7-I. CBI FORM 3.pdf

PDF 245 KB Posted

Attached to
Pump and Motor Repair Services
Solicitation number
269- 2026-183
Issued by
Mecklenburg County, Charlotte City, North Carolina

About this file

CBI Form 3 is a Subcontractor/Supplier Utilization Commitment document required by the City of Charlotte for Project 269.2026.183, which pertains to Pump and Motor Repair Services. This form must be submitted at the time of proposal opening and captures information regarding Minority/Women/Small Business Enterprises (MWSBEs) and other subcontractors and suppliers that proposers intend to use on the contract across all tiers. The form requires proposers to list all MWSBEs currently certified with the City as of the proposal opening date, as well as non-MWSBE subcontractors and suppliers, along with descriptions of work or materials and corresponding NIGP commodity codes. Proposers must maintain the stated level of MWSBE participation throughout the contract duration, except as specifically allowed by the CBI Administrative Procedures Manual, and must submit separate Letters of Intent (CBI Form 4) for each MWSBE within three business days of receiving a request from the City.

The form establishes mandatory compliance requirements for all proposers, including vendor registration with the City of Charlotte for every subcontractor and supplier utilized on the contract. Failure to properly complete and submit Form 3 with the proposal constitutes grounds for rejection. All subcontractors or suppliers added after proposal submission must also comply with Section 5 of the CBI Administrative Procedures Manual, and any substitution or termination of an MWSBE requires adherence to the procedures outlined in Section 5.3. Additionally, if the scope of work increases or if proposers elect to subcontract work not identified on the original form, they must follow Section 5.4 procedures. The document requires authorization by an official of the proposing firm, certifying compliance with all CBI Policy and Administrative Procedures Manual provisions.

View the file

Other files

File Type Posted
11-B. 269.2026.183, RFP.pdf PDF
3-D. Proposal Submission Form.pdf PDF
10-K. License info.pdf PDF
6-G. Debarment Cert.pdf PDF
8-A. Bonfire Guide.pdf PDF
2-E. References Form.pdf PDF
4-H. Anti Lobby Cert.pdf PDF
9-F. Price Schedule.xlsx XLSX spreadsheet
1-J. Exceptions Form.pdf PDF
5-C. Sample Services Contract .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 06-2023

Project 269.2026.183 CBI FORM 3: Subcontractor / Supplier Utilization Commitment

This form MUST be submitted at the time of Proposal Opening. Copy this CBI Form 3 as needed.

Failure to properly complete and submit Form 3 with the Proposal constitutes grounds for rejection of the Proposal.

Per Section 3.5 of the CBI Administrative Procedures Manual, the Subcontractor/Supplier Utilization Commitment (CBI Form 3), captures information regarding the MWSBEs and other subcontractors and suppliers that the Proposer intends to use on the Contract FOR ALL TIERS.

M/W/SBEs must satisfy the requirements of Section 2 of the CBI Administrative Procedures Manual in order to count the work they intend to perform on the contract with its own current workforces towards the Contract Goal, and must list themselves below.

Proposer Name:

Project Name:

MWBE Goal: MBE Goal:

MSBE Goal: WBE Goal:

MWSBE Goal: SBE Goal:

List below all M/W/SBEs that you intend to use on this Contract. NOTE: You will only receive credit for M/W/SBEs that are currently certified with the City as of the Proposal Opening Date.

M/W/SBE Vendor Name (Non-Hauling Services) Description of work / materials NIGP Code

CBI FORM 3: Subcontractor / Supplier Utilization Commitment

List below all non-M/W/SBEs (subcontractors and suppliers) that you intend to use on this Contract

Vendor Name Description of work / materials NIGP Commodity Code

Version 06-2023

Letters of Intent submitted upon notice from the City Per Section 3.5 of the CBI Administrative Procedures Manual, within three (3) Business Days after receiving a request from the City (or within such longer time as may be communicated by the City in writing), Proposers must submit a separate Letter of Intent (CBI Form 4) for each M/W/SBE listed on CBI Form 3. Each Letter of Intent must be executed by both the M/W/SBE and the Proposer. The City shall not count proposed M/W/SBE utilization for which it has not received a Letter of Intent by this deadline. The Proposer is still obligated to pay the M/W/SBE the full amount listed on the Contract with the M/W/SBE regardless of what percentage is actually counted towards the M/W/SBE Goal.

Adding subcontractors or suppliers after submitting this form Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Administrative Procedures Manual, you must comply with the following:

• You must maintain the level of M/W/SBE participation stated in the Contract throughout the duration of the Contract, except as specifically allowed in Section 5

• If you need to terminate or replace a M/W/SBE, you must comply with Section 5.3

• If the scope of work on the Contract increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with Section 5.4

• A Letter of Intent (CBI Form 4) must also be submitted for each M/W/SBE you add subsequent to contract award.

All Subcontractors and Suppliers must be registered with the City of Charlotte.

Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier (non-MBE/SBE, WBEs, SBEs and MBEs) that you use on this contract must be registered in the City’s vendor database.

Signature Your signature below indicates that the undersigned firm certifies and agrees that:

(a) It has complied with all provisions of the CBI Policy and Administrative Procedures Manual; and,

(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Policy and

Administrative Procedures Manual shall constitute grounds for rejection of your proposal.

Signature of Authorized Official Printed Name Title Submittal Date

File details come from the government source that posted it. Updated .