CA ERFO NP DEVA 2022-1(2) Salt Creek Interpretive Trail Plans.pdf
PDF 28 MB Posted
- Attached to
- CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail Federal contract opportunity
- Solicitation number
- 6982AF19B000019
About this file
The provided document is a Request for Proposals (RFP) for the CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail project. The project involves the replacement and reconstruction of a 2,871-foot-long, ABA accessible, raised timber boardwalk trail that was destroyed during flash flooding. The work also includes the removal of damaged boardwalk, reconstruction of the trailhead parking lot, and a 400-foot section of roadway. The project is set aside for small businesses and has an estimated value between $5,000,000 and $10,000,000. The work is scheduled to be advertised in September 2024 with construction anticipated from November 2024 to June 2025. The project requires prior experience on similar projects within National Parks, National Forests, or similar environments, and includes numerous environmental constraints and sensitive areas. Key work items include 2,100 square yards of thermally modified timber structural decking, 58,000 board feet of structural timber, 5,800 linear feet of timber curbing, 700 linear feet of timber bridge railing, 650 helical piles, 1,300 square yards of timber boardwalk debris removal, 2,000 cubic yards of embankment construction, 400 cubic yards of special rock embankment, 680 square yards of concrete sidewalk and pavement, and a double occupancy vault toilet.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2024.08.16 08:29:49 -06'00' jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
Sheet 1 of 2
ABBREVIATIONS
PLAN SYMBOLS AND
CONVENTIONAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:5
P
M
A u g u s t
S h e e t
N
C
A \e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
A2
NPS Drwg No. DEVA 143 189630 NPS PMIS No. 331907
0.00EL.
UTILITY SYMBOLS
SIGN SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State
National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
N
CP
36 31
36 31
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS 1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
NPS - National Park Service
DEVA - Death Valley National Park
C.Z. Rt. - Clear Zone, Right
C.Z. Lt. - Clear Zone, Left Edge of Roadway Trail
PROJECT SPECIFIC ABBREVIATIONS Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
DEVA Wilderness Boundary Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
Sheet 2 of 2
ABBREVIATIONS
PLAN SYMBOLS AND
CONVENTIONAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:5 u g u s t
S h e e
C
A \e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
A3
CONTROL SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Created SJS5/22/23
Update Targets 3, 6 & Add Target 8 10/23/23 SJS
Add STAs & Offsets 2/13/24 SJS
Update STAs & Offsets 5/28/24 SJS
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
NPS Drwg No. DEVA 143 189630 NPS PMIS No. 331907
:1
F e b r u a r y
U
S
S u r_ ft
D
C A
\e r f o n p
\R o a d w a y
\C A
D D
S h e e ts
\A G e n s h t\ C
A
D E
V A
C o n tr o l_
S h e e t.
d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
A4
PA
RK
IN
G
GO
V
N
Scale in Feet
211 miles to
Bakersfield, CA
136 miles to
Las Vegas, NV
© 2023 Microsoft Corporation © Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom
Eureka
SAN
FRANCISCO
LOS
ANGELES
San
Diego
Sacramento
OREGON
N E V A D
A
ARIZONA
MEXICO
Redding
KEY MAP OF CALIFORNIA
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
CA ERFO NP DEVA 2022-1(2)
NO SCALE
CA ERFO NP DEVA 2022-1(2)
Station 61+05 to 64+20.00
SALT CREEK PARKING LOT
CA ERFO NP DEVA 2022-1(2)
Station 100+00.00 to 128+13.37
SALT CREEK BOARDWALK
CA ERFO NP DEVA 2022-1(2)
END SCHEDULE A
CA ERFO NP DEVA 2022-1(2)
Station 1+00.00 to 61+05
SALT CREEK ROAD
CA ERFO NP DEVA 2022-1(2)
Station 01+00.00
BEGIN SCHEDULE A
CA ERFO NP DEVA 2022-1(2)
NO SCALE
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Scale in Feet
1000' 2000'
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS Earthstar Geographics SIO © 2024 TomTom
0+00
5+00
+00
+00
60+00
65+00
0+
120+00
:3 u g u s t
B
L
P la n W id e A r e a
S h e e t]
C A
\e r f o n p \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
S it e M a p s .d g n
Sheet 1 of 1
SALT CREEK ROAD & PARKING
SITE MAPOFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
A5
© 2023 Microsoft Corporation © Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom
Station 100+00.00
BEGIN SALT CREEK BOARDWALK
CA ERFO NP DEVA 2022-1(2)
Station 128+13.37
END SALT CREEK BOARDWALK
Staging Area
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
400'200'0
Scale in Feet
PARKING
GOV
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 TomTom
100+00
110+00
100+00
109+
110+00
121+
:3 u g u s t
N
A R
R O
W A
R E
A
S h e
C A
\e r f o n p \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
S it e M a p s .d g n
SALT CREEK BOARDWALK
SITE MAP
Sheet 1 of 1
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
A6
See Detail A (top of aggregate base)
Profile grade
Rounded cut slope
6" Roadway Aggregate, Method 2 limit
Slope stake
Existing ground
Slope stake limit
LC
Profile grade superelevation
Pivot point for for structural section details
See mainline typical section
Existing ground
LC
Existing ground
Depth varies, based on existing berm material berm
Existing berm
Existing for structural section details
See mainline typical section
Existing ground wedge constructing
Backfill after
See Detail B
(top of pavement)
Profile grade material
Embankment
Backfill
Channel
Stream limit stake
Slope
Riprap, Class 3
6" Roadway Aggregate, Method 2
A and B
See Details
Geotextile, Class 1, Type C ground
Existing
Limit
Slope Stake
1+00.00 to 52+75
SALT CREEK ROAD ROADWAY RECONDITIONING
TYPICAL SECTION
Varies (2% max.) Varies (2% max.)
NO SCALE
Construction and Roadway Reconditioning limits
Varies (11' typ.)
NOTE:
space is to be requested.
either side of the boardwalk. Propose the location(s) and side of the boardwalk this alignment. An additional 6 ft. of room to the construction limits may be requested on the D-Sheets for existing Boardwalk Removal locations and proposed boardwalk
Refer to the S-Sheets for proposed boardwalk typical sections and information. Refer to
Place Roadway Aggregate, Method 2 according to Section 302.
Construct Riprap slope protection according to Section 251.
according to Section 204.
Remove debris and other items according to Section 203. Construct embankment information.
Perform Roadway Reconditioning according to Section 303. See the SCR's for more the B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, reduce
See cross sections for cut and fill slope ratios.
slope ratios may be adjusted to ensure adequate drainage and stability.
The gradient and width of the roadway ditches and the excavation and embankment
8.
7.
6.
5.
4.
3.
2.
1.
11' 11'2'
2' C.Z. Lt.
Traveled Way Traveled Way
100+00 to 128+13.37
INTERPRETIVE TRAIL BOARDWALK
TYPICAL SECTION
Construction Limits
4'3'-6"3'-6"4'
8.
3.
2.
2.
2'
2' C.Z. Lt.
2' 11' 11' 2'
2.
.0
Embedment 3' typ.
2.
Varies Varies
Varies Varies
3'
13' 13'
13' 13'
Construction limits
52+75 to 56+50
SALT CREEK ROADWAY RECONSTRUCTION
TYPICAL SECTION
2%
B=3'
F= 3'
3'
Cu t s lop e
Traveled wayTraveled way
3' Fil l s lop e
2% min. superelevation 2% max. supereleva tion
-2% normal crown-2% normal crown
METHOD OF SUPERELEVATION ON CURVES
See plans for locations of curves and superelevations
1:4
Varies (11' typ.)
DETAIL B
(applies to both sides of roadway)
For heights less than 1' in cut slope
2%
2' C.Z. Rt.
1:4
DETAIL A
(applies to both sides of roadway)
2% 2%
Construction limits
Traveled way Traveled way
2' C.Z. Rt.
Fill slo pe (va ries
3'
1:
1.
m ax
56+50 to 61+05
SALT CREEK ROADWAY STREAM ARMORING
TYPICAL SECTION
From 60+53 to 61+05: See cross sections for transitions in cross slopes
Va rie s
SALT CREEK ROAD
TYPICAL SECTIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:5 u g u s t
R t y p ic a l
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\A -G e n s h t\ T
Y P
E
R F
O D
E V
A
-1
(2 d g n
Sheet 1 of 1
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
A7
LC
Profile grade superelevation
Pivot point for section details sectionfor structural
See mainline typical
11'
6' min. walkway
11'
19'
18"
5' lines
4" Stall
Method 2
6" Roadway Aggregate, Method 2
6" Roadway Aggregate, limit stake
Slope limit stake
Slope limit stake
Slope limit
Slope stake
Pavement Detail
See Minor Concrete
See Sidewalk Detail
" R2
5" Concrete Sidewalk
6" Roadway Aggregate, Method 2
Existing Ground
Existing Ground
See Detail A
See Detail A
6 x 6 - W8.3 x W8.3 Epoxy Coated
#4 bar typ.
19'
PARKING
GOV
lines
4" Stall
11' limit stake
Slope limit stake
Slope
Method 2
6" Roadway Aggregate, See Sidewalk Detail
See Sidewalk Detail
Existing Ground
See Sidewalk Detail
Class 3
Method B, 2' Riprap, Nonwoven
Class 1 Type C, Geotextile Filter
See Detail B
3' Embedment
#4 bar typ.
See Detail B
See Detail B
NO SCALE
NOTE:
material to seat boulders in and around. See Special 251-A for more information.
perimeter. Place smaller boulders and cobbles in the interior of the island. Place native
Construct island area using boulders and native material. Place boulders to create a island according to Section 609. Construct concrete sidewalk according to Section 615.
Construct concrete parking pad according to Section 501. Construct concrete curb
Place Roadway Aggregate, Method 2 according to Section 302.
according to Section 204.
Remove debris and other items according to Section 203. Construct embankment
B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, reduce the
See cross sections for cut and fill slope ratios.
ratios may be adjusted to ensure adequate drainage and stability.
The gradient and width of the roadway ditches and the excavation and embankment slope
7.
6.
5.
4.
3.
2.
1.
MINOR CONCRETE PAVEMENT DETAIL
CONCRETE PARKING PAD STRIPING DETAILS
Reinforced
8" Minor Concrete Pavement, 6" Roadway Aggregate, Method 2
19'12'12'19'varies3' 3'varies8'-6"
62+55 to 63+55
61+05 to 62+17
SALT CREEK PARKING LOT - AGGREGATE PARKING
TYPICAL SECTION
19'varies3' 19'12'12' 3'varies8'-6"
62+17 to 62+55
SALT CREEK PARKING LOT - AGGREGATE & CONCRETE PARKING
TYPICAL SECTION
2% 2% 2% 1.5%
1.5%2%2%2%
1:4
1:4
Fill slope
Fill slope
62+55 to 64+20.00
SALT CREEK PARKING LOT - ROUNDABOUT
TYPICAL SECTION
1.5%
1.5%
1.5% 2.5''
3" typ.
3" typ.
1.5%
1.5%
3' 3'
2% 2%
Fill slope
Fill s lope
VariesVariesVaries6'-6" typ. 6'-6" typ.Varies Varies
2% min. superelevation 2% max. supereleva tion
-2% normal crown-2% normal crown
METHOD OF SUPERELEVATION ON CURVES
See plans for locations of curves and superelevations
1:4
DETAIL A
(applies to both sides of roadway)
Construction Limits
Construction Limits
Aggregate Parking Travel Way
& Curb
Sidewalk
Aggregate Parking
Aggregate Parking
Concrete Parking Pad
Travel Way
Travel Way Travel Way
& Curb
Sidewalk
2.
2.
2.
2.
6"
6"
14"
DETAIL
CONCRETE CURB
5"
SIDEWALK DETAIL
6' min.
Sidewalk
Construction Limits
2. 2.
One-Way Travel Way Island Area One-Way Travel Way
& Curb
Sidewalk & Curb
Sidewalk7.
DETAIL B
(see tabulation for locations)
Varie s
SPACE MARKING
ACCESSIBILITY PARKING
m in
24" min.
'-4
R
4"
'-4
R
"83
'-2
R
" min.16
14'-4
Blue background
White border
7'-
'-4
R
R
SALT CREEK PARKING LOT
TYPICAL SECTIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:5 u g u s t
P a rk in g
L o t T y p ic a l
S e c ti o n s
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\A -G e n s h t\ T
Y P
E
R F
O D
E V
A
-1
(2 d g n
Sheet 1 of 1
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
A8
NPS PMIS No. 331907 NPS Drwg No. DEVA 143 189630 ght
Sheet and Description
B3 B4 D19 S2
Grading Summary
Tabulation of Quantities
Boardwalk Removal Summary
Structural Summary Allowance Bid Schedule
A0050 15101-0000 MOBILIZATION LPSM ALL
A0100 15201-0000 CONSTRUCTION SURVEY AND STAKING (BOARDWALK) LPSM All ALL
A0150 15214-3000 SURVEY AND STAKING, PARKING AREA LPSM All ALL
A0200 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 0.137 0.137
A0250 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.137 0.137
A0300 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0350 15401-0000 CONTRACTOR TESTING LPSM ALL
A0400 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0450 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0500 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
A0550 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (DEBRIS IN WILDERNESS, BY HELICOPTER) SQYD 858 92 950
A0600 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (ALL OTHER REMOVALS) LPSM All ALL
A0650 20420-0000 EMBANKMENT CONSTRUCTION CUYD 3,067 233 3,300
A0700 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 CUYD 425 25 450
A0750 25125-0000 BOULDER EACH 40 40
A0800 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,766 84 1,850
A0850 30301-6000 ROADWAY RECONDITIONING MILE 0.980 0.020 1.000
A0900 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH SQYD 80 5 85
A0950 55601-1300 BRIDGE RAILING, TIMBER (CURB RAILING) LNFT 4,988 262 5,250
A1000 55601-1300 BRIDGE RAILING, TIMBER (PEDESTRIAN RAILING) LNFT 716 34 750
A1050 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED MFBM 58 58 Contract Quantity
A1100 55703-2000 STRUCTURAL TIMBER AND LUMBER, TREATED, DECKING (THERMAL MODIFIED) SQYD 1,940 1,940 Contract Quantity
A1150 58202-0000 HELICAL PILE, IN PLACE (2-7/8" DIA. X 0.28") EACH 134 16 150
A1200 58202-0000 HELICAL PILE, IN PLACE (5-1/2" DIA. X 0.48") EACH 430 20 450
A1250 58202-0000 HELICAL PILE, IN PLACE (7" DIA x 0.49") EACH 44 6 50
A1300 60103-0000 CONCRETE, HEADWALL (ABUTMENT) EACH 1 1
A1350 60901-1200 CURB, CONCRETE, 14-INCH DEPTH LNFT 450 50 500
A1400 60915-1000 WHEELSTOP, CONCRETE EACH 2 2
A1450 61501-0100 SIDEWALK, CONCRETE SQYD 553 47 600
A1500 61901-0000 FENCE (POST & CABLE) LNFT 707 43 750
A1550 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 40
A1600 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20
A1650 62201-3000 HYDRAULIC EXCAVATOR HOUR 20
A1700 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM HOUR 100
A1750 62301-0000 GENERAL LABOR HOUR 120
A1800 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20
A1850 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
A1900 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (PALEONTOLOGICAL MONITORING) LPSM ALL
A1950 63301-0000 SIGN SYSTEM EACH 7 1 8
A2000 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 332 18 350
MileStone: CA EFRO DEVA 2022-1(2) Date Completed: 08/01/24 Report Date: 08/01/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 1-
A ug
-2
1:
P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities
N
C A \e rf on p2
2- 1(
2) \R oa dw ay \C
A D
D _S he et s\ B -S um m
D
EV
A
2-
1( 2)
_S O
Q T ab le
.x ls m ]S he et
PROJECT
B1CA ERFO NP DEVA 2022-1(2)
SALT CREEK INTERPRETIVE TRAIL
SHEET
NUMBER
NPS PMIS No. 331907 NPS Drwg No. DEVA 143 189630 ght
Sheet and Description
B3 B4 D19 S2
Grading Summary
Tabulation of Quantities
Boardwalk Removal Summary
Structural Summary Allowance Bid Schedule
A2050 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B) EACH 3 3
A2100 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A2150 63701-0000 FIELD OFFICE EACH 1
A2200 64603-0300 FIXTURE, BENCH (TREATED TIMBER) EACH 11 11
A2250 64603-0700 FIXTURE, PICNIC TABLE EACH 3 3
A2300 64603-1000 FIXTURE, VAULT TOILET (DOUBLE OCCUPANCY UNIT) EACH 1 1
A2350 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (TEMPORARY CROSSINGS) LPSM ALL
1- A ug
-2
1:
P
M
MileStone: CA EFRO DEVA 2022-1(2) Date Completed: 08/01/24 Report Date: 08/01/24
N
C A \e rf on p2
2- 1(
2) \R oa dw ay \C
A D
D _S he et s\ B -S um m
D
EV
A
2-
1( 2)
_S O
Q T ab le
.x ls m ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
PROJECT
B2CA ERFO NP DEVA 2022-1(2)
SALT CREEK INTERPRETIVE TRAIL
NUMBER
ROADWAY EXCAVATION
ADJUSTMENTS TO ROADWAY EXCAVATION
ROADWAY EMBANKMENT
Roadway Excavation
(Embankment)
Roadway Prism
Subexcavation
Subexcavation
STREAM ARMORING
Backfill
Stream Channel
Riprap, Class 3
(Available Material)
Structure Excavation Outline
Proposed Grade
Embankment
Sheet 1 of 1
SCHEDULE A
GRADING SUMMARY
excavation, embankment or backfill quantity.
subgrade material will be paid as Subexcavation, and will not be included in the Grading Summary as an
If a pay item for Subexcavation is included in the project pay items, removal and backfill of unsuitable2.
scenarios are shown, only representations for major project items are shown.
See earthwork diagrams for visual representation of major earthwork. Not all possible earthwork1.
EARTHWORK REPRESENTATION DRAWING NOTES:
:5 u g u s t
G r a d in g S u m m a r y
C A
\e r f o n p \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
B3
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:5 u g u s t
T a b u la ti o n o f Q u a n ti ti s
C A
\e r f o n p \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
Sheet 1 of 1
SCHEDULE A
TABULATION OF QUANTITIES
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
B4
JH
100'50'0
Scale in Feet
SPEED
LIMIT
A
B
C D
CA ERFO NP DEVA 2022-1(2)
BEGIN ROADWAY RECONSTRUCTION
END ROADWAY RECONDITIONING
STATION 52+75.00
S49°10'33"W
PI 52+08.23
Δ = 23°31'18" (RT)
R = 400.00' T = 83.28' L = 164.21'
PI 56+47.26
Δ = 29°15'02" (RT)
R = 200.00' T = 52.19' L = 102.10'
S34°00'24"W
S19° 55'31
"W
P C
.3
P T
.6
P C
.9
P T
.1
P C
.0
P T
.1
P C
.7
PI 54+23.71
Δ = 14°04'53" (LT)
R = 400.00' T = 49.40' L = 98.31'
S49°10'33"W S34°00'24"W
S19° 55'31
"W
51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00 56+50 57+00 57+50 58+00 58+50
-218 -218
-216 -216
-214 -214
-212 -212
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
+2.00% -2.50%
+3.18
-1.00%
+2.00%
-2.50%
+3.18
-2
.0
.0
-2
.0
.0
-2 .5
.0
-2 .0
.0
' VC100
22K =
'290SSD =
' VC150
27K =
'272SSD =
' VC100
33K =
' VC150
26K =
SALT CREEK ROAD PLAN AND PROFILE 52+00 TO 59+00
Install R2-1
Existing ground
Proposed grade
Placed Riprap, Class 3, Lt.
E:7152263.53 N: 2104887.17
:5 u g u s t
M a in
P la n
S h e
C
A \e rf o n p
-1 (2
R o a d w a y \C
A D
D
S h e e ts \C
-M L P
P
\P N
P -1
(2
E n tr a n c e R o a d
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
C5
PARKING
GOV
100'50'0
Scale in Feet
Wilderness Boundary
Wilderness Boundary
See D-Sheets
Proposed Boardwalk
E: 7151900.82
N: 2104430.23
BEGIN PARKING LOT RECONSTRUCTION
END ROADWAY RECONSTRUCTION
STATION 61+05
E: 7151492.79
N: 2104336.51
CA ERFO NP DEVA 2022-1(2)
END PROJECT
STATION 64+20.00
S79°08'06"W
PI 60+19.06
Δ = 29°57'33" (RT)
R = 300.00' T = 80.27' L = 156.87'
P C
.7
P T
.6
P O
E
.6
+00
+00.
POB
S79°08'06"W
59+00 59+50 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50 65+00 65+50 66+00
-216 -216
-214 -214
-212 -212
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-2.29% +0.79%
-2.29%
+0.79%
-2 .7
.0
' VC75
24K =
SALT CREEK ROAD PLAN AND PROFILE 59+00 TO 64+20
Existing ground
Proposed grade
Placed Riprap, Class 3, Lt.
:5 u g u s t
M a in
P la n
S h e
C
A \e rf o n p
-1 (2
R o a d w a y \C
A D
D
S h e e ts \C
-M L P
P
\P N
P -1
(2
E n tr a n c e R o a d
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
C6
PARKING
GOV
O
M
N
I
J K
H
L
P Q
S
T
W
V
U
C
A
B
D
R6
R5
R2
R1
R12
R11
R10
R9
R8
R4R7
R3
R
G
E
F
L2
L3
L4
L5
L1
N
Wilderness Boundary
Wilderness Boundary
Boardwalk Connection
Concrete Sidewalk
Concrete Curb
62+28 to 62+55 Rt.
Roundabout
Concrete Sidewalk
Concrete Curb
Install (2)
See Special 646-A
Vault Toilet
62+70 Rt.
60+51 to 63+50 Lt.
Install Fence
See Special 619-A
61+05 to 62+18 Rt.
Install Fence
See Special 619-A
Roundabout
Install Fence
See Special 619-A
Roundabout
Install Fence
Sidewalk Joint
Install Picnic Table (3)
See Special 615-A
Accessibility Ramp
See Headwall Detail
80'40'0
Scale in Feet
S79°08'06"W
.7
C
.6
T
.6
P
O E
100+00
100+00.00
POB
0 6
S79°08'06"W
.7
C
.6
T
.6
P
RESERVED
PARKING
VAN
ACCESSIBLE
Minor Concrete Pad
NOTE:
Place embed angle at edge of sidewalk connection.
5. Refer to the S-sheets for headwall reinforcing details.
4. Refer to D Sheets for boardwalk plan and profile.
3. Refer to the typical sections for more information.
2. Refer to cross sections for more information.
1. Refer to point table for layout information.
R7-8
R7-8P
Headwall Detail
10' 10'
10'
:2 u g u s t
P
R K
P la n
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\P L
N P
A R
K
IN
G L
O T
.d g n
PLAN LAYOUT
SALT CREEK PARKING LOT
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
C7
:2 u g u s t
P
R K
P o in t T a b le
S h e
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\C -M
L
P
P \P
L N
P
A R
K
IN
G
L O
T .d g n
GEOMETRIC POINT TABLE
SALT CREEK PARKING LOT
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
C8
Scale in Feet
40'20'0
Turnout A
Sta. 100+00
H1
Existing Ground
Profile Grade
Proposed Boardwalk
E: 7151573.80
N: 2104271.85
Sta. 100+00
Begin Boardwalk Reconstruction
.6
P
0+
0+
100+00 100+50 101+00 101+50 102+00 102+50
-212 -212
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
100+00 100+50 101+00 101+50 102+00 102+50
-212 -212
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
+0.00%- .7
+0.71%
+1.75% +0.00%
+0.71%
100+10.00Sta.
P1
100+19.47Sta.
P2
100+28.68Sta.
P3
100+37.75Sta.
P4
100+44.66Sta.
P5
100+54.66Sta.
P6
100+63.85Sta.
P7
100+73.05Sta.
P8
100+83.05Sta.
P9 100+93.05Sta.
P10
101+03.05Sta.
P11
101+13.05Sta.
P12
101+33.05Sta.
P14
101+23.05Sta.
P13
101+43.05Sta.
P15
101+53.05Sta.
P16
101+62.52Sta.
P17
101+71.99Sta.
P18
101+81.99Sta.
P19
101+91.99Sta.
P20
102+01.99Sta.
P21
102+11.73Sta.
P22
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
20°
10°
10°
30°
20°
10°
SALT CREEK BOARDWALK 100+00 TO 102+20
.9
.9
Turnout A
.9
.9
CURB RAILING, LT PEDESTRIAN RAILING CURB RAILING, LT
CURB RAILING, RT
.2
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D1
NScale in Feet
40'20'0102+31.20Sta.
P24
Turnout B
Turnout C
Profile Grade
Proposed Boardwalk
Existing Ground
103+00 103+50 104+00 104+50 105+00
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
103+00 103+50 104+00 104+50 105+00
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
+1.23%
+0.00% +3.33%
-0.00%
+0.00%
+1.23% +0.00%
+3.33%
102+21.46Sta.
P23
102+40.94Sta.
P25
102+50.68Sta.
P26
102+59.89Sta.
P27
102+69.36Sta.
P28
102+78.55Sta.
P29
102+87.75Sta.
P30
102+97.75Sta.
P31
103+07.22Sta.
P32
103+16.69Sta.
P33
103+26.69Sta.
P34
103+36.69Sta.
P35
103+46.69Sta.
P36
103+56.69Sta.
P37
103+66.69Sta.
P38
103+76.43Sta.
P39
103+85.64Sta.
P40
103+95.11Sta.
P41
104+05.11Sta.
P42
104+14.58Sta.
P43
104+23.25Sta.
P44
104+32.44Sta.
P45
104+42.44Sta.
P46
104+52.44Sta.
P47
104+61.64Sta.
P48
104+70.31Sta.
P49
104+79.25Sta.
P50
104+88.19Sta.
P51
104+97.66Sta.
P52
105+07.40Sta.
P53
105+36.87Sta.
P56
105+27.14
P55
105+17.14Sta.
P54
10° 10°
20°
30° 20°
10° 20°
20°
30°
30°
20° 20°
20°
10°
10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
SALT CREEK BOARDWALK 102+20 TO 105+40
.2
CURB RAILING, RT PEDESTRIAN RAIL CURB RAILING, RT
CURB RAILING, LT PEDESTRIAN RAIL CURB RAILING, LT
.7
.0
.9
.5
Turnout B + .3
.9
Turnout C
.4
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D2
Scale in Feet
40'20'0
105+46.61Sta.
P57
105+56.61Sta.
P58
105+66.61Sta.
P59
105+76.61Sta.
P60
105+86.35Sta.
P61
105+96.09Sta.
P62
106+06.09Sta.
P63
106+15.82Sta.
P64
106+25.56Sta.
P65
106+35.56Sta.
P66
106+45.30Sta.
P67
106+55.04Sta.
P68
106+64.77Sta.
P69
106+74.51Sta.
P70
106+84.51Sta.
P71
106+94.51Sta.
P72
107+04.51Sta.
P73
107+14.51Sta.
P74
108+13.99Sta.
P84
108+03.99Sta.
P83
107+93.99Sta.
P82
107+83.99Sta.
P81
107+73.99Sta.
P80
107+64.25Sta.
P79
107+54.51Sta.
P78
107+44.51Sta.
P77
107+34.51Sta.
P76
107+24.51Sta.
P75
Profile Grade
Proposed Boardwalk
Existing Ground
105+50 106+00 106+50 107+00 107+50 108+00
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
105+50 106+00 106+50 107+00 107+50 108+00
-210 -210
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-0.42% +0.00% +0.00%
-0.00% -0.42%
10°
10° 10°
10°
10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
SALT CREEK BOARDWALK 105+40 TO 108+20
.4
.6
CURB RAILING, LT
CURB RAILING, RT
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D3
40'20'0
108+23.99Sta.
P85
108+33.99Sta.
P86
108+53.99Sta.
P88
108+43.99Sta.
P87
108+63.99Sta.
P89 108+73.99Sta.
P90
108+83.72Sta.
P91
108+93.46Sta.
P92
109+03.20Sta.
P93
109+12.94Sta.
P94
109+22.94Sta.
P95
109+32.94Sta.
P96
109+42.94Sta.
P97
109+52.67Sta.
P98
109+62.41Sta.
P99
109+72.41Sta.
P100
109+82.15Sta.
P101
109+91.89Sta.
P102
110+01.89Sta.
P103
110+11.89Sta.
P104
110+21.89Sta.
P105
110+31.89Sta.
P106
110+41.89Sta.
P107
110+51.62Sta.
P108
110+61.36Sta.
P109
110+70.83Sta.
P110
110+80.30Sta.
P111
110+89.77Sta.
P112
110+99.25Sta.
P113
111+09.25Sta.
P114
Profile Grade
Proposed Boardwalk
Existing Ground
108+50 109+00 109+50 110+00 110+50
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
108+50 109+00 109+50 110+00 110+50
-208 -208
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
+0.00% +0.94%
+0.00%
+0.00%
+0.94%
10°
10°
10°
10°
10° 20°
20°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
.6
.8
CURB RAILING, LT
CURB RAILING, RT
SALT CREEK BOARDWALK 108+40 TO 111+00
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D4
40'20'0
Sta. 112+28.20
P126
111+19.25Sta.
P115
111+29.25Sta.
P116
111+39.25Sta.
P117
111+49.25Sta.
P118 111+59.25Sta.
P119
111+69.25Sta.
P120
111+79.25Sta.
P121
111+88.98Sta.
P122
Turnout D
111+98.72Sta.
P123
112+08.46Sta.
P124
112+18.20Sta.
P125
112+37.93Sta.
P127 112+47.67Sta.
P128 112+57.67Sta.
P129
112+67.67Sta.
P130
112+77.67Sta.
P131
112+87.67Sta.
P132
112+97.67Sta.
P133
113+07.67Sta.
P134
113+17.67Sta.
P135 113+27.67Sta.
P136
113+37.41Sta.
P137
113+46.88Sta.
P138
113+56.62Sta.
P139
113+66.62Sta.
P140
113+76.62Sta.
P141
113+86.62Sta.
P142
Profile Grade
Proposed Boardwalk
Existing Ground
See D11
128+00
111+00 111+50 112+00 112+50 113+00 113+50
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
111+00 111+50 112+00 112+50 113+00 113+50
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
+2.72% +0.00% -0.00%
+2.72% +0.00%
10° 10°
10°
10° 10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
.8
.0
CURB RAILING, LT
CURB RAILING, RT
.4
.0
Turnout D
SALT CREEK BOARDWALK 111+00 TO 114+00
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D5
40'20'0
113+96.62Sta.
P143
114+06.62Sta.
P144
114+16.62Sta.
P145
114+26.62Sta.
P146
114+36.62Sta.
P147
114+46.62Sta.
P148
114+56.62Sta.
P149 114+66.62Sta.
P150 114+76.62Sta.
P151
114+86.62Sta.
P152
114+96.62Sta.
P153
115+06.62Sta.
P154
115+16.62Sta.
P155
115+26.62Sta.
P156
115+36.62Sta.
P157
115+46.62Sta.
P158
115+56.62Sta.
P159
115+66.62Sta.
P160
115+76.62Sta.
P161
115+86.62Sta.
P162
115+96.36Sta.
P163
116+06.10Sta.
P164
116+16.10Sta.
P165
116+25.83Sta.
P166
116+65.57Sta.
P170
116+35.57Sta.
P167
116+45.57Sta.
P168
116+55.57Sta.
P169
116+75.57Sta.
P171
Turnout E
Profile Grade
Proposed Boardwalk
Existing Ground
114+00 114+50 115+00 115+50 116+00
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
114+00 114+50 115+00 115+50 116+00
-206 -206
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-1.25% -0.00%
+3.83
-1.25% -0.00%
10°
10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
.0
.2
CURB RAILING, RT PEDESTRIAN RAIL, RT CURB RAILING, RT
CURB RAILING, LT PEDESTRIAN RAIL, LT CURB RAILING, LT+
.9
.6
.2
.6
.6
Turnout E
SALT CREEK BOARDWALK 114+00 TO 116+80
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D6
40'20'0
116+85.57Sta.
P172
116+95.57Sta.
P173
117+05.31Sta.
P174
117+15.05Sta.
P175
117+25.05Sta.
P176
117+35.05Sta.
P177
117+45.05Sta.
P178
117+55.05Sta.
P179
117+65.05Sta.
P180
117+75.05Sta.
P181
117+85.05Sta.
P182
117+94.78Sta.
P183
118+04.52Sta.
P184
118+14.26Sta.
P185
118+24.00Sta.
P186
118+34.00Sta.
P187
118+44.00Sta.
P188
118+54.00Sta.
P189
118+64.00Sta.
P190
118+74.00Sta.
P191
118+83.73Sta.
P192 118+93.47Sta.
P193
119+03.47Sta.
P194
119+13.47Sta.
P195
119+23.47Sta.
P196
119+33.47Sta.
P197
119+43.47Sta.
P198
119+53.21Sta.
P199
119+62.95Sta.
P200
Turnout F
Profile Grade
Proposed Boardwalk
Existing Ground
116+50 117+00 117+50 118+00 118+50
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
116+50 117+00 117+50 118+00 118+50
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
-0.00% +0.00%
-2.54%
+0.00%
+3.83
-1.50%
-2.54%
10°
10°
10°
10°
10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
.2
.4
.1
.8
Turnout F
CURB RAILING, LT
CURB RAILING, RT
SALT CREEK BOARDWALK 116+80 TO 119+60
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D7
40'20'0
119+72.95Sta.
P201
119+82.95Sta.
P202
119+92.95Sta.
P203
120+02.42Sta.
P204
120+11.08Sta.
P205
120+19.48Sta.
P206
120+28.67Sta.
P207
120+38.67Sta.
P208
120+48.67Sta.
P209
120+58.67Sta.
P210
120+68.67Sta.
P211
120+78.67Sta.
P212
120+88.67Sta.
P213 120+98.67Sta.
P214
121+08.67Sta.
P215
121+18.67Sta.
P216
121+28.67Sta.
P217
121+38.14Sta.
P218
121+47.09Sta.
P219
121+56.03Sta.
P220
121+64.97Sta.
P221
121+73.91Sta.
P222
121+83.38Sta.
P223
121+93.38Sta.
P224
Turnout G
Profile Grade
Proposed Boardwalk
Existing Ground
120+
122+00
119+00 119+50 120+00 120+50 121+00 121+50
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
-186 -186
119+00 119+50 120+00 120+50 121+00 121+50
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
-186 -186
+3.70
+0.00% +1.22%
+0.00%
+3.70
+0.00%
20°
30°
30°
20°
20°
20°
20°
20°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
.4
.6
.6
.6
.0
.3
CURB RAILING, LTPEDESTRIAN RAIL, LTCURB RAILING, LT
CURB RAILING, RT PEDESTRIAN RAIL, RT CURB RAILING, RT
Turnout G
SALT CREEK BOARDWALK 119+60 TO 122+00
:4 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D8
40'20'0
122+03.38Sta.
P225
122+13.38Sta.
P226
122+23.12Sta.
P227
122+32.86Sta.
P228
122+42.86Sta.
P229
122+52.86Sta.
P230
122+62.86Sta.
P231
122+72.60Sta.
P232
122+82.33Sta.
P233
122+92.07Sta.
P234
123+01.81Sta.
P235
123+11.81Sta.
P236
123+21.81
P237
Sta. 123+31.55
P238
123+41.28Sta.
P239
123+51.02Sta.
P240
123+60.76Sta.
P241
123+70.50Sta.
P242
123+80.23Sta.
P243
123+90.23Sta.
P244
124+00.23Sta.
P245
124+09.97Sta.
P246
Profile Grade
Proposed Boardwalk
Existing Ground
122+00 122+50 123+00 123+50 124+00
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
-186 -186
122+00 122+50 123+00 123+50 124+00
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
-186 -186
-1.31%
+0.00% -1.36%
+0.00%
+1.22% +0.00%
-1.31% +0.00%
-1.36%
10°
10° 10°
10°
10°
10°
10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
SALT CREEK BOARDWALK 122+00 TO 124+20
.6
.8
CURB RAILING, RT
CURB RAILING, LT
:2 u g u s t
S a lt
C r e e k B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D9
40'20'0
124+19.71Sta.
P247
124+29.18Sta.
P248
124+38.65Sta.
P249
124+48.39Sta.
P250
124+58.13Sta.
P251
124+67.86Sta.
P252
124+77.60Sta.
P253
124+87.60Sta.
P254
124+97.34Sta.
P255
125+07.08Sta.
P256
125+16.81Sta.
P257
125+26.55Sta.
P258
125+36.29Sta.
P259
125+45.76Sta.
P260
125+55.50Sta.
P261
125+65.50Sta.
P262
125+75.50Sta.
P263
125+85.24Sta.
P264
125+94.98Sta.
P265
126+04.71Sta.
P266
126+14.19Sta.
P267
126+23.66Sta.
P268
126+33.40Sta.
P269
126+43.40Sta.
P270
126+53.14Sta.
P271
126+62.61Sta.
P272 Turnout H
Profile Grade
Proposed Boardwalk
Existing Ground
124+50 125+00 125+50 126+00 126+50 127+00
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
124+50 125+00 125+50 126+00 126+50 127+00
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
-1.64%
+0.00% -1.47%
+0.00%
+0.00%
-1.64% +0.00%
-1.47%
20°
10° 10°
10°
10° 10°
10°
10°
10°
10°
10°
10°
10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
.8
.0
CURB RAILING, LT
CURB RAILING, RT
.6
.3
Turnout H
SALT CREEK BOARDWALK 124+20 TO 126+60
:4 u g u s t
S a lt
C r e e k
B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D10
40'20'0
126+72.35Sta.
P273
126+82.35Sta.
P274 127+01.83Sta.
P276126+92.09Sta.
P275
127+11.83Sta.
P277
127+21.83Sta.
P278
127+31.83Sta.
P279
127+41.83Sta.
P280
127+51.02Sta.
P281
127+59.96Sta.
P282
127+69.69Sta.
P283
127+79.69Sta.
P284
127+89.69Sta.
P285
127+99.69Sta.
P286
128+09.69Sta.
P287
Profile Grade
Proposed Boardwalk
Existing Ground
E: 7150534.17
N: 2104725.92
Sta. 128+13.37
End Boardwalk Reconstruction
113+00
127+50 128+00
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
127+50 128+00
-204 -204
-202 -202
-200 -200
-198 -198
-196 -196
-194 -194
-192 -192
-190 -190
-188 -188
.5
-1.28%+0.00%
-1.28% -0.00%
10°
30°
10°
NOTE:
1. Refer to the S-Sheets for structural details.
2. Refer to Pier Summary Table for design information.
3. All spans are 10'-0" center to center, unless otherwise shown. Span length in turns based on outer-most dimension.
.0
.3
CURB RAILING, LT
CURB RAILING, RT
SALT CREEK BOARDWALK 126+60 TO 128+13.37
:4 u g u s t
S a lt
C r e e k
B o a r d w a lk
D
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \P
N P
-1
(2
B o a rd w a lk
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D11 u g u s t
S h e e
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\D -M in o r_ P
P
\B o a rd w a lk
P ie r_
D a ta
T a b le .d g n
Sheet 1 of 4
COORDINATE DATA
BOARDWALK PIER
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D12 u g u s t
S h e e
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\D -M in o r_ P
P
\B o a rd w a lk
P ie r_
D a ta
T a b le .d g n
Sheet 2 of 4
COORDINATE DATA
BOARDWALK PIER
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D13 u g u s t
S h e e
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\D -M in o r_ P
P
\B o a rd w a lk
P ie r_
D a ta
T a b le .d g n
Sheet 3 of 4
COORDINATE DATA
BOARDWALK PIER
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D14 u g u s t
S h e e
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\D -M in o r_ P
P
\B o a rd w a lk
P ie r_
D a ta
T a b le .d g n
Sheet 4 of 4
COORDINATE DATA
BOARDWALK PIER
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D15
Salt Creek Road
Wilderness Boundary
Proposed Boardwalk
Wilderness Boundary
Roadway CenterLine
EB 1
EB 2
EB 3
EB 4
EB 5
EB 6
EB 7
EB 8
EB 9
EB 10
EB 11
EB 12
EB 13
EB 14
EB
EB 16
EB 17
EB 18
EB 19
EB 20
EB 21
EB 22
EB
EB
EB
EB
EB
EB 28
EB 29
EB 30
EB
EB 32
EB 33
EB 34
EB 35
EB 36
EB 37
EB 38
EB 39 EB 40
EB 41
EB 42
EB 43
EB 44 EB 45
EB 46 EB 47
EB 48EB 49
EB 50
EB 51
EB 52
EB 53
EB 54
EB 55
EB 56
EB 57
EB 58
EB 59
EB 60
EB 61
EB 62
EB 63
EB 64
EB 65
EB 66
EB 67EB 68
EB 69
EB 70
EB 71
EB 72
EB 73
EB 74
EB 75
EB 76
EB 77
EB 78
EB 79
ER 80
EB 81
EB 82
EB 83
requirements.
See Section 203 of the SCR's for removal in wilderness2.
debris material.
See Boardwalk Removal Table for approximate locations of1.
NOTE:
NO SCALE
:2 u g u s t
A ll
B o a rd w a lk
R e m o v a l_
A e ri a l
[S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \B o a rd w a lk
D e b ri
R e m o v a l_
P la n .d g n
SHEET 1 OF 3
BOARDWALK REMOVAL PLAN
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D16
EB 1
EB 2
EB 3
EB 4
EB 5
EB 6
EB 7
EB 79
ER 80
EB 81
EB 82
EB 83
requirements.
See Section 203 of the SCR's for removal in wilderness2.
debris material.
See Boardwalk Removal Table for approximate locations of1.
NOTE:
NO SCALE
:2 u g u s t
B o a r d w a lk
R e m o v a l
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \B o a rd w a lk
D e b ri
R e m o v a l_
P la n .d g n
SHEET 2 OF 3
BOARDWALK REMOVAL PLAN
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D17
NPS Drwg No. DEVA 143 189630 NPS PMIS No. 331907
SALT CREEK INTERPRETIVE TRAIL
Entrance Road Alignment
+00
55+
60+00
EB 8
EB 9
EB 10
EB 11
EB 12
EB 13 EB 14
EB
EB 16
EB 17
EB 18
EB 19
EB 20
EB 21
EB 22
EB
EB
EB
EB
EB
EB 28
EB 29
EB 30
EB
EB 32
EB 33
EB 34
EB 35
EB 36
EB 37
EB 38
EB 39
EB 40
EB 41
EB 42
EB 43
EB 44
EB 45
EB 46
EB 47
EB 48
EB 49
EB 50
EB 51
EB 52
EB 53
EB 54
EB 55
EB 56
EB 57 EB 58
EB 59
EB 60
EB 61
EB 62
EB 63
EB 64
EB 65
EB 66
EB 67
EB 68
EB 69
EB 70
EB 71
EB 72
EB 73 EB 74
EB 75
EB 76
EB 77
EB 78
requirements.
See Section 203 of the SCR's for removal in wilderness2.
debris material.
See Boardwalk Removal Table for approximate locations of 1.
NOTE:
NO SCALE
:2 u g u s t
B o a r d w a lk
R e m o v a l
S h e
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \B o a rd w a lk
D e b ri
R e m o v a l_
P la n .d g n
SHEET 3 OF 3
BOARDWALK REMOVAL PLAN
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D18
NPS Drwg No. DEVA 143 189630 NPS PMIS No. 331907
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION
:1 u g u s t
B o a r d w lk
R m o v a l
Q u a n ti ty
C A
\e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\D -M in o r_
P
P \D e b ri
R e m o v a l
T a b le
.d g n
Sheet 1 of 1
QUANTITIES
BOARDWALK REMOVAL
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
D19 pattern
Typical benching
Existing ground
NOTE:
1. Benching is not required for ground sloped at 1V:3H or flatter.
2.Bench into existing slope as necessary to meet 12' minimum bench width and 2'-8' typical bench height.
NO SCALE
EMBANKMENT BENCHING
12' (min.)
4' max. bench height (typ.)
2' min. bench height (typ.)
Height varies
Top of subgrade
Proposed em ban km en t slope
See note 2
EMBANKMENT BENCHING
204-A
:1 u g u s t
C
S h e
C A
\e r f o n p
\R o a d w a y
\C A
D D
S h e e ts
\F
\C
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
F1
251-A
BOULDER PLACEMENT DETAILS
NOTES:
Vary adjacent boulders in size and dimension.
the terrain.
the characteristics of boulders indigenous to Boulders to be provided from local source. Match
Place boulders randomly within the maximum spacing.
Place boulders weathered side up, with largest side down.
Place as directed by the CO.
Boulder locations shown on the plans are approximate.
NOTES:
6.
5.
4.
3.
2.
1.
Edge of roundabout surfacing
Boulder (typ.)
Boulder (typ.)
0.5' to 2'
5' max. spacing 3' min - 5' max.
spacing between boulders
Proposed Roundabout surfacing for structural section details See typical section height boulder of3
(Without roadside ditch)
A
A surfacing Clear from
BARRIER BOULDER PLACEMENT
Elevation
Plan
SECTION A-A
randomly in clusters Place Boulders with ground (typ.)
native material and blend Fill up to boulder with m in
2' min.
BOULDER PLACEMENT DETAIL
placement detail, this sheet Boulder, see Boulder
25% to be approx. 4' x 4'
25% to be approx. 2' x 2'
50% to be approx. 3' x 3'
6.
6.
6.
detail, this sheet Boulder, see Boulder placement
Finished grade
V a r ie s
Varies
:1 u g u s t
U n ti tl e d
S h e
C A
\e rf o n p
-1
(2
R o a d w a y
\C A
D D
S h e e ts
\G -2
\2
-A
B O
U L
D E
R S
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
STATE PROJECT
NUMBER
SHEET
CA
CA ERFO NP DEVA 2022-1(2)
G1
NO SCALE
NOTE:
1.
2.
3.
PLAN PLAN
PROFILE PROFILE
REINFORCED MINOR CONCRETE PAVEMENTPLAIN MINOR CONCRETE PAVEMENT
Traffic Traffic
Transverse contraction joint
PAVEMENT
THICKNESS
TRANSVERSE
JOINT SPACING
See Note 2See Note 2
Provide the same type of dowel assemblies and tie bars for joints in plain portland cement concrete pavement as shown for joints in reinforced pavement.
Lap longitudinal and transverse reinforcement not
Transverse joint
Longitudinal joint
Tie bar
Dowel bar Dowel bar
See Standard 501-2 for joint and joint sealing details.
less than 15 inches.
(in) (ft)
6 ≤ T <12
T < 6
(typ.)
2'-0"
(t y p typ.
2" clear ty p c le a r ty p c le a r typ.
2" clear welded wire reinforcement or No. 4 bars Slab reinforcement 4" x 4" - W6 x W6 reinforcement or No. 4 bars W6 x W6 welded wire Slab reinforcement 4" x 4" -
STANDARD APPROVED FOR USE --/----
9/2016 REVISED: 501-1
MINOR CONCRETE PAVEMENT
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:1 u g u s t
S td
-1
C
A \e rf o n p -1
(2
R o a d w a y \C
A D
D S h e e ts
\R -5
\S td -1
.d g n
PROJECT
NUMBER
SHEET
SALT CREEK INTERPRETIVE TRAIL
CA ERFO NP DEVA 2022-1(2)
R1
NO SCALE
T/3 T/3 T/3
NOTE:
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAIN - TRANSVERSE or LONGITUDINAL
CONTRACTION JOINT CONSTRUCTION JOINT
UNDOWELED - TRANSVERSE and
UNTIED - LONGITUDINAL
CONTRACTION JOINT
DOWELED - TRANSVERSE
CONTRACTION JOINT
TIED - LONGITUDINAL
CONSTRUCTION JOINT
TIED BUTT - LONGITUDINAL
ISOLATION/EXPANSION JOINT
DOWELED - TRANSVERSE TIED BUTT - TRANSVERSE
CONSTRUCTION JOINT
CONSTRUCTION JOINT
DOWEL BUTT - TRANSVERSE
MINOR CONCRETE PAVEMENT JOINT SEALING DETAILS
ISOLATION JOINT CONSTRUCTION JOINT SAWED OR FORMED JOINT
UNDOWELED - LONGITUDINAL
ISOLATION JOINT
T/2
T/2 T/2
T/2T/2
BAR SIZES
PAVEMENT
THICKNESS (T) TIE BAR
DOWEL BAR
DIAMETER
Fixture or structure
T
T
T
TT
T
T
T
T joint filler
Preformed
Joint sealant
Joint sealant
Backer rod
Fixed endGrease free end
T/2
KEYWAY - LONGITUDINAL
CONSTRUCTION JOINT
T/2 piece connectors)
(or approved two-sealing details
See sawed or formed joint joint sealing details
See sawed or formed joint sealing details
See sawed or formed
See isolation joint sealing details
See isolation joint sealing details joint sealing details
See construction joint sealing details
See construction joint sealing details
See construction joint sealing details
See construction joint sealing details
See construction
T
Dowel cap
Use epoxy-coated material for all tie bars, dowels, and other steel used in the construction of concrete pavement.
Deformed reinforcing bars or hook bolts may be used for tie bars.
Install isolation joints when abutting a fixed structure.
Use expansion joint material extending the full depth and length of the concrete surface.
Transverse and longitudinal construction joints are not included in the joint layout plan. Use transverse and longitudinal construction joints sparingly. Submit planned construction joint locations for approval.
For construction joints, if tie bars and dowels are not set into concrete during placement, drill and anchor the tie bars and dowels into the existing concrete construction with epoxy resin.
Maintain joint sealant shape factor of 1:1; except when silicone sealant is used maintain the width to depth shape factor of 2:1 or as recommended by sealant manufacturer.
See Section 712 for joint material requirements.
See Standards 501-1 or 502-1 for reinforcement details.
10 < T ≤ 12
8 < T ≤ 10
T ≤ 8 1
9"9" 9"9"
18"18" 18"18"
9"9" 18"18"
Tie bar @ 30" c-c Tie bar @ 30" c-c
#6
#5
#5
(in) (in)
" keyway2 1T/3 x 1
18"18" Tie bar @ 30" c-c
#8 Tie bar @ 12" c-c
" typ.8 1" typ.8
1" typ.2
Do not place tie bars within 15 inches of transverse joints.
Dowel bar @ 12" c-c Dowel bar @ 12" c-c
Dowel bar @ 12" c-c
STANDARD APPROVED FOR USE --/----
9/2016 REVISED: 501-2
PAVEMENT JOINTS
MINOR CONCRETE
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .