AZ FLAP 439(1) & 202(1) Questions and Answers during Advertisement 11-14-19.pdf

PDF 87 KB Posted

Attached to
AZ FLAP 439(1) & 202(1), MARTINEZ LAKE & RED CLOUD MINE ROAD
Solicitation number
6982AF19B000024
Issued by

About this file

This document contains questions and answers regarding a federal transportation project solicitation. The solicitation is for AZ FLAP 439(1) & 202(1), Martinez Lake & Red Cloud Mine Road project in Yuma County, Arizona, consisting of road realignment, paving, drainage improvements including culvert replacement and installation, and totaling approximately 9.1 miles. Key project elements include 33,000 tons of asphalt pavement, 97,000 tons of aggregate base, 22,000 tons of cement treated aggregate course, and 219,000 cubic yards of roadway excavation. The bid opening date was extended to December 3, 2019 via Amendment A002 due to difficulties accessing information online. Construction is anticipated from November 2019 to September 2020 and will require adherence to water usage maximums of 25 acre-feet monthly, 6 acre-feet weekly and 1.2 acre-feet daily not exceeding a total of 300 acre-feet for the project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for AZ FLAP 439(1) & 202(1), Martinez Lake & Red Cloud Mine Road

November 7, 2019

Questions Answers We are a precast manufacture that will be bidding on the box culverts shown on the Martinez Lake & Red Cloud project over in Yuma, Az. After reviewing project, I noticed there’s some Corrugated Metal Pipe and End Section. Will DOT allow Reinforced Concrete Pipe in lieu of the Corrugated Metal?

The pipe culvert requirements will be as called out on the project plans. If the contractor desires to use reinforced concrete pipe, they should reference FP Section 103.03 Value Engineering.

November 14, 2019

Please review these two locations and let us know which one is going to be used. Bid schedule or spec section page E-67 Bid schedule

A0630 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

155,000 LNFT

Page E67 Section 634.05 Waterborne Traffic Paint (Type B and C)

The bid schedule (Type H) is correct.

We noticed that the solicitation number listed on the Standard Form 1442 within this Invitation to Bid was listed as 6982AF19SS0015 instead of Solicitation number 6982AF19B000024 noted on all other documents.

Can you please verify for us which is the correct Solicitation number for this project and let us know if an Addendum will be issued to correct this issue?

The correct number for this solicitation is 6982AF19B000024.

I cannot find where we register as an interest bidder on the new website beta.sam.gov. On fbo.gov there was a way to add yourself as an interested bidder.

Also on beta.sam.gov the estimate amount of contract was 15,000,000 – 20,000,000. This amount was lined out. Is there a new estimated amount of contract?

Currently beta.sam is experiencing technical issues with the interested vendors, please check back regularly on the site for updates.

It was brought to our attention by our Bonding company that the Bond Form you have included in the Information to Bid Packet expired on 7/31/2019. We have located the most current Bid Bond form provided by GSA with an expiration date of 08/31/2022. Please confirm this is the most current form.

The correct form is the one the bonding company brought to your attention, the one with the expiration date of 8/31/2022.

Are the CAD plan files available for use during the bidding phase?

We are requesting the files for quantity take-off and verification.

CAD files are not provided during bidding. They are, however, provided to the selected contractor after the project award.

On Sheet T24 the piping plug detail.

What is the spec requirements on the “impermeable backfill material”.

What is the designated “High Water Elevation” on the site.

The requirements for impermeable backfill material for a piping plug are presented in section 602.03 of FP-14.

High water elevation is 2-ft above the top of pipe, or the finished subgrade, whichever is lower.

Can the box culverts be “Cast in Place” in lieu of Precast? Both cast-in-place and pre-cast are acceptable.

Due to FBO going offline and difficulties with the launching of the (beta.SAM.GOV) web site we are experiencing difficulties downloading updated information and forwarding bid information on to subs and suppliers. We are requesting a 2 week bid extension.

The bid opening date will be changed to 12/3/2019, please see Amendment A002.

What would be the source of construction water for this project? See section 105.02(a) of the SCRs.

What risk level is the Storm Water Pollution Prevention Plan for this project?

We confirmed with our SWPPP designer that Arizona doesn’t have the risk level calculation. We can offer that no monitoring is required because there are no impaired waters within ¼ mile of the project. As noted on page 7 of the SWPPP, a portion of the Colorado River is listed as impaired but it is downstream of the project and more than ¼ mile away.

Do you think the bid date will change due to not being able to post an amendment?

The bid opening date will be changed to 12/3/2019, please see Amendment A002.

We would like to know if there will be any daily, weekly or monthly restrictions on the amount of water usage allowed for the above referenced project?

The maximum water allocations are as follows:

Monthly 25 Acre-feet (8,146,000 gallons)

Weekly

6.0 acre-feet (!,955,000 gallons)

Daily

1.2 acre-feet (391,000 gallons)

Project total should not to exceed 300 acre-feet.