Bridge Inspection Report 3300-033P.pdf

PDF 5 MB Posted

Attached to
George Washington Memorial Parkway Federal contract opportunity
Solicitation number
693C73-20-B-000013
Issued by
Department of Transportation Federal Highway Administration

About this file

This is a solicitation for construction services for the George Washington Memorial Parkway Project NP-GWMP 6(1), 7(2), Solicitation Number 693C73-20-B-000013. The project consists of rehabilitation work on the Clara Barton Parkway and associated parking areas, access roads, and ramps within the George Washington Memorial Parkway, including asphalt pavement milling and overlay, full depth asphalt pavement patching, concrete deck repair, culvert replacement, riprap, underdrain, guardrail replacement, signing, and pavement markings. The work will be split into multiple schedules, with the total project cost expected to exceed $10 million. Bid documents will be available on or about April 9, 2020, with bid due date and location to be specified in the solicitation. The solicitation is set aside for certified Small Business Concerns only. The contract will be awarded by the Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 3300-033P

CABIN JOHN CREEK BRIDGE INSPECTION DATE: 4/18/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... BOX BEAMS - MULTIPLE NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 2 STRUCT. TOTAL LENGTH: .. 377.8 FT (115.2 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 150.0 FT (45.7 M)

WEARING SURFACE: .......... MODIFIED CONCRETE DECK WIDTH: ...................... 71.5 FT (21.8 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 60.5 FT (18.4 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1985

PROJ./PLAN REF. NO: ......... 100A2,100A19 / 1433 SKEW ANGLE: ..................... 44 °

NPS ROAD CLASS: .............. 7 - URBAN PARKWAY FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1985-PARTIAL DEPTH DECK REPAIRS. 2014-NEW DECK EXPANSION JOINTS.

LOCATION

GEORGE WASHINGTON MEMORIAL PARKWAY MILE POINT: ..................... 3.44 (KM PT 5.54)

STATE: ................................. MARYLAND LOCATION: 1.6 MILES SOUTH OF I-495.

FACILITY CARRIED: ............ CLARA BARTON PARKWAY

FEATURE INTERSECTED: .. CABIN JOHN CREEK & CABIN JOHN PAR

STRUCTURE EVALUATION SUMMARY

This concrete frame bridge is in fair condition overall. The main problem at this time is the deterioration of the substructure concrete with cracking, delamination, and spalling of the abutments and the ends of the box girders.

In addition, cracking, spalling, and delamination of the deck underside are indicative of water intrusion through the deck concrete. The current deck corrosion protection system is no longer functioning and is in disrepair. Several arrow board signs on underpass roadway are leaning or have fallen down. Other problems include clogged deck drains, faded pavement markings, rusting of bridge railings, and vegetation growth on and around the structure.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: M.L. AGNES, T.A. STOKLEY (CLARK NEXSEN)

CONDITION ASSESSMENT:

MATTHEW L. AGNES, P.E., FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 8/30/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-033P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58, 60 REMOVE VEGETATION GROWTH FROM STRUCTURE. 1 LS

222.5 FILL VOID AND UNDERMINING AT END OF WEST SIDEWALK, SOUTH APPROACH. 1 LS

222.7 RESET FALLEN ARROW BOARD SIGNS ON UNDERPASS ROADWAY BELOW NORTH

SPAN.

1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

58.1, 59.2,4, 60.1

REMOVE UNSOUND CONCRETE FROM DECK UNDERSIDE,

SUPERSTRUCTURE, AND ABUTMENT BREASTWALLS, CLEAN

REBAR, AND PLACE NEW CONCRETE TO ORIGINAL DIMENSIONS.

1 LS

60.9,17 PLACE ENGINEERED RIPRAP OR PAVED RUNDOWNS AT PIER

COLUMNS AND SOUTH ABUTMENT TO PREVENT ADDITIONAL

EROSION.

1 LS

58.8 REPAIR, REPLACE, OR REMOVE CURRENT CORROSION

PROTECTION SYSTEM.

1 LS

58.3, 222.4 REPAVE APPROACHES AND RESTRIPE PAVEMENT MARKINGS ON

DECK.

1 LS

58.6,8 CLEAN AND PAINT RAILINGS AND UTILITY ACCESS COVER PLATES

IN SIDEWALKS AS NEEDED.

1 LS

58.7, 59.2, 60.7

CLEAN CLOGGED DECK DRAINS AND ABUTMENT WEEP HOLES.

REDIRECT WEST BOX GIRDER DRAIN AT SOUTH ABUTMENT TO

PREVENT DRAINAGE ON BEARINGS.

1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN, AND CONSTRUCTION ENGINEERING.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 3300-033P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

G F N F N G N N G

N G

F F F F F F

N

G

G

F

58.1 PARTIAL DEPTH DECK REPLACEMENT IN 1985; UNDERSIDE

CONCRETE IS FROM ORIGINAL 1963 DECK. 2'L X 22'W PARTIAL

DEPTH PATCH AT SOUTHEAST CORNER. MINOR TRANSVERSE

CRACKING WITH EFFLORESCENCE THROUGHOUT DECK

UNDERSIDE. SCATTERED MINOR TO MODERATE AREAS OF

DELAMINATION THROUGHOUT DECK UNDERSIDE; FIVE AREAS HAVE

SPALLED UP TO 2'L X 2'W X 1-1/2"D WITH EXPOSED REBAR.

SEVERAL FULL-DEPTH PATCHES ON DECK UNDERSIDE; FORM FOR

ONE PATCH REMAINS IN CENTER SPAN.

MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON DECK

SIDES, EXTENDING INTO OVERHANGS. MINOR AREAS OF

DELAMINATION ON UNDERSIDE OF OVERHANGS; SOME AREAS

HAVE SPALLED WITH EXPOSED REBAR.

58.2 EXPANSION JOINT ASSEMBLIES OVER ABUTMENTS REPLACED

BETWEEN 2013 AND 2015 INSPECTION. JOINTS ARE PARTIALLY

FILLED WITH SAND AND GRAVEL WITH VEGETATION GROWTH

ALONG CURBLINES AND MEDIAN.

58.3 MINOR RANDOM CRACKING OF CONCRETE WEARING SURFACE;

MINOR SCALING WITH EXPOSED AGGREGATE. MINOR CRACKING

OF REPAIRS ALONG SOUTH EXPANSION JOINT IN SOUTHBOUND

LANES. MODERATE SPALL IN RIGHT SOUTHBOUND LANE AT SOUTH

ABUTMENT. MODERATE SPALLING OF EXPANSION JOINT

CONCRETE HEADER IN LEFT SOUTHBOUND LANE AT NORTH

ABUTMENT. PAVEMENT MARKINGS ON WEARING SURFACE FADED.

1. BREASTWALLS OR COLUMNS F

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS F

4. BACKWALLS AND/OR BULKHEADS G

5. FOUNDATIONS N

6. WINGWALLS G

7. WEEP HOLES F

8. EXPANSION JOINTS N

9. EROSION AND/OR SCOUR F

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER N

PIER(S)

13. WALLS AND/OR COLUMNS G

14. PILE BENTS N

15. CAPS AND/OR BEARING SEATS N

16. FOUNDATIONS N

17. EROSION AND/OR SCOUR F

18. SETTLEMENT OR DEFLECTION G

19. OTHER N

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 8

G G N G N

MED

SUFF

30 FT.

SAND, ROCK

222. APPROACHES 6

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N F F G G G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

58.5 WIDESPREAD MODERATE TRANSVERSE CRACKING OF SIDEWALKS,

HEAVIEST AT PIERS. MINOR SCALING IN SEVERAL LOCATIONS.

MINOR SPALL IN TOP OF WEST SIDEWALK NEAR NORTH PIER

BEHIND RAIL POST. MODERATE RUSTING OF ACCESS PLATES IN

SIDEWALKS; PLATES RAISED UP TO 1". MODERATE SCALING AND

SPALLING WITH EXPOSED REBAR ON WEST SIDEWALK AT SOUTH

APPROACH; MINOR AT NORTH APPROACH.

MINOR COVER SPALLS ON SIDE OF WEST SIDEWALK OVERHANG AT

SOUTH APPROACH. MINOR TRANSVERSE CRACKING WITH

EFFLORESCENCE ON UNDERSIDE OF APPROACH SIDEWALK

OVERHANGS. MINOR SCRAPES FROM PLOWS ON TRAFFIC FACES.

MINOR VEHICLE SCRAPES ON FACES OF MEDIAN THROUGHOUT

WITH MINOR SPALLING AT ONE LOCATION, WEST SIDE OF MEDIAN

IN NORTH SPAN. MODERATE GRAVEL ON MEDIAN.

58.6 MINOR RUSTING OF RAILINGS, HEAVIEST AT SPLICES, BASE

PLATES, AND ALONG TOP RAILS; UP TO 50% SECTION LOSS TO

ANCHOR BOLT NUT IN CENTER SPAN NEAR SOUTH PIER ON EAST

SIDE. MODERATE CRACK ACROSS BASE OF SECOND RAIL POST

FROM NORTH EXPANSION JOINT, WEST SIDE. TREE LIMBS

OVERHANGING RAILING ON BOTH SIDES.

58.7 TWO DECK DRAINS AT WEST CURB IN SOUTHBOUND LANE AND AT

MEDIAN CURB IN NORTHBOUND LANE ARE CLOGGED WITH DIRT

AND DEBRIS. MODERATE DEBRIS AND GRAVEL ACCUMULATION IN

CURBLINES AND ON MEDIAN; HEAVY ACCUMULATION WITH

VEGETATION GROWTH IN RIGHT SOUTHBOUND CURBLINE AND ON

WEST SIDEWALK.

58.8 IMPRESSED CURRENT CORROSION PROTECTION SYSTEM WITH 2"

DIAMETER CONDUITS ON BOTH SIDES OF STRUCTURE; RECTIFIER

BOXES AND LINES PREVIOUSLY MOUNTED ON NORTH ABUTMENT

BREASTWALL HAVE FALLEN WITH WIRES EXPOSED, CUT, AND

TIGHT.

59.1 BEARINGS TILTED 5º TO 15º (EXPANDED) AT 75º FAHRENHEIT AT

BOTH ABUTMENTS. MINOR RUSTING OF BEARINGS IN SOME

LOCATIONS. SEMI-CIRCULAR SHEAR LOCK RUSTED AND BROKEN

FROM EAST SIDE OF EAST BEARING FOR EAST BOX GIRDER AT

SOUTH ABUTMENT.

ADDITIONAL ITEM REFERENCE AND REMARKS

59.2 MINOR VERTICAL AND HORIZONTAL CRACKING AT SIDES OF GIRDERS OVER PIERS ALONG COLD JOINTS.

MODERATE RUSTING OF BOX GIRDER DRAINS. WEST BOX GIRDER DRAIN AT SOUTH ABUTMENT DIRECTING

DRAINAGE ONTO ADJACENT BEARING.

SOUTH SPAN: MINOR DIAGONAL CRACKING WITH EFFLORESCENCE ON WEST BOX GIRDER ON WEST FACE AND UNDERSIDE. MINOR AREA OF DELAMINATION EXTENDING 2' ONTO UNDERSIDE OF WEST BOX GIRDER FROM SPALL OF STUB STRINGER SHEAR KEY AT SOUTH END (SEE ALSO 59.4). MINOR DIAGONAL CRACK IN EAST FACE

OF EAST BOX GIRDER; MINOR DELAMINATION OVER SOUTH ABUTMENT.

CENTER SPAN: MINOR LONGITUDINAL CRACKING OF BOTH BOX GIRDER UNDERSIDES AT NORTH PIER. MINOR

DELAMINATION OF EAST BOX GIRDER AT NORTH PIER.

NORTH SPAN: MINOR SPALL WITH EXPOSED REBAR IN WEST BOX GIRDER UNDERSIDE NEAR NORTH PIER.

MODERATE (4'L X 4'W) DELAMINATED AND SPALLED AREA ON WEST SIDE OF EAST BOX GIRDER OVER NORTH PIER EXPOSING REBAR, MODERATE SPALL ON FLOOR BEAM EXPOSING REBAR AT SAME LOCATION. MODERATE (15'L) AREA OF UP TO 1/4"W LONGITUDINAL CRACKING AND DELAMINATION OF WEST BOX GIRDER, EXTENDING 2' ONTO UNDERSIDE AND 1'H ONTO WEST FACE AT NORTH END. MINOR DELAMINATION OF EAST BOX GIRDER AT NORTH ABUTMENT. MINOR VEHICLE SCRAPES WITH TWO MINOR SPALLS ON EAST FACE OF BOTTOM CORNER

OF BOTH BOX GIRDERS OVER UNDERPASS ROADWAY.

59.4 MINOR CRACKING AND SPALLING WITH RUST STAINING AND EXPOSED REBAR ALONG BOTTOM OF STUB

STRINGER SHEAR KEYS AT SOUTH ABUTMENT. SEE ALSO 59.2.

60.1,7 MINOR VERTICAL CRACKING WITH EFFLORESCENCE AND RUST STAINING ON ABUTMENT BREASTWALLS.

RANDOM AREAS OF MINOR MAP CRACKING WITH EFFLORESCENCE AND RUST STAINING ON SOUTH ABUTMENT BREASTWALL. 10' H X 4' W DELAMINATED AREA NEAR WEST END OF SOUTH ABUTMENT; ADDITIONAL DELAMINATED AREAS PRESENT OVER 20% OF SURFACE AREA WITH MINOR TO MODERATE AREAS OF SPALLING WITH EXPOSED REBAR. MINOR SPALL WITH EXPOSED REBAR ON NORTH ABUTMENT BREASTWALL BELOW WEST BOX GIRDER AT TOP. MINOR DELAMINATION AND SPALLING WITH EXPOSED REBAR ON NORTH ABUTMENT

BREASTWALL BELOW EAST STRINGER AT TOP AND NEAR CENTERLINE.

WEEP HOLES AT ABUTMENT BREASTWALLS RUSTED AND FILLED WITH DEBRIS; RUST STAINING ON

BREASTWALLS.

60.3 MODERATE ACCUMULATION OF DEBRIS ON ABUTMENT BEARING SEATS.

60.6 MINOR VERTICAL AND DIAGONAL CRACKING OF WINGWALLS; MINOR EFFLORESCENCE ON SOUTHEAST WINGWALL. MINOR VEGETATION GROWTH (VINES) ON SOUTHWEST, AND SOUTHEAST WINGWALLS; HEAVY ON NORTHEAST AND NORTHWEST WINGWALLS, EXTENDING ONTO ABUTMENT BREASTWALLS AND RAILINGS

ABOVE.

60.9 MINOR EROSION OF SOUTH ABUTMENT SLOPE, PRIMARILY TOWARD WEST END.

ADDITIONAL ITEM REFERENCE AND REMARKS

60.17 MINOR TO MODERATE EROSION ADJACENT TO PIER COLUMNS. MODERATE EROSION 10'W X 10'L X 3'D ADJACENT TO EAST COLUMN OF SOUTH PIER. MODERATE EROSION OF RIPRAP AND SOIL 10'W X 20'L X 3'D ADJACENT TO EAST COLUMN OF NORTH PIER AND 6'W X 15'L X 2'D ADJACENT TO WEST COLUMN OF NORTH PIER WHERE DRAINAGE FROM UNDERPASS ROADWAY COLLECTS. RIPRAP AT EAST COLUMN OF NORTH PIER

ERODING AWAY.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

61.3 LARGE RIPRAP ON LOWER 10' OF SLOPES BELOW COLUMNS.

222.4 APPROACH PAVEMENT DETERIORATED THROUGHOUT. MODERATE PATCHES IN NORTH APPROACH ROADWAY.

222.5 32" DROP-OFF WITH UNDERMINING 2' HIGH X FULL WIDTH X 5' BACK UNDER AT END OF WEST SIDEWALK, SOUTH

APPROACH.

222.6 MINOR SETTLEMENT (UP TO 1/2") OF NORTH APPROACH PAVEMENT.

222.7 REFLECTIVE OBJECT MARKER PRESENT AT NORTHWEST CORNER OF STRUCTURE AND ON IMPACT ATTENUATOR AT SOUTHEAST CORNER. SEVERAL ARROW SIGNS ALONG UNDERPASS ROADWAY BELOW NORTH SPAN ARE

LEANING OR HAVE FALLEN DOWN.

STRUCTURE LOAD RATING STRUCTURE NO. 3300-033P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 13 12 22 20

HS 22 20 36 33

TYPE 3 21 19 35 32

TYPE 3S2 32 29 53 48

TYPE 3-3 34 31 57 52

DESIGN LOADING: H20 (M18)

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

X ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 12/15

LOAD RATING CONTROLLED BY: VARIOUS MEMBERS DEPENDING ON TRUCK TYPE

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-033P

STRUCTURE IDENTIFICATION

(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY (1) STATE: ....................................... 243 - MARYLAND (MD)

(202) STRUCTURE NAME: .......... CABIN JOHN CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 031 - MONTGOMERY

(204) STRUCTURE NUMBER: ..... 3300-033P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 2 - NATIONAL CAPITAL (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 6 (6) FEATURES INTERSECTED:....... CABIN JOHN CREEK & CABIN

(207) ROAD SECTION NO: ..........033P (7) FACILITY CARRIED: .................. CLARA BARTON PARKWAY

(208) NPS ROAD CLASS: ............ 7 - URBAN PARKWAY (8) STATE STRUCTURE NO: .......... 3300033P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 1.6 MILES SOUTH OF I-495.

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................100A2,100A19 (11) MILE POINT: .............................3.44 (KM PT 5.54)

(212) DRAWING NUMBERS: ....... 1433 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

05 - BOX BEAMS - MULTIPLE

150.0 FT (45.7 M)

377.8 FT (115.2 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 3 - MODIFIED CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 22.0 TONS (20.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 36.0 TONS (32.7 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 4/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-033P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 38°58'15.20"

(17) LONGITUDE: ......................... 77°08'49.30"

(19) DETOUR LENGTH: ............... 2 MI (3 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 02

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 6 - HIGHWAY-WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 18.0 FT (5.5 M)

(56) LEFT: ......................... 8.5 FT (2.6 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

60.5 FT (18.4 M)

71.5 FT (21.8 M)

56.0 FT (17.1 M)

56.0 FT (17.1 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

2 - CLOSED MEDIAN (no barrie

44 °

NO

60.5 FT (18.4 M)

4.5 FT (1.4 M)

4.5 FT (1.4 M)

1 - FULL HEIGHT (NO PARAPE

4 - STEEL

1 - CONTINUOUS RAIL

3.42 FT (1.04 M)

99.99 FT (99.99 M)

14.42 FT (4.40 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK: ..............35 - GENERAL REHAB

(75B) WORK DONE BY: .............1 - CONTRACT

(76) IMPROVEMENT LENGTH: ..378.0 FT (115.2 M)

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1985-PARTIAL DEPTH DECK REPAIRS. 2014-NEW DECK EXPANSION JOINTS.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 3300-033P

PHOTOGRAPHS STRUCTURE NO. 3300-033P

PHOTO #1 - LOOKING NORTH

FLOW

PHOTO #2 - WEST (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO #4 - TYPICAL CRACKING AND SCALING OF WEARING SURFACE;

RIGHT NORTHBOUND LANE IN SOUTH SPAN SHOWN

PHOTO #5 - SPALL IN WEARING SURFACE, RIGHT SOUTHBOUND

SHOULDER AT SOUTH ABUTMENT

PHOTO #6 - CRACKING OF CONCRETE WEARING SURFACE REPAIRS

ALONG SOUTH EXPANSION JOINT IN SOUTHBOUND LANES

PHOTO #7 - DEBRIS WITH VEGETATION GROWTH IN SOUTH

EXPANSION JOINT IN MEDIAN

PHOTO #8 - SPALL IN EXTERIOR SIDE OF WEST SIDEWALK IN CENTER

SPAN NEAR NORTH PIER

PHOTO #9 - SCALING AND SPALLING WITH EXPOSED REBAR ON WEST

SIDEWALK AT SOUTH ABUTMENT

PHOTO #10 - TRANSVERSE CRACKING, SCALING, AND SPALLING ON

WEST SIDEWALK AT SOUTH APPROACH

PHOTO #11 - EROSION WITH UNDERMINING AT SOUTH END OF WEST

SIDEWALK

PHOTO #12 - TYPICAL TREE LIMBS OVERHANGING RAILINGS; WEST

RAILING IN SPANS #2 AND #3 SHOWN

PHOTO #13 - TYPICAL RUSTING OF ACCESS PLATES IN SIDEWALK,

NORTH SPAN IN WEST SIDEWALK IN NORTH SPAN SHOWN; ALSO NOTE

TYPICAL RUSTING OF RAILING

PHOTO #14 - TYPICAL RUSTING OF RAILING; WEST RAILING IN NORTH

SPAN SHOWN

PHOTO #15 - DEBRIS AND GRAVEL ACCUMULATION ON MEDIAN; ALSO

NOTE FADED PAVEMENT MARKINGS

PHOTO #16 - DEBRIS AND GRAVEL ACCUMULATION WITH VEGETATION

GROWTH IN WEST CURBLINE AND SIDEWALK; ALSO NOTE FADED

PAVEMENT MARKINGS

PHOTO #17 - TYPICAL DETERIORATED APPROACH PAVEMENT; NORTH

APPROACH, SOUTHBOUND LANE SHOWN

PHOTO #18 - GENERAL UNDERSIDE VIEW LOOKING NORTH, CENTER

SPAN

PHOTO #19 - TYPICAL FULL-DEPTH PATCH ON DECK UNDERSIDE,

WEST BAY OF SOUTH SPAN NEAR SOUTH PIER SHOWN

PHOTO #20 - TYPICAL TRANSVERSE CRACKING WITH

EFFLORESCENCE ON DECK UNDERSIDE; WEST BAY OF SOUTH SPAN

NEAR SOUTH PIER SHOWN

PHOTO #21 - TYPICAL SPALLING WITH EXPOSED REBAR ON DECK

UNDERSIDE; CENTER BAY OF CENTER SPAN NEAR NORTH PIER

SHOWN

PHOTO #22 - TYPICAL DELAMINATION AND SPALLING WITH EXPOSED

REBAR ON UNDERSIDE OF OVERHANGS; EAST OVERHANG AT SOUTH

ABUTMENT SHOWN

PHOTO #23 - TYPICAL TRANSVERSE CRACKING WITH

EFFLORESCENCE ON UNDERSIDE OF OVERHANGS; EAST OVERHANG

IN NORTH SPAN SHOWN

PHOTO #24 - SHEAR LOCK BROKEN OFF ON EAST BOX GIRDER

BEARING AT SOUTH ABUTMENT

PHOTO #25 - CRACKING AND DELAMINATION OF WEST SIDE OF WEST

BOX GIRDER AT NORTH ABUTMENT

PHOTO #26 - DELAMINATION OF WEST FACE OF EAST BOX GIRDER IN

CENTER SPAN NEAR NORTH PIER

PHOTO #27 - DELAMINATION AND SPALLING WITH EXPOSED REBAR ON

WEST FACE OF EAST BOX GIRDER AT NORTH PIER

PHOTO #28 - HORIZONTAL CRACK WITH RUST STAINING OUTLINING

AREA OF DELAMINATION ON WEST SIDE OF WEST BOX GIRDER AT

SOUTH ABUTMENT

PHOTO #29 - SPALLING AND VEHICLE SCRAPES ON EAST SIDE OF

WEST BOX GIRDER IN NORTH SPAN

PHOTO #30 - SPALLING AND VEHICLE SCRAPES ON UNDERSIDE OF

EAST BOX GIRDER IN NORTH SPAN

PHOTO #31 - SPALLING WITH EXPOSED REBAR ON BOTTOM OF EAST

STUB STRINGER EXTENSION AT SOUTH ABUTMENT

PHOTO #32 - CRACKING AND DELAMINATION OF FLOORBEAM AT

SOUTH ABUTMENT; ALSO NOTE CRACKING AND DELAMINATION OF

STUB STRINGER SHEAR KEY BEYOND

PHOTO #33 - FAILED RECTIFIER AT WEST END OF NORTH ABUTMENT

PHOTO #34 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #35 - TYPICAL RUSTING OF ABUTMENT WEEP HOLE PIPES;

EAST WEEP HOLE AT SOUTH ABUTMENT SHOWN

PHOTO #36 - DEBRIS ACCUMULATION ON TOP OF SOUTH ABUTMENT

BREASTWALL

PHOTO #37 - SPALLING WITH EXPOSED REBAR BELOW EAST GIRDER

CENTER BEARING AT SOUTH ABUTMENT BREASTWALL

PHOTO #38 - VERTICAL AND HORIZONTAL CRACKING WITH

EFFLORESCENCE AND RUST STAINING AT TOP OF SOUTH ABUTMENT

BREASTWALL

PHOTO #39 - VERTICAL CRACKING WITH EFFLORESCENCE AND RUST

STAINING ON NORTH ABUTMENT BREASTWALL; ALSO NOTE

DELAMINATION AND SPALLING WITH EXPOSED REBAR AT TOP

PHOTO #40 - VEGETATION GROWTH ON NORTHEAST WINGWALL AND

ABUTMENT BREASTWALL

PHOTO #41 - GRAFFITI AND VEGETATION GROWTH ON SOUTHWEST

WINGWALL

PHOTO #42 - GENERAL VIEW OF NORTH PIER, SOUTH SIDE

PHOTO #43 - EROSION AT EAST COLUMN OF NORTH PIER DUE TO

ROADWAY DRAINAGE

PHOTO #44 - EROSION AT WEST COLUMN OF NORTH PIER DUE TO

ROADWAY DRAINAGE

PHOTO #45 - UPSTREAM CHANNEL

PHOTO #46 - DOWNSTREAM CHANNEL

File details come from the government source that posted it. Updated .