This document contains a bid tabulation report and details of a federal contract opportunity for road construction projects in Yuma County, Arizona. The bid tabulation report provides pricing from seven contractors for line items associated with minor road realignment and paving of approximately nine miles of roadway leading to Imperial National Wildlife Refuge, including over 33,000 tons of asphalt concrete pavement, 97,000 tons of aggregate base, 22,000 tons of cement treated aggregate course, and 219,000 cubic yards of roadway excavation. The estimated price range for the project is between $15-20 million. The federal contract opportunity notice specifies a solicitation number, provides a brief description of the work, and notes that construction is anticipated from November 2019 to September 2020. The opportunity is being offered through the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 12/11/19

1 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Contractor Responsive?

Engineer's Estimate

InterMountain West Civil Contructors, Inc.

Kirkland Construction LLLP

Pyramid Const & Aggregates Inc

Show Low Construction, Inc.

Steve Manning Construction Inc

Stormwater Plans, LLC dba SWP Contracting and Paving

Base Schedule A

$12,630,166.00

$13,413,826.20

$18,033,325.20

$20,457,843.46

$14,735,587.46

$17,305,151.00

$17,830,495.00

Option: X

$4,605,342.00

$4,672,304.70

$5,962,266.60

$5,695,304.74

$4,691,324.12

$5,358,271.00

$4,648,369.00

Option: Y

$1,746,805.00

$1,641,674.80

$1,765,910.05

$3,041,972.45

$1,358,378.53

$2,347,034.00

$3,584,198.00

Contractor Responsive?

Engineer's Estimate

InterMountain West Civil Contructors, Inc.

Kirkland Construction LLLP

Pyramid Const & Aggregates Inc

Show Low Construction, Inc.

Steve Manning Construction Inc

Stormwater Plans, LLC dba SWP Contracting and Paving

Option: Z

$198,012.00

$241,528.40

$177,737.40

$249,194.27

$156,251.00

$322,214.00

$942,510.00

2 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Contractor Responsive?

Engineer's Estimate

InterMountain West Civil Contructors, Inc.

Kirkland Construction LLLP

Pyramid Const & Aggregates Inc

Show Low Construction, Inc.

Steve Manning Construction Inc

Stormwater Plans, LLC dba SWP Contracting and Paving

Total Base Schedule A and Option(s): X

$17,235,508.00

$18,086,130.90

$23,995,591.80

$26,153,148.20

$19,426,911.58

$22,663,422.00

$22,478,864.00

Total Base Schedule A and Option(s): XY

$18,982,313.00

$19,727,805.70

$25,761,501.85

$29,195,120.65

$20,785,290.11

$25,010,456.00

$26,063,062.00

Total Base Schedule A and Option(s): XYZ

$19,180,325.00

$19,969,334.10

$25,939,239.25

$29,444,314.92

$20,941,541.11

$25,332,670.00

$27,005,572.00

Contractor Responsive?

Engineer's Estimate

InterMountain West Civil Contructors, Inc.

Kirkland Construction LLLP

Pyramid Const & Aggregates Inc

Show Low Construction, Inc.

Steve Manning Construction Inc

Stormwater Plans, LLC dba SWP Contracting and Paving

Total Base Schedule A and Option(s): XZ

$17,433,520.00

$18,327,659.30

$24,173,329.20

$26,402,342.47

$19,583,162.58

$22,985,636.00

$23,421,374.00

Total Base Schedule A and Option(s): Y

$14,376,971.00

$15,055,501.00

$19,799,235.25

$23,499,815.91

$16,093,965.99

$19,652,185.00

$21,414,693.00

Total Base Schedule A and Option(s): YZ

$14,574,983.00

$15,297,029.40

$19,976,972.65

$23,749,010.18

$16,250,216.99

$19,974,399.00

$22,357,203.00

3 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Contractor Responsive?

Engineer's Estimate

InterMountain West Civil Contructors, Inc.

Kirkland Construction LLLP

Pyramid Const & Aggregates Inc

Show Low Construction, Inc.

Steve Manning Construction Inc

Stormwater Plans, LLC dba SWP Contracting and Paving

Total Base Schedule A and Option(s): Z

$12,828,178.00

$13,655,354.60

$18,211,062.60

$20,707,037.73

$14,891,838.46

$17,627,365.00

$18,773,005.00

4 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF19B000024

Division: Central Federal Lands

State: AZ County: Yuma

Federal Land: BLM, DOD, FWS Opened at: Lakewood, CO

Opened by: Eric Grosskreuz

Date: 12/03/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

InterMountain West Civil Contructors, Inc. $13,413,826.20 1564 N Alma School Road. Suite 200 Mesa, AZ 85201

Show Low Construction, Inc. $14,735,587.46 PO Box 29 Show Low, AZ 85901

Steve Manning Construction Inc $17,305,151.00 P.O. Box 491660 Redding, CA 96049

Stormwater Plans, LLC dba SWP Contracting and Paving $17,830,495.00 5624 N. 54th Avenue Glendale, AZ 85301

Kirkland Construction LLLP $18,033,325.20 2101 Main St Rye, CO 81069

Pyramid Const & Aggregates Inc $20,457,843.46 839 Dogwood Road Heber, CA 92249

Engineer's Estimate $12,630,166.00

5 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0010 15101-0000 MOBILIZATION

InterMountain West Civil Contructors, Inc. Lump Sum $1,044,000.00 Show Low Construction, Inc. Lump Sum $1,932,000.00 Steve Manning Construction Inc Lump Sum $1,500,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $330,000.00 Kirkland Construction LLLP Lump Sum $2,150,000.00 Pyramid Const & Aggregates Inc Lump Sum $3,403,849.52 Engineer's Estimate ALL LPSM Lump Sum $1,118,182.00

A0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

InterMountain West Civil Contructors, Inc. $7,000.00 $41,496.00 Show Low Construction, Inc. $5,832.12 $34,572.81 Steve Manning Construction Inc $6,000.00 $35,568.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15,000.00 $88,920.00 Kirkland Construction LLLP $8,000.00 $47,424.00 Pyramid Const & Aggregates Inc $1,676.11 $9,935.98 Engineer's Estimate 5.928 MILE $6,000.00 $35,568.00

A0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING

InterMountain West Civil Contructors, Inc. $1,400.00 $8,299.20 Show Low Construction, Inc. $3,499.27 $20,743.67 Steve Manning Construction Inc $1,000.00 $5,928.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $29,640.00 Kirkland Construction LLLP $1,600.00 $9,484.80 Pyramid Const & Aggregates Inc $1,676.11 $9,935.98 Engineer's Estimate 5.928 MILE $2,500.00 $14,820.00

A0040 15215-1000 SURVEY AND STAKING, APPROACH ROAD

InterMountain West Civil Contructors, Inc. $700.00 $7,000.00 Show Low Construction, Inc. $2,074.37 $20,743.70 Steve Manning Construction Inc $1,800.00 $18,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $30,000.00 Kirkland Construction LLLP $800.00 $8,000.00 Pyramid Const & Aggregates Inc $1,656.00 $16,560.00 Engineer's Estimate 10 EACH $2,500.00 $25,000.00

A0050 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

InterMountain West Civil Contructors, Inc. $900.00 $33,300.00 Show Low Construction, Inc. $373.76 $13,829.12 Steve Manning Construction Inc $1,100.00 $40,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,500.00 $55,500.00 Kirkland Construction LLLP $1,000.00 $37,000.00 Pyramid Const & Aggregates Inc $298.38 $11,040.06 Engineer's Estimate 37 EACH $2,000.00 $74,000.00

6 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0060 15215-5000 SURVEY AND STAKING, BOX CULVERT

InterMountain West Civil Contructors, Inc. $4,200.00 $21,000.00 Show Low Construction, Inc. $2,765.82 $13,829.10 Steve Manning Construction Inc $1,600.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $12,500.00 Kirkland Construction LLLP $2,400.00 $12,000.00 Pyramid Const & Aggregates Inc $4,416.00 $22,080.00 Engineer's Estimate 5 EACH $5,000.00 $25,000.00

A0070 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

InterMountain West Civil Contructors, Inc. $6,500.00 $77,064.00 Show Low Construction, Inc. $2,916.06 $34,572.81 Steve Manning Construction Inc $3,000.00 $35,568.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $237,120.00 Kirkland Construction LLLP $7,400.00 $87,734.40 Pyramid Const & Aggregates Inc $3,538.47 $41,952.10 Engineer's Estimate 11.856 MILE $3,500.00 $41,496.00

A0080 15301-0000 CONTRACTOR QUALITY CONTROL

InterMountain West Civil Contructors, Inc. Lump Sum $250,000.00 Show Low Construction, Inc. Lump Sum $402,600.00 Steve Manning Construction Inc Lump Sum $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $300,000.00 Kirkland Construction LLLP Lump Sum $500,000.00 Pyramid Const & Aggregates Inc Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $113,000.00

A0090 15401-0000 CONTRACTOR TESTING

InterMountain West Civil Contructors, Inc. Lump Sum $200,000.00 Show Low Construction, Inc. Lump Sum $231,800.00 Steve Manning Construction Inc Lump Sum $420,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $900,000.00 Kirkland Construction LLLP Lump Sum $600,000.00 Pyramid Const & Aggregates Inc Lump Sum $986,424.00 Engineer's Estimate ALL LPSM Lump Sum $113,000.00

A0100 15501-0000 CONSTRUCTION SCHEDULE

InterMountain West Civil Contructors, Inc. Lump Sum $40,000.00 Show Low Construction, Inc. Lump Sum $12,000.00 Steve Manning Construction Inc Lump Sum $38,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $50,000.00 Kirkland Construction LLLP Lump Sum $20,000.00 Pyramid Const & Aggregates Inc Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

7 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0110 15705-0100 SOIL EROSION CONTROL, SILT FENCE

InterMountain West Civil Contructors, Inc. $3.00 $13,200.00 Show Low Construction, Inc. $2.75 $12,100.00 Steve Manning Construction Inc $3.80 $16,720.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4.00 $17,600.00 Kirkland Construction LLLP $5.50 $24,200.00 Pyramid Const & Aggregates Inc $8.00 $35,200.00 Engineer's Estimate 4,400 LNFT $10.00 $44,000.00

A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

InterMountain West Civil Contructors, Inc. $3.00 $13,200.00 Show Low Construction, Inc. $3.60 $15,840.00 Steve Manning Construction Inc $4.20 $18,480.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4.00 $17,600.00 Kirkland Construction LLLP $1.70 $7,480.00 Pyramid Const & Aggregates Inc $6.00 $26,400.00 Engineer's Estimate 4,400 LNFT $8.00 $35,200.00

A0130 15706-0200 SOIL EROSION CONTROL, CHECK DAM

InterMountain West Civil Contructors, Inc. $200.00 $7,000.00 Show Low Construction, Inc. $89.50 $3,132.50 Steve Manning Construction Inc $150.00 $5,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $8,750.00 Kirkland Construction LLLP $33.00 $1,155.00 Pyramid Const & Aggregates Inc $500.00 $17,500.00 Engineer's Estimate 35 EACH $250.00 $8,750.00

A0140 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

InterMountain West Civil Contructors, Inc. $120.00 $4,800.00 Show Low Construction, Inc. $72.00 $2,880.00 Steve Manning Construction Inc $180.00 $7,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $75.00 $3,000.00 Kirkland Construction LLLP $69.00 $2,760.00 Pyramid Const & Aggregates Inc $500.00 $20,000.00 Engineer's Estimate 40 EACH $500.00 $20,000.00

A0150 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

InterMountain West Civil Contructors, Inc. $2,500.00 $15,000.00 Show Low Construction, Inc. $600.00 $3,600.00 Steve Manning Construction Inc $2,990.00 $17,940.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $7,800.00 Kirkland Construction LLLP $1,600.00 $9,600.00 Pyramid Const & Aggregates Inc $3,000.00 $18,000.00 Engineer's Estimate 6 EACH $3,500.00 $21,000.00

8 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0160 15802-0000 WATERING FOR DUST CONTROL

InterMountain West Civil Contructors, Inc. Lump Sum $400,000.00 Show Low Construction, Inc. Lump Sum $366,000.00 Steve Manning Construction Inc Lump Sum $178,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,000,000.00 Kirkland Construction LLLP Lump Sum $600,000.00 Pyramid Const & Aggregates Inc Lump Sum $490,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00

A0170 20104-0000 CLEARING

InterMountain West Civil Contructors, Inc. $2,000.00 $160,000.00 Show Low Construction, Inc. $575.00 $46,000.00 Steve Manning Construction Inc $3,600.00 $288,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $400,000.00 Kirkland Construction LLLP $6,000.00 $480,000.00 Pyramid Const & Aggregates Inc $3,000.00 $240,000.00 Engineer's Estimate 80.0 ACRE $1,500.00 $120,000.00

A0180 20301-2400 REMOVAL OF SIGN

InterMountain West Civil Contructors, Inc. $250.00 $13,750.00 Show Low Construction, Inc. $175.00 $9,625.00 Steve Manning Construction Inc $100.00 $5,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $9,625.00 Kirkland Construction LLLP $175.00 $9,625.00 Pyramid Const & Aggregates Inc $125.00 $6,875.00 Engineer's Estimate 55 EACH $200.00 $11,000.00

A0190 20401-0000 ROADWAY EXCAVATION

InterMountain West Civil Contructors, Inc. $7.25 $1,319,500.00 Show Low Construction, Inc. $12.78 $2,325,960.00 Steve Manning Construction Inc $16.40 $2,984,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $2,184,000.00 Kirkland Construction LLLP $10.50 $1,911,000.00 Pyramid Const & Aggregates Inc $18.00 $3,276,000.00 Engineer's Estimate 182,000 CUYD $10.00 $1,820,000.00

A0200 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2

InterMountain West Civil Contructors, Inc. $130.00 $247,000.00 Show Low Construction, Inc. $139.00 $264,100.00 Steve Manning Construction Inc $121.00 $229,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $285,000.00 Kirkland Construction LLLP $143.00 $271,700.00 Pyramid Const & Aggregates Inc $208.08 $395,352.00 Engineer's Estimate 1,900.0 CUYD $175.00 $332,500.00

9 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0210 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3

InterMountain West Civil Contructors, Inc. $165.00 $28,050.00 Show Low Construction, Inc. $145.00 $24,650.00 Steve Manning Construction Inc $138.00 $23,460.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $25,500.00 Kirkland Construction LLLP $182.00 $30,940.00 Pyramid Const & Aggregates Inc $225.00 $38,250.00 Engineer's Estimate 170.0 CUYD $225.00 $38,250.00

A0220 30101-0000 AGGREGATE BASE

InterMountain West Civil Contructors, Inc. $23.75 $1,945,125.00 Show Low Construction, Inc. $19.00 $1,556,100.00 Steve Manning Construction Inc $25.00 $2,047,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $35.00 $2,866,500.00 Kirkland Construction LLLP $28.00 $2,293,200.00 Pyramid Const & Aggregates Inc $19.00 $1,556,100.00 Engineer's Estimate 81,900.0 TON $22.00 $1,801,800.00

A0240 30703-0000 CEMENT TREATED AGGREGATE COURSE

InterMountain West Civil Contructors, Inc. $125.00 $933,750.00 Show Low Construction, Inc. $147.00 $1,098,090.00 Steve Manning Construction Inc $116.00 $866,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $42.00 $313,740.00 Kirkland Construction LLLP $202.00 $1,508,940.00 Pyramid Const & Aggregates Inc $147.00 $1,098,090.00 Engineer's Estimate 7,470 CUYD $85.00 $634,950.00

A0260 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL

InterMountain West Civil Contructors, Inc. $86.00 $2,001,220.00 Show Low Construction, Inc. $81.00 $1,884,870.00 Steve Manning Construction Inc $105.00 $2,443,350.00 Stormwater Plans, LLC dba SWP Contracting and Paving $115.00 $2,676,050.00 Kirkland Construction LLLP $89.00 $2,071,030.00 Pyramid Const & Aggregates Inc $103.40 $2,406,118.00 Engineer's Estimate 23,270.0 TON $90.00 $2,094,300.00

10 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0270 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

InterMountain West Civil Contructors, Inc. $225.00 $51,750.00 Show Low Construction, Inc. $275.00 $63,250.00 Steve Manning Construction Inc $360.00 $82,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $57,500.00 Kirkland Construction LLLP $238.00 $54,740.00 Pyramid Const & Aggregates Inc $281.00 $64,630.00 Engineer's Estimate 230.0 TON $300.00 $69,000.00

A0290 40601-0000 FOG SEAL

InterMountain West Civil Contructors, Inc. $850.00 $53,550.00 Show Low Construction, Inc. $945.00 $59,535.00 Steve Manning Construction Inc $800.00 $50,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,000.00 $63,000.00 Kirkland Construction LLLP $900.00 $56,700.00 Pyramid Const & Aggregates Inc $800.00 $50,400.00 Engineer's Estimate 63.0 TON $900.00 $56,700.00

A0300 41101-1000 PRIME COAT, METHOD 1

InterMountain West Civil Contructors, Inc. $740.00 $102,860.00 Show Low Construction, Inc. $903.00 $125,517.00 Steve Manning Construction Inc $770.00 $107,030.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $180,700.00 Kirkland Construction LLLP $1,000.00 $139,000.00 Pyramid Const & Aggregates Inc $800.00 $111,200.00 Engineer's Estimate 139.0 TON $900.00 $125,100.00

A0310 41105-0000 BLOTTER

InterMountain West Civil Contructors, Inc. $20.00 $16,500.00 Show Low Construction, Inc. $30.00 $24,750.00 Steve Manning Construction Inc $10.00 $8,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $25.00 $20,625.00 Kirkland Construction LLLP $52.00 $42,900.00 Pyramid Const & Aggregates Inc $350.00 $288,750.00 Engineer's Estimate 825.0 TON $50.00 $41,250.00

A0320 41201-0000 TACK COAT

InterMountain West Civil Contructors, Inc. $675.00 $43,875.00 Show Low Construction, Inc. $824.00 $53,560.00 Steve Manning Construction Inc $900.00 $58,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $84,500.00 Kirkland Construction LLLP $1,200.00 $78,000.00 Pyramid Const & Aggregates Inc $800.00 $52,000.00 Engineer's Estimate 65.0 TON $900.00 $58,500.00

11 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0330 60101-0000 CONCRETE (HEADWALLS/WINGWALLS)

InterMountain West Civil Contructors, Inc. $2,000.00 $440,000.00 Show Low Construction, Inc. $3,385.00 $744,700.00 Steve Manning Construction Inc $2,100.00 $462,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $660,000.00 Kirkland Construction LLLP $1,400.00 $308,000.00 Pyramid Const & Aggregates Inc $2,396.53 $527,236.60 Engineer's Estimate 220.0 CUYD $450.00 $99,000.00

A0340 60201-0800 24-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $117.00 $238,680.00 Show Low Construction, Inc. $73.50 $149,940.00 Steve Manning Construction Inc $178.00 $363,120.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $336,600.00 Kirkland Construction LLLP $182.00 $371,280.00 Pyramid Const & Aggregates Inc $299.01 $609,980.40 Engineer's Estimate 2,040 LNFT $140.00 $285,600.00

A0350 60201-0900 30-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $140.00 $98,000.00 Show Low Construction, Inc. $84.00 $58,800.00 Steve Manning Construction Inc $200.00 $140,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $170.00 $119,000.00 Kirkland Construction LLLP $187.00 $130,900.00 Pyramid Const & Aggregates Inc $333.25 $233,275.00 Engineer's Estimate 700 LNFT $160.00 $112,000.00

A0360 60201-1000 36-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $175.00 $54,250.00 Show Low Construction, Inc. $95.00 $29,450.00 Steve Manning Construction Inc $248.00 $76,880.00 Stormwater Plans, LLC dba SWP Contracting and Paving $205.00 $63,550.00 Kirkland Construction LLLP $242.00 $75,020.00 Pyramid Const & Aggregates Inc $334.80 $103,788.00 Engineer's Estimate 310 LNFT $180.00 $55,800.00

A0370 60201-1200 48-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $225.00 $19,125.00 Show Low Construction, Inc. $126.00 $10,710.00 Steve Manning Construction Inc $352.00 $29,920.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $21,250.00 Kirkland Construction LLLP $296.00 $25,160.00 Pyramid Const & Aggregates Inc $438.78 $37,296.30 Engineer's Estimate 85 LNFT $200.00 $17,000.00

12 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0380 60201-1300 54-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $250.00 $30,000.00 Show Low Construction, Inc. $170.00 $20,400.00 Steve Manning Construction Inc $421.00 $50,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $350.00 $42,000.00 Kirkland Construction LLLP $336.00 $40,320.00 Pyramid Const & Aggregates Inc $435.70 $52,284.00 Engineer's Estimate 120 LNFT $220.00 $26,400.00

A0390 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $940.00 $48,880.00 Show Low Construction, Inc. $580.00 $30,160.00 Steve Manning Construction Inc $400.00 $20,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $900.00 $46,800.00 Kirkland Construction LLLP $2,340.00 $121,680.00 Pyramid Const & Aggregates Inc $1,666.00 $86,632.00 Engineer's Estimate 52 EACH $800.00 $41,600.00

A0400 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT (POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $1,100.00 $19,800.00 Show Low Construction, Inc. $708.00 $12,744.00 Steve Manning Construction Inc $600.00 $10,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,100.00 $19,800.00 Kirkland Construction LLLP $2,500.00 $45,000.00 Pyramid Const & Aggregates Inc $1,856.23 $33,412.14 Engineer's Estimate 18 EACH $1,000.00 $18,000.00

A0410 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $1,200.00 $12,000.00 Show Low Construction, Inc. $950.00 $9,500.00 Steve Manning Construction Inc $750.00 $7,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,500.00 $15,000.00 Kirkland Construction LLLP $3,600.00 $36,000.00 Pyramid Const & Aggregates Inc $1,896.50 $18,965.00 Engineer's Estimate 10 EACH $1,200.00 $12,000.00

A0420 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT (POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $2,600.00 $10,400.00 Show Low Construction, Inc. $1,950.00 $7,800.00 Steve Manning Construction Inc $1,500.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,700.00 $10,800.00 Kirkland Construction LLLP $6,200.00 $24,800.00 Pyramid Const & Aggregates Inc $3,028.50 $12,114.00 Engineer's Estimate 4 EACH $1,400.00 $5,600.00

13 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0430 60210-1300 END SECTION FOR 54-INCH PIPE CULVERT (POLYMERIC COATED)

InterMountain West Civil Contructors, Inc. $3,400.00 $13,600.00 Show Low Construction, Inc. $2,535.00 $10,140.00 Steve Manning Construction Inc $2,200.00 $8,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,500.00 $14,000.00 Kirkland Construction LLLP $6,600.00 $26,400.00 Pyramid Const & Aggregates Inc $3,023.50 $12,094.00 Engineer's Estimate 4 EACH $1,600.00 $6,400.00

A0440 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (EIGHT BARRELS)

InterMountain West Civil Contructors, Inc. $900.00 $684,000.00 Show Low Construction, Inc. $859.00 $652,840.00 Steve Manning Construction Inc $1,360.00 $1,033,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $912,000.00 Kirkland Construction LLLP $1,030.00 $782,800.00 Pyramid Const & Aggregates Inc $864.63 $657,118.80 Engineer's Estimate 760 LNFT $620.00 $471,200.00

A0450 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (FIVE BARRELS)

InterMountain West Civil Contructors, Inc. $975.00 $448,500.00 Show Low Construction, Inc. $859.00 $395,140.00 Steve Manning Construction Inc $1,360.00 $625,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $552,000.00 Kirkland Construction LLLP $1,076.00 $494,960.00 Pyramid Const & Aggregates Inc $829.72 $381,671.20 Engineer's Estimate 460 LNFT $620.00 $285,200.00

A0460 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL

InterMountain West Civil Contructors, Inc. $1,400.00 $119,000.00 Show Low Construction, Inc. $859.00 $73,015.00 Steve Manning Construction Inc $1,360.00 $115,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $102,000.00 Kirkland Construction LLLP $1,705.00 $144,925.00 Pyramid Const & Aggregates Inc $1,213.40 $103,139.00 Engineer's Estimate 85 LNFT $620.00 $52,700.00

A0470 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (FOUR BARRELS)

InterMountain West Civil Contructors, Inc. $1,000.00 $340,000.00 Show Low Construction, Inc. $859.00 $292,060.00 Steve Manning Construction Inc $1,360.00 $462,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $408,000.00 Kirkland Construction LLLP $1,125.00 $382,500.00 Pyramid Const & Aggregates Inc $913.03 $310,430.20 Engineer's Estimate 340 LNFT $620.00 $210,800.00

14 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0480 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (SIX BARRELS)

InterMountain West Civil Contructors, Inc. $1,000.00 $336,000.00 Show Low Construction, Inc. $859.00 $288,624.00 Steve Manning Construction Inc $1,360.00 $456,960.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $403,200.00 Kirkland Construction LLLP $1,130.00 $379,680.00 Pyramid Const & Aggregates Inc $838.60 $281,769.60 Engineer's Estimate 336 LNFT $620.00 $208,320.00

A0490 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS

InterMountain West Civil Contructors, Inc. $51.00 $59,925.00 Show Low Construction, Inc. $55.35 $65,036.25 Steve Manning Construction Inc $53.00 $62,275.00 Stormwater Plans, LLC dba SWP Contracting and Paving $65.00 $76,375.00 Kirkland Construction LLLP $53.00 $62,275.00 Pyramid Const & Aggregates Inc $52.00 $61,100.00 Engineer's Estimate 1,175 LNFT $32.00 $37,600.00

A0500 61701-1250 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A WOOD POSTS

InterMountain West Civil Contructors, Inc. $42.00 $168,000.00 Show Low Construction, Inc. $43.00 $172,000.00 Steve Manning Construction Inc $43.00 $172,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $240,000.00 Kirkland Construction LLLP $41.00 $164,000.00 Pyramid Const & Aggregates Inc $41.00 $164,000.00 Engineer's Estimate 4,000 LNFT $25.00 $100,000.00

A0510 61702-0800 TERMINAL SECTION TYPE TANGENT

InterMountain West Civil Contructors, Inc. $3,500.00 $49,000.00 Show Low Construction, Inc. $5,535.00 $77,490.00 Steve Manning Construction Inc $4,000.00 $56,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $35,000.00 Kirkland Construction LLLP $5,250.00 $73,500.00 Pyramid Const & Aggregates Inc $5,175.00 $72,450.00 Engineer's Estimate 14 EACH $4,000.00 $56,000.00

A0520 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

InterMountain West Civil Contructors, Inc. $105.00 $4,200.00 Show Low Construction, Inc. $119.00 $4,760.00 Steve Manning Construction Inc $150.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $6,000.00 Kirkland Construction LLLP $139.00 $5,560.00 Pyramid Const & Aggregates Inc $100.00 $4,000.00 Engineer's Estimate 40 HOUR $130.00 $5,200.00

15 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0530 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

InterMountain West Civil Contructors, Inc. $95.00 $3,800.00 Show Low Construction, Inc. $93.00 $3,720.00 Steve Manning Construction Inc $170.00 $6,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $6,000.00 Kirkland Construction LLLP $110.00 $4,400.00 Pyramid Const & Aggregates Inc $150.00 $6,000.00 Engineer's Estimate 40 HOUR $175.00 $7,000.00

A0540 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY

InterMountain West Civil Contructors, Inc. $115.00 $4,600.00 Show Low Construction, Inc. $150.00 $6,000.00 Steve Manning Construction Inc $170.00 $6,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $10,000.00 Kirkland Construction LLLP $155.00 $6,200.00 Pyramid Const & Aggregates Inc $300.00 $12,000.00 Engineer's Estimate 40 HOUR $175.00 $7,000.00

A0550 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

InterMountain West Civil Contructors, Inc. $165.00 $6,600.00 Show Low Construction, Inc. $225.00 $9,000.00 Steve Manning Construction Inc $200.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $10,000.00 Kirkland Construction LLLP $152.00 $6,080.00 Pyramid Const & Aggregates Inc $437.00 $17,480.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00

A0560 62301-0000 GENERAL LABOR

InterMountain West Civil Contructors, Inc. $40.00 $1,600.00 Show Low Construction, Inc. $34.00 $1,360.00 Steve Manning Construction Inc $70.00 $2,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $2,800.00 Kirkland Construction LLLP $103.00 $4,120.00 Pyramid Const & Aggregates Inc $125.00 $5,000.00 Engineer's Estimate 40 HOUR $65.00 $2,600.00

A0570 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

InterMountain West Civil Contructors, Inc. $250.00 $10,000.00 Show Low Construction, Inc. $250.00 $10,000.00 Steve Manning Construction Inc $100.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $10,000.00 Kirkland Construction LLLP $175.00 $7,000.00 Pyramid Const & Aggregates Inc $250.00 $10,000.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00

16 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

InterMountain West Civil Contructors, Inc. $150.00 $6,000.00 Show Low Construction, Inc. $200.00 $8,000.00 Steve Manning Construction Inc $200.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $8,000.00 Kirkland Construction LLLP $197.00 $7,880.00 Pyramid Const & Aggregates Inc $250.00 $10,000.00 Engineer's Estimate 40 HOUR $220.00 $8,800.00

A0590 62510-2000 SEEDING, HYDRAULIC METHOD

InterMountain West Civil Contructors, Inc. $1,500.00 $73,500.00 Show Low Construction, Inc. $3,350.00 $164,150.00 Steve Manning Construction Inc $3,400.00 $166,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $122,500.00 Kirkland Construction LLLP $3,200.00 $156,800.00 Pyramid Const & Aggregates Inc $3,156.42 $154,664.58 Engineer's Estimate 49.0 ACRE $2,200.00 $107,800.00

A0600 63301-0000 SIGN SYSTEM

InterMountain West Civil Contructors, Inc. $775.00 $42,625.00 Show Low Construction, Inc. $481.90 $26,504.50 Steve Manning Construction Inc $300.00 $16,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $600.00 $33,000.00 Kirkland Construction LLLP $650.00 $35,750.00 Pyramid Const & Aggregates Inc $500.00 $27,500.00 Engineer's Estimate 55 EACH $600.00 $33,000.00

A0610 63316-1000 REMOVE AND RESET SIGN (PANEL)

InterMountain West Civil Contructors, Inc. $275.00 $2,200.00 Show Low Construction, Inc. $75.00 $600.00 Steve Manning Construction Inc $300.00 $2,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $6,000.00 Kirkland Construction LLLP $640.00 $5,120.00 Pyramid Const & Aggregates Inc $500.00 $4,000.00 Engineer's Estimate 8 EACH $300.00 $2,400.00

A0620 63316-1000 REMOVE AND RESET SIGN

InterMountain West Civil Contructors, Inc. $280.00 $7,000.00 Show Low Construction, Inc. $290.00 $7,250.00 Steve Manning Construction Inc $300.00 $7,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $18,750.00 Kirkland Construction LLLP $1,000.00 $25,000.00 Pyramid Const & Aggregates Inc $500.00 $12,500.00 Engineer's Estimate 25 EACH $500.00 $12,500.00

17 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0630 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

InterMountain West Civil Contructors, Inc. $0.45 $69,750.00 Show Low Construction, Inc. $0.51 $79,050.00 Steve Manning Construction Inc $0.40 $62,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $23,250.00 Kirkland Construction LLLP $0.47 $72,850.00 Pyramid Const & Aggregates Inc $0.46 $71,300.00 Engineer's Estimate 155,000 LNFT $0.75 $116,250.00

A0640 63401-1600 PAVEMENT MARKINGS, TYPE H, BROKEN

InterMountain West Civil Contructors, Inc. $0.45 $3,600.00 Show Low Construction, Inc. $0.16 $1,280.00 Steve Manning Construction Inc $0.50 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.07 $560.00 Kirkland Construction LLLP $0.58 $4,640.00 Pyramid Const & Aggregates Inc $0.58 $4,640.00 Engineer's Estimate 8,000 LNFT $0.60 $4,800.00

A0650 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

InterMountain West Civil Contructors, Inc. $110.00 $1,760.00 Show Low Construction, Inc. $150.00 $2,400.00 Steve Manning Construction Inc $100.00 $1,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $275.00 $4,400.00 Kirkland Construction LLLP $100.00 $1,600.00 Pyramid Const & Aggregates Inc $35.00 $560.00 Engineer's Estimate 16 EACH $600.00 $9,600.00

A0660 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

InterMountain West Civil Contructors, Inc. $80.00 $24,000.00 Show Low Construction, Inc. $17.00 $5,100.00 Steve Manning Construction Inc $30.00 $9,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $26.00 $7,800.00 Kirkland Construction LLLP $5.00 $1,500.00 Pyramid Const & Aggregates Inc $30.00 $9,000.00 Engineer's Estimate 300 EACH $27.00 $8,100.00

A0670 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

InterMountain West Civil Contructors, Inc. $45.00 $72,000.00 Show Low Construction, Inc. $11.00 $17,600.00 Steve Manning Construction Inc $50.00 $80,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20.00 $32,000.00 Kirkland Construction LLLP $5.00 $8,000.00 Pyramid Const & Aggregates Inc $35.00 $56,000.00 Engineer's Estimate 1,600 EACH $27.00 $43,200.00

18 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0680 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

InterMountain West Civil Contructors, Inc. $100.00 $50,000.00 Show Low Construction, Inc. $21.00 $10,500.00 Steve Manning Construction Inc $70.00 $35,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $27,500.00 Kirkland Construction LLLP $50.00 $25,000.00 Pyramid Const & Aggregates Inc $150.00 $75,000.00 Engineer's Estimate 500 EACH $55.00 $27,500.00

A0690 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

InterMountain West Civil Contructors, Inc. $50.00 $2,500.00 Show Low Construction, Inc. $40.00 $2,000.00 Steve Manning Construction Inc $400.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $45.00 $2,250.00 Kirkland Construction LLLP $10.00 $500.00 Pyramid Const & Aggregates Inc $60.00 $3,000.00 Engineer's Estimate 50 EACH $50.00 $2,500.00

A0700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

InterMountain West Civil Contructors, Inc. $200.00 $10,000.00 Show Low Construction, Inc. $40.00 $2,000.00 Steve Manning Construction Inc $100.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $45.00 $2,250.00 Kirkland Construction LLLP $10.00 $500.00 Pyramid Const & Aggregates Inc $60.00 $3,000.00 Engineer's Estimate 50 EACH $50.00 $2,500.00

A0710 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

InterMountain West Civil Contructors, Inc. $17,000.00 $34,000.00 Show Low Construction, Inc. $16,500.00 $33,000.00 Steve Manning Construction Inc $10,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $40,000.00 Kirkland Construction LLLP $20,000.00 $40,000.00 Pyramid Const & Aggregates Inc $100.00 $200.00 Engineer's Estimate 2 EACH $15,000.00 $30,000.00

A0720 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

InterMountain West Civil Contructors, Inc. $0.17 $10,642.00 Show Low Construction, Inc. $0.13 $8,138.00 Steve Manning Construction Inc $0.12 $7,512.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $9,390.00 Kirkland Construction LLLP $0.12 $7,512.00 Pyramid Const & Aggregates Inc $1.00 $62,600.00 Engineer's Estimate 62,600 LNFT $0.30 $18,780.00

19 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0730 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

InterMountain West Civil Contructors, Inc. $2.00 $6,000.00 Show Low Construction, Inc. $5.00 $15,000.00 Steve Manning Construction Inc $2.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.00 $18,000.00 Kirkland Construction LLLP $2.50 $7,500.00 Pyramid Const & Aggregates Inc $3.00 $9,000.00 Engineer's Estimate 3,000 LNFT $10.00 $30,000.00

A0740 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

InterMountain West Civil Contructors, Inc. $50.00 $75,000.00 Show Low Construction, Inc. $16.25 $24,375.00 Steve Manning Construction Inc $25.00 $37,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20.00 $30,000.00 Kirkland Construction LLLP $30.00 $45,000.00 Pyramid Const & Aggregates Inc $16.00 $24,000.00 Engineer's Estimate 1,500.00 SQFT $30.00 $45,000.00

A0750 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

InterMountain West Civil Contructors, Inc. $39.00 $409,500.00 Show Low Construction, Inc. $33.00 $346,500.00 Steve Manning Construction Inc $45.00 $472,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $735,000.00 Kirkland Construction LLLP $47.00 $493,500.00 Pyramid Const & Aggregates Inc $70.00 $735,000.00 Engineer's Estimate 10,500 HOUR $65.00 $682,500.00

A0760 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

InterMountain West Civil Contructors, Inc. $49.00 $171,500.00 Show Low Construction, Inc. $48.00 $168,000.00 Steve Manning Construction Inc $65.00 $227,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $297,500.00 Kirkland Construction LLLP $80.00 $280,000.00 Pyramid Const & Aggregates Inc $81.00 $283,500.00 Engineer's Estimate 3,500 HOUR $75.00 $262,500.00

A0770 63602-3000 SYSTEM INSTALLATION, ELECTRICAL (RESET SOLAR WARNING LIGHT)

InterMountain West Civil Contructors, Inc. $2,500.00 $2,500.00 Show Low Construction, Inc. $2,500.00 $2,500.00 Steve Manning Construction Inc $5,000.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $10,000.00 $10,000.00 Kirkland Construction LLLP $2,500.00 $2,500.00 Pyramid Const & Aggregates Inc $6,500.00 $6,500.00 Engineer's Estimate 1 EACH $750.00 $750.00

20 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0780 64502-0000 LOCATE UTILITIES

InterMountain West Civil Contructors, Inc. $550.00 $27,500.00 Show Low Construction, Inc. $400.00 $20,000.00 Steve Manning Construction Inc $1,500.00 $75,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $25,000.00 Kirkland Construction LLLP $500.00 $25,000.00 Pyramid Const & Aggregates Inc $3,500.00 $175,000.00 Engineer's Estimate 50 EACH $750.00 $37,500.00

Total Schedule - All Items

InterMountain West Civil Contructors, Inc. $13,413,826.20 Show Low Construction, Inc. $14,735,587.46 Steve Manning Construction Inc $17,305,151.00 Stormwater Plans, LLC dba SWP Contracting and Paving $17,830,495.00 Kirkland Construction LLLP $18,033,325.20 Pyramid Const & Aggregates Inc $20,457,843.46 Engineer's Estimate $12,630,166.00

21 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: X

Schedule Type: Options

Solcitation No: 6982AF19B000024

Division: Central Federal Lands

State: AZ County: Yuma

Federal Land: BLM, DOD, FWS Opened at: Lakewood, CO

Opened by: Eric Grosskreuz

Date: 12/03/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Stormwater Plans, LLC dba SWP Contracting and Paving $4,648,369.00 5624 N. 54th Avenue Glendale, AZ 85301

InterMountain West Civil Contructors, Inc. $4,672,304.70 1564 N Alma School Road. Suite 200 Mesa, AZ 85201

Show Low Construction, Inc. $4,691,324.11 PO Box 29 Show Low, AZ 85901

Steve Manning Construction Inc $5,358,271.00 P.O. Box 491660 Redding, CA 96049

Pyramid Const & Aggregates Inc $5,695,304.73 839 Dogwood Road Heber, CA 92249

Kirkland Construction LLLP $5,962,266.60 2101 Main St Rye, CO 81069

Engineer's Estimate $4,605,342.00

22 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0010 15101-0000 MOBILIZATION

Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $465,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $353,000.00 Show Low Construction, Inc. Lump Sum $48,172.50 Steve Manning Construction Inc Lump Sum $500,000.00 Pyramid Const & Aggregates Inc Lump Sum $161,389.16 Kirkland Construction LLLP Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $292,816.50

X0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

Stormwater Plans, LLC dba SWP Contracting and Paving $15,000.00 $32,115.00 InterMountain West Civil Contructors, Inc. $7,000.00 $14,987.00 Show Low Construction, Inc. $5,326.02 $11,403.01 Steve Manning Construction Inc $9,000.00 $19,269.00 Pyramid Const & Aggregates Inc $6,531.53 $13,984.01 Kirkland Construction LLLP $8,000.00 $17,128.00 Engineer's Estimate 2.141 MILE $6,000.00 $12,846.00

X0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $10,705.00 InterMountain West Civil Contructors, Inc. $2,200.00 $4,710.20 Show Low Construction, Inc. $4,261.11 $9,123.04 Steve Manning Construction Inc $3,000.00 $6,423.00 Pyramid Const & Aggregates Inc $2,578.24 $5,520.01 Kirkland Construction LLLP $1,600.00 $3,425.60 Engineer's Estimate 2.141 MILE $2,500.00 $5,352.50

X0040 15215-1000 SURVEY AND STAKING, APPROACH ROAD

Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $9,000.00 InterMountain West Civil Contructors, Inc. $700.00 $2,100.00 Show Low Construction, Inc. $3,041.01 $9,123.03 Steve Manning Construction Inc $1,500.00 $4,500.00 Pyramid Const & Aggregates Inc $1,226.67 $3,680.01 Kirkland Construction LLLP $800.00 $2,400.00 Engineer's Estimate 3 EACH $2,500.00 $7,500.00

X0050 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Stormwater Plans, LLC dba SWP Contracting and Paving $1,500.00 $4,500.00 InterMountain West Civil Contructors, Inc. $900.00 $2,700.00 Show Low Construction, Inc. $1,520.51 $4,561.53 Steve Manning Construction Inc $1,200.00 $3,600.00 Pyramid Const & Aggregates Inc $1,226.67 $3,680.01 Kirkland Construction LLLP $1,000.00 $3,000.00 Engineer's Estimate 3 EACH $2,000.00 $6,000.00

23 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0060 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Stormwater Plans, LLC dba SWP Contracting and Paving $22,000.00 $94,204.00 InterMountain West Civil Contructors, Inc. $6,500.00 $27,833.00 Show Low Construction, Inc. $2,663.01 $11,403.01 Steve Manning Construction Inc $4,500.00 $19,269.00 Pyramid Const & Aggregates Inc $3,437.65 $14,720.02 Kirkland Construction LLLP $7,400.00 $31,686.80 Engineer's Estimate 4.282 MILE $3,500.00 $14,987.00

X0070 15301-0000 CONTRACTOR QUALITY CONTROL

Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $300,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $100,000.00 Show Low Construction, Inc. Lump Sum $20,000.00 Steve Manning Construction Inc Lump Sum $60,000.00 Pyramid Const & Aggregates Inc Lump Sum $15,000.00 Kirkland Construction LLLP Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $63,000.00

X0080 15401-0000 CONTRACTOR TESTING

Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $315,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $150,000.00 Show Low Construction, Inc. Lump Sum $10,000.00 Steve Manning Construction Inc Lump Sum $114,000.00 Pyramid Const & Aggregates Inc Lump Sum $35,000.00 Kirkland Construction LLLP Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $63,000.00

X0090 15501-0000 CONSTRUCTION SCHEDULE

Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $5,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $5,000.00 Show Low Construction, Inc. Lump Sum $1,000.00 Steve Manning Construction Inc Lump Sum $12,000.00 Pyramid Const & Aggregates Inc Lump Sum $10,000.00 Kirkland Construction LLLP Lump Sum $2,500.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00

X0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Stormwater Plans, LLC dba SWP Contracting and Paving $4.00 $32,800.00 InterMountain West Civil Contructors, Inc. $3.00 $24,600.00 Show Low Construction, Inc. $3.60 $29,520.00 Steve Manning Construction Inc $4.60 $37,720.00 Pyramid Const & Aggregates Inc $8.00 $65,600.00 Kirkland Construction LLLP $1.70 $13,940.00 Engineer's Estimate 8,200 LNFT $8.00 $65,600.00

24 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0110 15706-0200 SOIL EROSION CONTROL, CHECK DAM

Stormwater Plans, LLC dba SWP Contracting and Paving $600.00 $81,000.00 InterMountain West Civil Contructors, Inc. $200.00 $27,000.00 Show Low Construction, Inc. $90.00 $12,150.00 Steve Manning Construction Inc $60.00 $8,100.00 Pyramid Const & Aggregates Inc $500.00 $67,500.00 Kirkland Construction LLLP $33.00 $4,455.00 Engineer's Estimate 135 EACH $250.00 $33,750.00

X0120 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

Stormwater Plans, LLC dba SWP Contracting and Paving $75.00 $1,425.00 InterMountain West Civil Contructors, Inc. $120.00 $2,280.00 Show Low Construction, Inc. $72.00 $1,368.00 Steve Manning Construction Inc $150.00 $2,850.00 Pyramid Const & Aggregates Inc $500.00 $9,500.00 Kirkland Construction LLLP $69.00 $1,311.00 Engineer's Estimate 19 EACH $500.00 $9,500.00

X0130 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $2,600.00 InterMountain West Civil Contructors, Inc. $2,500.00 $5,000.00 Show Low Construction, Inc. $600.00 $1,200.00 Steve Manning Construction Inc $2,900.00 $5,800.00 Pyramid Const & Aggregates Inc $3,500.00 $7,000.00 Kirkland Construction LLLP $1,600.00 $3,200.00 Engineer's Estimate 2 EACH $3,500.00 $7,000.00

X0140 15802-0000 WATERING FOR DUST CONTROL

Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $150,000.00 Show Low Construction, Inc. Lump Sum $7,000.00 Steve Manning Construction Inc Lump Sum $112,000.00 Pyramid Const & Aggregates Inc Lump Sum $90,000.00 Kirkland Construction LLLP Lump Sum $38,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

X0150 20104-0000 CLEARING

Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $105,000.00 InterMountain West Civil Contructors, Inc. $3,200.00 $67,200.00 Show Low Construction, Inc. $3,919.00 $82,299.00 Steve Manning Construction Inc $3,400.00 $71,400.00 Pyramid Const & Aggregates Inc $6,000.00 $126,000.00 Kirkland Construction LLLP $6,000.00 $126,000.00 Engineer's Estimate 21.0 ACRE $1,500.00 $31,500.00

25 out of 49

Project No: AZ FLAP 439(1) & 202(1)

Project Name: Martinez Lake Road & Red Cloud Mine Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0160 20301-2400 REMOVAL OF SIGN

Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $3,500.00 InterMountain West Civil Contructors, Inc. $250.00 $5,000.00 Show Low Construction, Inc. $175.00 $3,500.00 Steve Manning Construction Inc $100.00 $2,000.00 Pyramid Const & Aggregates Inc $250.00 $5,000.00 Kirkland Construction LLLP $235.00 $4,700.00 Engineer's Estimate 20 EACH $200.00 $4,000.00

X0170 20401-0000 ROADWAY EXCAVATION

Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $205,440.00 InterMountain West Civil Contructors, Inc. $6.40 $109,568.00 Show Low Construction, Inc. $16.80 $287,616.00 Steve Manning Construction Inc $34.00 $582,080.00 Pyramid Const & Aggregates Inc $17.00 $291,040.00 Kirkland Construction LLLP $10.50 $179,760.00 Engineer's Estimate 17,120 CUYD $10.00 $171,200.00

X0180 20403-0000 UNCLASSIFIED BORROW

Stormwater Plans, LLC dba SWP Contracting and Paving $20.00 $240,000.00 InterMountain West Civil Contructors, Inc. $17.50 $210,000.00 Show Low Construction, Inc. $27.50 $330,000.00 Steve Manning Construction Inc $35.00 $420,000.00 Pyramid Const & Aggregates Inc $20.00 $240,000.00 Kirkland Construction LLLP $26.00 $312,000.00 Engineer's Estimate 12,000 CUYD $50.00 $600,000.00

X0190 25101-2200 PLACED RIPRAP, METHOD B,…

This is the start of the file's text. The full file is on GovTribe.