Bridge Inspection Report 3300-031P.pdf
PDF 3 MB Posted
- Attached to
- George Washington Memorial Parkway Federal contract opportunity
- Solicitation number
- 693C73-20-B-000013
About this file
This federal solicitation is seeking sealed bids from certified Small Business Concerns for the George Washington Memorial Parkway Project. Work includes asphalt pavement milling and overlay, full depth asphalt pavement patching, concrete deck repair, culvert replacement, riprap, underdrain, guardrail replacement, signing, pavement markings, and other miscellaneous work. The project will be split into multiple schedules with the total cost expected to exceed $10 million. Bids are due by the date specified on the SF1442 form included with solicitation documents available for download starting around April 9, 2020 from www.beta.sam.gov. The contract award and notice to proceed are subject to receipt of permits. Annual Representations and Certifications must be completed at www.beta.sam.gov and Vets-4212 at http://www.dol.gov/vets/vets4212.htm per FAR 52.222-37. Questions should be directed to eflhd.contracts@dot.gov. Firms must be registered in SAM for payment in accordance with FAR 52.232-33.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-GWMP 6(1) 7(2).pdf | ||
| Amendment 0001 - NP-GWMP 6(1) 7(2).pdf | ||
| PEPCO Procedure for Working in Close Proximity to Underground Transmission Facilities.pdf | ||
| Bridge Inspection Report 3300-030P.pdf | ||
| VETS-4212 Form.pdf | ||
| Pavement Report No. FY18-01_Addendum.pdf | ||
| IFB Solicitation - NP-GWMP 6(1) 7(2).pdf | ||
| Plans - NP-GWMP 6(1) 7(2).pdf | ||
| CE_GWMP 6(1) 7(2)_NPS.pdf | ||
| Bridge Inspection Report 3300-034P.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| CE_GWMP 6(1) 7(2)_EFLHD.pdf | ||
| Bridge Inspection Report 3300-044P.pdf | ||
| Bridge Inspection Report 3300-033P.pdf | ||
| Bridge Inspection Report 3300-032P.pdf | ||
| FP14_Eng.pdf | ||
| Pavement Report No. FY18-01_FINAL.pdf | ||
| Bridge Inspection Report 3300-037P.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 3300-031P
RIVERSIDE AVENUE BRIDGE INSPECTION DATE: 4/18/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
CONCRETE
FRAME
NOT APPLICABLE
NOT APPLICABLE
SPREAD FTG ON BEARING MAT'L
N/A
CONCRETE
100A4 / NONE
7 - URBAN PARKWAY
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
28.1 FT (8.6 M)
28.1 FT (8.6 M)
84.0 FT (25.6 M)
80.0 FT (24.4 M)
N/A
0 °
NO
LOCATION
GEORGE WASHINGTON MEMORIAL PARKWAY MILE POINT: ..................... 4.38 (KM PT 7.05)
STATE: ................................. MARYLAND LOCATION: 0.7 MILES SOUTH OF I-495; STRUCTURE CAN BE IDENTIFIED FROM PARKWAY BY SHORT FACILITY CARRIED: ............ CLARA BARTON PARKWAY
CONCRETE RAILING SEPARATE FROM MASONRY
FEATURE INTERSECTED: .. RIVERSIDE AVENUE GUARDWALL.
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in fair condition overall. Problems include cracking with efflorescence in the wingwalls and east side of the slab, several areas of delamination and spalling with exposed rebar in the abutment breastwalls, and a large tree growing at the base of the northeast wingwall.
Other problems include vegetation growth overhanging the wingwalls and approach rails, erosion along the curbs at the approaches and at end of the west wingwalls, and clogged drop inlets in the underpass approach roadway. In addition, the pavement over the structure and at the approaches exhibits some cracking which should be sealed to inhibit moisture intrusion and further deterioration.
Since the last inspection, the underpass approach roadways have been repaved.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M.L. AGNES, T.A. STOKLEY (CLARK NEXSEN)
CONDITION ASSESSMENT:
MATTHEW L. AGNES, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 8/30/19
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
FIELD INSPECTION REPORT STRUCTURE NO. 3300-031P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
(STRIPING)
N N G N N N N N G
N G
F N N N N F N N G G N N
N N N N N N N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
(BURIED)
58.3, 222.4 MINOR TO MODERATE LONGITUDINAL AND TRANSVERSE CRACKING
OF PAVEMENT OVER STRUCTURE AND AT APPROACHES.
MODERATE DETERIORATION OF ASPHALT ALONG LANE LINES IN
SOUTHBOUND LANE OVER STRUCTURE.
58.5,6 MINOR LONGITUDINAL AND TRANSVERSE CRACKING THROUGHOUT
CURBS AND RAILINGS. MINOR TO MODERATE SPALLING OF CURBS
IN SOME LOCATIONS. MINOR VEGETATION GROWTH (VINES) ON
APPROACH RAILINGS.
58.7 DROP GRATE INLETS AT SOUTHEAST AND SOUTHWEST CORNERS
OF UNDERPASS APPROACH ROADWAYS ARE PARTIALLY CLOGGED,
WITH UP TO A 1'-4" DROP OFF FROM EDGE OF PAVEMENT AT
SOUTHEAST INLET.
58.10 STRIPING ON PAVEMENT OVER STRUCTURE IS HEAVILY FADED AND
MISSING IN PLACES.
59.3 MINOR EFFLORESCENCE FROM CONSTRUCTION JOINT ON SLAB
UNDERSIDE AT CENTERLINE OF STRUCTURE. TWO MINOR
LONGITUDINAL CRACKS WITH DELAMINATION ON SLAB UNDERSIDE
BETWEEN CENTER LINE AND WEST SIDE. MINOR RUSTING OF
EXPOSED REBAR CHAIRS THROUGHOUT.
MODERATE HORIZONTAL AND VERTICAL CRACKING WITH
EFFLORESCENCE ON EAST SIDE OF SLAB AT SOUTH ABUTMENT;
MINOR AT NORTH ABUTMENT. MINOR DIAGONAL CRACKING OF
SLAB UNDERSIDE AT EAST ABUTMENT.
60.1 MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS WITH
EFFLORESCENCE, PRIMARILY AT CONSTRUCTION JOINTS. FOUR
AREAS OF MINOR TO MODERATE DELAMINATION AND SPALLING
WITH EXPOSED REBAR ON SOUTH ABUTMENT BREASTWALL; EIGHT
ON NORTH BREASTWALL, SEVERAL ARE PATCHED. WIDESPREAD
GRAFFITI ON ABUTMENT BREASTWALLS, SOME PAINTED OVER.
60.6 MINOR (UP TO 1/16"W) VERTICAL AND DIAGONAL CRACKING OF
WINGWALLS AT ABUTMENT BREASTWALLS WITH EFFLORESCENCE,
POPOUTS, AND WATER SEEPAGE; TYPICALLY TWO TO SIX CRACKS
PER WINGWALL. MINOR VEGETATION GROWTH (VINES) ON
WINGWALLS. LARGE TREE GROWING AT BASE OF NORTHEAST
WINGWALL.
F G F G P N
P
N
N
N
FIELD INSPECTION REPORT STRUCTURE NO. 3300-031P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL N
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (UNDERPASS ROADWAY)
N N N F F G F G G
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
60.9 MINOR EROSION AND UNDERMINING OF CURBS UP TO 12" AT ENDS
OF SOUTHWEST AND NORTHWEST WINGWALLS.
222.5 MINOR EROSION ALONG WEST CURB AT BOTH APPROACHES AND
EAST CURB AT SOUTH APPROACH.
222.7 "13 FT - 7 IN" CLEARANCE SIGN POSTED ON NORTH SHOULDERS OF
UNDERPASS APPROACHES, MINOR DAMAGE TO SIGN AT EAST
APPROACH; STOP SIGN AT EAST APPROACH. "NO PARKING
ANYTIME" SIGNS MOUNTED ON ABUTMENT BREASTWALLS.
222.9 MINOR ACCUMULATION OF DEBRIS IN CURBLINE ALONG SIDEWALK
AT BASE OF NORTH ABUTMENT. WIDESPREAD MINOR MAP
CRACKING AND POPOUTS IN UNDERPASS ROADWAY SLAB. MINOR
TRANSVERSE CRACKING AND SPALLING IN NORTH SIDEWALK AND
CURB IN UNDERPASS. UNDERPASS APPROACH PAVEMENT
REPAVED SINCE PREVIOUS INSPECTION.
36.A BRIDGE RAILING HEIGHT OF 1'-10" DOES NOT MEET MINIMUM
SAFETY HEIGHT REQUIREMENTS OF 2'-3" FOR TRAFFIC BARRIERS.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 3300-031P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 38 34 63 57
HS 54 49 91 83
TYPE 3 53 48 88 80
TYPE 3S2 79 72 132 120
TYPE 3-3 97 88 162 147
DESIGN LOADING: H20 (M18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 6/15
LOAD RATING CONTROLLED BY: TOP SLAB
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-031P
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY
(202) STRUCTURE NAME: .......... RIVERSIDE AVENUE BRIDGE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 3300-031P
(205) NPS REGION: .................... 2 - NATIONAL CAPITAL
(206) ROUTE CODE NUMBER: ... 6
(207) ROAD SECTION NO: ..........031P
(208) NPS ROAD CLASS: ............ 7 - URBAN PARKWAY
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................100A4
(212) DRAWING NUMBERS: ....... NONE
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
243 - MARYLAND (MD)
031 - MONTGOMERY
161000060
RIVERSIDE AVENUE
CLARA BARTON PARKWAY
3300031P0000000
0.7 MILES SOUTH OF I-495;
99.99 FT (99.99 M)
4.38 (KM PT 7.05)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
07 - FRAME
28.1 FT (8.6 M)
28.1 FT (8.6 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE
B) TYPE MEMBRANE: ................. N - NOT APPLICABLE
C) TYPE PROTECTION: .............. N - NOT APPLICABLE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 54.0 TONS (49.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 91.0 TONS (82.6 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 4/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-031P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 38°58'22.50"
(17) LONGITUDE: ......................... 77°09'52.00"
(19) DETOUR LENGTH: ............... 5 MI (8 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
80.0 FT (24.4 M)
84.0 FT (25.6 M)
64.0 FT (19.5 M)
64.0 FT (19.5 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
2 - CLOSED MEDIAN (no barrie
0 °
NO
80.0 FT (24.4 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
1 - CONCRETE
1 - CONTINUOUS RAIL
1.83 FT (0.56 M)
99.99 FT (99.99 M)
13.67 FT (4.17 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
1 - MAINTENANCE
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 3300-031P
PHOTOGRAPHS STRUCTURE NO. 3300-031P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD GEORGETOWN
PHOTO #2 - EAST SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING NORTH; NOTE FADED
PAVEMENT MARKINGS
PHOTO #4 - TYPICAL CRACKING OF PAVEMENT OVER STRUCTURE;
LEFT NORTHBOUND LANE SHOWN
PHOTO #5 - DETERIORATION OF ASPHALT ALONG LANE LINE IN
SOUTHBOUND LANES OVER STRUCTURE
PHOTO #6 - TYPICAL CRACKING OF CURBS AND RAILING; EAST CURB
AND RAILING SHOWN
PHOTO #7 - CRACKING AND SPALLING OF EAST CURB NEAR SOUTH
ABUTMENT
PHOTO #8 - EROSION AND UNDERMINING OF WEST CURB AT SOUTH
END
PHOTO #9 - EROSION AND UNDERMINING OF WEST CURB AT NORTH
END
PHOTO #10 - GENERAL UNDERSIDE VIEW LOOKING EAST
PHOTO #11 - EFFLORESCENCE AT CONSTRUCTION JOINT ALONG
CENTERLINE OF SLAB UNDERSIDE; ALSO NOTE EXPOSED REBAR
CHAIR TIPS
PHOTO #12 - LONGITUDINAL CRACK WITH DELAMINATION IN SLAB
UNDERSIDE BETWEEN CENTERLINE OF STRUCTURE AND WEST SIDE
PHOTO #13 - CRACKING WITH EFFLORESCENCE ON EAST SIDE OF
SLAB AT EAST ABUTMENT
PHOTO #14 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #15 - TYPICAL SPALLS WITH EXPOSED REBAR IN ABUTMENT
BREASTWALLS; NORTH ABUTMENT SHOWN
PHOTO #16 - TYPICAL DIAGONAL CRACKING WITH EFFLORESCENCE
ON WINGWALLS; SOUTHEAST WINGWALL SHOWN; ALSO NOTE
VEGETATION GROWTH ON WINGWALL
PHOTO #17 - GENERAL VIEW OF UNDERPASS ROADWAY SLAB
LOOKING EAST
PHOTO #18 - TYPICAL CRACKING AND POPOUTS IN UNDERPASS
ROADWAY SLAB; MIDSPAN AT CENTERLINE SHOWN
PHOTO #19 - TYPICAL CRACKING IN UNDERPASS ROADWAY SLAB;
SLAB IN EAST HALF OF ROADWAY SHOWN
PHOTO #20 - SPALLING OF UNDERPASS SIDEWALK CURB AT EAST END;
ALSO NOTE TYPICAL DEBRIS ACCUMULATION ALONG CURBLINES
PHOTO #21 - PARTIALLY CLOGGED DROP INLET FOR UNDERPASS
ROADWAY AT WEST END OF SOUTH ABUTMENT
PHOTO #22 - DAMAGED CLEARANCE SIGN ON EAST APPROACH; ALSO
NOTE VEGETATION GROWTH ON NORTHEAST WINGWALL