CA ERFO NP DEVA 2022-1-2 Bid Opening Summary Sched A.pdf
PDF 96 KB Posted
- Attached to
- CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail Federal contract opportunity
- Solicitation number
- 6982AF19B000019
About this file
This document is a Bid Opening Summary for the CA ERFO NP DEVA 2022-1(2) Salt Creek Interpretive Trail project. The project will consist of replacement and reconstruction of a 2,871-foot-long, ABA accessible, raised timber boardwalk trail that was destroyed during flash flooding. The work also includes removal of damaged boardwalk, reconstructing the trailhead parking lot, and reconstructing a 400-foot section of roadway. This is a total small business set-aside project with an estimated value between $5,000,000 and $10,000,000. The project is being procured by the Department of Transportation Federal Highway Administration. The bid opening date was 10/16/2024, and 7 bids were received, with the apparent low bidder being Herback General Engineering at $6,373,136.10. The project is anticipated to have construction from November 2024 to June 2025. Key requirements include 2,100 square yards of thermally modified timber structural decking, 58,000 board feet of structural timber, 5,800 linear feet of timber, 650 helical piles, 1,300 square yards of timber boardwalk debris removal, and 400 cubic yards of special rock embankment.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
6982AF24B000019
Project Name: Salt Creek Interpretative Trail Project Number: CA ERFO NP DEVA 2022-1(2) Bid Opening Date: 10/16/2024 Time: 2:30 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Eric Grosskreuz
Amendments: (1) 09/17/24 (2) 09/24/24 (3) 09/27/24 (4) 10/01/24 (5) 10/09/24 (6) 10/14/24
Bidder Name Schedule A BID TOTAL 1.
Aventus Boulder City, NV
$7,693,419.00
$7,693,419.00
2.
Empire Equipment Service, Inc.
Mira Loma, CA
$7,279,419.00
$7,279,419.00
3.
Herback General Engineering Minden, NV
$6,373,136.10
$6,373,136.10
4.
Jilk Heavy Construction, Inc.
Brea, CA
$6,582,341.50
$6,582,341.50
5.
MWC Group, Inc.
Adelanto, CA
$6,355,766.15
$6,355,766.15
6.
Steelhead Constructors, JV Palo Cedro, CA
$9,793,777.00
$9,793,777.00
7.
Steve Manning Construction, Inc.
Redding, CA
$7,731,222.00
$7,731,222.00
Engineer’s Estimate
$7,770,000.00
*All bids are subject to verification.