Bridge Inspection Report 3300-044P.pdf
PDF 4 MB Posted
- Attached to
- George Washington Memorial Parkway Federal contract opportunity
- Solicitation number
- 693C73-20-B-000013
About this file
This solicitation is for the George Washington Memorial Parkway Project NP-GWMP 6(1), 7(2), Solicitation Number 693C73-20-B-000013. The project consists of rehabilitating the Clara Barton Parkway and associated parking areas, access roads, and ramps within the George Washington Memorial Parkway. The work includes asphalt pavement milling and overlay, full depth asphalt pavement patching, concrete deck repair, culvert replacement, riprap, underdrain, guardrail replacement, signing, pavement markings, and other miscellaneous work. The project will be split into multiple work schedules/contract options, with the total cost expected to be greater than $10,000,000. Contract Award/Notice to Proceed is subject to the receipt of permits. Sealed bids from certified Small Business Concerns only will be accepted, with bid documents available on or about April 9, 2020 and bids due on a date specified in Block 13a of the SF 1442 Solicitation. The Department of Transportation Federal Highway Administration is the agency soliciting bids.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-GWMP 6(1) 7(2).pdf | ||
| Amendment 0001 - NP-GWMP 6(1) 7(2).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| CE_GWMP 6(1) 7(2)_EFLHD.pdf | ||
| Bridge Inspection Report 3300-033P.pdf | ||
| CE_GWMP 6(1) 7(2)_NPS.pdf | ||
| Bridge Inspection Report 3300-034P.pdf | ||
| PEPCO Procedure for Working in Close Proximity to Underground Transmission Facilities.pdf | ||
| Bridge Inspection Report 3300-030P.pdf | ||
| VETS-4212 Form.pdf | ||
| Bridge Inspection Report 3300-031P.pdf | ||
| Pavement Report No. FY18-01_Addendum.pdf | ||
| IFB Solicitation - NP-GWMP 6(1) 7(2).pdf | ||
| Plans - NP-GWMP 6(1) 7(2).pdf | ||
| Bridge Inspection Report 3300-032P.pdf | ||
| FP14_Eng.pdf | ||
| Pavement Report No. FY18-01_FINAL.pdf | ||
| Bridge Inspection Report 3300-037P.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 3300-044P
CANTILEVER STRUCTURE INSPECTION DATE: 4/24/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
CONCRETE
SLAB
CONCRETE CAST-IN-PLACE
INTEGRAL CONCRETE
SPREAD FTG ON BEARING MAT'L
N/A
CONCRETE
100A24 / NONE
7 - URBAN PARKWAY
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
1,409.0 FT (429.5 M)
1,409.0 FT (429.5 M)
29.5 FT (9.0 M)
27.5 FT (8.4 M)
0 °
NO
LOCATION
GEORGE WASHINGTON MEMORIAL PARKWAY MILE POINT: ..................... 0.00 (KM PT 0.00)
STATE: ................................. MARYLAND LOCATION: 0.1 MILES WEST OF MACARTHUR BLVD.
FACILITY CARRIED: ............ CLARA BARTON PARKWAY (NB)
FEATURE INTERSECTED: .. CLARA BARTON PARKWAY (SB)
STRUCTURE EVALUATION SUMMARY
This cantilever structure is in fair condition overall. The main problems are the asphalt patching, delamination, and spalling of the slab/roadway surface, and the areas of delamination and spalling in the underside of the cantilever slab. Since the last inspection, numerous areas in the slab/roadway surface have been patched with asphalt. Areas of loose concrete on the underside of the cantilever slab should be removed to improve safety for underpass traffic in the southbound lanes on Clara Barton Parkway.
Other problems include collision damage to the timber guardrail on the west side of the south approach, several sections of damaged aluminum railing on the west side of the north approach, cracking and deterioration of the approach pavement, areas of delamination and spalling in the retaining wall below the structure and in the parapet, and an accumulation of debris along the curblines.
The structure is posted for a minimum vertical clearance of 13'-3", and the actual minimum vertical clearance measured beneath the structure is 13'-4". Consideration should be given to revising the signage to accommodate for vehicle bounce.
Repairs to the slab are scheduled for the near future under Project GWMP 6(1), 7(2). Other problems should be addressed as outlined in this report prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: K.M. GREEN, M.D. SPEAS (CLARK NEXSEN)
CONDITION ASSESSMENT:
KATIE M. GREEN, PE, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 8/30/19
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
FIELD INSPECTION REPORT STRUCTURE NO. 3300-044P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 6 ITEM REFERENCE AND REMARKS
F1. DECK SLAB
G SEGMENTS ARE NUMBERED FROM NORTH END. AREAS OF 58.1,4,7, 59.3 2. EXPANSION JOINTS
ASPHALT PATCHING (180 SF TOTAL) WITH SEVERAL AREAS OF N3. WEARING SURFACE
F MODERATE DELAMINATION AND SPALLING (15 SF TOTAL X UP TO 4. RIDEABILITY
G5. CURBS, SIDEWALKS, AND MEDIAN 3"D) IN SLAB SURFACE OF SEGMENT #16. SEVERE DIAGONAL F6. PARAPETS AND/OR RAILINGS CRACK (1/4"W X 4'L) WITH MODERATE SPALLING (4"W X 2-1/2"D) IN
F7. DRAINS AND DRAINAGE RIGHT LANE (ROADWAY PORTION) OF SEGMENT #16 ADJACENT TO
N8. UTILITIES DRAIN. LARGE AREA OF ASPHALT PATCHING (55 SF TOTAL) WITH
G9. DEFLECTION AND/OR VIBRATION MODERATE DELAMINATION (8 SF) IN SLAB SURFACE OF SEGMENT
F10. OTHER (STRIPING) #18. NUMEROUS AREAS OF ASPHALT PATCHING, MINOR TO
59. SUPERSTRUCTURE 6 MODERATE DELAMINATION, AND/OR SPALLING (UP TO 1-1/2"D)
THROUGHOUT SLAB SURFACE, TYPICALLY RANGING FROM 5 SF TO N1. BEARING DEVICES
15 SF TOTAL PER SEGMENT AT THE FOLLOWING LOCATIONS: N2. GIRDERS OR BEAMS
SEGMENTS #12, #14, #17, #19, #25, #26, #27, #28, AND #29. AREAS F3. ARCH(ES) OR SLAB(S) OF ASPHALT PATCHING, DELAMINATION, AND SPALLING (UP TO 2"D), N4. FLOOR BEAMS AND STRINGERS
N TYPICALLY UP TO 3 SF ALONG CONSTRUCTION JOINT IN ROADWAY 5. TRUSSES
N SURFACE ADJACENT TO SLAB IN SEGMENTS #35 - #40; EXPOSED 6. DIAPHRAGMS AND BRACING
N7. PAINT REBAR IN SEGMENT #35. SLAB/ROADWAY SURFACE TYPICALLY
N8. FASCIA(E) HAS ONE TRANSVERSE CRACK (UP TO 1/16" W) WITH SPALLING
G9. DEFLECTION AND/OR VIBRATION ALONG CRACK (UP TO 1"W) IN RIGHT LANE AT MID-LENGTH OF
G10. ALIGNMENT MOST SEGMENTS; CRACKS TERMINATE AT NEWER CONCRETE IN
N11. OTHER LEFT LANE. SEVERAL ADDITIONAL MINOR TRANSVERSE CRACKS IN
60. SUBSTRUCTURE N EACH SEGMENT, PRIMARILY IN LEFT LANE. MINOR MAP CRACKING
IN ROADWAY SLAB ADJACENT TO CANTILEVER SECTION. MINORABUTMENTS
ABRASION OF SLAB/ROADWAY SURFACE IN SEVERAL AREAS. 1. BREASTWALLS OR COLUMNS
MINOR CRACKING AND SPALLING OF ROADWAY SURFACE ALONG 2. PILE BENTS
SOME EXPANSION JOINTS; MINOR EFFLORESCENCE IN ONE 3. CAPS AND/OR BEARING SEATS
LOCATION. MINOR RUST STAINING ALONG CENTERLINE 4. BACKWALLS AND/OR BULKHEADS
CONSTRUCTION JOINT AT RANDOM LOCATIONS. MODERATE TO 5. FOUNDATIONS
6. WINGWALLS HEAVY DEBRIS ACCUMULATION (UP TO 15"D) ALONG CURBLINES.
7. WEEP HOLES
8. EXPANSION JOINTS MINOR TO MODERATE DELAMINATION AND SPALLING (UP TO 1"D) OF
9. EROSION AND/OR SCOUR CONCRETE OVER TRAFFIC ON UNDERSIDE OF CANTILEVER SLAB
10. SETTLEMENT OR DEFLECTION WITH EXPOSED REBAR, TYPICALLY RANGING FROM 1 SF TO 15 SF
11. SLOPE PROTECTION TOTAL PER SEGMENT AT THE FOLLOWING LOCATIONS: SEGMENTS
12. OTHER #9, #16, #17, #18, #19, #20, #22, #24, #25, #27, #30, #31, #32, #33, #35, PIER(S) #36, #41. LARGE AREA OF MODERATE DELAMINATION (25 SF) IN
13. WALLS AND/OR COLUMNS UNDERSIDE OF SLAB IN SEGMENT #9. MINOR TRANSVERSE
14. PILE BENTS CRACKING THROUGHOUT UNDERSIDE OF CANTILEVER SLAB, SOME
15. CAPS AND/OR BEARING SEATS WITH EFFLORESCENCE. MINOR MAP CRACKING AND VERTICAL
16. FOUNDATIONS CRACKING WITH EFFLORESCENCE ON SLAB SIDE.
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL N
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (UNDERPASS SIDEWALK)
N N F F G G P G F
223. RETAINING WALL 6
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER (UPPER WALL)
F G N G G F
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
58.2 MINOR DEBRIS ACCUMULATION IN SLAB/ROADWAY EXPANSION
JOINTS. MINOR DETERIORATION OF COMPRESSION SEALS IN A
FEW LOCATIONS.
58.5 MINOR SPALLING OF CURBS IN A FEW LOCATIONS.
58.6 PARAPET ON WEST SIDE OF STRUCTURE ONLY, EXTENDS ONTO
APPROACHES. MINOR VERTICAL CRACKING WITH RUST STAINING,
EFFLORESCENCE AND WIDESPREAD MINOR MAP CRACKING OF
PARAPET. MINOR TO MODERATE SPALLING OF PARAPET WITH
EXPOSED REBAR DUE TO INSUFFICIENT CONCRETE COVER IN
SEGMENTS #3, #4, #14, #38 AND IN SOME LOCATIONS AT SOUTH
APPROACH.
58.10 LANE STRIPING IS FADED THROUGHOUT.
222.3 TWO SECTIONS OF BROKEN RAILING AT NORTH APPROACH NEAR
STRUCTURE. ONE AREA OF IMPACT DAMAGE TO RAILING AT NORTH
APPROACH WITH TWO SHEARED RAIL POSTS AND ONE BENT POST,
APPROXIMATELY 300' FROM STRUCTURE. AREA OF IMPACT
DAMAGE TO WEST GUARDRAIL AT SOUTH APPROACH RESULTING IN
TIMBER RAIL CRACKED AND BOWED FOR 20'L AND ADJACENT RAIL
POST LEANING AWAY FROM ROADWAY. TREE LIMBS OVERHANG
RAILS AT WEST SIDE OF SOUTH APPROACH.
222.4 MODERATE MAP CRACKING OF APPROACH PAVEMENT. LARGE
AREA OF ASPHALT PATCHING ALONG CENTERLINE OF SOUTH
APPROACH ROADWAY WITH SEVERAL AREAS WHERE PATCH IS
BREAKING UP (UP TO 2-1/2"D) AND RUTTED. MODERATE POTHOLE
(2-1/2"D) IN SOUTH APPROACH PAVEMENT AT ROADWAY
CENTERLINE ADJACENT TO BRIDGE END. MODERATE POTHOLE
(2-1/2"D) AT SOUTH APPROACH TRANSITION IN RIGHT LANE.
222.7 13'-3" CLEARANCE SIGN MOUNTED ON WEST SIDE OF STRUCTURE
AT NORTH END; MEASURED 13'-3" DURING THIS INSPECTION.
OBJECT MARKER AT SOUTHWEST APPROACH SET TOO FAR (2')
BEHIND FACE OF APPROACH RAIL.
222.9 TWO DISPLACED SECTIONS OF SIDEWALK (HEAVED UP TO 4")
UNDERNEATH CANTILEVER AT SEGMENTS #12 AND #38.
223.1 RANDOM MINOR VERTICAL CRACKING AND VEHICLE SCRAPES ON
LOWER CONCRETE RETAINING WALL (MAIN SUPPORT FOR
CANTILEVER). MINOR MAP CRACKING (UP TO 1/32"W) AT ISOLATED
LOCATIONS. MINOR TO MODERATE DELAMINATION AND SPALLING
(UP TO 2"D) OF RETAINING WALL, PRIMARILY IN LOWER PORTION OF
WALL IN SEGMENTS #7, #9, #18, #25, #31, #32, #34, #35, #40, AND #42;
EXPOSED REBAR AT SOME LOCATIONS. MINOR HORIZONTAL
CRACKING WITH EFFLORESCENCE NEAR SEVERAL VERTICAL
JOINTS; MINOR ADHESION FAILURE OF SEALANT IN ISOLATED
LOCATIONS. MODERATE VEGETATION GROWTH ON WALL AT SOUTH
END.
ADDITIONAL ITEM REFERENCE AND REMARKS
223.6 SEVERAL STONES MISSING OR DISPLACED FROM UPPER MASONRY RETAINING WALL (ON EAST EMBANKMENT SLOPE APPROXIMATELY 500' FROM NORTH END OF STRUCTURE). MINOR VEGETATION GROWTH IN MASONRY
MORTAR JOINTS AND VERTICAL JOINTS.
STRUCTURE LOAD RATING STRUCTURE NO. 3300-044P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 26 24
HS 28 25 47 43
TYPE 3 37 34 62 56
TYPE 3S2 58 53 98 89
TYPE 3-3 63 57 105 95
DESIGN LOADING: HS20 (MS18)
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 3/16
LOAD RATING CONTROLLED BY: SLAB MOMENT AT SUPPORT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-044P
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY (1) STATE: ....................................... 243 - MARYLAND (MD)
(202) STRUCTURE NAME: .......... CANTILEVER STRUCTURE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............5 - OTHER (3) COUNTY CODE: ........................ 031 - MONTGOMERY
(204) STRUCTURE NUMBER: ..... 3300-044P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 2 - NATIONAL CAPITAL (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 0 (6) FEATURES INTERSECTED:....... CLARA BARTON PARKWAY (S
(207) ROAD SECTION NO: ..........044P (7) FACILITY CARRIED: .................. CLARA BARTON PARKWAY (N
(208) NPS ROAD CLASS: ............ 7 - URBAN PARKWAY (8) STATE STRUCTURE NO: .......... 3300044P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 0.1 MILES WEST OF MACART
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................100A24 (11) MILE POINT: .............................0.00 (KM PT 0.00)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
01 - SLAB
1,409.0 FT (429.5 M)
1,409.0 FT (429.5 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 2 - INTEGRAL CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 28.0 TONS (25.4 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 47.0 TONS (42.6 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 4/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-044P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 38°57'49.30"
(17) LONGITUDE: ......................... 77°08'13.10"
(19) DETOUR LENGTH: ............... 0 MI (0 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 3.0 FT (0.9 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
27.5 FT (8.4 M)
29.5 FT (9.0 M)
24.0 FT (7.3 M)
24.0 FT (7.3 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - NO MEDIAN
0 °
NO
27.5 FT (8.4 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
2 - MOUNTED ON PARAPET
6 - ALUMINUM
1 - CONTINUOUS RAIL
2.83 FT (0.86 M)
99.99 FT (99.99 M)
13.33 FT (4.06 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
B - MAJOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 3300-044P
PHOTOGRAPHS STRUCTURE NO. 3300-044P
PHOTO #1 - LOOKING SOUTH TOWARD GEORGETOWN
PHOTO #2 - GENERAL TOPSIDE VIEW LOOKING NORTH
PHOTO #3 - ASPHALT PATCHING WITH DELAMINATION AND SPALLING
OF SLAB SURFACE IN SEGMENT #16; ALSO NOTE TYPICAL
ACCUMULATION OF DEBRIS IN CURBLINES
PHOTO #4 - ASPHALT PATCHING WITH DELAMINATION AND SPALLING
IN SLAB SURFACE OF SEGMENT #16
PHOTO #5 - DIAGONAL CRACK WITH SPALLING IN RIGHT LANE
(ROADWAY PORTION) OF SEGMENT #16 ADJACENT TO DRAIN
PHOTO #6 - ASPHALT PATCHING WITH DELAMINATION IN SLAB
SURFACE OF SEGMENT #18; ALSO NOTE TYPICAL ACCUMULATION OF
DEBRIS IN CURBLINES
PHOTO #7 - TYPICAL ASPHALT PATCHING, DELAMINATION, AND
SPALLING OF SLAB SURFACE; SEGMENT #19 SHOWN
PHOTO #8 - TYPICAL ASPHALT PATCHING, DELAMINATION, AND
SPALLING OF SLAB SURFACE; SEGMENT #25 SHOWN
PHOTO #9 - TYPICAL DELAMINATION AND SPALLING OF SLAB SURFACE;
SEGMENT #29 SHOWN
PHOTO #10 - TYPICAL DELAMINATION AND SPALLING ALONG
CONSTRUCTION JOINT IN ROADWAY SURFACE ADJACENT TO SLAB;
SEGMENT #35 SHOWN; NOTE EXPOSED REBAR
PHOTO #11 - TYPICAL TRANSVERSE CRACK
WITH SPALLING ALONG CRACK AT
MID-LENGTH OF SEGMENTS; SEGMENT #8
SHOWN
PHOTO #12 - TYPICAL CRACKING AND
SPALLING OF ROADWAY SURFACE ALONG
EXPANSION JOINTS; JOINT BETWEEN
SEGMENTS #6 AND #7 SHOWN; ALSO NOTE
TYPICAL DETERIORATION OF COMPRESSION
SEALS
PHOTO #13 - TYPICAL SPALLING OF PARAPET WITH EXPOSED REBAR;
SEGMENT #38 SHOWN
PHOTO #14 - TYPICAL DETERIORATION AND PATCHING OF SOUTH
APPROACH PAVEMENT; NOTE POTHOLE AT ROADWAY CENTERLINE
ADJACENT TO BRIDGE END
PHOTO #15 - TYPICAL DETERIORATION AND
PATCHING OF SOUTH APPROACH PAVEMENT;
NOTE DETERIORATION OF PATCHING
PHOTO #16 - BROKEN RAILING AT NORTH
APPROACH NEAR STRUCTURE
PHOTO #17 - IMPACT DAMAGE TO WEST
GUARDRAIL AT SOUTH APPROACH; NOTE
TIMBER RAIL CRACKED AND BOWED; ALSO
NOTE PLACEMENT OF OBJECT MARKER
PHOTO #18 - TREE LIMBS OVERHANG RAILS AT
WEST SIDE OF SOUTH APPROACH
PHOTO #19 - GENERAL UNDERSIDE VIEW
LOOKING SOUTH, SEGMENT #7
PHOTO #20 - TYPICAL DELAMINATION AND
SPALLING ON UNDERSIDE OF CANTILEVER
SLAB WITH EXPOSED REBAR; SEGMENT #17
SHOWN
PHOTO #21 - TYPICAL DELAMINATION AND SPALLING ON UNDERSIDE
OF CANTILEVER SLAB WITH EXPOSED REBAR; SEGMENT #32 SHOWN
PHOTO #22 - TYPICAL DELAMINATION AND SPALLING ON UNDERSIDE
OF CANTILEVER SLAB WITH EXPOSED REBAR; SEGMENT #35 SHOWN
PHOTO #23 - TYPICAL DELAMINATION AND
SPALLING WITH EXPOSED REBAR ON
RETAINING WALL BELOW STRUCTURE;
SEGMENT #40 SHOWN
PHOTO #24 - TYPICAL ADHESION FAILURE OF
SEALANT IN VERTICAL JOINTS OF RETAINING
WALL BELOW STRUCTURE; SOUTH END OF
BRIDGE SHOWN
File details come from the government source that posted it. Updated .