Amendment 0001 - NP-GWMP 6(1) 7(2).pdf
PDF 536 KB Posted
- Attached to
- George Washington Memorial Parkway Federal contract opportunity
- Solicitation number
- 693C73-20-B-000013
About this file
This federal contract opportunity solicitation seeks sealed bids for the rehabilitation of the Clara Barton Parkway and associated areas within the George Washington Memorial Parkway. The project includes asphalt milling and overlay, full depth asphalt patching, concrete deck repair, culvert replacement, guardrail replacement, signing, and other miscellaneous work. The multi-schedule project is expected to cost over $10 million.
Bids are due on May 12, 2020 by 2:00 PM EST. The solicitation was issued on April 9, 2020 by the U.S. Department of Transportation Federal Highway Administration Eastern Federal Lands Highway Division. Annual Representations and Certifications must be completed in SAM.gov. Bidders must be registered in SAM.gov for payment processing. The incumbent was not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-GWMP 6(1) 7(2).pdf | ||
| PEPCO Procedure for Working in Close Proximity to Underground Transmission Facilities.pdf | ||
| Bridge Inspection Report 3300-030P.pdf | ||
| VETS-4212 Form.pdf | ||
| Bridge Inspection Report 3300-031P.pdf | ||
| Pavement Report No. FY18-01_Addendum.pdf | ||
| IFB Solicitation - NP-GWMP 6(1) 7(2).pdf | ||
| Plans - NP-GWMP 6(1) 7(2).pdf | ||
| CE_GWMP 6(1) 7(2)_NPS.pdf | ||
| Bridge Inspection Report 3300-034P.pdf | ||
| Bridge Inspection Report 3300-032P.pdf | ||
| FP14_Eng.pdf | ||
| Pavement Report No. FY18-01_FINAL.pdf | ||
| Bridge Inspection Report 3300-037P.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| CE_GWMP 6(1) 7(2)_EFLHD.pdf | ||
| Bridge Inspection Report 3300-044P.pdf | ||
| Bridge Inspection Report 3300-033P.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7320B000013 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
693C73
STERLING VA 20166-6511
21400 Ridgetop Circle
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
693C73
STERLING VA 20166-6511
21400 RIDGETOP CIRCLE
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
See Block 1405/07/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/09/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP-GWMP 6(1), 7(2)
The purpose of this Amendment is to:
1) Revise Section 156 of the Special Contract Requirements (J Pages) to clarify the requirements for repaving milled areas.
2) Replace Plan Sheet N01 to revise the Construction Sequence in order to clarify the design intent for patching and repaving the Clara Barton Parkway.
The Bid Opening date of May 12, 2020, at 2:00 p.m. EST remains unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Amendment Info
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project NP-GWMP 6(1), 7(2)
George Washington Memorial Parkway Solicitation: 693C73-20-B-000013
The purpose of this Amendment is to:
1) Revise Section 156 of the Special Contract Requirements (J Pages) to clarify the requirements for repaving milled areas.
2) Replace Plan Sheet N01 to revise the Construction Sequence in order to clarify the design intent for patching and repaving the Clara Barton Parkway.
The Bid Opening date of May 12, 2020, at 2:00 p.m. EST remains unchanged.
Special Contract Requirements (J Pages) changes
Add the following to Subsection 156.04 of the Special Contract Requirements, page J-10, after the second paragraph:
Place asphalt surface course on milled areas within 72 hours after milling. Obtain approval from the CO for leaving milled pavement more than 72 hours.
Plan Sheet changes
Delete Plan Sheet N01 and substitute amended Plan Sheet N01.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project NP-GWMP 6(1), 7(2) |
| George Washington Memorial Parkway |
| Solicitation: 693C73-20-B-000013 |
File details come from the government source that posted it. Updated .