Bid Tabs Red Cloud Mine Road.pdf
PDF 646 KB Posted
- Solicitation number
- 6982AF19B000024
About this file
This document contains a bid tabulation report and details of a federal contract opportunity for road construction projects in Yuma County, Arizona. The bid tabulation report provides pricing from seven contractors for line items associated with minor road realignment and paving of approximately nine miles of roadway leading to Imperial National Wildlife Refuge, including over 33,000 tons of asphalt concrete pavement, 97,000 tons of aggregate base, 22,000 tons of cement treated aggregate course, and 219,000 cubic yards of roadway excavation. The estimated price range for the project is between $15-20 million. The federal contract opportunity notice specifies a solicitation number, provides a brief description of the work, and notes that construction is anticipated from November 2019 to September 2020. The opportunity is being offered through the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 12/11/19
1 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Contractor Responsive?
Engineer's Estimate
InterMountain West Civil Contructors, Inc.
Kirkland Construction LLLP
Pyramid Const & Aggregates Inc
Show Low Construction, Inc.
Steve Manning Construction Inc
Stormwater Plans, LLC dba SWP Contracting and Paving
Base Schedule A
$12,630,166.00
$13,413,826.20
$18,033,325.20
$20,457,843.46
$14,735,587.46
$17,305,151.00
$17,830,495.00
Option: X
$4,605,342.00
$4,672,304.70
$5,962,266.60
$5,695,304.74
$4,691,324.12
$5,358,271.00
$4,648,369.00
Option: Y
$1,746,805.00
$1,641,674.80
$1,765,910.05
$3,041,972.45
$1,358,378.53
$2,347,034.00
$3,584,198.00
Contractor Responsive?
Engineer's Estimate
InterMountain West Civil Contructors, Inc.
Kirkland Construction LLLP
Pyramid Const & Aggregates Inc
Show Low Construction, Inc.
Steve Manning Construction Inc
Stormwater Plans, LLC dba SWP Contracting and Paving
Option: Z
$198,012.00
$241,528.40
$177,737.40
$249,194.27
$156,251.00
$322,214.00
$942,510.00
2 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Contractor Responsive?
Engineer's Estimate
InterMountain West Civil Contructors, Inc.
Kirkland Construction LLLP
Pyramid Const & Aggregates Inc
Show Low Construction, Inc.
Steve Manning Construction Inc
Stormwater Plans, LLC dba SWP Contracting and Paving
Total Base Schedule A and Option(s): X
$17,235,508.00
$18,086,130.90
$23,995,591.80
$26,153,148.20
$19,426,911.58
$22,663,422.00
$22,478,864.00
Total Base Schedule A and Option(s): XY
$18,982,313.00
$19,727,805.70
$25,761,501.85
$29,195,120.65
$20,785,290.11
$25,010,456.00
$26,063,062.00
Total Base Schedule A and Option(s): XYZ
$19,180,325.00
$19,969,334.10
$25,939,239.25
$29,444,314.92
$20,941,541.11
$25,332,670.00
$27,005,572.00
Contractor Responsive?
Engineer's Estimate
InterMountain West Civil Contructors, Inc.
Kirkland Construction LLLP
Pyramid Const & Aggregates Inc
Show Low Construction, Inc.
Steve Manning Construction Inc
Stormwater Plans, LLC dba SWP Contracting and Paving
Total Base Schedule A and Option(s): XZ
$17,433,520.00
$18,327,659.30
$24,173,329.20
$26,402,342.47
$19,583,162.58
$22,985,636.00
$23,421,374.00
Total Base Schedule A and Option(s): Y
$14,376,971.00
$15,055,501.00
$19,799,235.25
$23,499,815.91
$16,093,965.99
$19,652,185.00
$21,414,693.00
Total Base Schedule A and Option(s): YZ
$14,574,983.00
$15,297,029.40
$19,976,972.65
$23,749,010.18
$16,250,216.99
$19,974,399.00
$22,357,203.00
3 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Contractor Responsive?
Engineer's Estimate
InterMountain West Civil Contructors, Inc.
Kirkland Construction LLLP
Pyramid Const & Aggregates Inc
Show Low Construction, Inc.
Steve Manning Construction Inc
Stormwater Plans, LLC dba SWP Contracting and Paving
Total Base Schedule A and Option(s): Z
$12,828,178.00
$13,655,354.60
$18,211,062.60
$20,707,037.73
$14,891,838.46
$17,627,365.00
$18,773,005.00
4 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF19B000024
Division: Central Federal Lands
State: AZ County: Yuma
Federal Land: BLM, DOD, FWS Opened at: Lakewood, CO
Opened by: Eric Grosskreuz
Date: 12/03/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
InterMountain West Civil Contructors, Inc. $13,413,826.20 1564 N Alma School Road. Suite 200 Mesa, AZ 85201
Show Low Construction, Inc. $14,735,587.46 PO Box 29 Show Low, AZ 85901
Steve Manning Construction Inc $17,305,151.00 P.O. Box 491660 Redding, CA 96049
Stormwater Plans, LLC dba SWP Contracting and Paving $17,830,495.00 5624 N. 54th Avenue Glendale, AZ 85301
Kirkland Construction LLLP $18,033,325.20 2101 Main St Rye, CO 81069
Pyramid Const & Aggregates Inc $20,457,843.46 839 Dogwood Road Heber, CA 92249
Engineer's Estimate $12,630,166.00
5 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0010 15101-0000 MOBILIZATION
InterMountain West Civil Contructors, Inc. Lump Sum $1,044,000.00 Show Low Construction, Inc. Lump Sum $1,932,000.00 Steve Manning Construction Inc Lump Sum $1,500,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $330,000.00 Kirkland Construction LLLP Lump Sum $2,150,000.00 Pyramid Const & Aggregates Inc Lump Sum $3,403,849.52 Engineer's Estimate ALL LPSM Lump Sum $1,118,182.00
A0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
InterMountain West Civil Contructors, Inc. $7,000.00 $41,496.00 Show Low Construction, Inc. $5,832.12 $34,572.81 Steve Manning Construction Inc $6,000.00 $35,568.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15,000.00 $88,920.00 Kirkland Construction LLLP $8,000.00 $47,424.00 Pyramid Const & Aggregates Inc $1,676.11 $9,935.98 Engineer's Estimate 5.928 MILE $6,000.00 $35,568.00
A0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING
InterMountain West Civil Contructors, Inc. $1,400.00 $8,299.20 Show Low Construction, Inc. $3,499.27 $20,743.67 Steve Manning Construction Inc $1,000.00 $5,928.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $29,640.00 Kirkland Construction LLLP $1,600.00 $9,484.80 Pyramid Const & Aggregates Inc $1,676.11 $9,935.98 Engineer's Estimate 5.928 MILE $2,500.00 $14,820.00
A0040 15215-1000 SURVEY AND STAKING, APPROACH ROAD
InterMountain West Civil Contructors, Inc. $700.00 $7,000.00 Show Low Construction, Inc. $2,074.37 $20,743.70 Steve Manning Construction Inc $1,800.00 $18,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $30,000.00 Kirkland Construction LLLP $800.00 $8,000.00 Pyramid Const & Aggregates Inc $1,656.00 $16,560.00 Engineer's Estimate 10 EACH $2,500.00 $25,000.00
A0050 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
InterMountain West Civil Contructors, Inc. $900.00 $33,300.00 Show Low Construction, Inc. $373.76 $13,829.12 Steve Manning Construction Inc $1,100.00 $40,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,500.00 $55,500.00 Kirkland Construction LLLP $1,000.00 $37,000.00 Pyramid Const & Aggregates Inc $298.38 $11,040.06 Engineer's Estimate 37 EACH $2,000.00 $74,000.00
6 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0060 15215-5000 SURVEY AND STAKING, BOX CULVERT
InterMountain West Civil Contructors, Inc. $4,200.00 $21,000.00 Show Low Construction, Inc. $2,765.82 $13,829.10 Steve Manning Construction Inc $1,600.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $12,500.00 Kirkland Construction LLLP $2,400.00 $12,000.00 Pyramid Const & Aggregates Inc $4,416.00 $22,080.00 Engineer's Estimate 5 EACH $5,000.00 $25,000.00
A0070 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
InterMountain West Civil Contructors, Inc. $6,500.00 $77,064.00 Show Low Construction, Inc. $2,916.06 $34,572.81 Steve Manning Construction Inc $3,000.00 $35,568.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $237,120.00 Kirkland Construction LLLP $7,400.00 $87,734.40 Pyramid Const & Aggregates Inc $3,538.47 $41,952.10 Engineer's Estimate 11.856 MILE $3,500.00 $41,496.00
A0080 15301-0000 CONTRACTOR QUALITY CONTROL
InterMountain West Civil Contructors, Inc. Lump Sum $250,000.00 Show Low Construction, Inc. Lump Sum $402,600.00 Steve Manning Construction Inc Lump Sum $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $300,000.00 Kirkland Construction LLLP Lump Sum $500,000.00 Pyramid Const & Aggregates Inc Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $113,000.00
A0090 15401-0000 CONTRACTOR TESTING
InterMountain West Civil Contructors, Inc. Lump Sum $200,000.00 Show Low Construction, Inc. Lump Sum $231,800.00 Steve Manning Construction Inc Lump Sum $420,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $900,000.00 Kirkland Construction LLLP Lump Sum $600,000.00 Pyramid Const & Aggregates Inc Lump Sum $986,424.00 Engineer's Estimate ALL LPSM Lump Sum $113,000.00
A0100 15501-0000 CONSTRUCTION SCHEDULE
InterMountain West Civil Contructors, Inc. Lump Sum $40,000.00 Show Low Construction, Inc. Lump Sum $12,000.00 Steve Manning Construction Inc Lump Sum $38,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $50,000.00 Kirkland Construction LLLP Lump Sum $20,000.00 Pyramid Const & Aggregates Inc Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
7 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0110 15705-0100 SOIL EROSION CONTROL, SILT FENCE
InterMountain West Civil Contructors, Inc. $3.00 $13,200.00 Show Low Construction, Inc. $2.75 $12,100.00 Steve Manning Construction Inc $3.80 $16,720.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4.00 $17,600.00 Kirkland Construction LLLP $5.50 $24,200.00 Pyramid Const & Aggregates Inc $8.00 $35,200.00 Engineer's Estimate 4,400 LNFT $10.00 $44,000.00
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
InterMountain West Civil Contructors, Inc. $3.00 $13,200.00 Show Low Construction, Inc. $3.60 $15,840.00 Steve Manning Construction Inc $4.20 $18,480.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4.00 $17,600.00 Kirkland Construction LLLP $1.70 $7,480.00 Pyramid Const & Aggregates Inc $6.00 $26,400.00 Engineer's Estimate 4,400 LNFT $8.00 $35,200.00
A0130 15706-0200 SOIL EROSION CONTROL, CHECK DAM
InterMountain West Civil Contructors, Inc. $200.00 $7,000.00 Show Low Construction, Inc. $89.50 $3,132.50 Steve Manning Construction Inc $150.00 $5,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $8,750.00 Kirkland Construction LLLP $33.00 $1,155.00 Pyramid Const & Aggregates Inc $500.00 $17,500.00 Engineer's Estimate 35 EACH $250.00 $8,750.00
A0140 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A
InterMountain West Civil Contructors, Inc. $120.00 $4,800.00 Show Low Construction, Inc. $72.00 $2,880.00 Steve Manning Construction Inc $180.00 $7,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $75.00 $3,000.00 Kirkland Construction LLLP $69.00 $2,760.00 Pyramid Const & Aggregates Inc $500.00 $20,000.00 Engineer's Estimate 40 EACH $500.00 $20,000.00
A0150 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
InterMountain West Civil Contructors, Inc. $2,500.00 $15,000.00 Show Low Construction, Inc. $600.00 $3,600.00 Steve Manning Construction Inc $2,990.00 $17,940.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $7,800.00 Kirkland Construction LLLP $1,600.00 $9,600.00 Pyramid Const & Aggregates Inc $3,000.00 $18,000.00 Engineer's Estimate 6 EACH $3,500.00 $21,000.00
8 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0160 15802-0000 WATERING FOR DUST CONTROL
InterMountain West Civil Contructors, Inc. Lump Sum $400,000.00 Show Low Construction, Inc. Lump Sum $366,000.00 Steve Manning Construction Inc Lump Sum $178,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,000,000.00 Kirkland Construction LLLP Lump Sum $600,000.00 Pyramid Const & Aggregates Inc Lump Sum $490,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
A0170 20104-0000 CLEARING
InterMountain West Civil Contructors, Inc. $2,000.00 $160,000.00 Show Low Construction, Inc. $575.00 $46,000.00 Steve Manning Construction Inc $3,600.00 $288,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $400,000.00 Kirkland Construction LLLP $6,000.00 $480,000.00 Pyramid Const & Aggregates Inc $3,000.00 $240,000.00 Engineer's Estimate 80.0 ACRE $1,500.00 $120,000.00
A0180 20301-2400 REMOVAL OF SIGN
InterMountain West Civil Contructors, Inc. $250.00 $13,750.00 Show Low Construction, Inc. $175.00 $9,625.00 Steve Manning Construction Inc $100.00 $5,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $9,625.00 Kirkland Construction LLLP $175.00 $9,625.00 Pyramid Const & Aggregates Inc $125.00 $6,875.00 Engineer's Estimate 55 EACH $200.00 $11,000.00
A0190 20401-0000 ROADWAY EXCAVATION
InterMountain West Civil Contructors, Inc. $7.25 $1,319,500.00 Show Low Construction, Inc. $12.78 $2,325,960.00 Steve Manning Construction Inc $16.40 $2,984,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $2,184,000.00 Kirkland Construction LLLP $10.50 $1,911,000.00 Pyramid Const & Aggregates Inc $18.00 $3,276,000.00 Engineer's Estimate 182,000 CUYD $10.00 $1,820,000.00
A0200 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
InterMountain West Civil Contructors, Inc. $130.00 $247,000.00 Show Low Construction, Inc. $139.00 $264,100.00 Steve Manning Construction Inc $121.00 $229,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $285,000.00 Kirkland Construction LLLP $143.00 $271,700.00 Pyramid Const & Aggregates Inc $208.08 $395,352.00 Engineer's Estimate 1,900.0 CUYD $175.00 $332,500.00
9 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0210 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
InterMountain West Civil Contructors, Inc. $165.00 $28,050.00 Show Low Construction, Inc. $145.00 $24,650.00 Steve Manning Construction Inc $138.00 $23,460.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $25,500.00 Kirkland Construction LLLP $182.00 $30,940.00 Pyramid Const & Aggregates Inc $225.00 $38,250.00 Engineer's Estimate 170.0 CUYD $225.00 $38,250.00
A0220 30101-0000 AGGREGATE BASE
InterMountain West Civil Contructors, Inc. $23.75 $1,945,125.00 Show Low Construction, Inc. $19.00 $1,556,100.00 Steve Manning Construction Inc $25.00 $2,047,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $35.00 $2,866,500.00 Kirkland Construction LLLP $28.00 $2,293,200.00 Pyramid Const & Aggregates Inc $19.00 $1,556,100.00 Engineer's Estimate 81,900.0 TON $22.00 $1,801,800.00
A0240 30703-0000 CEMENT TREATED AGGREGATE COURSE
InterMountain West Civil Contructors, Inc. $125.00 $933,750.00 Show Low Construction, Inc. $147.00 $1,098,090.00 Steve Manning Construction Inc $116.00 $866,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $42.00 $313,740.00 Kirkland Construction LLLP $202.00 $1,508,940.00 Pyramid Const & Aggregates Inc $147.00 $1,098,090.00 Engineer's Estimate 7,470 CUYD $85.00 $634,950.00
A0260 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
InterMountain West Civil Contructors, Inc. $86.00 $2,001,220.00 Show Low Construction, Inc. $81.00 $1,884,870.00 Steve Manning Construction Inc $105.00 $2,443,350.00 Stormwater Plans, LLC dba SWP Contracting and Paving $115.00 $2,676,050.00 Kirkland Construction LLLP $89.00 $2,071,030.00 Pyramid Const & Aggregates Inc $103.40 $2,406,118.00 Engineer's Estimate 23,270.0 TON $90.00 $2,094,300.00
10 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0270 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
InterMountain West Civil Contructors, Inc. $225.00 $51,750.00 Show Low Construction, Inc. $275.00 $63,250.00 Steve Manning Construction Inc $360.00 $82,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $57,500.00 Kirkland Construction LLLP $238.00 $54,740.00 Pyramid Const & Aggregates Inc $281.00 $64,630.00 Engineer's Estimate 230.0 TON $300.00 $69,000.00
A0290 40601-0000 FOG SEAL
InterMountain West Civil Contructors, Inc. $850.00 $53,550.00 Show Low Construction, Inc. $945.00 $59,535.00 Steve Manning Construction Inc $800.00 $50,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,000.00 $63,000.00 Kirkland Construction LLLP $900.00 $56,700.00 Pyramid Const & Aggregates Inc $800.00 $50,400.00 Engineer's Estimate 63.0 TON $900.00 $56,700.00
A0300 41101-1000 PRIME COAT, METHOD 1
InterMountain West Civil Contructors, Inc. $740.00 $102,860.00 Show Low Construction, Inc. $903.00 $125,517.00 Steve Manning Construction Inc $770.00 $107,030.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $180,700.00 Kirkland Construction LLLP $1,000.00 $139,000.00 Pyramid Const & Aggregates Inc $800.00 $111,200.00 Engineer's Estimate 139.0 TON $900.00 $125,100.00
A0310 41105-0000 BLOTTER
InterMountain West Civil Contructors, Inc. $20.00 $16,500.00 Show Low Construction, Inc. $30.00 $24,750.00 Steve Manning Construction Inc $10.00 $8,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $25.00 $20,625.00 Kirkland Construction LLLP $52.00 $42,900.00 Pyramid Const & Aggregates Inc $350.00 $288,750.00 Engineer's Estimate 825.0 TON $50.00 $41,250.00
A0320 41201-0000 TACK COAT
InterMountain West Civil Contructors, Inc. $675.00 $43,875.00 Show Low Construction, Inc. $824.00 $53,560.00 Steve Manning Construction Inc $900.00 $58,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $84,500.00 Kirkland Construction LLLP $1,200.00 $78,000.00 Pyramid Const & Aggregates Inc $800.00 $52,000.00 Engineer's Estimate 65.0 TON $900.00 $58,500.00
11 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0330 60101-0000 CONCRETE (HEADWALLS/WINGWALLS)
InterMountain West Civil Contructors, Inc. $2,000.00 $440,000.00 Show Low Construction, Inc. $3,385.00 $744,700.00 Steve Manning Construction Inc $2,100.00 $462,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $660,000.00 Kirkland Construction LLLP $1,400.00 $308,000.00 Pyramid Const & Aggregates Inc $2,396.53 $527,236.60 Engineer's Estimate 220.0 CUYD $450.00 $99,000.00
A0340 60201-0800 24-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $117.00 $238,680.00 Show Low Construction, Inc. $73.50 $149,940.00 Steve Manning Construction Inc $178.00 $363,120.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $336,600.00 Kirkland Construction LLLP $182.00 $371,280.00 Pyramid Const & Aggregates Inc $299.01 $609,980.40 Engineer's Estimate 2,040 LNFT $140.00 $285,600.00
A0350 60201-0900 30-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $140.00 $98,000.00 Show Low Construction, Inc. $84.00 $58,800.00 Steve Manning Construction Inc $200.00 $140,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $170.00 $119,000.00 Kirkland Construction LLLP $187.00 $130,900.00 Pyramid Const & Aggregates Inc $333.25 $233,275.00 Engineer's Estimate 700 LNFT $160.00 $112,000.00
A0360 60201-1000 36-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $175.00 $54,250.00 Show Low Construction, Inc. $95.00 $29,450.00 Steve Manning Construction Inc $248.00 $76,880.00 Stormwater Plans, LLC dba SWP Contracting and Paving $205.00 $63,550.00 Kirkland Construction LLLP $242.00 $75,020.00 Pyramid Const & Aggregates Inc $334.80 $103,788.00 Engineer's Estimate 310 LNFT $180.00 $55,800.00
A0370 60201-1200 48-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $225.00 $19,125.00 Show Low Construction, Inc. $126.00 $10,710.00 Steve Manning Construction Inc $352.00 $29,920.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $21,250.00 Kirkland Construction LLLP $296.00 $25,160.00 Pyramid Const & Aggregates Inc $438.78 $37,296.30 Engineer's Estimate 85 LNFT $200.00 $17,000.00
12 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 60201-1300 54-INCH PIPE CULVERT (CORRUGATED METAL PIPE, POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $250.00 $30,000.00 Show Low Construction, Inc. $170.00 $20,400.00 Steve Manning Construction Inc $421.00 $50,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $350.00 $42,000.00 Kirkland Construction LLLP $336.00 $40,320.00 Pyramid Const & Aggregates Inc $435.70 $52,284.00 Engineer's Estimate 120 LNFT $220.00 $26,400.00
A0390 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $940.00 $48,880.00 Show Low Construction, Inc. $580.00 $30,160.00 Steve Manning Construction Inc $400.00 $20,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $900.00 $46,800.00 Kirkland Construction LLLP $2,340.00 $121,680.00 Pyramid Const & Aggregates Inc $1,666.00 $86,632.00 Engineer's Estimate 52 EACH $800.00 $41,600.00
A0400 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT (POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $1,100.00 $19,800.00 Show Low Construction, Inc. $708.00 $12,744.00 Steve Manning Construction Inc $600.00 $10,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,100.00 $19,800.00 Kirkland Construction LLLP $2,500.00 $45,000.00 Pyramid Const & Aggregates Inc $1,856.23 $33,412.14 Engineer's Estimate 18 EACH $1,000.00 $18,000.00
A0410 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $1,200.00 $12,000.00 Show Low Construction, Inc. $950.00 $9,500.00 Steve Manning Construction Inc $750.00 $7,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,500.00 $15,000.00 Kirkland Construction LLLP $3,600.00 $36,000.00 Pyramid Const & Aggregates Inc $1,896.50 $18,965.00 Engineer's Estimate 10 EACH $1,200.00 $12,000.00
A0420 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT (POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $2,600.00 $10,400.00 Show Low Construction, Inc. $1,950.00 $7,800.00 Steve Manning Construction Inc $1,500.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,700.00 $10,800.00 Kirkland Construction LLLP $6,200.00 $24,800.00 Pyramid Const & Aggregates Inc $3,028.50 $12,114.00 Engineer's Estimate 4 EACH $1,400.00 $5,600.00
13 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0430 60210-1300 END SECTION FOR 54-INCH PIPE CULVERT (POLYMERIC COATED)
InterMountain West Civil Contructors, Inc. $3,400.00 $13,600.00 Show Low Construction, Inc. $2,535.00 $10,140.00 Steve Manning Construction Inc $2,200.00 $8,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,500.00 $14,000.00 Kirkland Construction LLLP $6,600.00 $26,400.00 Pyramid Const & Aggregates Inc $3,023.50 $12,094.00 Engineer's Estimate 4 EACH $1,600.00 $6,400.00
A0440 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (EIGHT BARRELS)
InterMountain West Civil Contructors, Inc. $900.00 $684,000.00 Show Low Construction, Inc. $859.00 $652,840.00 Steve Manning Construction Inc $1,360.00 $1,033,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $912,000.00 Kirkland Construction LLLP $1,030.00 $782,800.00 Pyramid Const & Aggregates Inc $864.63 $657,118.80 Engineer's Estimate 760 LNFT $620.00 $471,200.00
A0450 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (FIVE BARRELS)
InterMountain West Civil Contructors, Inc. $975.00 $448,500.00 Show Low Construction, Inc. $859.00 $395,140.00 Steve Manning Construction Inc $1,360.00 $625,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $552,000.00 Kirkland Construction LLLP $1,076.00 $494,960.00 Pyramid Const & Aggregates Inc $829.72 $381,671.20 Engineer's Estimate 460 LNFT $620.00 $285,200.00
A0460 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL
InterMountain West Civil Contructors, Inc. $1,400.00 $119,000.00 Show Low Construction, Inc. $859.00 $73,015.00 Steve Manning Construction Inc $1,360.00 $115,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $102,000.00 Kirkland Construction LLLP $1,705.00 $144,925.00 Pyramid Const & Aggregates Inc $1,213.40 $103,139.00 Engineer's Estimate 85 LNFT $620.00 $52,700.00
A0470 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (FOUR BARRELS)
InterMountain West Civil Contructors, Inc. $1,000.00 $340,000.00 Show Low Construction, Inc. $859.00 $292,060.00 Steve Manning Construction Inc $1,360.00 $462,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $408,000.00 Kirkland Construction LLLP $1,125.00 $382,500.00 Pyramid Const & Aggregates Inc $913.03 $310,430.20 Engineer's Estimate 340 LNFT $620.00 $210,800.00
14 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0480 60221-3000 10 FEET SPAN, 5 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL (SIX BARRELS)
InterMountain West Civil Contructors, Inc. $1,000.00 $336,000.00 Show Low Construction, Inc. $859.00 $288,624.00 Steve Manning Construction Inc $1,360.00 $456,960.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $403,200.00 Kirkland Construction LLLP $1,130.00 $379,680.00 Pyramid Const & Aggregates Inc $838.60 $281,769.60 Engineer's Estimate 336 LNFT $620.00 $208,320.00
A0490 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
InterMountain West Civil Contructors, Inc. $51.00 $59,925.00 Show Low Construction, Inc. $55.35 $65,036.25 Steve Manning Construction Inc $53.00 $62,275.00 Stormwater Plans, LLC dba SWP Contracting and Paving $65.00 $76,375.00 Kirkland Construction LLLP $53.00 $62,275.00 Pyramid Const & Aggregates Inc $52.00 $61,100.00 Engineer's Estimate 1,175 LNFT $32.00 $37,600.00
A0500 61701-1250 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A WOOD POSTS
InterMountain West Civil Contructors, Inc. $42.00 $168,000.00 Show Low Construction, Inc. $43.00 $172,000.00 Steve Manning Construction Inc $43.00 $172,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $240,000.00 Kirkland Construction LLLP $41.00 $164,000.00 Pyramid Const & Aggregates Inc $41.00 $164,000.00 Engineer's Estimate 4,000 LNFT $25.00 $100,000.00
A0510 61702-0800 TERMINAL SECTION TYPE TANGENT
InterMountain West Civil Contructors, Inc. $3,500.00 $49,000.00 Show Low Construction, Inc. $5,535.00 $77,490.00 Steve Manning Construction Inc $4,000.00 $56,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $35,000.00 Kirkland Construction LLLP $5,250.00 $73,500.00 Pyramid Const & Aggregates Inc $5,175.00 $72,450.00 Engineer's Estimate 14 EACH $4,000.00 $56,000.00
A0520 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
InterMountain West Civil Contructors, Inc. $105.00 $4,200.00 Show Low Construction, Inc. $119.00 $4,760.00 Steve Manning Construction Inc $150.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $6,000.00 Kirkland Construction LLLP $139.00 $5,560.00 Pyramid Const & Aggregates Inc $100.00 $4,000.00 Engineer's Estimate 40 HOUR $130.00 $5,200.00
15 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0530 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
InterMountain West Civil Contructors, Inc. $95.00 $3,800.00 Show Low Construction, Inc. $93.00 $3,720.00 Steve Manning Construction Inc $170.00 $6,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $6,000.00 Kirkland Construction LLLP $110.00 $4,400.00 Pyramid Const & Aggregates Inc $150.00 $6,000.00 Engineer's Estimate 40 HOUR $175.00 $7,000.00
A0540 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
InterMountain West Civil Contructors, Inc. $115.00 $4,600.00 Show Low Construction, Inc. $150.00 $6,000.00 Steve Manning Construction Inc $170.00 $6,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $10,000.00 Kirkland Construction LLLP $155.00 $6,200.00 Pyramid Const & Aggregates Inc $300.00 $12,000.00 Engineer's Estimate 40 HOUR $175.00 $7,000.00
A0550 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT
InterMountain West Civil Contructors, Inc. $165.00 $6,600.00 Show Low Construction, Inc. $225.00 $9,000.00 Steve Manning Construction Inc $200.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $10,000.00 Kirkland Construction LLLP $152.00 $6,080.00 Pyramid Const & Aggregates Inc $437.00 $17,480.00 Engineer's Estimate 40 HOUR $225.00 $9,000.00
A0560 62301-0000 GENERAL LABOR
InterMountain West Civil Contructors, Inc. $40.00 $1,600.00 Show Low Construction, Inc. $34.00 $1,360.00 Steve Manning Construction Inc $70.00 $2,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $2,800.00 Kirkland Construction LLLP $103.00 $4,120.00 Pyramid Const & Aggregates Inc $125.00 $5,000.00 Engineer's Estimate 40 HOUR $65.00 $2,600.00
A0570 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
InterMountain West Civil Contructors, Inc. $250.00 $10,000.00 Show Low Construction, Inc. $250.00 $10,000.00 Steve Manning Construction Inc $100.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $10,000.00 Kirkland Construction LLLP $175.00 $7,000.00 Pyramid Const & Aggregates Inc $250.00 $10,000.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00
16 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0580 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
InterMountain West Civil Contructors, Inc. $150.00 $6,000.00 Show Low Construction, Inc. $200.00 $8,000.00 Steve Manning Construction Inc $200.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $8,000.00 Kirkland Construction LLLP $197.00 $7,880.00 Pyramid Const & Aggregates Inc $250.00 $10,000.00 Engineer's Estimate 40 HOUR $220.00 $8,800.00
A0590 62510-2000 SEEDING, HYDRAULIC METHOD
InterMountain West Civil Contructors, Inc. $1,500.00 $73,500.00 Show Low Construction, Inc. $3,350.00 $164,150.00 Steve Manning Construction Inc $3,400.00 $166,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,500.00 $122,500.00 Kirkland Construction LLLP $3,200.00 $156,800.00 Pyramid Const & Aggregates Inc $3,156.42 $154,664.58 Engineer's Estimate 49.0 ACRE $2,200.00 $107,800.00
A0600 63301-0000 SIGN SYSTEM
InterMountain West Civil Contructors, Inc. $775.00 $42,625.00 Show Low Construction, Inc. $481.90 $26,504.50 Steve Manning Construction Inc $300.00 $16,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $600.00 $33,000.00 Kirkland Construction LLLP $650.00 $35,750.00 Pyramid Const & Aggregates Inc $500.00 $27,500.00 Engineer's Estimate 55 EACH $600.00 $33,000.00
A0610 63316-1000 REMOVE AND RESET SIGN (PANEL)
InterMountain West Civil Contructors, Inc. $275.00 $2,200.00 Show Low Construction, Inc. $75.00 $600.00 Steve Manning Construction Inc $300.00 $2,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $6,000.00 Kirkland Construction LLLP $640.00 $5,120.00 Pyramid Const & Aggregates Inc $500.00 $4,000.00 Engineer's Estimate 8 EACH $300.00 $2,400.00
A0620 63316-1000 REMOVE AND RESET SIGN
InterMountain West Civil Contructors, Inc. $280.00 $7,000.00 Show Low Construction, Inc. $290.00 $7,250.00 Steve Manning Construction Inc $300.00 $7,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $18,750.00 Kirkland Construction LLLP $1,000.00 $25,000.00 Pyramid Const & Aggregates Inc $500.00 $12,500.00 Engineer's Estimate 25 EACH $500.00 $12,500.00
17 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0630 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
InterMountain West Civil Contructors, Inc. $0.45 $69,750.00 Show Low Construction, Inc. $0.51 $79,050.00 Steve Manning Construction Inc $0.40 $62,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $23,250.00 Kirkland Construction LLLP $0.47 $72,850.00 Pyramid Const & Aggregates Inc $0.46 $71,300.00 Engineer's Estimate 155,000 LNFT $0.75 $116,250.00
A0640 63401-1600 PAVEMENT MARKINGS, TYPE H, BROKEN
InterMountain West Civil Contructors, Inc. $0.45 $3,600.00 Show Low Construction, Inc. $0.16 $1,280.00 Steve Manning Construction Inc $0.50 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.07 $560.00 Kirkland Construction LLLP $0.58 $4,640.00 Pyramid Const & Aggregates Inc $0.58 $4,640.00 Engineer's Estimate 8,000 LNFT $0.60 $4,800.00
A0650 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
InterMountain West Civil Contructors, Inc. $110.00 $1,760.00 Show Low Construction, Inc. $150.00 $2,400.00 Steve Manning Construction Inc $100.00 $1,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $275.00 $4,400.00 Kirkland Construction LLLP $100.00 $1,600.00 Pyramid Const & Aggregates Inc $35.00 $560.00 Engineer's Estimate 16 EACH $600.00 $9,600.00
A0660 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
InterMountain West Civil Contructors, Inc. $80.00 $24,000.00 Show Low Construction, Inc. $17.00 $5,100.00 Steve Manning Construction Inc $30.00 $9,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $26.00 $7,800.00 Kirkland Construction LLLP $5.00 $1,500.00 Pyramid Const & Aggregates Inc $30.00 $9,000.00 Engineer's Estimate 300 EACH $27.00 $8,100.00
A0670 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
InterMountain West Civil Contructors, Inc. $45.00 $72,000.00 Show Low Construction, Inc. $11.00 $17,600.00 Steve Manning Construction Inc $50.00 $80,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20.00 $32,000.00 Kirkland Construction LLLP $5.00 $8,000.00 Pyramid Const & Aggregates Inc $35.00 $56,000.00 Engineer's Estimate 1,600 EACH $27.00 $43,200.00
18 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0680 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
InterMountain West Civil Contructors, Inc. $100.00 $50,000.00 Show Low Construction, Inc. $21.00 $10,500.00 Steve Manning Construction Inc $70.00 $35,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $27,500.00 Kirkland Construction LLLP $50.00 $25,000.00 Pyramid Const & Aggregates Inc $150.00 $75,000.00 Engineer's Estimate 500 EACH $55.00 $27,500.00
A0690 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
InterMountain West Civil Contructors, Inc. $50.00 $2,500.00 Show Low Construction, Inc. $40.00 $2,000.00 Steve Manning Construction Inc $400.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $45.00 $2,250.00 Kirkland Construction LLLP $10.00 $500.00 Pyramid Const & Aggregates Inc $60.00 $3,000.00 Engineer's Estimate 50 EACH $50.00 $2,500.00
A0700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
InterMountain West Civil Contructors, Inc. $200.00 $10,000.00 Show Low Construction, Inc. $40.00 $2,000.00 Steve Manning Construction Inc $100.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $45.00 $2,250.00 Kirkland Construction LLLP $10.00 $500.00 Pyramid Const & Aggregates Inc $60.00 $3,000.00 Engineer's Estimate 50 EACH $50.00 $2,500.00
A0710 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
InterMountain West Civil Contructors, Inc. $17,000.00 $34,000.00 Show Low Construction, Inc. $16,500.00 $33,000.00 Steve Manning Construction Inc $10,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $40,000.00 Kirkland Construction LLLP $20,000.00 $40,000.00 Pyramid Const & Aggregates Inc $100.00 $200.00 Engineer's Estimate 2 EACH $15,000.00 $30,000.00
A0720 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
InterMountain West Civil Contructors, Inc. $0.17 $10,642.00 Show Low Construction, Inc. $0.13 $8,138.00 Steve Manning Construction Inc $0.12 $7,512.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $9,390.00 Kirkland Construction LLLP $0.12 $7,512.00 Pyramid Const & Aggregates Inc $1.00 $62,600.00 Engineer's Estimate 62,600 LNFT $0.30 $18,780.00
19 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0730 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
InterMountain West Civil Contructors, Inc. $2.00 $6,000.00 Show Low Construction, Inc. $5.00 $15,000.00 Steve Manning Construction Inc $2.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.00 $18,000.00 Kirkland Construction LLLP $2.50 $7,500.00 Pyramid Const & Aggregates Inc $3.00 $9,000.00 Engineer's Estimate 3,000 LNFT $10.00 $30,000.00
A0740 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
InterMountain West Civil Contructors, Inc. $50.00 $75,000.00 Show Low Construction, Inc. $16.25 $24,375.00 Steve Manning Construction Inc $25.00 $37,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20.00 $30,000.00 Kirkland Construction LLLP $30.00 $45,000.00 Pyramid Const & Aggregates Inc $16.00 $24,000.00 Engineer's Estimate 1,500.00 SQFT $30.00 $45,000.00
A0750 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
InterMountain West Civil Contructors, Inc. $39.00 $409,500.00 Show Low Construction, Inc. $33.00 $346,500.00 Steve Manning Construction Inc $45.00 $472,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $735,000.00 Kirkland Construction LLLP $47.00 $493,500.00 Pyramid Const & Aggregates Inc $70.00 $735,000.00 Engineer's Estimate 10,500 HOUR $65.00 $682,500.00
A0760 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
InterMountain West Civil Contructors, Inc. $49.00 $171,500.00 Show Low Construction, Inc. $48.00 $168,000.00 Steve Manning Construction Inc $65.00 $227,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $297,500.00 Kirkland Construction LLLP $80.00 $280,000.00 Pyramid Const & Aggregates Inc $81.00 $283,500.00 Engineer's Estimate 3,500 HOUR $75.00 $262,500.00
A0770 63602-3000 SYSTEM INSTALLATION, ELECTRICAL (RESET SOLAR WARNING LIGHT)
InterMountain West Civil Contructors, Inc. $2,500.00 $2,500.00 Show Low Construction, Inc. $2,500.00 $2,500.00 Steve Manning Construction Inc $5,000.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $10,000.00 $10,000.00 Kirkland Construction LLLP $2,500.00 $2,500.00 Pyramid Const & Aggregates Inc $6,500.00 $6,500.00 Engineer's Estimate 1 EACH $750.00 $750.00
20 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0780 64502-0000 LOCATE UTILITIES
InterMountain West Civil Contructors, Inc. $550.00 $27,500.00 Show Low Construction, Inc. $400.00 $20,000.00 Steve Manning Construction Inc $1,500.00 $75,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $25,000.00 Kirkland Construction LLLP $500.00 $25,000.00 Pyramid Const & Aggregates Inc $3,500.00 $175,000.00 Engineer's Estimate 50 EACH $750.00 $37,500.00
Total Schedule - All Items
InterMountain West Civil Contructors, Inc. $13,413,826.20 Show Low Construction, Inc. $14,735,587.46 Steve Manning Construction Inc $17,305,151.00 Stormwater Plans, LLC dba SWP Contracting and Paving $17,830,495.00 Kirkland Construction LLLP $18,033,325.20 Pyramid Const & Aggregates Inc $20,457,843.46 Engineer's Estimate $12,630,166.00
21 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF19B000024
Division: Central Federal Lands
State: AZ County: Yuma
Federal Land: BLM, DOD, FWS Opened at: Lakewood, CO
Opened by: Eric Grosskreuz
Date: 12/03/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Stormwater Plans, LLC dba SWP Contracting and Paving $4,648,369.00 5624 N. 54th Avenue Glendale, AZ 85301
InterMountain West Civil Contructors, Inc. $4,672,304.70 1564 N Alma School Road. Suite 200 Mesa, AZ 85201
Show Low Construction, Inc. $4,691,324.11 PO Box 29 Show Low, AZ 85901
Steve Manning Construction Inc $5,358,271.00 P.O. Box 491660 Redding, CA 96049
Pyramid Const & Aggregates Inc $5,695,304.73 839 Dogwood Road Heber, CA 92249
Kirkland Construction LLLP $5,962,266.60 2101 Main St Rye, CO 81069
Engineer's Estimate $4,605,342.00
22 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0010 15101-0000 MOBILIZATION
Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $465,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $353,000.00 Show Low Construction, Inc. Lump Sum $48,172.50 Steve Manning Construction Inc Lump Sum $500,000.00 Pyramid Const & Aggregates Inc Lump Sum $161,389.16 Kirkland Construction LLLP Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $292,816.50
X0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Stormwater Plans, LLC dba SWP Contracting and Paving $15,000.00 $32,115.00 InterMountain West Civil Contructors, Inc. $7,000.00 $14,987.00 Show Low Construction, Inc. $5,326.02 $11,403.01 Steve Manning Construction Inc $9,000.00 $19,269.00 Pyramid Const & Aggregates Inc $6,531.53 $13,984.01 Kirkland Construction LLLP $8,000.00 $17,128.00 Engineer's Estimate 2.141 MILE $6,000.00 $12,846.00
X0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $10,705.00 InterMountain West Civil Contructors, Inc. $2,200.00 $4,710.20 Show Low Construction, Inc. $4,261.11 $9,123.04 Steve Manning Construction Inc $3,000.00 $6,423.00 Pyramid Const & Aggregates Inc $2,578.24 $5,520.01 Kirkland Construction LLLP $1,600.00 $3,425.60 Engineer's Estimate 2.141 MILE $2,500.00 $5,352.50
X0040 15215-1000 SURVEY AND STAKING, APPROACH ROAD
Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $9,000.00 InterMountain West Civil Contructors, Inc. $700.00 $2,100.00 Show Low Construction, Inc. $3,041.01 $9,123.03 Steve Manning Construction Inc $1,500.00 $4,500.00 Pyramid Const & Aggregates Inc $1,226.67 $3,680.01 Kirkland Construction LLLP $800.00 $2,400.00 Engineer's Estimate 3 EACH $2,500.00 $7,500.00
X0050 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Stormwater Plans, LLC dba SWP Contracting and Paving $1,500.00 $4,500.00 InterMountain West Civil Contructors, Inc. $900.00 $2,700.00 Show Low Construction, Inc. $1,520.51 $4,561.53 Steve Manning Construction Inc $1,200.00 $3,600.00 Pyramid Const & Aggregates Inc $1,226.67 $3,680.01 Kirkland Construction LLLP $1,000.00 $3,000.00 Engineer's Estimate 3 EACH $2,000.00 $6,000.00
23 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0060 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
Stormwater Plans, LLC dba SWP Contracting and Paving $22,000.00 $94,204.00 InterMountain West Civil Contructors, Inc. $6,500.00 $27,833.00 Show Low Construction, Inc. $2,663.01 $11,403.01 Steve Manning Construction Inc $4,500.00 $19,269.00 Pyramid Const & Aggregates Inc $3,437.65 $14,720.02 Kirkland Construction LLLP $7,400.00 $31,686.80 Engineer's Estimate 4.282 MILE $3,500.00 $14,987.00
X0070 15301-0000 CONTRACTOR QUALITY CONTROL
Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $300,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $100,000.00 Show Low Construction, Inc. Lump Sum $20,000.00 Steve Manning Construction Inc Lump Sum $60,000.00 Pyramid Const & Aggregates Inc Lump Sum $15,000.00 Kirkland Construction LLLP Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $63,000.00
X0080 15401-0000 CONTRACTOR TESTING
Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $315,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $150,000.00 Show Low Construction, Inc. Lump Sum $10,000.00 Steve Manning Construction Inc Lump Sum $114,000.00 Pyramid Const & Aggregates Inc Lump Sum $35,000.00 Kirkland Construction LLLP Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $63,000.00
X0090 15501-0000 CONSTRUCTION SCHEDULE
Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $5,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $5,000.00 Show Low Construction, Inc. Lump Sum $1,000.00 Steve Manning Construction Inc Lump Sum $12,000.00 Pyramid Const & Aggregates Inc Lump Sum $10,000.00 Kirkland Construction LLLP Lump Sum $2,500.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
X0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Stormwater Plans, LLC dba SWP Contracting and Paving $4.00 $32,800.00 InterMountain West Civil Contructors, Inc. $3.00 $24,600.00 Show Low Construction, Inc. $3.60 $29,520.00 Steve Manning Construction Inc $4.60 $37,720.00 Pyramid Const & Aggregates Inc $8.00 $65,600.00 Kirkland Construction LLLP $1.70 $13,940.00 Engineer's Estimate 8,200 LNFT $8.00 $65,600.00
24 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0110 15706-0200 SOIL EROSION CONTROL, CHECK DAM
Stormwater Plans, LLC dba SWP Contracting and Paving $600.00 $81,000.00 InterMountain West Civil Contructors, Inc. $200.00 $27,000.00 Show Low Construction, Inc. $90.00 $12,150.00 Steve Manning Construction Inc $60.00 $8,100.00 Pyramid Const & Aggregates Inc $500.00 $67,500.00 Kirkland Construction LLLP $33.00 $4,455.00 Engineer's Estimate 135 EACH $250.00 $33,750.00
X0120 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A
Stormwater Plans, LLC dba SWP Contracting and Paving $75.00 $1,425.00 InterMountain West Civil Contructors, Inc. $120.00 $2,280.00 Show Low Construction, Inc. $72.00 $1,368.00 Steve Manning Construction Inc $150.00 $2,850.00 Pyramid Const & Aggregates Inc $500.00 $9,500.00 Kirkland Construction LLLP $69.00 $1,311.00 Engineer's Estimate 19 EACH $500.00 $9,500.00
X0130 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $2,600.00 InterMountain West Civil Contructors, Inc. $2,500.00 $5,000.00 Show Low Construction, Inc. $600.00 $1,200.00 Steve Manning Construction Inc $2,900.00 $5,800.00 Pyramid Const & Aggregates Inc $3,500.00 $7,000.00 Kirkland Construction LLLP $1,600.00 $3,200.00 Engineer's Estimate 2 EACH $3,500.00 $7,000.00
X0140 15802-0000 WATERING FOR DUST CONTROL
Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 InterMountain West Civil Contructors, Inc. Lump Sum $150,000.00 Show Low Construction, Inc. Lump Sum $7,000.00 Steve Manning Construction Inc Lump Sum $112,000.00 Pyramid Const & Aggregates Inc Lump Sum $90,000.00 Kirkland Construction LLLP Lump Sum $38,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
X0150 20104-0000 CLEARING
Stormwater Plans, LLC dba SWP Contracting and Paving $5,000.00 $105,000.00 InterMountain West Civil Contructors, Inc. $3,200.00 $67,200.00 Show Low Construction, Inc. $3,919.00 $82,299.00 Steve Manning Construction Inc $3,400.00 $71,400.00 Pyramid Const & Aggregates Inc $6,000.00 $126,000.00 Kirkland Construction LLLP $6,000.00 $126,000.00 Engineer's Estimate 21.0 ACRE $1,500.00 $31,500.00
25 out of 49
Project No: AZ FLAP 439(1) & 202(1)
Project Name: Martinez Lake Road & Red Cloud Mine Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0160 20301-2400 REMOVAL OF SIGN
Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $3,500.00 InterMountain West Civil Contructors, Inc. $250.00 $5,000.00 Show Low Construction, Inc. $175.00 $3,500.00 Steve Manning Construction Inc $100.00 $2,000.00 Pyramid Const & Aggregates Inc $250.00 $5,000.00 Kirkland Construction LLLP $235.00 $4,700.00 Engineer's Estimate 20 EACH $200.00 $4,000.00
X0170 20401-0000 ROADWAY EXCAVATION
Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $205,440.00 InterMountain West Civil Contructors, Inc. $6.40 $109,568.00 Show Low Construction, Inc. $16.80 $287,616.00 Steve Manning Construction Inc $34.00 $582,080.00 Pyramid Const & Aggregates Inc $17.00 $291,040.00 Kirkland Construction LLLP $10.50 $179,760.00 Engineer's Estimate 17,120 CUYD $10.00 $171,200.00
X0180 20403-0000 UNCLASSIFIED BORROW
Stormwater Plans, LLC dba SWP Contracting and Paving $20.00 $240,000.00 InterMountain West Civil Contructors, Inc. $17.50 $210,000.00 Show Low Construction, Inc. $27.50 $330,000.00 Steve Manning Construction Inc $35.00 $420,000.00 Pyramid Const & Aggregates Inc $20.00 $240,000.00 Kirkland Construction LLLP $26.00 $312,000.00 Engineer's Estimate 12,000 CUYD $50.00 $600,000.00
X0190 25101-2200 PLACED RIPRAP, METHOD B,…