6982AF24B000019 A005 SF30 CA ERFO DEVA 2022-1(2).pdf
PDF 1 MB Posted
- Attached to
- CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail Federal contract opportunity
- Solicitation number
- 6982AF19B000019
About this file
This document appears to be an amendment to a solicitation for the CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail project. The amendment modifies the IFB and project plans, including replacing pages A-1, E-36, and plan sheets S2 and S15. The project involves the replacement and reconstruction of a 2,871-foot-long, ABA accessible, raised timber boardwalk trail that was destroyed during flash flooding. It also includes removal of damaged boardwalk, reconstruction of the trailhead parking lot, and a 400-foot section of roadway. The work is located in cultural and natural resource sensitive areas, with numerous environmental constraints. Prior experience on similar projects within National Parks, National Forests, or similar environments is required. The estimated price range is between $5,000,000 and $10,000,000, and the project is set aside for small businesses. The anticipated advertisement date is September 2024, with construction from November 2024 to June 2025.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A005
The purpose of this amendment is to amend the IFB and PLANS as follows:
1. Replace page A-1 with the attached page A-1
2. Replace page E-36 with the attached page E-36
3. Replace Plan Sheets S2 and S15 with the attached Plan Sheet pages S2 and S15
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID. (REFER TO ITEM 11)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: KELLY PALMER
6982AF24B000019
5. PROJECT NUMBER (If applicable)
CA ERFO DEVA 2022-1(2)
10/09/2024
09/03/2024
0*
*See Item 14
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
6982AF24B000019
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
09/03/2024
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
HFLCEO240370PR
6. PROJECT NO.
CA ERFO NP DEVA 2022-1(2)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Kelly Palmer, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 10/03/2024 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA
FAR (48 CFR) 53.236-1(d)
X
X
X
X
X
A-1
10/10/2024 10/16/2024 2:30
6982AF24B000019
AMENDMENT: A005
10/09/2024 kelly.palmer Cross-Out kelly.palmer Cross-Out
E-36
CA ERFO NP DEVA 2022-1(2)
Salt Creek Interpretive Trail
PMIS #: 331907
(3) The remaining portion of the pay item amount will be paid when a copy of the final SWPPP and all accompanying documentation, to include, inspection reports, water quality sampling results, and annual report submittals, is submitted and accepted by the CO after the final inspection and resolution of punch list items.
(b) Progress payments for erosion and sediment control measures or devices will be paid as follows:
(1) 80 percent of the pay item amount will be prorated based on total contract work completed.
(2) 20 percent of the pay item amount will be paid at completion of contract after final acceptance.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Construction Requirements
203.04 Removing Material.
(c) Concrete removal in repair areas. Add the following to the second paragraph:
Use hand tools (hammers and chisels) to remove final particles of concrete or to achieve the required depth.
Delete the third paragraph and substitute the following:
Sandblast all exposed structural steel, reinforcing steel, and concrete surfaces that will be in contact with repair material. Remove all rust and foreign material. Clean the sound concrete surface by flushing with a high-pressure water jet or oil-free compressed air.
Add the following subsection:
(d) Removal of Structures and Obstructions. Remove all existing debris material not suitable for use in roadway embankment construction, remaining boardwalk debris, existing restroom facility and any other debris material from the project. Refer to the plans for approximate locations of major boardwalk debris to be removed.
Small lightweight debris may be removed by hand in the Wilderness areas. Remove larger, heavier debris by helicopter in the Wilderness areas. Track and tire equipment is not permitted and helicopters may not land in Wilderness areas, only hand power tools are allowed. Track and tire equipment is also not allowed for boardwalk debris removal outside the construction limits of the boardwalk and parking lot, and within paleontological resources high intensity zones. Debris is this area may be removed by hand. Submit a debris removal in wilderness area plan for review. Allow 21 days for review. Include with the plan;
6982AF24B000019
AMENDMENT: A005
10/09/2024
6982AF24B000019
6982AF24B000019
| A005-SCRs.pdf |
| Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
| Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS |
File details come from the government source that posted it. Updated .