document providing the structural and architectural specifications necessary for building the weapons handling facility.

View the file

Other files

File Type Posted
2.4.1(l) Attachment L-C54 As-Bilt 5 Roof Plan 5 HVAC Expansion.pdf PDF
2.4.1(f) Attachment F-CLIN Pricing Excel Sheet.pdf PDF
2.4.1(i) Attachment I-C54 As-Bilt 2 Roof Plan 2 Roof Replacement.pdf PDF
2.4.1(h) Attachment H-C54 As-Bilt 1 Roof Plan Office Area.pdf PDF
2.4.1(c) Attachment C-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.4.1(d) Attachment D-Technical Evaluation Factors-NWSE HVAC Replacement_ 07.14.26_v1_OR.pdf PDF
2.8.1(a) Q&A in response to RFP 09.09.26.pdf PDF
2.4.1(a) Attachment A-SOW-NWSE HVAC Replacement revised v2 09.09.26.pdf PDF
2.4.1(g) Attachment G-C54 BMS Spec Sheet HON 9000 Controller.pdf PDF
2.4.1(k) Attachment K-C54 As-Bilt 4 Roof Plan 4 Foundation Sections.pdf PDF
2.4.1 70FBR226R00000018_0001.pdf PDF
2.4.1(e) Attachment E-Wage Determination 2015-4195 Rev.33 7.30.26.pdf PDF
2.4.1(b) Attachment B-A100 Floor Plan.pdf PDF
2.4.1(f) Attachment F-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(h) Attachment H-C54 As-Bilt 1 Roof Plan Office Area.pdf PDF
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.pdf PDF
2.2.1(k) Attachment K-C54 As-Bilt 4 Roof Plan 4 Foundation Sections.pdf PDF
2.2.1 Solicitation 70FBR226R00000018.pdf PDF
2.8.1 Q&A in response to RFP.pdf PDF
2.2.1(j) Attachment J-C54 As-Bilt 3 Roof Plan 3 T&E Lab.pdf PDF
2.2.1(i) Attachment I-C54 As-Bilt 2 Roof Plan 2 Roof Replacement.pdf PDF
2.2.1(g) Attachment G-C54 BMS Spec Sheet HON 9000 Controller.pdf PDF
2.2.1(l) Attachment L-C54 As-Bilt 5 Roof Plan 5 HVAC Expansion.pdf PDF
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(e) Attachment E-Wage Determination 2015-4195 Rev.33 7.30.26.pdf PDF
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.pdf PDF
2.2.1(b) Attachment B-A100 Floor Plan.pdf PDF
2.2.1(a) Attachment A-SOW-NWSE HVAC Replacement revised.pdf PDF
2.2.1(e) Attachment E-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.2.1 Solicitation 70FBR226R00000018.pdf PDF
2.2.1(c) Attachment C-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(d) Attachment D-Technical Evaluation Factors-NWSE HVAC Replacement_ 07.14.26_v1_OR.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .