This is a Questions and Answers document for federal contract opportunity 6982AF25B000004, ND NP THRO 204(1) Buck Hill Road, dated October 14, 2026.
The document addresses five questions received during the pre-solicitation phase for a landslide stabilization project at Buck Hill Road located within Theodore Roosevelt National Park. Key clarifications include: (1) Contractors must bid the project plans as specified, with value engineering proposals permitted only after contract award; (2) No pre-bid events are scheduled; (3) The project location is accessible for viewing, though interested parties must contact Theodore Roosevelt National Park directly at Philip_McCall@nps.gov to determine access requirements; (4) All project-related questions must be directed to CFLContracts@dot.gov in accordance with solicitation procedures, as the National Park Service cannot answer project questions; and (5) The period of performance is detailed in SCR Section 108.01 Commencement, Prosecution and Completion of Work on page E-13 of the associated solicitation documents. The scope involves landslide stabilization work, with the current design specifying a large excavation and replacement operation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6982AF25B000004
ND NP THRO 204(1) Buck Hill Road
Questions & Answers 10/14/26 Page | 1
Questions Answers
Received September 21, 2026 1Q. In response to the Buck Hill Road landslide stabilization scope that is currently in pre-solicitation, would the Owner be interested in a value engineered solution alternative to stabilize the landslide? The current description details a large excavate/replace operation, and we could likely minimize disturbance in the National Park with a soil nail stabilization option.
Please let me know if we can discuss.
1A. The Contractor needs to bid the plans as
is. The successful Contractor can submit a VE proposal for evaluation after award.
Received October 6, 2026 2Q. Is there any type of prebid event planned? 2A. No pre-bid events are planned.
3Q. Is the project location available for viewing?
3A. The project location is accessible.
4Q. Are there any requirements to get into the park to view the project?
4A. Contact Theodore Roosevelt National Park directly via email at Philip_McCall@nps.gov for any requirements. The NPS cannot answer any questions concerning the project. All questions must be emailed to CFLContracts@dot.gov in accordance with the solicitation.
Received October 14, 2026 5Q. What is the period of performance for this project?
5A. Please see SCR Section 108.01 Commencement, Prosecution and Completion of Work starting on page E-13.