Pavement Report No. FY18-01_Addendum.pdf
PDF 295 KB Posted
- Attached to
- George Washington Memorial Parkway Federal contract opportunity
- Solicitation number
- 693C73-20-B-000013
About this file
This addendum amends the pavement recommendations for the George Washington Memorial Parkway Project solicitation. The solicitation seeks sealed bids from small businesses only for rehabilitation of the Clara Barton Parkway, associated parking areas, access roads, and ramps. Work includes asphalt milling and overlay, full depth patching, concrete repair, culvert replacement, guardrail installation, signing, pavement markings, and other miscellaneous work. Pavement structure configurations in Tables 4 through 8 of the original Pavement Report are replaced with amended tables specifying asphalt layer thicknesses and material types for the Clara Barton Parkway, adjacent parking areas, and access road ramps. Bids are due by the date specified on the solicitation form SF1442 to be issued on or around April 9, 2020. The total project cost is estimated to exceed $10 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-GWMP 6(1) 7(2).pdf | ||
| Amendment 0001 - NP-GWMP 6(1) 7(2).pdf | ||
| PEPCO Procedure for Working in Close Proximity to Underground Transmission Facilities.pdf | ||
| Bridge Inspection Report 3300-030P.pdf | ||
| VETS-4212 Form.pdf | ||
| Bridge Inspection Report 3300-031P.pdf | ||
| IFB Solicitation - NP-GWMP 6(1) 7(2).pdf | ||
| Plans - NP-GWMP 6(1) 7(2).pdf | ||
| CE_GWMP 6(1) 7(2)_NPS.pdf | ||
| Bridge Inspection Report 3300-034P.pdf | ||
| Bridge Inspection Report 3300-032P.pdf | ||
| FP14_Eng.pdf | ||
| Pavement Report No. FY18-01_FINAL.pdf | ||
| Bridge Inspection Report 3300-037P.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| CE_GWMP 6(1) 7(2)_EFLHD.pdf | ||
| Bridge Inspection Report 3300-044P.pdf | ||
| Bridge Inspection Report 3300-033P.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 2 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MINUTE-MEMO
SUBJECT: Project NP-GWMP 6(1), 7(2) – Addendum to the Pavement Report No. FY 18-01
TO MESSAGE/COMMENT FROM/DATE
S.
Hailegiorgis Project Manager
And:
J. Johnson Highway Design Manager
This memorandum is an addendum to the Pavement Report No. FY 18-01, dated July 2019. The purpose of this memorandum is to amend the pavement recommendations provided on Tables 4, 5, 6, 7 and 8 of the report, specifically, the pavement structure configurations provided in the report should be replaced with the configurations provided in the following Tables and according to the FP-14 Specifications:
Table 4. (amended) Clara Barton Parkway – 2-inch Overlay
Layer Minimum Thickness
(in)
Comments
AC Surface Course 2.0
Asphalt Concrete Pavement – Gyratory Method (GACP), 0.3 to 3 million ESAL, 3/8″ Nominal Maximum Size Aggregate (NMSA), Type I-A Roughness, according to Section 401
Asphalt Tack Coat -- AC Tack Coat according to Section 412
Table 5. (amended) Clara Barton Parkway, FDP-1
Minimum Thickness
GACP, 0.3 to 3 million ESAL, 3/8″ NMSA, Type I-A Roughness, according to Section 401
AC Base Course 4.0
GACP, 0.3 to 3 million ESAL, 1/2″ NMSA, placed in 2 equal lifts, according to Section 401, with Tack Coat placed between the lifts (Section 412)
Aggregate Base Course 6.0 Aggregate base, Grading C or D, according to Section 301
Geotextile --- Separation and Stabilization Geotextile Class 2, Type E, according to Section
Select Borrow 12.0 Backfill Material, according to Section
M. Elias Pavements Team Leader
2/25/2020
Page 2 of 2 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MINUTE-MEMO
TO MESSAGE/COMMENT FROM/DATE
Table 6. (amended) Clara Barton Parking near Chain Bridge (Rte 0932), FDP-2
Minimum Thickness
GACP, 0.3 to 3 million ESAL, 3/8″ NMSA, Type IV Roughness, according to Section 401
Asphalt Tack Coat --- AC Tack Coat according to Section 412
AC Base Course 2.0 GACP, 0.3 to 3 million ESAL, 1/2″ NMSA, according to Section 401
Table 7. (amended) Cabin John Access Road Ramps – Reconstruction
Minimum Thickness
Asphalt Concrete Pavement – Gyratory Method (GACP), 0.3 to 3 million ESAL, 3/8″ Nominal Maximum Size Aggregate (NMSA), Type IV Roughness, according to Section 401
Asphalt Tack Coat --- AC Tack Coat according to Section 412
AC Base Course 6.0 GACP, 0.3 to 3 million ESAL, 1/2″ NMSA, placed in 3 equal lifts, per Section 401, with Tack Coat placed between the lifts (Section 412)
Aggregate Base Course 6.0 Base Aggregate, Grading C or D, according to
Section 301.
Table 8. (amended) MacArthur Blvd Ramps – Reconstruction
Minimum Thickness
GACP, 0.3 to 3 million ESAL, 3/8″ NMSA, Type IV Roughness, according to Section
Asphalt Tack Coat --- AC Tack Coat according to Section 412
AC Base Course 6.0
GACP, 0.3 to 3 million ESAL, 1/2″ NMSA, placed in 3 equal lifts, according to Section 401, with Tack Coat placed between the lifts (Section 412)
Aggregate Base Course 8.0 Base Aggregate, Grading C or D, as per
Section 301 cc: Highway Design (J. Ruppert)