Results of Bid Opening - NP-GWMP 6(1) 7(2).pdf
PDF 115 KB Posted
- Attached to
- George Washington Memorial Parkway
- Solicitation number
- 693C73-20-B-000013
About this file
This document summarizes a bid opening for the George Washington Memorial Parkway Project NP-GWMP 6(1), 7(2). The project consists of rehabilitation work on the Clara Barton Parkway and associated parking areas, access roads, and ramps within the George Washington Memorial Parkway. Work includes asphalt pavement milling and overlay, full depth asphalt pavement patching, concrete deck repair, culvert replacement, riprap, underdrain, guardrail replacement, signing, pavement markings, and other miscellaneous work. The project will be split into multiple schedules and contract options, with the total cost expected to exceed $10 million. Seven contractors submitted bids ranging from approximately $9.8 million to $15.9 million. The engineer's estimate was $9.94 million. The solicitation number is 693C73-20-B-000013 and was issued by the Federal Highway Administration Eastern Federal Lands Highway Division. The agency overseeing the project is the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
George Washington Memorial Parkway
PROJECT: NP-GWMP 6(1), 7(2)
SOLICITATION NO. 693C73-20-B-000013
May 12, 2020 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-20-B-000013 Project: NP-GWMP 6(1), 7(2)
May 12, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Civil Construction, LLC SCHEDULE A
$6,028,810.00
SCHEDULE B (GOVERNMENT OPTION 1)
$10,782,040.00
SCHEDULE C (GOVERNMENT OPTION 2)
$620,716.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$17,431,566.00
Highway and Safety Services SCHEDULE A
$2,903,625.00
SCHEDULE B (GOVERNMENT OPTION 1)
$6,733,325.50
SCHEDULE C (GOVERNMENT OPTION 2)
$342,284.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$9,979,234.50
Metro Paving Corporation SCHEDULE A
$2,923,233.00
SCHEDULE B (GOVERNMENT OPTION 1)
$6,589,515.00
SCHEDULE C (GOVERNMENT OPTION 2)
$308,106.50
SCHEDULE A + OPTION 1 + OPTION 2 =
$9,820,854.50
If the Government awards the contract as Schedules A + B + C, the performance period will be 150 calendar days.
If separate: Schedule A will be 55 calendar days; Schedule B will be 195 calendar days; and Schedule C will be 30 calendar days.
BID OPENING for SOLICITATION NO. 693C73-20-B-000013 Project: NP-GWMP 6(1), 7(2)
May 12, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Milani Construction, LLC SCHEDULE A
$4,129,385.00
SCHEDULE B (GOVERNMENT OPTION 1)
$8,779,619.00
SCHEDULE C (GOVERNMENT OPTION 2)
$363,996.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$13,273,000.00
Sagres Construction Corp. SCHEDULE A
$4,489,325.00
SCHEDULE B (GOVERNMENT OPTION 1)
$9,645,240.00
SCHEDULE C (GOVERNMENT OPTION 2)
$552,986.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$14,687,551.00
Terra Site Constructors, LLC SCHEDULE A
$5,267,988.47
SCHEDULE B (GOVERNMENT OPTION 1)
$10,021,666.87
SCHEDULE C (GOVERNMENT OPTION 2)
$623,771.27
SCHEDULE A + OPTION 1 + OPTION 2 =
$15,913,427.00
If the Government awards the contract as Schedules A + B + C, the performance period will be 150 calendar days.
If separate: Schedule A will be 55 calendar days; Schedule B will be 195 calendar days; and Schedule C will be 30 calendar days.
BID OPENING for SOLICITATION NO. 693C73-20-B-000013 Project: NP-GWMP 6(1), 7(2)
May 12, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
SCHEDULE A
SCHEDULE B (GOVERNMENT OPTION 1)
SCHEDULE C (GOVERNMENT OPTION 2)
SCHEDULE A + OPTION 1 + OPTION 2 =
SCHEDULE A
SCHEDULE B (GOVERNMENT OPTION 1)
SCHEDULE C (GOVERNMENT OPTION 2)
SCHEDULE A + OPTION 1 + OPTION 2 =
Engineer’s Estimate SCHEDULE A
$2,900,000.00
SCHEDULE B (GOVERNMENT OPTION 1)
$6,700,000.00
SCHEDULE C (GOVERNMENT OPTION 2)
$340,000.00
SCHEDULE A + OPTION 1 + OPTION 2 =
$9,940,000.00
If the Government awards the contract as Schedules A + B + C, the performance period will be 150 calendar days.
If separate: Schedule A will be 55 calendar days; Schedule B will be 195 calendar days; and Schedule C will be 30 calendar days.
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000013� Project: NP-GWMP 6(1), 7(2)�May 12, 2020, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000013� Project: NP-GWMP 6(1), 7(2)�May 12, 2020, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000013� Project: NP-GWMP 6(1), 7(2)�May 12, 2020, 2:00 p.m. local time � |
File details come from the government source that posted it. Updated .