Two (2) Portable Distributed Energy Resource (DER) units - OKC-Bahamas Federal contract opportunity
Solicitation number
6973GH-25-R-00206
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This Request for Information (RFI) dated 10/09/2025 with solicitation number 6973GH-25-R-00206 concerns Photovoltaic (PV) Battery Energy Storage System (BESS) units for the Federal Aviation Administration (FAA). The document addresses a vendor's inquiry about whether the Solar and BESS components of the requirement can be separated, with the FAA explicitly stating that their requirement is for a complete deployment-ready portable PV/BESS microgrid configured system solution as detailed in the Statement of Work (SOW). The FAA response clearly indicates that providing only the BESS system component would not be acceptable, emphasizing the need for an integrated solution.

View the file

Other files for this federal contract opportunity

Other files attached to Two (2) Portable Distributed Energy Resource (DER) units - OKC-Bahamas, newest first.
File Type Posted
Amendment 00004 - RFI signed 101525.pdf PDF
RFI Amendment 00004 101425.pdf PDF
Amendment 00003 - RFI Questions signed 100925.pdf PDF
Amendment 00002 - OKC- PV BESS units- NMC battery signed 100825.pdf PDF
Amendment 00001 - Responses RFIs 100125.pdf PDF
Amendment 00001 - OKC- PV BESS units- RFIs 100125 signed.pdf PDF
SIR 6973GH-25-R-00206 signed 092425.pdf PDF
Mobile DER Unit Evaluation Instruction 7-15-2025.docx DOCX document
UPDATED Two Portable DER Unit SOW - JCN25016200_08-17-2025.docx DOCX document
Mobile DER - Proposal Evaluation 7-10-2025(002).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI – 10/09/2025 – 6973GH-25-R-00206; PV BESS units

1. Can you please clarify whether the Solar and BESS portions of the requirement can be separated, and if it would be acceptable to provide only the BESS component.

RESPONSE - FAA’s requirement is for a deployment ready portable PV/BESS (microgrid configured) system solution as stated in the SOW. It would not be acceptable to only provide the BESS system component.