QA_12-02-2020.pdf

PDF 97 KB Posted

Attached to
WA Jeff 91420(1), Upper Hoh River Road Phase 2
Solicitation number
69056719B000003
Issued by

About this file

This document contains answers to technical questions regarding solicitation number 69056719B000003 from the Department of Transportation Federal Highway Administration for construction of WA Jeff 91420(1), Upper Hoh River Road Phase 2. Deflector logs and rootwads can be measured using standard DBH measurement. All schedules must be completed by September 8, 2023. Government-provided material that does not meet size specifications may still be used if it meets the requirements outlined in the revised subsection. Falcon Cultural Resources must be used for required archeological work at Willoughby Creek and Tower Creek, including developing monitoring reports, and their services may be required at other locations. The bid opening date will remain as scheduled and will include pricing for four separate schedules of work amid COVID-19 restrictions and holiday pricing considerations.

View the file

Other files

File Type Posted
Bid Opening Summary_Upper Hoh.pdf PDF
QA_01-07-2021.pdf PDF
Amendment A005.pdf PDF
QA_01-06-2021.pdf PDF
QA_01-05-2021.pdf PDF
Amendment A004.pdf PDF
QA_12-31-2020.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_12-22-2020.pdf PDF
Amendment A001.pdf PDF
Amendment A001.pdf PDF
A001 Tower Cr Bridge sheet pile plans.pdf PDF
A001 Tower Cr Bridge construction plans.pdf PDF
QA_12-10-2020.pdf PDF
QA_12-09-2020.pdf PDF
QA_12-07-2020.pdf PDF
IFB Upper Hoh.pdf PDF
wa-a2013020-Final_Plans.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA JEFF 91420(1)

Upper Hoh River Road Phase 2

# General Technical Question Answer Date

1 X Deflector logs and deflector rootwads‐ states 18” to 37” diameter‐ standard DBH measurement or measured somewhere else?

See Subsection 713.22. 12/2/2020

2 X

There are 4 schedules of work‐ Completion date under FAR 52.211‐10 states that it is 09/08/2023‐ is this the completion state regardless of the schedule awarded?

The 09/08/2023 date applies to all Schedules according to FAR 52.211‐10.

12/2/2020

3 X

Section 105.02 (b) Government provided material‐ states that are 34 root wads and 60 logs with an approximate DBH of 12” min, if this material does not meet the size specified can it still be used in the project?

See third sentence of the paragraph added under SCR Subsection 105.02(b).

12/2/2020

4 X

Page E‐17 (17) States to use Falcon Cultural Resources to perform on‐site archeological monitoring and consultation during excavation work at Willoughby Creek and Tower Creek‐ So they are only to be used during excavation only at the two mentioned locations? Since FHWA has an agreement with them already‐ who is paying for their service?

FHWA does not have an agreement with Falcon Cultural Resources. Subsection 107.10(d)(17) says use Falcon Cultural Resources to perform the required work, so the Contractor needs to obtain the services of Falcon Cultural Resources for the specified work, which also includes developing and finalizing archeological monitoring reports that may require additional on‐site archeological monitoring at other locations.

12/2/2020

5 X With 4 schedules to price‐ holidays and Covid restrictions can the bid be moved to at least 01/12/21?

We are not planning to move the bid opening date at this time.

12/2/2020