This is a Questions and Answers document for federal contract opportunity 6982AF25B000004, ND NP THRO 204(1) Buck Hill Road, dated October 7, 2026.

The document addresses four inquiries received during the pre-solicitation phase for a landslide stabilization project at Buck Hill Road located within Theodore Roosevelt National Park. The first question, received September 21, 2026, concerns the feasibility of submitting a value-engineered alternative to the planned excavate/replace operation, specifically proposing soil nail stabilization to minimize disturbance to the National Park. The government response requires contractors to bid the plans as written, with the option to submit value engineering proposals for evaluation only after contract award. Three additional questions received October 6, 2026 address pre-bid event scheduling (none planned), project site accessibility (location is accessible), and entry requirements for the park (prospective bidders must contact Theodore Roosevelt National Park directly at Philip_McCall@nps.gov). The document clarifies that the National Park Service cannot answer project-related questions; all inquiries must be directed to CFLContracts@dot.gov in accordance with the solicitation requirements.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6982AF25B000004

ND NP THRO 204(1) Buck Hill Road

Questions & Answers 10/07/26 Page | 1

Questions Answers

Received September 21, 2026 1Q. In response to the Buck Hill Road landslide stabilization scope that is currently in pre-solicitation, would the Owner be interested in a value engineered solution alternative to stabilize the landslide? The current description details a large excavate/replace operation, and we could likely minimize disturbance in the National Park with a soil nail stabilization option.

Please let me know if we can discuss.

1A. The Contractor needs to bid the plans as

is. The successful Contractor can submit a VE proposal for evaluation after award.

Received October 6, 2026 2Q. Is there any type of prebid event planned? 2A. No pre-bid events are planned.

3Q. Is the project location available for viewing?

3A. The project location is accessible.

4Q. Are there any requirements to get into the park to view the project?

4A. Contact Theodore Roosevelt National Park directly via email at Philip_McCall@nps.gov for any requirements. The NPS cannot answer any questions concerning the project. All questions must be emailed to CFLContracts@dot.gov in accordance with the solicitation.

mailto:CFLContracts@dot.gov