2.2.1(h) Attachment H-C54 As-Bilt 1 Roof Plan Office Area.pdf

PDF 249 KB Posted

Attached to
FEMA Region 2 Naval Weapons Station Earle Building C-54 HVAC Rooftop Units Replacement and Mini Split Units for Server Room & Warehouse
Solicitation number
70FBR226R00000018
Issued by

About this file

This is an architectural drawing for a Weapons Handling Facility located in the Northern Division. The document presents a detailed roof framing plan with multiple sections and elevations showing the structural design and construction specifications for the facility.

The roof framing plan illustrates a complex structural layout with typical joist spacing, dimensions, and load-bearing details across multiple bays. The drawing includes ten numbered sections spanning approximately 280 feet in total length, with varying bay widths. Key structural elements depicted include typical roof construction details showing 1½-inch open web joists, metal deck systems, and concentrated live load specifications. Supporting details on the plan include a typical joist bridging detail, tip joist end details, edge closure specifications, sump pan details, connection details for joists to beams, and roof opening details. Dimensional annotations throughout the plan provide specific measurements for joist spacing, bay widths, and structural member sizing. The graphic scales section indicates the drawing is not to scale. The document is marked as revision "F" with associated approval dates and contractor information noted in the title block.

View the file

Other files

File Type Posted
2.4.1(l) Attachment L-C54 As-Bilt 5 Roof Plan 5 HVAC Expansion.pdf PDF
2.4.1(f) Attachment F-CLIN Pricing Excel Sheet.pdf PDF
2.4.1(i) Attachment I-C54 As-Bilt 2 Roof Plan 2 Roof Replacement.pdf PDF
2.4.1(h) Attachment H-C54 As-Bilt 1 Roof Plan Office Area.pdf PDF
2.4.1(c) Attachment C-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.4.1(d) Attachment D-Technical Evaluation Factors-NWSE HVAC Replacement_ 07.14.26_v1_OR.pdf PDF
2.8.1(a) Q&A in response to RFP 09.09.26.pdf PDF
2.4.1(a) Attachment A-SOW-NWSE HVAC Replacement revised v2 09.09.26.pdf PDF
2.4.1(g) Attachment G-C54 BMS Spec Sheet HON 9000 Controller.pdf PDF
2.4.1(k) Attachment K-C54 As-Bilt 4 Roof Plan 4 Foundation Sections.pdf PDF
2.4.1 70FBR226R00000018_0001.pdf PDF
2.4.1(e) Attachment E-Wage Determination 2015-4195 Rev.33 7.30.26.pdf PDF
2.4.1(j) Attachment J-C54 As-Bilt 3 Roof Plan 3 T&E Lab.pdf PDF
2.4.1(b) Attachment B-A100 Floor Plan.pdf PDF
2.4.1(f) Attachment F-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.pdf PDF
2.2.1(k) Attachment K-C54 As-Bilt 4 Roof Plan 4 Foundation Sections.pdf PDF
2.2.1 Solicitation 70FBR226R00000018.pdf PDF
2.8.1 Q&A in response to RFP.pdf PDF
2.2.1(j) Attachment J-C54 As-Bilt 3 Roof Plan 3 T&E Lab.pdf PDF
2.2.1(i) Attachment I-C54 As-Bilt 2 Roof Plan 2 Roof Replacement.pdf PDF
2.2.1(g) Attachment G-C54 BMS Spec Sheet HON 9000 Controller.pdf PDF
2.2.1(l) Attachment L-C54 As-Bilt 5 Roof Plan 5 HVAC Expansion.pdf PDF
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(e) Attachment E-Wage Determination 2015-4195 Rev.33 7.30.26.pdf PDF
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.pdf PDF
2.2.1(b) Attachment B-A100 Floor Plan.pdf PDF
2.2.1(a) Attachment A-SOW-NWSE HVAC Replacement revised.pdf PDF
2.2.1(e) Attachment E-Wage Determination Davis Bacon No. NJ20260037 Mod 1 05.18.26.pdf PDF
2.2.1 Solicitation 70FBR226R00000018.pdf PDF
2.2.1(c) Attachment C-Notice to Offerors-Statement of Contractor Assurance.pdf PDF
2.2.1(f) Attachment F-CLIN Pricing Excel Sheet.xlsx XLSX spreadsheet
2.2.1(d) Attachment D-Technical Evaluation Factors-NWSE HVAC Replacement_ 07.14.26_v1_OR.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .