AZ_FLAP_439(1)_202(1)_Martinez_Lake_Rd_Red_Cloud_Mine_Rd_100_Plans.pdf
PDF 297 MB Posted
- Solicitation number
- 6982AF19B000024
About this file
This federal solicitation is for a transportation infrastructure project in Yuma County, Arizona. The project consists of realigning and paving approximately 6 miles of existing asphalt roadway and 2.1 miles of gravel roadway leading to the Imperial National Wildlife Refuge, as well as fully realigning an additional 1 mile of roadway. Work will include drainage improvements such as culvert replacement and installation. The estimated price range for the project is between $15-20 million. The anticipated advertisement date is mid-October 2019 with construction expected to take place from November 2019 through September 2020. Significant construction elements include 33,000 tons of asphalt pavement, 97,000 tons of aggregate base, 22,000 tons of cement treated aggregate course, and various quantities of excavation, guardrail, riprap, concrete box culverts, and metal pipe culverts. Construction phasing and traffic control will be important to minimize disruptions to refuge visitors during the project. The soliciting agency is the US Department of Transportation Federal Highway Administration.
Plans
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .