About this file

This is a Screening Information Request (SIR) for establishing a Qualified Vendors List (QVL) for construction services performed by the Federal Aviation Administration (FAA). The QVL will cover construction services for AJW-242 Unstaffed Infrastructure Sustainment (UIS) facilities located on and off Airport Operating Areas across the United States, with a total estimated potential value of $150,000,000 over five years.

The solicitation is specifically targeting small businesses and requires applicants to submit detailed documentation including past performance surveys, capability statements, and experience information for construction categories. Key submission requirements include providing two past performance surveys for each construction category, with contracts valued over $20,000 for tower structural inspections, over $75,000 for access road installations, and over $100,000 for other categories. Applications are due by August 29, 2025 at 5:00 pm CST, with questions due by August 15, 2025. The FAA will evaluate applications based on relevant experience, past performance, and capability statements, with the intent to award contracts to technically acceptable offerors at the lowest price.

View the file

Other files

File Type Posted
Attachment 10. QVL Application Form as of 9-2-2025.docx DOCX document
6973GH-25-R-00167 Amendment 00003.pdf PDF
6973GH-25-R-00167 Amendment 00002.pdf PDF
QVL Compiled Questions.pdf PDF
Attachment 1. = FAA-STD-019g Lightning & Surge Protection, Grounding, Bonding, & Shielding.pdf PDF
Attachment 7. = Contractor's Release Form DOT F 4220.4.pdf PDF
Attachment 8. = Past Performance Experience Information Form.doc DOC document
Attachment 9. = Solicitation Questions Form 5-20-2025.doc DOC document
Attachment 10. QVL Application Form as of 6-5-2025.docx DOCX document
QVL Compiled Questions.pdf PDF
Attachment 2. = FAA-C-1217h Electrical Work, Interior.pdf PDF
Attachment 3.= FAA-C-1391f Installation, Termination, Splicing, & Transient-Surge Protection.pdf PDF
Attachment 4. = FAA Guide to Ground Vehicle Operations.pdf PDF
6973GH-25-R-00167.pdf PDF
6973GH-25-R-00167 Amendment 00001.pdf PDF
Attachment 5. = COMM QVL Presentation.pptx PPTX presentation
Attachment 6. = NAVAIDs QVL Presentation.pptx PPTX presentation
6973GH-25-R-00167.pdf PDF
Attachment 1. = FAA-STD-019g Lightning & Surge Protection, Grounding, Bonding, & Shielding.pdf PDF
Attachment 3.= FAA-C-1391f Installation, Termination, Splicing, & Transient-Surge Protection.pdf PDF
Attachment 14.= FAA JO 6580.3B Remote Communications Facilities Installation Standards Handbook.pdf PDF
QVL Compiled Questions.pdf PDF
Attachment 10. QVL Application Form as of 6-5-2025.docx DOCX document
Attachment 15.= FAA JO 6050.32B Spectrum Management Regulations and Procedures Manual.pdf PDF
6973GH-25-R-00167 Amendment 00001.pdf PDF
Attachment 5. = COMM QVL Presentation.pptx PPTX presentation
Attachment 7. = Contractor's Release Form DOT F 4220.4.pdf PDF
Attachment 9. = Solicitation Questions Form 5-20-2025.doc DOC document
Attachment 2. = FAA-C-1217h Electrical Work, Interior.pdf PDF
Attachment 4. = FAA Guide to Ground Vehicle Operations.pdf PDF
Attachment 6. = NAVAIDs QVL Presentation.pptx PPTX presentation
Attachment 8. = Past Performance Experience Information Form.doc DOC document
Attachment 11. = Past Performance Survey Form 5-20-2025.doc DOC document
Attachment 12.= Qualified Vendor List (QVL) 6973GH-25-R-00167 Section K - Copy.pdf PDF
Attachment 13.= FAA JO 6850.2C Visual Guidance Lighting system.pdf PDF
Attachment 1. = FAA-STD-019g Lightning & Surge Protection, Grounding, Bonding, & Shielding.pdf PDF
Attachment 10. QVL Application Form as of 6-5-2025.docx DOCX document
Attachment 12.= Qualified Vendor List (QVL) 6973GH-25-R-00167 Section K - Copy.pdf PDF
Attachment 5. = COMM QVL Presentation.pptx PPTX presentation
Attachment 11. = Past Performance Survey Form 5-20-2025.doc DOC document
Attachment 2. = FAA-C-1217h Electrical Work, Interior.pdf PDF
Attachment 4. = FAA Guide to Ground Vehicle Operations.pdf PDF
Attachment 6. = NAVAIDs QVL Presentation.pptx PPTX presentation
Attachment 7. = Contractor's Release Form DOT F 4220.4.pdf PDF
Attachment 9. = Solicitation Questions Form 5-20-2025.doc DOC document
Attachment 3. = FAA-C-1391e Installation, Termination, Splicing, & Transient-Surge Protection....pdf PDF
Attachment 8. = Past Performance Experience Information Form.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

AAQ-720 DIVERSIFIED FRANCHISE ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ720-AFN

OKLAHOMA CITY OK 73125

Jason Fox 405-954-4940

106/25/2025 2

PURCHASE REQUEST NO.

6973GH-25-R-00167

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

**In accordance with AMS T3.2.2.3 (A), with this SIR, the Federal Aviation

Administration (FAA) intends to establish a Qualified Vendors List (QVL) for construction services performed on AJW-242 Unstaffed Infrastructure Sustainment

(UIS) facilities on and off Airport Operating Areas in various locations throughout the United States.

**Applications are due on 29 August 2025 by 5:00pm CST

** Questions will be due by 15 August 2025 by 5:00pm CST

**Small business competition unless otherwise indicated on individual requirements solicited under this QVL.

**Each requirement solicited under this QVL will have its own additional clauses specific to the requirement.

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

0 0 calendar days and complete it within ________________ ________________ calendar days after receiving

1 1700

08/29/2025 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

AAQ-720 DIVERSIFIED FRANCHISE ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ720-AFN

OKLAHOMA CITY OK 73125

Janice K. Hammonds

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Section A - Solicitation/Contract Form Clauses

In accordance with AMS T3.2.2.3 (A), with this SIR, the Federal Aviation Administration (FAA) intends to establish a Qualified Vendors List (QVL) for AJW-242 Unstaffed Infrastructure Sustainment (UIS) construction services to be performed on and off Airport Operating Areas in various locations throughout the United States.

This QVL SIR consists of the following Parts/Sections:

Part I - The Schedule Section A: Solicitation Index Section B: General Information about the QVL Section C: Scope of Work Section D: Packaging and Marking Section E: Inspection and Acceptance Section F: Deliveries or Performance Area Section G: Contract Administration Data Section H: Special Contract Requirements

Part II - Contract Clauses Section I: Contract Clauses

Part III - List of Documents, Exhibits, and Attachments Section J List of Documents, Exhibits, and Attachments *

Part IV - Representations and Instructions Section K: Representations, Certifications and Other Statements of Offerors Section L: Application Instructions, Conditions, and Notices to Offerors Section M: Evaluation Factors for Award

* Attachments located after end of Section M.

Section B - Supplies or Services/Prices Section B - Schedule

General Information about the QVL

B.1 What is a Qualified Vendors List (QVL) A Qualified Vendors List (QVL) is a list of service or product providers who have had their products or services examined, tested or evaluated and who have satisfied all applicable qualification requirements. QVLs are intended as a mechanism to establish a pool of qualified vendors, any of which FAA would be satisfied with the products delivered or services performed. Pre-screening vendors allows only those most qualified contractors to perform a particular service or provide a particular product during a specific period. QVLs are most appropriate when the contracting office can reasonably anticipate recurring or repetitive requirements for the same or similar supplies or services.

The Contracting Officer has established one QVL for AJW-242 Unstaffed Infrastructure Sustainment (UIS) construction services in the Western, Central and Eastern Service Areas for On-Airport Operations Area (On-AOA) and Off-AOA projects, 6973GH-25-R-00167.

B.2 Why a QVL AAQ-720 selected a QVL because the source selection tool provides solutions to: (1) ensuring employment of quality, experienced contractors; and (2) addressing the need for quicker, more responsive procurements.

With regards to employment of quality, experienced contractors - This effort is a culmination of experience and knowledge in all three service areas. AAQ-720 took all of the combined lessons learned, and crafted a solicitation that focused on the quality of vendors.

With regards to procurement action lead times (PALT) -The 2012 Service Level Agreement between ACQ and ATO agrees to a timeline of between 88 and 177 calendar days for negotiated, competitive procurements. This is the often-hated “180 days”. By comparison, QVL-based procurements have a timeline of between 60 to 120 calendar days. In other words, a QVL reduces the procurement timeline by roughly a third. This source selection tool helps to alleviate some of that concern.

In addition to the procurement timeline savings, there are other unquantifiable benefits to QVLs. For instance, in a QVL setting, there is an inherent performance incentive for contractors: future work is dependent upon current, successful performance. As a result, there should also be an additional time/administrative cost savings: less time spent enforcing specifications or correcting performance.

B.3 Duration of the QVL The QVL will be in effect for five (5) years.

B.4 Requalification/Updating the QVL Application Process The FAA reserves the right to add vendors or update the list at any time. There will be an official requalification/reopening of the application process at some time after the initiation of this QVL to allow new vendors an opportunity to apply. At that time, members may be asked to confirm their continued interest to remain on the list, or opt out of the list, by responding in writing. A non-response will be viewed as lack of interest resulting in removal from the QVL.

B.5 Withdrawal from the QVL Members may, at any time, submit a written request to withdraw from the QVL.

B.6 Disqualification of the QVL The FAA reserves the right to disqualify and remove any member from the QVL at any time and for any reason including, but not limited to:

1. Poor quality of work as determined by the Contracting Officer

2. Debarment from Government Contracting

3. Failure to satisfy qualifying factors in subsequent RFQs

The FAA will provide the subject member with a Notification of Disqualification and the reasons for disqualification prior to removal from the QVL.

B.7 Canceling/Termination of the QVL If it is ever determined that the QVL is not in the best interest of the FAA, all members on the list will be provided with notice of termination.

B.8 Performance Difficulties If at any time, a vendor on an established QVL has performance difficulties, changes ownership, or otherwise becomes less than highly qualified, the CO may request that the vendor requalify by submitting qualification information again. A notification to the vendor of the reasons it is being required to requalify will be sent out.

B.9 Administration of the QVL

1. Once established, the Acquisitions Division will utilize the QVL for solicitations to the maximum extent possible.

2. The Contract Specialist (CS) will prepare the Request for Offer (RFO) or Request for Quote (RFQ) and ensure all applicable drawings and specifications are sent to each vendor on the QVL to obtain pricing. Each RFO or RFQ is prepared with clauses applicable to the particular requirement needed. The CS will evaluate proposals and make contract award in accordance with procedures outlined in the RFO or RFQ and AMS.

3. Offerors must be registered with the System for Award Management, www.sam.gov on the date established for receipt of offers on each individual order solicited under this QVL. The Offeror must ensure that their company's information on www.sam.gov is up to date, current business size level indicated on SAM will be applied for this QVL. Reference AMS Clause 3.3.1-33, paragraph (d), “if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror.”

4. The Contract Specialist (CS) will conduct a review of each vendor's performance at a minimum of every two (2) years. The review will cover the vendor's performance over the previous 12 month period. The CS will evaluate all vendors for responsiveness, competitiveness, and performance.

Clause List http://www.sam.gov/ http://www.sam.gov/

Section C - Description/Specifications Scope of Work

C.1 Construction services anticipated to be solicited and awarded:

Work may include, but is not limited to all construction services (concrete, masonry, metals, woods/plastics, thermal/moisture, doors/windows, finishes, specialties, equipment, furnishings, special construction, mechanical, engineering, site work, electrical, Antenna Tower Installation/Replacements, HVAC Installation/Replacements, Roof Replacements, Stair Installation/Replacements, Platform/Decking Installation/Replacements, Access Road Installation/Replacements, Tower Structural Inspections, Shelter Installation/Replacements, Shelter Purchases (Shelter Manufacturers Only), Electrical, Paving Installation/Repair, Fencing Installation/Repair, Painting, Remediation services, Geotechnical Surveys, Construction Services on NAVIDS facilities/equipment (examples:

MALSR, PAPI, VASI, REIL, ALS, VOR, etc.), Construction Services on COMM facilities/equipment (examples: RTR, RCO, RCAG, BUEC, RCLR, RCLT, etc.) associated in the construction of the following facilities:

Navigational and Landing Facilities A/G RCVR Air/Ground Receiver ALS Approach Lighting Systems ALSF-2 Approach Lighting System with Sequenced Flashing Lights ARSR Air Route Surveillance Radar ASR Airport Surveillance Radar DMER Distance Measuring Equipment (downgraded from TACAN) co-located with VOR DME Distance Measuring Equipment GS Glide Slope G/G RCVR Ground/Ground Receiver ILS Instrument Landing System (Glide Slope or Localizer) IM Inner Marker LDIN Lead-In Lights LOC Localizer LOM Locator Outer Marker MALSR Medium Intensity Approach Light System MALS/R/F Medium Intensity Approach Lighting System/ with Runway Alignment Indicator Lights/with

Sequenced Flashing Lights MM Middle Marker NDB Non-Directional Beacon ODALS Omnidirectional Approach Lighting System OM Outer Marker PAPI Precision Approach Path Indicator Lights RRCIU Remote Radio Control Interface Unit RAIL Runway Alignment Indicator Lights REIL Runway End Identification Lights RVR Runway Visual Range SSALR Simplified Short Approach Lighting System with Runway Alignment Indicator Lights

TACAN Tactical Air Navigation

TACR Tactical Air Navigation Collocated

VOR Very High Frequency Omnidirectional Range

VOT VHF Omnidirectional Range Test Site

VASI Visual Approach Slope Indicator

Communications Facilities

BUEC Backup Emergency Communication System RCAG Remote Center Air/Ground Communication RCLR Radio Communication Link Repeater RCLT Radio Communications Link Terminal RCO Remote Communication Outlet RTR Remote Transmitter Receiver

C.2 Statement of Work The contractor is responsible for furnishing all labor, materials, equipment, transportation, insurance, notifications, licenses, permits, fees and supervision necessary for the specified requirements solicited under this QVL in accordance with the specifications, drawings, contract clauses, wage rates, as well as any attachments pertaining to that individual requirement. All work performed and any materials and equipment used will be subject to approval by the Contracting Officer Representative (COR) and the Contracting Officer (CO). This shall include but not be limited to testing, inspection, scheduling, reporting, and submittals.

Clause List

AC4548 EMERGENCY SITUATIONS AND EXERCISES DURING CONTRACT PERFORMANCE

(JUL 2015) *R

(a) Emergency situations and exercises are temporary exceptions to the prohibition of contractor personnel not being subject to the direction and control of Government personnel when performing non-personal contract services in FAA facilities.

(b) All contractor personnel at a FAA work site or facility during an actual emergency shall conform to the procedures posted or directed by FAA officials responsible for emergency response at that site or facility.

Such officials include evacuation wardens/monitors, security personnel, Emergency Readiness Officers, management, etc.

(c) Contractor personnel shall participate in all emergency exercises, including evacuations, as part of performance under this contract.

(d) Contractor management/supervisors shall ensure that each contractor employee assigned work in FAA facilities possesses a general awareness of emergency and evacuation procedures at all locations where the employees might be during an emergency or exercise. Information on emergency procedures may be requested from the Contracting Officer’s Representative (COR) or a designated FAA contact point at the work site.

Section D - Packaging and Marking Clause List

There are no applicable Section D clauses.

The remainder of this page has been intentionally left blank.

Section E - Inspection and Acceptance Clause List

3.10.4-2 INSPECTION OF SUPPLIES - FIXED PRICE (NOV 1997)

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS

(APR 1996)

The remainder of this page has been intentionally left blank.

Section F - Deliveries or Performance Clause List

F.1 Areas of Interest This QVL is divided in three geographical areas of interest: the Western, Central and Eastern Service Areas.

Each responding firm may apply to one, some, or all of the Service Areas pictured below. (Geographical election must be indicated on the application, or it is assumed that Applicant will work in all areas.)

The QVL has a total estimated potential value of up to $150,000,000.00 over 5 years. There is no dollar limitation for individual orders solicited under this QVL.

** The work may be performed at civilian airports, so Applicant is put on notice that there are increased security and operational requirements, additional airport access requirements dictated by each individual Airport.

Each individual order placed under this QVL will specify the heightened requirements. **

F.2 WORKING HOURS

Work on the individual orders solicited under this QVL will have the working hours determined on a per project basis amounting to a total of 40 hours/week. No work is allowed on weekends and Federal Holidays unless approved by the FAA in writing. Deviation from this work schedule may be discussed prior to the Notice To Proceed date during the Pre-construction Conference. Additional changes/requests to previously agreed upon work schedule shall be submitted to the COR and the CO for approval. All work beyond normal work hours shall be requested in writing to the COR and CO 24 hours in advance. Approval of the request shall be allowed at the COR and CO's discretion.

F.3 UTILITY OUTAGES AND SHUTDOWN

Utility outages and shutdowns on the individual orders solicited under this QVL shall be coordinated with the Contracting Officer (CO) and Project Manager. Outages affecting FAA operations are required to be accomplished at night, on weekends or designated government holidays. COR and CO review is required before any interruption.

During construction, if the contractor plans to stop work, the contractor shall notify the COR and CO at least 24 hours prior to that time. The contractor shall notify the COR and CO 48 hours in advance in order to reschedule any on site activity after stopping work.

F.4 TEMPORARY SERVICES AND FACILITIES

The contractor shall provide and pay for all temporary services and facilities as specified on the individual orders solicited under this QVL and as necessary for the proper and expeditious execution of the work. Contractor shall make, or have made, all connections to existing services and sources of supply as necessary and/or indicated and pay all charges for same. Contractor shall provide all labor, materials, equipment and appurtenances necessary for the completion of the identified project. All work under this section shall comply with applicable laws, rules, regulations, codes, ordinances and orders of all federal, state and local authorities having jurisdiction for the safety of persons, materials and property. Contractor shall remove all such temporary installations and connections when no longer necessary for the project work.

Clause List

Each requirement solicited under this QVL will have its own additional clauses that fall under Section F:

Deliveries or Performance.

3.10.1-9 STOP-WORK ORDER (APR 2025)

3.10.1-11 GOVERNMENT DELAY OF WORK (APR 1996)

3.10.1-24 NOTICE OF DELAY (MAR 2009)

3.11-34 F.O.B. DESTINATION (APR 1999)

3.2.2.8-5 LIQUIDATED DAMAGES - CONSTRUCTION (OCT 2019)

(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor must pay to FAA as liquidated damages, the sum of $[insert amount] for each day of delay.

(b) If FAA terminates the Contractor's right to proceed, the resulting damage will consist of liquidated damages until such reasonable time as may be required for final completion of the work, together with any increased costs to FAA in completing the work.

(c) If FAA does not terminate the Contractor's right to proceed, the resulting damage will consist of liquidated damages until the work is completed or accepted.

(End of clause)

AC1817 ACCELERATED DELIVERY (JAN 1997)

Any Schedule for delivery or performance may be expedited at the contractor's option, if without additional expense to the Government.

Section G - Contract Administration Data Clause List

Each requirement solicited under this QVL will have its own additional clauses that fall under Section G:

Contract Administration Data.

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 10 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

(End of clause)

AC1227 RELEASE FORM (JAN 1997)

The contractor will be required to execute Contractor's Release Form DOT F 4220.4 (2-71) prior to final payment under the contract. (Note: A copy of Form DOT F 4220.4 (2-71) is attached hereto for information purposes.)

Section H - Special Contract Requirements Clause List

H.1 PERMITS AND RESPONSIBILITIES

The Contractor shall obtain and pay fees for permits, licenses, or certificates required by Federal, State and City/Town officials as necessary to perform the work, prior to starting construction, and in a timely manner to avoid delays in starting the job. The Contractor shall abide by all requirements dictated by the municipality for such permits without any additional cost.

H.2 ACCIDENT AND FIRE REPORTING

(a) The Contractor shall report to the CO any accident or fire occurring at the site of the work which causes:

(1) A fatality or as much as one lost workday on the part of any employee of the Contractor or subcontractor at any tier;

(2) Damage of $1,000 or more to Federal property, either real or personal;

(3) Damage of $1,000 or more to Contractor or subcontractor owned or leased motor vehicles or mobile equipment; or

(4) Damage for which a contract time extension may be requested.

(b) Accident and fire reports required by paragraph (a) above shall be accomplished by the following means:

(1) Report immediately by telephone to the CO or his/her authorized representative and shall be confirmed by email or facsimile transmission within 24 hours to the Contracting Officer. Such email or facsimile transmission shall state all known facts as to extent of injury and damage and as to cause of the accident or fire.

(2) Accident and fire reports required by paragraph (a) above may be reported by the Contractor using a state, private insurance carrier, or Contractor accident report form which provides for the statement of:

(i) The extent of injury; and

(ii) The damage and cause of the accident or fire. Such report shall be mailed or otherwise delivered to the Contracting Officer within 48 hours of the occurrence of the accident or fire.

(c) The Contractor shall assure compliance by subcontractors at all tiers with the requirements of this clause.

Clause List

Each requirement solicited under this QVL will have its own additional clauses that fall under Section H:

Special Contract Requirements.

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

AC1231 NOTIFICATION REQUIREMENTS WHEN FRIABLE ASBESTOS MATERIAL IS

REMOVED/DISTURBED (JAN 1997) *R

(a) Prior to any planned and/or scheduled disturbance of friable asbestos material, the contractor shall present a written plan to the Contracting Officer. The plan shall include, but not be limited to, location, type facility, size of area to be disturbed or removed, method of containment to be used, disposal procedures, clean-up procedures, number of employees involved, protective clothing/equipment to be used, the date and time removal/disturbance is planned and any other information requested by the Contracting Officer. The contractor shall not proceed with any removal or disturbance of friable asbestos material without written approval from the Contracting Officer.

(b) If during the performance of the contract the contractor inadvertently disturbs friable asbestos material, the contractor shall immediately cease operations and notify the Contracting Officer. The contractor shall remain at the site of disturbance for the Contracting Officer's instructions.

AC4555 NOTICE OF CONTRACTOR TESTIMONY (SEP 2006)

(a) The contractor shall notify the Contracting Officer promptly in writing of its intention, or the intention of its employees, subcontractors of any tier, or subcontractor employees, either voluntarily or under compulsion of competent authority, to provide sworn testimony on any matter related to or arising under the work required by and/or performed under, this contract. Such written notification at a minimum shall consist of the date and time of the testimony, identification of the court, board, or other body before which the testimony is made, the nature of the testimony to be given to the extent it is known at the time of this report, the nature of the contractor’s involvement in the proceeding and any other circumstances related to the work performed under or related to the contract and the proceeding in which the testimony will be taken.

(b) The contractor shall include the substance of this clause, including this paragraph (b), in all subcontracts executed under this contract and shall require all subcontractors to provide the required report to the contractor.

AC4557 STRIKES OR PICKETING

Notwithstanding any other provision hereof, the Contractor is responsible for delays arising out of labor disputes, including but not limited to strikes, if such strikes are reasonably avoidable. A delay caused by a strike or by picketing which constitutes an unfair labor practice is not excusable unless the Contractor takes all reasonable and appropriate action to end such a strike or picketing, such as the filing of a charge with the National Labor Relations Board, the use of other available Government procedures, and the use of private boards or organizations for the settlement of disputes.

Section I - Contract Clauses Clause List

Each requirement solicited under this QVL will have its own additional clauses that fall under Section I:

Contract Clauses.

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)

3.1.7-5 DISCLOSURE OF CONFLICTS OF INTEREST (JUL 2018)

3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024)

3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024)

3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2024)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2024)

3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2024)

3.2.2.3-48 OTHER CONTRACTS (JUL 2024)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS (JUL 2024)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (JUL 2024)

3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2024)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2024)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2024)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2024)

3.2.2.3-58 LAYOUT OF WORK (JUL 2024)

3.2.2.3-59 ORGANIZATION AND DIRECTION OF THE WORK (JUL 2024)

3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2024)

3.2.2.3-64 DISMANTLING AND DEMOLISHING OF PROPERTY (JUL 2024)

3.2.2.3-66 CONTRACTOR'S DAILY LOG (JUL 2024)

3.2.2.3-67 SPECIAL PRECAUTIONS FOR WORK AT OPERATING AIRPORTS (JUL 2024)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (OCT 2024)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2024)

3.2.5-4 CONTINGENT FEES (OCT 2024)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2024)

3.2.5-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE FAA (OCT 2024)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 2024)

3.2.5-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2024)

3.2.5-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2024)

3.3.1-10 AVAILABILITY OF FUNDS (OCT 2024)

3.3.1-16 PROHIBITION OF ASSIGNMENT OF CLAIMS (OCT 2024)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS

(OCT 2012)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (OCT 2024)

3.4.1-6 ADDITIONAL BOND SECURITY (APR 1996)

3.4.1-7 NOTICE TO PROCEED (OCT 2019)

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)

3.4.1-12 INSURANCE (OCT 2019)

3.4.1-13 ERRORS AND OMISSIONS (JUL 1996)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (APR 2025)

3.5-1 AUTHORIZATION AND CONSENT (APR 2023)

3.5-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT

(JAN 2009)

3.5-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (JAN 2009)

3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2019)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-

DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (APR 2025)

3.6.1-7 LIMITATIONS ON SUBCONTRACTING (JUL 2021)

3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME

COMPENSATION (OCT 2018)

3.6.2-2 CONVICT LABOR (APR 2025)

3.6.2-4 WALSH-HEALEY PUBLIC CONTRACTS ACT (APR 2025)

3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (APR 2022)

3.6.2-13 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (APR 2022)

3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (APR 2025)

3.6.2-18 DAVIS BACON ACT (APR 2025)

3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (APR 2025)

3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2025)

3.6.2-21 APPRENTICES AND TRAINEES (APR 2025)

3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (APR 2025)

3.6.2-39 TRAFFICKING IN PERSONS (OCT 2024)

3.6.2-44 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (APR 2025)

3.6.2-46 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (APR 2025)

3.6.3-8 ALTERNATIVES TO PRODUCTS CONTAINING OZONE DEPLETING SUBSTANCES

AND HYDROFLUOROCARBONS (APR 2025)

3.6.3-10 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (OCT 2024)

3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (OCT 2024)

3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2024)

3.6.4-5 FAA BUY AMERICAN PREFERENCE - STEEL AND MANUFACTURED GOODS (APR

2022)

3.6.4-8 BUY AMERICAN ACT AND FAA BUY AMERICAN PREFERENCE - USMCA

IMPLEMENTATION ACT - BALANCE OF PAYMENTS PROGRAM (JAN 2024)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.6-1 DRUG FREE WORKPLACE (APR 2023)

3.6.6-2 SEAT BELT USE BY CONTRACTOR EMPLOYEES (APR 2023)

3.6.6-3 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JUL 2023)

3.8.2-10 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (JUL

2019)

3.8.9-2 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JUL 2023)

3.9.1-1 CONTRACT DISPUTES (JAN 2020)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-8 SUSPENSION OF WORK (SEP 1998)

3.10.1-12 CHANGES - FIXED-PRICE (APR 1996)

3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS (JUL 2023)

3.10.1-16 CHANGES AND CHANGED CONDITIONS (JUL 2023)

3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.1-28 CHANGES REQUIRED BY AMS (JAN 2024)

3.10.3-2 GOVERNMENT PROPERTY - BASIC CLAUSE (APR 2022)

3.10.3-2 GOVERNMENT PROPERTY - BASIC CLAUSE (APR 2022) - ALTERNATE I (OCT 2018)

3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV

1997)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT

1996)

3.10.6-4 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (JAN 2020)

3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)

3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (APR 2025)

3.1.7-6 DISCLOSURE OF CERTAIN EMPLOYEE RELATIONSHIPS (APR 2023)

(a) The policy of the FAA is to avoid doing business with contractors, subcontractors, and consultants who have a conflict of interest or an appearance of a conflict of interest. The purpose of this policy is to maintain the highest level of integrity within its workforce and to ensure that the award of procurement contracts is based upon fairness and merit.

(b) The contractor must provide to the Contracting Officer the following information with its proposal and must provide an information update within 30 days of the award of a contract, any subcontract, or any consultant agreement, or within 30 days of the retention of a Subject Individual or former FAA employee subject to this clause:

(1) The names of all Subject Individuals who:

(i) participated in preparation of proposals for award; or

(ii) are planned to be used during performance; or

(iii) are used during performance; and

(2) The name of each individual, retained in any capacity by the contractor, who was employed by FAA during the five-year period immediately prior to the date of award; and

(3) The date on which the initial expression of interest in a future financial arrangement was discussed with the contractor by any former FAA employee whose name is required to be provided by the contractor pursuant to subparagraph (2); and

(4) The location where any Subject Individual or former FAA employee whose name is required to be provided by the contractor pursuant to subparagraphs (1) and (2), are expected to be assigned.

(c) "Subject Individual" means a current FAA employee's father, mother, son, daughter, brother, sister, uncle, aunt, first cousin, nephew, niece, husband, wife, father-in-law, mother-in-law, son-in-law, daughter-in-law, brother-in-law, sister-in-law, stepfather, stepmother, stepson, stepdaughter, stepbrother, stepsister, half brother, half sister, spouse of an in-law, or a member of his/her household.

(d) The contractor must incorporate this clause into all subcontracts or consultant agreements awarded under this contract and must further require that each such subcontractor or consultant incorporate this clause into all subcontracts or consultant agreements at any tier awarded under this contract unless the Contracting Officer determines otherwise.

(e) The information as it is submitted, must be certified as being true and correct. If there is no such information, the certification must so state.

(f) Remedies for nondisclosure: The following are possible remedies available to the FAA should a contractor misrepresent or refuse to disclose or misrepresent any information required by this clause:

(1) Termination of the contract.

(2) Exclusion from subsequent FAA contracts.

(3) Other remedial action as may be permitted or provided by law or regulation or policy or by the terms of the contract.

(g) Annual Certification. The contractor must provide annually, based on the anniversary date of contract award, the following certification in writing to the Contracting Officer:

ANNUAL CERTIFICATION OF DISCLOSURE OF CERTAIN EMPLOYEE RELATIONSHIPS

The contractor represents and certifies that to the best of its knowledge and belief that during the prior 12 month period:

[ ] A former FAA employee(s) or Subject Individual(s) has been retained to work under the contract or subcontract or consultant agreement and complete disclosure has been made in accordance with subparagraph (b) of AMS Clause 3.1.7-6.

[ ] No former FAA employee(s) or Subject Individual(s) has been retained to work under the contract or subcontract or consultant agreement, and disclosure required by AMS Clause 3.1.7-6 is not applicable.

Authorized Representative

Company Name

Date

(h) The contractor agrees to include the substance of this clause in all subcontracts awarded under this contract. The Contracting Officer will consider case-by-case exceptions to this requirement for individual subcontracts in the event that: (1) the contractor considers this clause to be inappropriate and unnecessary in the case of a particular subcontract; (2) the contractor provides a written statement affirming absolute unwillingness of a subcontractor to perform, absent some relief from the substance of this prohibition and the reason why; (3) use of an alternate subcontract source would unreasonably detract from the quality of effort; and (4) the contractor provides the Contracting Officer timely written advance notice of these and any other extenuating circumstances.

(End of clause)

3.2.2.3-41 PERFORMING WORK (APR 2024)

The Contractor must perform, using its own organization, work equivalent to at least 51 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if the Contractor requests a reduction and the CO determines that it would be to the FAA's advantage to do so.

(End of clause)

3.2.2.3-44 PHYSICAL DATA (JUL 2024)

Data and information the FAA provides or refers to below is for the Contractor's information. The FAA is not responsible for any interpretation or conclusions drawn from the data or information from the Contractor. Further, the FAA does not warrant construction methodology which may be included in these documents.

(a) The descriptions of physical conditions on the drawings and in the specifications are the result of site investigations by the on-site engineer.

(b) Other relevant information it is the Contractor's responsibility to obtain weather patterns for the area, inspect the site in a manner which will provide the Contractor sufficient information concerning the site conditions in order to complete the project within the stated amount of time.

(End of clause)

3.2.2.3-50 PROPERTY PROTECTION (JUL 2024)

(a) The Contractor must construct and maintain any temporary fences, gates and other facilities needed to preserve crops, control livestock, and protect property. Before cutting a fence, the Contractor must take necessary precautions to prevent livestock from straying. The Contractor must prevent loss of tension in or damage to adjacent portions of the fence. The Contractor must immediately replace all fencing and gates cut, removed, damaged, or destroyed with new materials to the original standard. Undamaged gates may be reused.

(b) The Contractor must comply with the property owner's requests to leave gates open or closed.

(c) The Contractor must use all necessary precautions to avoid destroying surveying markers such as section corners, witness trees, property corners, mining claim markers, bench markers, triangulation stations, and the like. If the Contractor must destroy any marker, the Contractor must first notify the agency responsible for the marker, as well as the Contracting Officer's (CO) representative, and replace the markers.

(d) The Contractor must use care to prevent unnecessary damage to property in or near the work area caused by the Contractor's work. Unnecessary damage is that which the Contractor can avoid through efficient and careful performance of the work, considering the Contractor's land rights. If the Contractor damages any property, the Contractor must at once notify the owner or custodian and make or arrange to make prompt and full restitution.

(e) Maps and specifications the FAA provides may not give the location of all water supply, drainage, irrigation, and other underground facilities. Before entering a tract of land for contract purposes, the Contractor must determine from the property owner (or other reasonably available source) the location of any irrigation system, domestic water system, source of water, and drainage system existing on the property, whether serving that property or other property. The Contractor must avoid damaging or obstructing these facilities or polluting water supplies.

(f) The Contractor must hold the FAA harmless from any and all suits, actions, and claims for damages, including environmental impairment, to property arising from any of the Contractor's acts or omissions, the Contractor's subcontractors, or any of the Contractor's employees or subcontractor employees, in any way related to the work or operations under this contract.

(g) The Contractor must indemnify and hold harmless the property owners or parties lawfully in possession against all claims or liabilities asserted by third parties, including all governmental agencies, resulting directly or indirectly from the Contractor's wrongful or negligent acts or omissions.

(End of clause)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (JUL 2024)

(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, the Contractor must submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify the Contractor in writing. Any adjustment made by the Contractor without the CO's determination is at the Contractor's own risk and expense. As needed, the CO will provide necessary detailed drawings and other information, unless otherwise provided.

(b) Wherever in the specifications or the drawings, the FAA uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. The Contractor must have a complete set of plans and specifications on-site and available for the FAA's use.

(c) Where the FAA uses "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."

(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing those omitted or erroneously described details of the work. The Contractor must perform them as if fully and correctly set forth and described in the drawings and specifications.

(e) The Contractor must check all drawings the FAA provides before starting work and must promptly notify the CO of any discrepancies. In general, the Contractor should follow figures marked on drawings, rather than scale measurements. In general, large-scale drawings have precedence over small-scale drawings. The Contractor must compare all drawings and verify the figures before laying out the work. If the Contractor does not verify the figures, the Contractor will be responsible for any errors that might have been avoided had it verified them.

(f) "Shop drawings" means drawings, the Contractor or any subcontractor submit to the FAA under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials the Contractor provided to explain in detail specific portions of the work the contract requires.

The FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.

(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), the Contractor must coordinate all of its offers, and review them for accuracy, completeness, and compliance with contract requirements. The Contractor must provide evidence that it approves the submittals. If the Contractor submits materials to the FAA without this evidence, the FAA may return them and ask the Contractor to resubmit the materials. The CO will indicate whether he or she approves or disapproves the offer, and if the CO does not approve it as submitted, will indicate the reasons for rejecting it. Any work done before the CO's approval is at the Contractor's risk. The CO's approval does not relieve the Contractor from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).

(h) If the submittals vary from the contract requirements, the Contractor must describe the variations in writing, separate from the submittal, when it submits them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.

(i) The Contractor must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to the Contractor.

(j) The Contractor must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.

(End of clause)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014) - ALTERNATE I (JUL 2004)

(a) Before beginning work, the Contractor (you) must:

(1)…