Question and Answers CA ERFO NP DEVA 2022-1(2) 09 17 2024.pdf
PDF 149 KB Posted
- Attached to
- CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail Federal contract opportunity
- Solicitation number
- 6982AF19B000019
About this file
This document contains questions and answers related to a federal contract opportunity for the CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail project. Key details include:
The project involves replacement and reconstruction of a 2,871-foot-long, ABA accessible, raised timber boardwalk trail (6-feet wide) that was destroyed by flash flooding. It also includes removal of damaged boardwalk, reconstructing the trailhead parking lot, and reconstructing a 400-foot section of roadway with special rock embankment. The work will be conducted in cultural and natural resource sensitive areas with environmental constraints. Prior experience on similar projects within National Parks, National Forests, or similar environments is required. The project is anticipated to be advertised in September 2024 with construction from November 2024 to June 2025. The estimated price range is $5,000,000 to $10,000,000.
The questions and answers provide clarification on the site visit, finishing requirements for thermally modified wood decking, and the number of test piles required. An amendment will be issued to clarify that one test pile is required for each pile diameter prior to production pile installation.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6982AF24B000019
CA ERFO DEVA 2022-1(2)
SALT CREEK INTREPRETIVE TRAIL
9/17/2024
Question Answer Received September 11, 2024
1. I wanted to find out if and when a scheduled site showing will occur or has occurred for the above referenced project at Death Valley NP; the Salt Creek Trail Boardwalk?
A non-mandatory site visit is scheduled for Tuesday, September 17, 2024, from 11:00am to 2:00pm PST when NPS staff will be onsite to unlock the gate. NPS staff will not be answering bidder questions. Submit all questions to CFLContracts@dot.gov by the question due date. If planning to attend the Site Visit, please send an email to cflcontracts@dot.gov and Charles Thompson at charles_thompson@nps.gov to RSVP.
The project site is also accessible by foot (approximately five (5) miles roundtrip hike on the road) if accessing at all other times. Please provide Name and License Plate information to Charles Thompson at charles_thompson@nps.gov at 24 hrs. prior to accessing the project site.
Received September 13, 2024
2. I am not finding any details on finishing for the thermally modified wood decking.
Should this wood be coated with either a wood stabilizer or waterproofing per the same standards as regular lumber? Or should it be bare thermally modified wood?
See SCRs Subsection 716.01A.
3. I was looking to run up and take a job walk. Is there a way to open the access gate so we can drive closer, or would we need to hike all the way in?
See response to question #1 above.
Received September 16, 2024
4. According to Helical Specifications 582.06, “one (1) test pile is to be installed, and a static load test is to be conducted prior to the production pile installation.”
An amendment will be issued to clarify that one (1) test pile is required for each pile diameter.
mailto:CFLContracts@dot.gov mailto:cflcontracts@dot.gov mailto:charles_thompson@nps.gov mailto:charles_thompson@nps.gov
6982AF24B000019
CA ERFO DEVA 2022-1(2)
SALT CREEK INTREPRETIVE TRAIL
9/17/2024
Please confirm if only one test is required before beginning the production pile installation or if there is one test per pile size required?
File details come from the government source that posted it. Updated .