This document summarizes a bid opening for the George Washington Memorial Parkway Project NP-GWMP 6(1), 7(2). The project consists of rehabilitation work on the Clara Barton Parkway and associated parking areas, access roads, and ramps within the George Washington Memorial Parkway. Work includes asphalt pavement milling and overlay, full depth asphalt pavement patching, concrete deck repair, culvert replacement, riprap, underdrain, guardrail replacement, signing, pavement markings, and other miscellaneous work. The project will be split into multiple schedules and contract options, with the total cost expected to exceed $10 million. Seven contractors submitted bids ranging from approximately $9.8 million to $15.9 million. The engineer's estimate was $9.94 million. The solicitation number is 693C73-20-B-000013 and was issued by the Federal Highway Administration Eastern Federal Lands Highway Division. The agency overseeing the project is the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration Eastern Federal Lands Highway Division

Bid Opening for

George Washington Memorial Parkway

PROJECT: NP-GWMP 6(1), 7(2)

SOLICITATION NO. 693C73-20-B-000013

May 12, 2020 at 2:00 p.m.

Sterling, VA

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-20-B-000013 Project: NP-GWMP 6(1), 7(2)

May 12, 2020, 2:00 p.m. local time

BIDDER’S BID TOTALS DAYS TOTAL PRICE

Civil Construction, LLC SCHEDULE A

$6,028,810.00

SCHEDULE B (GOVERNMENT OPTION 1)

$10,782,040.00

SCHEDULE C (GOVERNMENT OPTION 2)

$620,716.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$17,431,566.00

Highway and Safety Services SCHEDULE A

$2,903,625.00

SCHEDULE B (GOVERNMENT OPTION 1)

$6,733,325.50

SCHEDULE C (GOVERNMENT OPTION 2)

$342,284.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$9,979,234.50

Metro Paving Corporation SCHEDULE A

$2,923,233.00

SCHEDULE B (GOVERNMENT OPTION 1)

$6,589,515.00

SCHEDULE C (GOVERNMENT OPTION 2)

$308,106.50

SCHEDULE A + OPTION 1 + OPTION 2 =

$9,820,854.50

If the Government awards the contract as Schedules A + B + C, the performance period will be 150 calendar days.

If separate: Schedule A will be 55 calendar days; Schedule B will be 195 calendar days; and Schedule C will be 30 calendar days.

BID OPENING for SOLICITATION NO. 693C73-20-B-000013 Project: NP-GWMP 6(1), 7(2)

May 12, 2020, 2:00 p.m. local time

BIDDER’S BID TOTALS DAYS TOTAL PRICE

Milani Construction, LLC SCHEDULE A

$4,129,385.00

SCHEDULE B (GOVERNMENT OPTION 1)

$8,779,619.00

SCHEDULE C (GOVERNMENT OPTION 2)

$363,996.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$13,273,000.00

Sagres Construction Corp. SCHEDULE A

$4,489,325.00

SCHEDULE B (GOVERNMENT OPTION 1)

$9,645,240.00

SCHEDULE C (GOVERNMENT OPTION 2)

$552,986.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$14,687,551.00

Terra Site Constructors, LLC SCHEDULE A

$5,267,988.47

SCHEDULE B (GOVERNMENT OPTION 1)

$10,021,666.87

SCHEDULE C (GOVERNMENT OPTION 2)

$623,771.27

SCHEDULE A + OPTION 1 + OPTION 2 =

$15,913,427.00

If the Government awards the contract as Schedules A + B + C, the performance period will be 150 calendar days.

If separate: Schedule A will be 55 calendar days; Schedule B will be 195 calendar days; and Schedule C will be 30 calendar days.

BID OPENING for SOLICITATION NO. 693C73-20-B-000013 Project: NP-GWMP 6(1), 7(2)

May 12, 2020, 2:00 p.m. local time

BIDDER’S BID TOTALS DAYS TOTAL PRICE

SCHEDULE A

SCHEDULE B (GOVERNMENT OPTION 1)

SCHEDULE C (GOVERNMENT OPTION 2)

SCHEDULE A + OPTION 1 + OPTION 2 =

SCHEDULE A

SCHEDULE B (GOVERNMENT OPTION 1)

SCHEDULE C (GOVERNMENT OPTION 2)

SCHEDULE A + OPTION 1 + OPTION 2 =

Engineer’s Estimate SCHEDULE A

$2,900,000.00

SCHEDULE B (GOVERNMENT OPTION 1)

$6,700,000.00

SCHEDULE C (GOVERNMENT OPTION 2)

$340,000.00

SCHEDULE A + OPTION 1 + OPTION 2 =

$9,940,000.00

If the Government awards the contract as Schedules A + B + C, the performance period will be 150 calendar days.

If separate: Schedule A will be 55 calendar days; Schedule B will be 195 calendar days; and Schedule C will be 30 calendar days.

Slide Number 1
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000013� Project: NP-GWMP 6(1), 7(2)�May 12, 2020, 2:00 p.m. local time �
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000013� Project: NP-GWMP 6(1), 7(2)�May 12, 2020, 2:00 p.m. local time �
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000013� Project: NP-GWMP 6(1), 7(2)�May 12, 2020, 2:00 p.m. local time �