7._EXHIBIT_G_-_TO-BE-PROCESS_DIAGRAMS.pdf
PDF 6 MB Posted
- Attached to
- RFP 25-4-002-1 DOC SMARA-4 Project
- Solicitation number
- 0000037279
- Issued by
- California
About this file
This document is a comprehensive to-be process diagram exhibit for the SMARA-4 (State Mining and Reclamation Records) case management system being developed by the California Department of Conservation (DOC), Division of Mine Reclamation (DMR). The exhibit outlines 11 major administrative support processes and associated sub-processes that will be implemented through the new system, including account management for lead agencies, consultants, and mine operators; mine management document processing; initial and inspection report handling; Financial Assurance Cost Estimate (FACE) and Financial Assurance Mechanism (FAM) management; annual report processing and fee collection; violations tracking and enforcement; reporting functions; mail handling; and miscellaneous case management. The processes are designed to streamline interactions between DMR, lead agencies, mine operators, and the State Mining and Geology Board, with electronic filing capabilities through dedicated portals for each user type. Key timelines indicated include 30-day notice requirements for various approvals, 60-day FACE review periods, 15-day FAM submission windows, and annual cycles for inspection requests, FACE submissions, FAM establishment, and annual report filing occurring between specific months (May through July for annual report filing season, July through October for FACE review and processing).
The document specifies detailed workflows with decision points, system validations, and quality assurance checkpoints designed to improve administrative efficiency and reduce manual processing burden. Notable features include automated system notifications and reminders; integrated payment processing through First Data; document scanning and OCR capabilities; case assignment logic based on county jurisdiction; template-driven letter generation; and support for exception handling and manager overrides. The system will maintain a Purchase Preference List with automated eligibility determination based on compliance with reclamation plan requirements, timely FACE and FAM submissions, annual report filing, absence of violations or administrative penalties, and sufficient financial assurance on file. The processes emphasize electronic submission and portal-based document management to replace paper-based workflows, though provisions remain for paper submissions with subsequent scanning and data entry. Integration points include connections to external agencies such as the California Geological Survey, State Mining and Geology Board, financial institutions, and the Department of Technology's payment processing system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2._ATTACHMENT_12_-_BIDDER_QUALIFICATIONS_WORKBOOK.xlsx | XLSX spreadsheet | |
| 3._ATTACHMENT_14_-_KEY_STAFF_QUALIFICATIONS_WORKBOOK.xlsx | XLSX spreadsheet | |
| 9._Exhibit_I_-_DELIVERABLES_EXPECTATION_DOCUMENT_TEMPLATE.pdf | ||
| 1._RFP_25-4-002-1__Division_of_Mine_Reclamation_SMARA-4.pdf | ||
| 8._Exhibit_H_-_DELIVERABLES_ACCEPTANCE_DOCUMENT_TEMPLATE.pdf | ||
| 10.eVAQ-Manual_for_Vendors.pdf | ||
| 6._EXHIBIT_C_-_COST_WORKBOOK.xlsx | XLSX spreadsheet | |
| 5._EXHIBIT_B_-_DELIVERABLES_TABLE.xlsx | XLSX spreadsheet | |
| 4._EXHIBIT_A_-_FUNCTIONAL_AND_NON-FUNCTIONAL_REQUIREMENTS.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative Support Activities
Administrative Support Activities
A n n u a l P ro ce ss es
A n n u a l P ro ce ss es
To-Be Process Context Map
This diagram is intended to help provide timing and business context to the attached To-Be Process diagrams. Like processes are grouped in small boxes and then further grouped into larger boxes based on timing or related processes. The numbered processes in the bulleted lists correspond to attached To-Be Process flows.
Mail Handling
• 10.1 – Receive and Scan Mail
Intake Inspection Reports
• 4.1 – Receive Inspection Reports and Notices of Completion of Inspection
Process Financial Assurance Cost Estimates (FACEs)
• 5.1 – Receive Financial Assurance Cost
Estimate
• 5.2 – Review Financial Assurance Cost
Estimates
• 5.3 – Track Financial Assurance Cost Estimate
Approvals
Process Financial Assurance Mechanisms (FAMs)
• 6.1 – Review Financial Assurance Mechanisms
• 6.2 – Reconcile Financial Assurance Mechanism
• 6.3 – Release Financial Assurance Mechanisms
• 6.4 – Replace Financial Assurance Mechanisms
• 6.5 – Process Forfeited Financial Assurance
Mechanisms
Process Annual Reports
• 7.1 – Establish Annual Report Fee Schedule
• 7.2 – Receive Annual Reports
• 7.3 – Process Paper Annual Reports and Fees
• 7.4 – Analyze Annual Reports
• 7.5 – Determine Annual Report Outcomes
• 7.6 – Follow Up on Incomplete Annual Reports
Violations
• 8.1 – Initiate Violations Process
• 8.2 – Issue Notices of Violation
• 8.3 – Track Notices of Violation
• 8.4 – Issue Administrative Penalties
• 8.5 – Submit for Clerks Judgment
• 8.6 – Appeal to the State Mining and Geology
Board
Reporting
• 9.1 – Assemble Reports
• 9.2 – Maintain Purchase Preference List
January December FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec
This Annual Report is submitted with values from Calendar Year 1, including Inspection Reports, FACE values, and FAMs.
The cycle then starts again with the next year’s inspections, FACE submissions, and FAM establishments.
E xa m p le T im e lin e o f
SM
A
R A
A ct iv it ie s
Establish a Mine (One Time Processes – Occur at any time of year)
Process Mine Management Documents
• 2.1 – Receive Mine Management
Documents
• 2.2 – Provide Comments on Mine
Management Documents
• 2.3 – Review Lead Agency Intent to Approve Mine Management Documents
Process Initial Reports
• 3.1 – Receive Initial Report
Account Management
• 1.1 – Manage Lead Agency
Employee Accounts
• 1.2 – Manage Lead Agency
Consultant Accounts
• 1.3 – Manage Mine Operator
Accounts
September - October
DMR FACE
Review
September - October
DMR FACE
Review
October - December
Follow up on Non-
Compliant Filers
October - December
Follow up on Non-
Compliant Filers
September
Operator Submits FACE within 30 days of Inspection
September
Operator Submits FACE within 30 days of Inspection
July - October
Process Annual Reports
July - October
Process Annual Reports
January - December
Calendar Year 2
January - December
Calendar Year 2
March - April
Board Develops
Fee Schedule
March - April
Board Develops
Fee Schedule
May - July
Annual Report Filing Season for Previous
Calendar Year
May - July
Annual Report Filing Season for Previous
Calendar Year
July
Operator Requests Inspection Date
July
Operator Requests Inspection Date
May - July
Annual Report Filing Season for Calendar
Year 1
May - July
Annual Report Filing Season for Calendar
Year 1
August
Lead Agency Conducts Mine Inspection
August
Lead Agency Conducts Mine Inspection
January - December
Calendar Year 1
January - December
Calendar Year 1
May
Fee Schedule Posted
May
Fee Schedule Posted
November - December
FAM
Processing
November - December
FAM
Processing
Other
• 11.1 – Create Other Case Type
As part of the Annual Report, Operators request an inspection date from the Lead Agency.
November
Operator Submits FAM within 30 days of
FACE Approval
November
Operator Submits FAM within 30 days of
FACE Approval
July - September
Intake Inspection
Reports
July - September
Intake Inspection
Reports
Department of Conservation, Division of Mine Reclamation
To-Be – 1.1 – Account Management – Manage Lead Agency Employee Accounts Department of Conservation, Division of Mine Reclamation
To-Be – 1.1 – Account Management – Manage Lead Agency Employee Accounts
Le ad
A ge n cy
(L
A
SM
A R
C o n ta ct
Le ad
A ge
SM
A n ta ct Le ad A ge n cy
LA
N ew U se r
Le ad
A ge n cy
LA
N ew
U se r D
M R
A n al ys t
D M
R
A n al ys t
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start (for Lead Agency employee)
2. Requests to create an account on Lead Agency
Portal
3. Enters necessary account information, including county and
LA role
4. System generates review task for county assigned analyst
5. Contacts Lead Agency contact to verify that new account request is valid
6. New account request is valid?
7. Approves account creation and sets appropriate initial configurations
8. System notifies new account user that account has been verified
Yes
9. Logs into account
10. Updates user information?
12. EndNo
11. Updates user information and saves
Yes
13. Start (Lead Agency employee modifies user information)
14. Rejects account creation
15. End
No
Lead Agency Portal
16. System notifies county assigned analyst(s) of update to user account
To-Be – 1.2 – Account Management – Manage Lead Agency Consultant Accounts Department of Conservation, Division of Mine Reclamation
To-Be – 1.2 – Account Management – Manage Lead Agency Consultant Accounts
Le ad
A ge
SM
A n ta ct
Le ad
A ge
SM
A n ta ct C o n su lt a n t o n b e h a lf o f
Le ad
A ge n cy
LA
C o n su lt a n t o n b e h a lf o f
Le ad
A ge n cy
LA
D
M R
A n al ys t
D M
R
A n al ys t
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start (for Lead Agency consultant)
2. Requests to create an account on Lead Agency
Portal
3. Enters necessary account information, including county and
LA role
4. System generates review task for county assigned analyst
5. Contacts Lead Agency contact to verify that new account request is valid
6. New account access request is valid?
7. Approves account creation/county access with agreed permissions for agreed period of time
8. System notifies account user that account access has been verified
Yes
9. Logs into account
10. Updates user information?
13. EndNo
11. Updates user information and saves
Yes
14. Start (Lead Agency consultant modifies user information)
15. Rejects account creation/county access
16. End
No
Lead Agency Portal12. Requests access to another county?
No
Yes
17. System notifies county assigned analyst(s) of update to user account
As part of confirming whether the consultant account is valid, the DMR STU Analyst will ask the county how long the account should be active, since consultants should not necessarily have access to counties in perpetuity.
Some consultants serve multiple counties or Lead
Agencies, so they need the ability to request access to multiple Lead Agencies under the same account. The new system generated review task needs to go to the analyst assigned to the additional county.
To-Be – 1.3 – Account Management – Manage Mine Operator Accounts Department of Conservation, Division of Mine Reclamation
To-Be – 1.3 – Account Management – Manage Mine Operator Accounts Le ad A ge
Le ad A ge
M in e
O p e ra to r
M in e O p e ra to r D
M R
A n al ys t
D M
R
A n al ys t
ProcessProcess ToolsTools
SMARA-4 Case Management
16. Start (fallback path for Mine
Operators)
5. Requests to create an account on Operator Portal
6. Enters necessary account information, including Mine ID(s) and mine role
7. System generates review task for county assigned analyst
10. Approves account creation and marks it in the system
12. System notifies new account user that account has been verified/ updated
13. Logs into account
14. Updates user information?
15. EndNo
23. Updates user information and saves
Yes22. Start (Operator modifies account information)
20. Rejects account creation and marks it in the system
21. End
Operator Portal
17. Start (for existing Mine
Operators)
18. Assemble list of email addresses for existing mine operators
19. Send mass outreach email to existing mine operators to encourage account enrollment
4. Receives outreach email
2. Issues new governing documents and uploads them to DMR via Lead Agency
Portal
3. System sends email to encourage account enrollment prior to submitting
Initial Report
11. Updates other operator accounts associated to mine, as applicable
24. System notifies county assigned analyst(s) of update to operator account
8. Review account to confirm validity
9. Account valid?
Yes
No
After the mine operator successfully navigates the mine permitting process, they are required to file an initial report with DMR. This would be the opportune time to encourage operators to register for an account and encourage electronic filing of documents.
1. Start (for new Mine Operators on new mines)
Mine roles include Mine Land Owner, Mine Operator, and Designated Agent. An operator can one or many of these roles simultaneously.
This could include updating the mine roles and/or applicable dates for mine roles to reflect changes in mine ownership or operation.
For accounts for existing mine operators that DMR is already familiar with, this step can be bypassed or expedited during implementation/initial set up.
Mine Operators may be responsible for more than one mine, so during account set up, they will need the ability to register multiple Mine IDs to their account.
This could include updating the Mine IDs tied to the Mine Operator account.
To-Be Process – 2.1 – Mine Management Documents – Receive Mine Management Document Department of Conservation, Division of Mine Reclamation
To-Be Process – 2.1 – Mine Management Documents – Receive Mine Management Document
D M
R
SM
A
R A
T e ch n ic al
U n it
ST
U
C o u n ty
A n al ys t( s)
D M
R
SM
A
R A
T e ch n ic al
U n it
ST
U
C o u n ty
A n al ys t( s)
Le ad
A ge n cy
Le ad
A ge n cy
M in e O pe ra to r
M in e O pe ra to r
D M
R
A d m in is tr at io n D
M R
A d m in is tr at io n
ProcessProcess ToolsTools
1. Start
3. Reviews MMD
5. Submits electronically?
No
Yes
2. Submits “Mine Management
Document” (MMD) to Lead Agency (LA)
Yes
4. Deems MMD adequate to send to
DMR?
No
26. LA returns MMD to Operator with comments
27. Revises MMD
10.1 – Receive and Scan Mail
8. MMD belongs to an existing mine?
No
15. System creates case for Reclamation
Plan Review and assigns to the appropriate county team
24. Uploads MMD with some minimal information entry in the Lead Agency Portal
6. Mails MMD to
DMR
7. System sends confirmation email to the Lead Agency
If the LA had mailed in physical copy of the IRP, DMR will still email a confirmation receipt to the LA, using the LA contact information on file 9. System creates new Mine entity for submitted document
11. Subject to completeness review?
Yes
No
Continued to 2.2 – Provide Comments on Mine
Management Document, Step 1
Continued to 2.2 – Provide Comments on Mine
Management Document, Step 1
10. Is for existing in process MMD?
13. Updates existing MMD case with the latest information or document
Yes
Response to Comments
No
14. Type of document?
Notice of Intent to Approve/ Approved Document
Continued to 2.3 – Review Lead Agency Intent to Approve Mine Management Document, Step 4
(Notice)/Step 8 (Approved)
Continued to 2.3 – Review Lead Agency Intent to Approve Mine Management Document, Step 4
(Notice)/Step 8 (Approved)
For purposes of these process flows, “Mine Management Documents” will include Reclamation Plans (both initial and amendments), Interim Management P lans , CEQA/
NEPA documents, and any associated Lead Agency responses/notices.
Interim Management Plans and CEQA/NEPA documents are not subject to a completeness review.
25. Acknowledges certifying language for MMD submission and submits
Yes
12. System creates MMD case and assigns to the appropriate county team
16. Team Reviews for completeness and enters determination and notes on case
17. RP
considered complete?
Yes
18. PL drafts Incomplete
Submittal Letter to LA and Operator
19. SEG reviews Incomplete
Submittal Letter and provides feedback
No
20. Changes to Letter?
21. PL gets letter signed and uploads and notifies the LA and Operator
22. Receives Incomplete
Submittal Letter/ Notification
23. Works with Operator to rectify
Incomplete Submission
No
SMARA 4 Case Management
Since not all proposed mines will be approved/permitted, the official Mine ID should not be issued until later in the process. The Mine ID structure could use a prefix or suffix to indicate whether mines have been permitted or not.
Lead Agency Portal
YesContinued to 2.2 – Provide Comments on Mine Management Document, Step 14
Continued to 2.2 – Provide Comments on Mine Management Document, Step 14
To-Be Process – 2.2 – Mine Management Documents – Provide Comments on Mine Management Document Department of Conservation, Division of Mine Reclamation
To-Be Process – 2.2 – Mine Management Documents – Provide Comments on Mine Management Document A ss ig ne d
D M
R
S M
A R
A T ec h n ic al U n it
ST
U
Te am
A ss ig ne d D
M R
S
M A
R A
T ec h n ic al
U n it
ST
U
Te am Le ad A ge n cy Le ad A ge n cy D
M R
ST
U
M an ag e r D
M R
ST
ag e r
ProcessProcess ToolsTools
3. Team has comments?
2. Team has time to comment?
16. Coordinates with STU Manager to prioritize work
17. Prioritized comments on this?
Yes
Comment Period ElapsesComment Period ElapsesComment Period Elapses
No
No
5. Team indicates that they have no comments on the case
4. Team enters comments on the case
6. Completes comments effort and routes to manager for review
7. Reviews response and provides feedback, if any
8. Sends back to team to make updates
9. Updates response based on manager feedback No
Yes
11. System uploads response to
Operator and Lead Agency Portals
10. System generates appropriate letter based on information entered on case
12. Reviews DMR comments
13. Responds to Comments explaining if
LA will /will not adopt DMR’s comments, v ia file upload on LA Portal
2.1 – Receive Mine
Management Document
14. LA adopts comments?
Yes
15. Meets internally to discuss LA not adopting comments No
1. Start Yes
SMARA 4 Case Management
Lead Agency Portal
Continued to 2.3 – Review Lead Agency Intent to Approve Mine Management Document, Step 1
Continued to 2.3 – Review Lead Agency Intent to Approve Mine Management Document, Step 1
The team generally has an idea of whether they’ll have comments or not from the Completeness review phase, if applicable.
The LA must send their response to comments at least 30 days prior to approving a Mine Management Document. However, this can often be a long period of time after DMR sent comments depending on what actions the LA is taking to address concerns or otherwise work through local processes.
This internal meeting is to prepare in advance once
Lead Agency takes action.
Until Lead Agency takes action (such as notifying of intent to approve), DMR cannot provide further comment on the Mine Management
Document.
The system should help prioritize which MMDs will be able to be reviewed, but with manager and user override ability.
To-Be Process – 2.3 – Mine Management Documents – Review Lead Agency Intent to Approve Mine Management Document Department of Conservation, Division of Mine Reclamation
To-Be Process – 2.3 – Mine Management Documents – Review Lead Agency Intent to Approve Mine Management Document
A ss ig ne d D
M R
S
M A
R A
T ec h ni ca l U ni t
(S
TU
Te am A ss ig ne d
D M
R
S M
A R
A T ec h ni ca l U ni t (S
TU
Te am
Le ad
A ge n cy
Le ad
A ge n cy
O p e ra to r
O p e ra to r
ProcessProcess ToolsTools
1. Start
2. Intends to
Approve MMD?
No
11. Public Hearing to Approve?
Yes
3. Uploads 30 Day Notice of Hearing or Notice of Intent to
Approve via LA Portal
2.1 – Receive Mine
Management Document
12. PL uploads correspondence stating concerns to
LA
5. Has concerns with approval?
Yes
6. Approves Mine Management
Document (Administratively/At
Hearing)
No
14. Holds Public Hearing for Mine
Management Document approval
15. Receives and reviews concerns regarding approval
13. PL prepares evidence/ presentation for Public Hearing
Yes
No
16. Approves?
Yes
No
18. Work with Lead Agency to address concerns locally Continued to 2.1 –Receive
Mine Management Document, Step 2
Continued to 2.1 –Receive Mine Management Document, Step 2
7. Uploads approved copy of Mine Management
Document via LA Portal
2.1 – Receive Mine
Management Document
8. Challenging Approval?
No
As with response to comments, the LA must send the Notice of Hearing or Notice of Intent to Approve at least 30 days prior to approving the
Mine Management Document. However, this can often be a long period of time after DMR sent comments depending on what actions the LA is taking to address concerns or otherwise work through local processes.
20. System updates the Mine record with approved document and archives draft documents
21. System sends LA reminder to Notify County Recorder of
Approval
10. End
9. Challenge at the local level and update case/Mine Record accordingly
Yes
17. Appeals to the Board? No
Continued to 8.6 –Appeal to State Mining and Geology
Board, Step 3
Continued to 8.6 –Appeal to State Mining and Geology
Board, Step 3
Yes
SMARA 4 Case Management
4. Notes any concerns or lack of concerns with approval on case
Lead Agency Portal
19. If not already assigned, System assigns official Mine ID for Mine entity
To avoid gaps in the Mine ID sequencing, the official Mine ID should be assigned once the mine has been formally approved.
To-Be Process – 3.1 – Initial Reports – Process Initial Reports Department of Conservation, Division of Mine Reclamation
To-Be Process – 3.1 – Initial Reports – Process Initial Reports
D M
R
R ep or ti n g
U ni t (R
U
A n al ys t D
M R
R ep or ti n g U ni t
(R U
A n al ys t
M in e O p e ra to r M in e
O p e ra to r
D M
R
P ay m e n t
A llo ca ti o n al ys t
D M
R
P ay m e n t
A llo ca ti o n al ys t
Le ad
A ge n cy
Le ad
A ge n cy
D M
R
O ff ic e
Te ch ni ci an D
M R
O ff ic e Te ch ni ci an
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start
Operator Portal
First Data Payment Processor
Lead Agency Portal3. Uploads recently issued permit to
DMR via Lead Agency Portal
6. System updates Mine record with new permit and alerts county analyst team
2. Issues Operator new mine permit
4. Receives new mine permit
5. Files Initial Report?
8. Files electronically?
No
7. Follows up with Mine Operator and
Lead Agency to check on initial report being filed
Yes
9. Uploads Initial
Report via the Operator Portal
10. Confirms all supporting documents have been submitted to
DMR
Yes
Prepares paper copy of Initial Report and payment and mails to DMR
10.1 – Receive and Scan Mail
No
13. System updates Mine record and creates Initial Report case for assigned county analyst
11. System directs operator to First
Data to make Initial Report payment
12. System imports electronic payment data and allocates based on Initial Report Continued to 7.2 – Receive
Annual Reports, Step 11 Continued to 7.2 – Receive
Annual Reports, Step 11
14. Reviews Initial Report for any missing components
15. Missing document or payment?
16. Contact Operator for missing document or payment
18. Complete Initial Report, indicating
Mine is now Active
Yes
No
17. Sends DMR Analyst any missing
Initial Report components, via Operator Portal
19. System sends “Welcome” notice to Operator, LA, and Designated Agen
20. Receives Welcome
Notification
21. Receives Welcome
Notification
22. End
To-Be Process – 4.1 – Inspection Reports – Receive Inspection Reports and Notices of Completion of Inspection Department of Conservation, Division of Mine Reclamation
To-Be Process – 4.1 – Inspection Reports – Receive Inspection Reports and Notices of Completion of Inspection
D M
R
SM
A
R A
T ec h ni ca l U ni t
(S
TU
Te a m
D M
R
SM
A
R A
T ec h ni ca l U ni t
(S
TU
Te a m
O p e ra to r
O p e ra to r
Le ad
A ge n cy
Le ad
A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start (Annual IR)
2. Requests Inspection Date in
Annual Report
4. Conducts Inspection and drafts Inspection Report (IR)
6. Uploads Inspection Report document and supporting attachments to MODS/LA Portal
9. Enters Notice of Completion of Inspection
(NOCI) form data in MODS/LA Portal and attaches supporting documents
11. Receives NOCI
12. Receives
Inspection Report
14. System updates Mine Entity
Information and stores IR and NOCI
5. Logs/Reports essential IR data in
LA Portal
13. Triggers staff verification of document before releasing for public view
8. End
10. Confirms previously filed IR is the correct IR for
NOCI
3. Conducts Inspection?
Yes
16. Start (Other Inspections)
Go to 5.1 – Receive Financial Assurance Cost Estimates, Step 1
Go to 5.1 – Receive Financial Assurance Cost Estimates, Step 1
Lead Agency Portal
No
15. End
7. Annual Inspection?
Yes
No
This verification process is currently contained within MODS, with staff being notified by email.
30 Days30 Days
Lead Agencies may perform Inspections outside of the Annual Inspection cycle. They are not required to upload Inspection Reports for these off cycle inspections, but it would be helpful and they are welcome to provide that information.
To-Be Process – 5.1 – FACEs – Receive Financial Assurance Cost Estimates Department of Conservation, Division of Mine Reclamation
To-Be Process – 5.1 – FACEs – Receive Financial Assurance Cost Estimates
D M
R
S M
A R
A T e ch n ic al U it
(S
TU
Te am
D M
R
S M
A R
A T e ch n ic al U
TU
Te am
O p e ra to r
O p e ra to r
Le ad
A ge n cy
Le ad
A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start
2. Complete FACE and send to LA for review
4. Reviews FACE and provides feedback
5. Updates FACE based on LA feedback and resubmits to LA
6. Reviews and finds FACE adequate
7. Uploads FACE to LA Portal as draft
FACE
8. System prompts LA to confirm inspection report uploaded and FACE complete
10. Upload/provide first page of FACE to
DMR
9. Sends Receipt/ Completeness
Review Confirmation
3. Inspection conducted?
11. Indicate FACE submitted by
Operator (not LA) and upload for public access
13. Send follow-up notification to Lead
Agency for explanation
14. LA takes action?
Yes
No Go to 5.2 – Review Financial Assurance Cost
Estimate, Step 1 Go to 5.2 – Review Financial Assurance Cost
Estimate, Step 1
Yes
No
Go to 8.6 – Appeal to State Mining and Geology Board, Step 1
Go to 8.6 – Appeal to State Mining and Geology Board, Step 1
12. System notifies STU PL that
Operator submitted first page of FACE
Operator Portal
Lead Agency Portal
In prompting the Lead Agency to confirm that the appropriate corresponding Inspection Report has been uploaded, the system is helping ensure that the necessary components for complete FACE submission are included. Additionally, by submitting the FACE and the Inspection Report to DMR, the LA is indicating that they believe the contents of the FACE to be adequate and complete (e.g. includes DOA and Inspection Report).
LA has 60 days to review the FACE
In the event that the LA doesn’t conduct an inspection or is taking an unreasonable length of time, then the Operator would send in the first page of the FACE. This keeps the Operator on the Purchase Preference List, but there isn’t a ton of recourse with the LA for getting the rest of the FACE.
To-Be Process – 5.2 – FACEs – Review Financial Assurance Cost Estimates Department of Conservation, Division of Mine Reclamation
To-Be Process – 5.2 – FACEs – Review Financial Assurance Cost Estimates
D M
R
SM
A
R A
T ec h ni ca l U ni t
(S
TU
Te a m
D M
R
SM
A
R A
T ec h ni ca l U ni t
(S
TU
Te a m
Le ad
A ge n cy
Le ad
A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
2. Creates FACE case for review
3. Assigns FACE Case to PL based on county assignment
4. PL previews submitted FACE and creates assignments under FACE Case for county Team
5. PL decides if need specialist assignment for comments
6. Team members work comments assignments and enter comments into system
8. PL/Specialist assembles letter with comments for
FACE
9. Manager Review FACE Comment
Letter
10. Send FACE Comment Letter to
LA (upload to portal)
13. Reviews comments and has 30 days to respond indicating whether they’ll incorporate comments or not
14. Upload/provide response to comments back to
DMR
15. Update system with record of LA response to FACE comments
16. County Team reviews LA response to comments
17. Optional Manager review LA response to comments
19. Request Consultation with LA
18. Want consultation? Yes
20. Hold consultation with
DMR and Operator
7. As necessary (Zero FACE or team discretion), conduct inspection
No
12. Send alert to LA and Operator that comments available for review
21. Update system of record that consultation was held and upload notes/supporting documents from consultation
Send follow-up notification to Lead Agency to find out where FACE approval is
22. Notice of Intent to Approve Received in
60 Days?
Yes
No
23. Send follow-up notification (in portal for administrative record and email) to Lead Agency regarding FACE
Go to 5.3 – Track Financial Assurance Cost Estimate Approval, Step 1
Go to 5.3 – Track Financial Assurance Cost Estimate Approval, Step 1
1. Start
Lead Agency Portal
11. Send alert to RU Analyst that comments available for review
Because team moves on to work on other things in the interim, having the ability to quickly reference /see where they left off is helpful
(currently having to dive back through the mine file)
Conducting Inspection allows for proper data collection/ perspective that is hard to gain from desk review. Confirm site conditions match the FACE submittal. Also necessary to confirm all aspects of Rec Plan have been addressed for
Zero FACE.
This is an essential activity to ensuring that FACES are representative of mine conditions. Currently, the team doesn’t get to spend nearly enough time doing these site visits because they are bogged down with document and administrative inefficiencies.
With the new system, the administrative time savings would allow for these essential activities that will improve FACE estimates and build relationships with operators and Lead Agencies, subsequently improving compliance across the board.
Inspection Report forms are only required in the context of an annual inspection. DMR doesn’t have to use this form for their inspections. Need a document upload feature to gather write-ups and supporting documents (pictures, maps, graphs, drawings, etc) and associate to the inspection.
System could upload request to portal or initiate an email. Regardless, the request for consultation should be recorded in the administrative record.
60 days from end of comment period expiration in No Comment situation or 60 days after Request to Consult received or consultation held
To-Be Process – 5.3 – FACEs – Track Financial Assurance Cost Estimates Approval Department of Conservation, Division of Mine Reclamation
To-Be Process – 5.3 – FACEs – Track Financial Assurance Cost Estimates Approval
D M
R
SM
A
R A
T ec h ni ca l U ni t
(S
TU
Te a m
D M
R
SM
A
R A
T ec h ni ca l U ni t
(S
TU
Te a m
O p e ra to r
O p e ra to r
Le ad
A ge n cy
Le ad
A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
17. Zero FACE?
Yes
18. Release of FAM requested? YesNo19. End
No
2. Intends to Approve FACE?
6. Upload/Send 30 Day Notice of Intent to Approve or Notice of Hearing
7. Update system with record of LA intent to Approve/ Hearing
Yes
3. Upload/Send Denial or 30 Day Notice of Hearing
No
4. Appeal to the Board?
Yes
5. Work with Lead Agency to address issues and resubmit FACE to LA
No
9. Hold Hearing 10. Approves?
No
11. Approves FACE
8. Hearing? Yes
No
Yes
13. Upload Approved FACE to LA Portal/MODS
12. Uploads Approved FACE within 30 days?
20. System sends follow-up notification to Lead Agency to follow up on Approved FACE
No
Yes
14. System notifies STU PL that an
Approved FACE has been uploaded
16. Appeal?Yes No
1. Start
Go to 6.1 - Review Financial Assurance Mechanisms, Step 1
Go to 6.1 - Review Financial Assurance Mechanisms, Step 1
15. Reviews document prior to releasing for public viewing
Go to 8.6 - Appeal to State Mining and Geology Board, Step 1
Go to 8.6 - Appeal to State Mining and Geology Board, Step 1
Go to 6.3 - Release Financial Assurance Mechanisms, Step 1
Go to 6.3 - Release Financial Assurance Mechanisms, Step 1
21. Receives Upload Approved FACE
Reminder
Go to 5.1 - Review Financial Assurance Mechanisms, Step 5
Go to 5.1 - Review Financial Assurance Mechanisms, Step 5
Go to 8.6 - Appeal to State Mining and Geology Board, Step 3
Go to 8.6 - Appeal to State Mining and Geology Board, Step 3
Lead Agency Portal
If DMR has outstanding concerns, they can attend the hearing and present further evidence or send correspondence to LA regarding concerns. These supporting documents need to be able to be saved to the system of record/ administrative record.
To-Be Process – 6.1 – FAMs – Review Financial Assurance Mechanisms Department of Conservation, Division of Mine Reclamation
To-Be Process – 6.1 – FAMs – Review Financial Assurance Mechanisms
D M
R
R ep or ti n g
U ni t (R
U ) A na ly st D
M R
R ep or ti n g U ni t
(R U
) A na ly st
O pe ra to r O pe ra to r
Le ad
A ge n cy
Le ad
A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
4. Uploads FAM documents to DMR via Operator Portal, and enters some key values
6. System creates FAM case and assigns to RU
Analyst for County
7. Analyst reviews FAM and provides comments, if applicable
8. Comments?
18. Send Comments back to Operator
(copy LA)
Yes
19. Receives Comments/Follow-up and resolves concerns
10. Sends No Comments letter to Operator and Lead
Agency
No
11. Receives No Comments Letter
12. Receives No Comments Letter
9. Enter essential FAM Data into
SMARA 4
1. Start
2. FAM Received within 15 Days of FACE Approval?
Yes
13. System sends follow up to
Operator and Lead Agency for FAM
No
16. Operator provides FAM?
No
Yes
5. Approved FACE on file?
Yes
17. Follow up with
LA for approved FACE (cc: STU County Team)
No
14. Receives FAM follow up notification
15. Receives FAM follow up notification Continue to 6.2 – Reconcile Financial Assurance Mechanisms, Step 1
Continue to 6.2 – Reconcile Financial Assurance Mechanisms, Step 1
10.1 – Mail – Receive and
Scan Mail
3. Submits electronically? Yes
No
Continue to 8.1 - Violations – Initiate Violations Process, Step 1
Continue to 8.1 - Violations – Initiate Violations Process, Step 1
Lead Agency Portal
Operator Portal
20. Addresses concerns?
Yes
21. Follow up with Operator regarding outstanding concerns
No
If repeatedly non-responsive, escalate to V iolations process, as necessary
Aside from the normal FAM types, the system will need an “Other” indicator and notes option for FAMs to account for FAMs established with third party agencies, such as the Bureau of Land Management.
This can be written references in an email or it can be document markup, meaning that the analyst needs to be able to send attached mark up documents back in response.
Set to 15 days so that fo llow up can still be within compliance window of 30 days
To increase probability of compliance, DMR wants to spend more time pursuing Stipulated
Orders to Comply for mines where big changes in FACE value happen suddenly and the mine needs time to build up the FAM. Being able to track this would be essential to improved compliance.
Ideally, the approved FACE has already been on file, but this is an opportunity to make sure that there is one, while still continuing to process the FAM.
This would include Financial Inst itution contact information.
To-Be Process – 6.2 – FAMs – Reconcile Financial Assurance Mechanisms Department of Conservation, Division of Mine Reclamation
To-Be Process – 6.2 – FAMs – Reconcile Financial Assurance Mechanisms
D M
R
R e p o rt in g U n it
R
U
A n a ly st D
M R
R e p o rt in g
U n it
R U
A n a ly st
Le ad
A ge n cy
Le ad
A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
6. Uploads Approved FAM to LA
Portal
8. Reviews and confirms FAM prior to making available publicly
2. Approved FAM submitted with in 30 days?
4. Follow up with Lead Agency for approved FAM
No
Yes
5. LA provides approved FAM?
No
Yes
9. Confirm/enter approved FAM values in SMARA 4
10. System checks total approved FAM value against approved FACE
13. Total FAMs >= Approved FACE value?
14. EndYes
15. Send nudge letter/contact that insufficient FAM on file to LA and/or OperatorNo
Go to 9.2 – Maintain Purchase Preference List, Step 1
11. Approved FACE on file?
12. Send notification to LA for follow up for approved FACE
(cc: STU County Team)
No
Yes
1. Start
3. System reminds county analyst to follow up with Lead Agency on approved
FAM
Go to 8.6 – Appeal to State Mining and Geology Board, Step 1
Go to 8.6 – Appeal to State Mining and Geology Board, Step 1
7. System notifies county analyst of uploaded Approved
FAM
Lead Agency Portal
2774.2.5 doesn’t specifically call out a recourse path. 2774.2.5(c) calls out posting a “LA not provided document” statement. If escalating to the Board, it would probably be for a wholesale
LA takeover, which would likely require more open concerns than just this is sue.
Checking that approved FAM matches values previously captured in the system. If not, the analyst would reach out to Lead Agency to address discrepancies.
This would be a helpful place for a template communication that the analyst could elect to trigger sending.
Note that the FAM submitted by the LA is not redacted. Redaction will come later when the Approved FAM is made available to the public.
This would be a helpful place for a template communication that the analyst could elect to trigger sending.
To-Be Process – 6.3 – FAMs – Release Financial Assurance Mechanisms Department of Conservation, Division of Mine Reclamation
To-Be Process – 6.3 – FAMs – Release Financial Assurance Mechanisms D
M R
R ep o rt in g U n it
R
U ) A n al ys t
D M
R
R ep o rt in g
U n it
R U
) A n al ys t O pe ra to r
O pe ra to r Le ad A ge n cy Le ad A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start
2. Requests FAM
Release
4. Approves Zero FACE and uploads approved Zero FACE via MODS/LA Portal
5.1 – Receive Financial
Assurance Cost Estimate
Yes
5. Upload Request for FAM Release via
LA Online Portal
7. Review for correct Mine ID, FAM values, approved Zero FACE on file or sufficient FAM post-release
11. Analyst agrees ready for release
13. Route case for RU manager review and approval on FAM Release
8. Approved Zero FACE on file?
Yes
No
14. System generates FAM Release letters
12. Route case for peer review on FAM
Release
16. Upload to Portal/ notify Operator, Lead Agency, and Financial Institution that FAM release request is approved
17. Receives/ accesses FAM release authorization
18. Receives/ accesses FAM release authorization
19. Coordinates FAM release with
Financial Institution
20. End
6. System creates case for FAM
Release and assigns to county analyst
3. Zero FACE release?
9. Total FAM left after release covers
FACE?
Replace and Release Request
Yes
10. Contact Lead Agency and Operator for resolution
No
Lead Agency Portal
Operator Portal
15. Gather DMR Supervisor signature for FAM Release Letter
17. For Zero FACE, System updates mine status and
Annual Report filing requirement
As part of Zero FACE review process, STU unit should notify RU analyst when comments issued to LA on FACE so as to keep the RUA apprised of upcoming FAM Release request. Would be helpful for RUA to know what comments were in order to know whether STU agreed with FACE or not. If the FACE is in dispute (appealed to the Board), wait for resolution prior to releasing the
FACE.
If STU has no comments on Zero FACE, then RU would like to be notified also because that could indicate a coming FAM release.
Followed through on the Zero FACE review path.
As part of the Zero FACE process, STU may conduct final inspection with LA to confirm site reclaimed.
If chasing down the Approved Zero FACE, not necessarily going to force
LA resubmit a FAM release request again (use existing one, barring any issues).
Also checking that there are no outstanding concerns or issues with the FACE
For the most part, th is would be a default template letter. On rare occasion, would need to edit in the event of a contentious
FAM release.
Also, if rejecting/FAM release request found deficient, would communicate with
LA and STU unit to get issue resolved.
In the instance of a Replace and Release Request, the newly established FAM (the replacement FAM) needs to adequately cover the Approved FACE on file prior to the release of previous FAM (replaced
FAM).
In the instance of a Zero FACE FAM release, the mine is essentially considered reclaimed and does not need to file an Annual Report. The system needs to keep track of this status change. Additionally, this attribute should allow for user override as needed in exception circumstances.
To-Be Process – 6.4 – FAMs – Replace Financial Assurance Mechanisms Department of Conservation, Division of Mine Reclamation
To-Be Process – 6.4 – FAMs – Replace Financial Assurance Mechanisms
D M
R
R ep or ti n g
U ni t (R
U
A n al ys t D
M R
R ep or ti n g U ni t
(R U
A n al ys t
O pe ra to r
O pe ra to r
Le ad
A ge n cy
Le ad
A ge n cy
O pe ra to r
O pe ra to r
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start (Same Op, Rep lace a nd
Release)
6.1 – Receive Financial
Assurance Mechanisms
2. Request FAM Release
3. Review and submit FAM Release request via LA Online Portal
4. Start (Change of Op, Replace and
Release)
6.1 – Receive Financial
Assurance Mechanisms
6. Original Operator requests release of their FAM
5. Review and submit FAM Release request via LA Online Portal
Go to 6.3 – Release Financial Assurance Mechanisms, Step 1
Go to 6.3 – Release Financial Assurance Mechanisms, Step 1
Go to 6.3 – Release Financial Assurance Mechanisms, Step 1
Go to 6.3 – Release Financial Assurance Mechanisms, Step 1
Operator Portal
Operator Portal
Lead Agency Portal
This includes getting approved FACE on file and approved FAM on file, prior to handling release request.
This includes getting approved FACE on file and approved FAM on file, prior to handling release request.
Operator here means “person responsible for FAM.”
In some circumstances, an operator wi ll want to switch the type or Financial
Institution with which they have their FAM. In this case, they must establish the new FAM in an appropriate amount before the existing FAM can be released.
In the circumstance that there is a change of operators, the new operator must set up a new FAM in an appropriate amount prior to the previous operator’s FAM being able to be released.
This is also a crit ical t ime to update the operator and other mine information.
To-Be Process – 6.5 – FAMs – Process Forfeited Financial Assurance Mechanisms Department of Conservation, Division of Mine Reclamation
To-Be Process – 6.5 – FAMs – Process Forfeited Financial Assurance Mechanisms D
M R
R ep or ti n g U ni t
(R U
) A na ly st
D M
R
R ep or ti n g
U ni t (R
U ) A na ly st O pe ra to r
O pe ra to r Le ad A ge n cy Le ad A ge n cy
ProcessProcess ToolsTools
SMARA-4 Case Management
1. Start (Forfeiture - LA Identified)
6. Hold public hearing to determine Operator financial incapability or abandonment
2. Send/Upload 30 Day Notice of Public
Hearing
4. Receive/Review notice of public hearing
3. Receive notice of public hearing
5. Optionally, attend hearing
7. Operator found financially incapable or has abandoned mine?
EndNo
8. Send/upload intent for forfeiture letter to Operator
10. Upload hearing resolution to LA
Portal
12. System reminds user to follow up for hearing resolution if not received within 15 days of hearing
13. Follow up with Lead Agency for
Hearing Resolution
9. Receives forfeiture letter
Yes
14. System updates Mine Entity information with the hearing resolution document
11. Uploads FAM forfeiture request per hearing resolution
15. System creates case for FAM
Release and assigns to county analyst
16. Reviews request information and generates Forfeiture agreement letter
17. Routes to a peer for review of forfeiture letter
18. Routes to a manager to review forfeiture letter
19. Upload/notify LA and Operator of
Forfeiture Agreement letter
20. Receives forfeiture letter
21. Receives forfeiture letter
22. Coordinates release of FAM
23. Reclaims mine
24. End
Lead Agency Portal
Operator Portal
In the event that a Lead Agency believes a mine is financially incapable or abandoned, a hearing may be held to begin the process of forfeit ing their FAM so that the LA can use the funds to reclaim the mine. This includes situations in which the State Mining and Geology Board is funct ioning as the Lead
Agency.
Al l DMR team members assigned to the given mine/ county should be notified regarding this potent ial forfeiture.
To-Be Process – 7.1 – Annual Reports – Establish Annual Report Fee Schedule Department of Conservation, Division of Mine Reclamation
To-Be Process – 7.1 – Annual Reports – Establish Annual Report Fee Schedule
D O
C
E n te rp ri se
Te ch n o lo gy S e rv ic e s D iv is io n
ET
SD
D O
C
E n te rp ri se n o lo gy S e rv ic e s D iv is io n
ET
SD
St at e M in in g d
G e o lo gy B o ar
G B
St at e M in in g o lo gy B o
G B
D
O C
B u d g et
O ff ic e
D O
C
B u d g et O ff ic e D
M R
R e p o rt in g
U
(R
D
M R
R e p o rt in g
U
D
M m in is tr at iv e U n it
D M m in is tr at iv e
U n it
ProcessProcess ToolsTools
1. Start
2. Pull Current Year
Revenue report from SMARA-4
5. Gathers and sends information on DMR Budget
3. Requests Budget information
4. Gathers and sends information on SMGB Budget
SMARA 4
7. Analyzes financial data and develops fee schedule options
8. Provides fee schedule options to the Board
10. Holds Board meeting and presents fee schedule options
11. Votes on fee schedule
13. Updates Annual Report form and Fee Schedule document
16. Coordinates with ETSD to update system with new fee schedule
15. Updates external website with Annual Report form and Fee
Schedule
17. Updates system with new fee schedule
18. End
6. Receives and aggregates financial and budget data
14. Coordinates with Admin. Unit to publish updated forms on external website
Division of Mine Reclamation External Webpage
12. Fee schedule approved?
Yes
No Operator Portal
Annual Reporting System
9. Prepares Agenda and Informational Report for meeting
As part of setting up SMARA 4, DMR needs to formalize the report format and data they currently query from SMARA 3 in order to facilitate the Budget Office being able to self-serve and pull the Current Year Revenue report. Additionally, it would be helpful to notify the Reporting Unit Manager when the Budget Office pulls this report.
Updating the system with the new fee schedule values does not necessarily have to be an ETSD function if the software solution allows for business user updates to configurable values.
To-Be Process – 7.2 – Annual Reports – Receive Annual Reports Department of Conservation, Division of Mine Reclamation
To-Be Process – 7.2 – Annual Reports – Receive Annual Reports
D M
R
R e p o rt in g U n it
(R U
A na ly st D
M R
R e p o rt in g
U n it (R
U
A na ly st
M in e O pe ra to r
M in e O pe ra to r
D M
R
P ay m e n t
A llo ca ti o n al ys t
D M
R
P ay m e n t
A llo ca ti o n al ys t
D M
R
D e si gn a te
A n al ys t D
M R
D e si gn a te
A n al ys t
ProcessProcess ToolsTools
1.3 - Manage Mine Operator
Accounts
2. System sends notification to remind Operators to file Annual Report
(AR)
5. Logs onto Operator Portal and files AR(s)
4. File AR electronically?
7.3 – Process Paper Annual Reports and
Fees
No
Yes
10.1 – Receive and Scan Mail
8. Pay Annual Fees?
9. Pay electronically?
11. System imports electronic payment data and allocates based on Statement of Fees Due
7.3 – Process Paper Annual Reports and
Fees
No
15. Retrieves physical checks, totals them, and arranges in same order as deposit sheet
14. System generates deposit sheet for paper checks, including check images
16. Send deposit to accounting
17. End
6. System sends Acknowledgement to Operator and LA with Statement of
Fees Due Yes
SMARA-4 Case Management
1. Start
Operator Portal
3. File AR? Yes
No
7. System directs Operator to First
Data to make Annual Fee payment
18. System reflects incomplete filing in
Operator portal until payment is made
No
19. System sends reminder emails to Operator to make payment
Go to 7.6 – Follow Up on Incomplete Annual Reports, Step 12
Go to 7.6 – Follow Up on Incomplete Annual Reports, Step 12
20. Prepares paper
AR and sends to DMR and Lead
Agency (LA)
12. Pulls deposit reports
13. System generates deposit sheet for electronic payments
Continue to 7.4 – Analyze Annual Reports, Step 1
Continue to 7.4 – Analyze Annual Reports, Step 1
10. Makes payment through First Data
Yes
First Data Payment Processor
For operators with established online accounts, this could be an automated system email (or series of emails) after the Fee Schedule has been published. For operators without online accounts, this would look very similar to the annual Courtesy Letter currently sent, but with encouragement to register for an online account rather than MOARS log-in codes.
When filing an AR onl ine, the operator fills out data pages, rather than uploading a PDF so that there is full data capture. This also includes any
Low Gross Exemptions (LGE) or Multi- Site S ingle Fee Requests (MSSFR).
If an operator doesn’t already have an account, but wants to file online, they must register for an account first.
For electronically filed ARs, this acknowledgement satisfies the statutorily required acknowledgement within 90 days of AR receipt.
To-Be Process – 7.3 – Annual Reports – Process Paper Annual Reports and Fees Department of Conservation, Division of Mine Reclamation
To-Be Process – 7.3 – Annual Reports – Process Paper Annual Reports and Fees
D M
R
A d m in is tr at iv e U n it
O ff ic e
Te ch ni ci an
O T)
R ep or ti ng
U ni t (R
U ) A n al ys t
D M
R
A d m in is tr at iv e U n it
O ff ic e
Te ch ni ci an
O T)
R ep or ti ng
U ni t (R
U ) A n al ys t
ProcessProcess ToolsTools
25. Received on or before July 1?
26. Date stamps front page of AR(s) with postmark date and retains envelope
27. Date stamps front page of AR(s) with received date and recycles envelope
Yes
No
2. Opens Annual Report (AR)
1. Start
22. Multiple ARs in the package?
No
23. Groups documents by Mine
ID
Yes
3. Only check in envelope?
10. Date stamps and categorizes as
“Research check”
11. Scans each packet completely with OCR
Creates AR case for scanned AR and uploads AR scan to case
19. Stores AR packages in locking cabinet for 1 year retention
No
4. Investigates whether check is truly for AR
5. For DMR?
6. Routes to appropriate destination (SMGB, other DOC division, etc)
8. Check is for Initial Report fee amount?
7. End
Yes
No
Yes
Continue to 3.1 – Process Initial Reports, Step 17
Continue to 3.1 – Process Initial Reports, Step 17
Yes No
Continue to 7.4 – Analyze Annual Reports, Step 1
Continue to 7.4 – Analyze Annual Reports, Step 1
9. Related to existing AR?
No
Yes
12. Contains Multi-Site Single Fee Request
(MSSFR)?
13. Creates MSSFR Case, enters minimal essential information, and uploads MSSFR scan
14. Creates AR case for each AR associated to the MSSFR and uploads AR scans to cases
15. Enter minimum essential information for each AR case
Yes
No
16. Contains check?
21. Searches SMARA 4 for existing AR case
17. Enter payment information into AR case, including allocations
Yes
18. Store AR packages in secure processing cabinet until deposit completed
No
20. End
Continue to 7.2 – Receive Annual Reports, Step 12
Continue to 7.2 – Receive Annual Reports, Step 12
SMARA-4 Case Management
Correct order (not all items are always present):
• Check payment
• MRRC-2 (Annual Report)
• MRRC-4M (Multi-Site Single Fee Request Form)
• MRRC-4L (Low Gross Exemption Request Form)
• Cover Letter for AR Package (can be 1 for multiple ARs)
• MRRC-1 (Inspection Report)
• Financial Assurance Cost Estimate (FACE) and backup documents
• Financial Assurance Mechanism (FAM) documents
• Reclamation Plan (RP) or Interim Management Plan (IMP) copies
• Envelope
24. Organizes AR components in correct order (for each AR) with check on top (if present)
The minimum essential information entered should be enough to allow the system to correctly route and prioritize the cases for processing, as well as satisfy reporting needs for management and the California Geological Survey (CGS). Additionally, when creating the AR case, the previous year’s AR data should pre-populate the case to expedite data entry and reduce potential keying errors.
To-Be Process – 7.4 – Annual Reports – Analyze Annual Reports Department of Conservation, Division of Mine Reclamation
To-Be Process – 7.4 – Annual Reports – Analyze Annual Reports D
M R
R e p o rt in g
U n it
R U
A n al ys t
D M
R
R e p o rt in g U n it
R
U
A n al ys t D
M R
A n o th e r R
U A n al ys t
D M
R
A n o th e r
R U
A n al ys t D
M R a n ag e r
D M
R a n ag e r
ProcessProcess ToolsTools
3. System assigns Annual Report case to DMR county RU analyst
2. Contains a Multi- Site Single Fee
Request (MSSFR)?
SMARA-4 Case Management
1. Start
15. System assigns MSSFR Case to DMR county RU analyst with highest proportion of mines
No
Yes
16. System notifies analyst that MSSFR case is available to be worked
17. Reviews MSSFR
– confirming values captured and reviewing for internal consistency
18. Works each AR associated to MSSFR to confirm MSSFR validity
19. Reconciles MSSFR with associated ARs
14. System computes and applies appropriate fees
6. Contains Low Gross Exemption
(LGE)?
20. MSSFR Valid?
21. Enters MSSFR Denial Reasons on the MSSFR case
No
Yes
9. LGE Valid?
10. Enters LGE
Denial Reasons on the AR case
No
Yes
Yes
No
7. Verifies whether proof of income reflects income below threshold in a valid format
11. Reviews LGE Denial decision and reasons
13. Reviews LGE Denial decision and reasons
12. Agrees with LGE Denial?
Yes
Discusses LGE Denial with original county analyst and come to an agreement
No
22. Reviews MSSFR Denial decision and reasons
25. Reviews MSSFR Denial decision and reasons
23. Agrees with MSSFR Denial?
Yes
24. Discusses MSSFR Denial with original county analyst and come to an agreement
No
Go to 7.5 – Determine Annual Report Outcomes, Step 1
Go to 7.5 – Determine Annual Report Outcomes, Step 1
8. Verifies all questions on the
LGE form
Multi-Site S ingle Fee Requests (MSSFR) are sometimes comprised of mines across multiple counties. In those instances, the
RU analyst with largest proportion of mines within the MSSFR will take point on analyzing the
MSSFR.
Multi-Site S ingle Fee Requests (MSSFR) have many Annual
Reports (AR) linked to them, so it’s essential to assess the val idity of the MSSFR first as that wi ll impact the processing of each AR.
Electronically filed ARs receive a confi rmation email that satisfies the statutorily required acknowledgement letter within 9 0 days of AR receipt.
At this point , paper ARs stil l need to receive an acknowledgement, so paper AR cases should be priori tized for processing. The system should help with this pr ioritization, while st ill allowing users the abi lity to work in a different order when appropriate.
For paper ARs, this would be the point in which any additional information that needed keying would be entered.
This is the start of the file's text. The full file is on GovTribe.