This document is an amendment to a solicitation for the CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail project. The amendment replaces pages E-14 and E-15 of the Invitation for Bid (IFB) and modifies Plan Sheet G1.

The key details are:

  • The project will replace and reconstruct approximately 2,871 feet of an ABA accessible, raised timber boardwalk trail that was destroyed by flash flooding. It also includes removing damaged boardwalk, reconstructing a trailhead parking lot, and a 400-foot section of roadway.
  • There are numerous environmental constraints, including paleontological monitoring, limitations on equipment, and matting requirements that will affect the construction schedule and operations.
  • The estimated price range for the work is $5,000,000 to $10,000,000. The project is a Total Small Business Set-Aside.
  • The anticipated advertisement date is September 2024 with construction from November 2024 to June 2025.
  • The contracting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Other files attached to CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail, newest first.
File Type Posted
Bid Tabs CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail.pdf PDF
CA ERFO NP DEVA 2022-1-2 Bid Opening Summary Sched A.pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_10 15 2024.pdf PDF
6982AF24B000019 A006 SF 30 CA ERFO DEVA 2022-1(2).pdf PDF
6982AF24B000019 A005 SF30 CA ERFO DEVA 2022-1(2).pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_10 08 2024.pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_10 02 2024.pdf PDF
6982AF24B000019 A004 SF30 CA ERFO DEVA 2022-1(2).pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_10 01 2024.pdf PDF
6982AF24B000019 INTERESTED VENDORS LIST 09 30 2024.pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_09 30 2024.pdf PDF
6982AF24B000019 A003 SF30 CA ERFO DEVA 2022-1(2).pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_09 27 2024.pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_UPDATED 09 25 2024.pdf PDF
09 24 2024 Site Visit Attendee List.pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2)_09 24 2024.pdf PDF
6982AF24B000019 A001 SF30 CA ERFO NP DEVA 2022-1(2).pdf PDF
Question and Answers CA ERFO NP DEVA 2022-1(2) 09 17 2024.pdf PDF
6982AF24B000019 INTERESTED VENDORS LIST 09 11 2024.pdf PDF
6982AF24B000019 IFB CA ERFO NP DEVA 2022-1(2).pdf PDF
CA ERFO NP DEVA 2022-1(2).Salt Creek Interpretive Trail.DRAFT-FINAL Geotechnical Memorandum.July 2024.pdf PDF
6982AF24B000019 INTERESTED VENDORS LIST 09 03 2024.pdf PDF
CA ERFO NP DEVA 2022-1(2) Cross Sections.pdf PDF
CA ERFO NP DEVA 2022-1(2) Salt Creek Interpretive Trail Plans.pdf PDF
CA ERFO NP DEVA 2022-1(2) Final Report_Signed.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

A002

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: KELLY PALMER

9A. AMENDMENT OF SOLICITATION NUMBER

6982AF24B000019

5. PROJECT NUMBER (If applicable)

CA ERFO DEVA 2022-1(2)

09/24/2024

9B. DATED (SEE ITEM 11)

09/03/2024

0*

*See Item 14

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to amend the IFB and Plans as follows:

1. Replace IFB pages E-14 and E-15 with the attached pages E-14 and E-15

2. Replace Plan Sheet G1 with the attached Plan Sheet G1

15. FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN

THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

E-14

CA ERFO NP DEVA 2022-1(2)

Salt Creek Interpretive Trail

PMIS #: 331907

ground disturbing activities, submit a Paleontological Resources Mitigation Plan (PRMP) for review and approval. Allow 21 days for review. Include with the plan the following;

(a) Training materials to be provided to construction staff. Include information on fossil resources, the geology and bedrock in which fossils are found, the sensitivity of the information available for the project, monitoring, mitigation and reporting procedures if fossils are encountered during construction;

(b) Methods of monitoring procedures to be used during construction including proposed tools and equipment for documenting discoveries;

(c) Communication protocols to be followed if a fossil discovery is made during construction

(d) Mitigation recommendations, in detail, including; preparation, curation, final reporting requirements;

(e) Methods and proposed forms for documenting fossil discoveries. Include with documentation photographs, observational notes, geospacial coordinates, contextual data.

Incorporate this information into the final report for the project.

(f) In-field delineation of high, medium and low intensity zones.

Provide a paleontological monitor lead who possesses a graduate degree (MS, MA, PhD) with emphasis in paleontology, in combination with one year or more of paleontological mitigation in experience in California, Nevada, or a geological province similar to the project area.

If a monitor is not available for field monitoring, pProvide a paleontological monitor (technician) who possesses a minimum of a bachelor’s degree with emphasis in paleontology, in combination with one year of experience in; laboratory preparation, curation and in field monitoring with fossil salvage and treatment in California, Nevada, or a geological province similar to the project area.

Obtain a paleontological resources research permit from the NPS prior to beginning ground disturbing activities. Comply with all terms of the permit.

The paleontological monitor lead will provide training to all project construction staff. Maintain a log of training provided during construction. Provide a copy of the log to the CO with the final report.

In the event that fossil(s) are encountered by construction personnel or by the monitor (technician) anywhere in the project area, immediately suspend operations at the location(s) of discovery and notify the CO. Do not collect, move, vandalize or disturb fossils encountered. The CO will inform the Contractor when operations may resume at the discovery site(s).

6982AF24B000019

Amendment: A002

9/24/2024

E-15

CA ERFO NP DEVA 2022-1(2)

Salt Creek Interpretive Trail

PMIS #: 331907

At the conclusion of construction, submit a final report to the CO describing the results of the paleontological monitoring efforts associated with the project. A final report is required even if no paleontological resources are discovered during monitoring. Submit the final report to the

CO.

Add the following Subsection:

107.15 Resource Protection, Construction Material and Debris Management. Prior to beginning ground disturbing activities, submit a resource protection, construction material and debris management plan for review. Allow 14 days for review. Include with the plan the following;

(a) Proposed materials to cover paleontological sensitive areas from damage within the project limits. Materials and methods may include the use of flexible mats, placement of excavated material from footings over paleontological sensitive areas, with separation fabric. Where material or matting is used, lightly scarify the ground after removing temporary protection;

(b) Proposed equipment; only rubber tired and rubber tracked equipment, such as skid steers, mini/small excavators, mini cranes, and rubber tired equipment such as off-highway utility vehicles with trailers may be permitted within the boardwalk construction limits. Do not exceed a Ground Pressure of 5.5 psi and Gross Vehicle Weight (GVW) of 12,000 32,000 lb for tracked equipment and GVW of 5,000 lb combined for off-highway utility vehicles and trailers.

(c) Proposed material and debris containment and cleanup from boardwalk construction.

Including the use of a physical barrier between existing ground and debris to collect sawdust, drop materials, fasteners, etc..;

Section 108. — PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work. Add the following:

Limit operations according to Subsection 107.10(e) and Section 156.

Limit operations as follows:

(a) Construct the boardwalk, parking lot and roadway that crosses or is within 20 feet of the limits of Salt Creek from October 1 through March 30. Remove any temporary diversions or crossings constructed within these limits prior to April 1. If temporary crossings are still required, submit an alternate crossing for review. Have alternate crossing installed by March 30.

(b) Construct the boardwalk starting at the western loop and then work back towards the parking lot.

6982AF24B000019

251-A

BOULDER PLACEMENT DETAILS

the proposed boulders to the CO prior to importing.

the native stone in the project vicinity. Provide a photo of unsuitable material. Furnish rock that is similar in color to Furnish hard, durable rock that is free of organic or other

Place boulders randomly within the maximum spacing.

Place boulders weathered side up, with largest side down.

Place as directed by the CO.

Boulder locations shown on the plans are approximate.

NOTES:

5.

4.

3.

2.

1.

Edge of roundabout surfacing

Boulder (typ.)

Boulder (typ.)

0.5' to 2'

5' max. spacing 3' min - 5' max.

spacing between boulders

Proposed Roundabout surfacing for structural section details See typical section height boulder of3

(Without roadside ditch)

A

A surfacing Clear from

BARRIER BOULDER PLACEMENT

Elevation

Plan

SECTION A-A

randomly in clusters Place Boulders with ground (typ.)

native material and blend Fill up to boulder with m in

2' min.

BOULDER PLACEMENT DETAIL

placement detail, this sheet Boulder, see Boulder

25% to be approx. 4' x 4'

25% to be approx. 2' x 2'

50% to be approx. 3' x 3'

6.

6.

6.

detail, this sheet Boulder, see Boulder placement

Finished grade

V a r ie s

Varies

NO SCALE

AMENDMENT A002

REVISIONS (OR CHANGE NOTICES)

DESCRIPTION

NO.

DATE INIT.

Added "NO SCALE"

Revised note 4, deleted note 5 JF

JF

:2

A

M

A u g u s t

U n ti tl e d

S h e e t

N

C A

\e rf o n p -1

(2

R o a d w a y \C

A D

D S h e e ts

\G -2

\2

-A

B O

U L

D E

R S

.d g n

SPECIAL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

CFLHD SPECIAL

STATE PROJECT

NUMBER

SHEET

CA

CA ERFO NP DEVA 2022-1(2)

G1

NPS Drwg No. DEVA 143 189630 NPS PMIS No. 331907

SALT CREEK INTERPRETIVE TRAIL6982AF24B000019