Amendment A002.pdf
PDF 3 MB Posted
- Attached to
- WA Jeff 91420(1), Upper Hoh River Road Phase 2
- Solicitation number
- 69056719B000003
About this file
This amendment modifies a solicitation for the WA Jeff 91420(1) Upper Hoh River Road Phase 2 project. The amendment extends the bid opening date from January 5, 2021 to January 11, 2021. It also revises contract requirements related to safety plans, environmental protection, riprap specifications, mitigation measures, and construction limits depicted in the plans. The Department of Transportation Federal Highway Administration is seeking bids to improve approximately 4 miles of the Upper Hoh River Road located in Jefferson County, Washington, involving bank stabilization, culvert replacement, and roadway work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Upper Hoh.pdf | ||
| QA_01-07-2021.pdf | ||
| Amendment A005.pdf | ||
| QA_01-06-2021.pdf | ||
| QA_01-05-2021.pdf | ||
| Amendment A004.pdf | ||
| QA_12-31-2020.pdf | ||
| Amendment A003.pdf | ||
| QA_12-22-2020.pdf | ||
| Amendment A001.pdf | ||
| Amendment A001.pdf | ||
| A001 Tower Cr Bridge sheet pile plans.pdf | ||
| A001 Tower Cr Bridge construction plans.pdf | ||
| QA_12-10-2020.pdf | ||
| QA_12-09-2020.pdf | ||
| QA_12-07-2020.pdf | ||
| QA_12-02-2020.pdf | ||
| IFB Upper Hoh.pdf | ||
| wa-a2013020-Final_Plans.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 12/23/2020 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056719B000003
9B. DATED (SEE ITEM 11)
11/30/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (_x_ ) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA JEFF 91420(1), Upper Hoh River Road Phase 2
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 12/23/2020 WA JEFF 91420(1) Solicitation No. 69056719B000003 Upper Hoh River Road Phase
REVISIONS ARE AS FOLLOWS:
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)
Page A-3, Block 13A. Revises bid opening date from 01/05/2021 to 01/11/2021.
SPECIAL CONTRACT REQUIREMENTS
Page E-15, Subsection 107.10(d), Other requirements. Revises Subsection (2).
Page F-6, Section 251, Riprap. Revises Subsections 251.07 and 251.08.
Page F-40 and Page F-42, Section 647, Environmental Mitigation (Added Section). Revises
Subsections 647.09, 647.10, and 647.14.
PLANS
Plan Sheet D.3. Adds callout for construction limits and Footnote 1.
Plan Sheet D.4. Adds callouts for construction limits.
Plan Sheet D.5. Adds callout for construction limits and adjusts slopes stake and clearing limits at the culvert.
Plan Sheets D.7 through D.8 Adds callouts for construction limits.
Plan Sheet F.3 Modifies scale of P/E line so it does not look like silt fence.
ENCLOSURES
Pages:
E-15 / F-6 / F-40 / F-42
Plan Sheets:
D.3 through D.5 / D.7 through D.8 / F.3
New bid opening date: 01/11/2021
E-15 DIVISION 100
Special Contract Requirements Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2
107.08 Sanitation, Health, and Safety. Add the following after the first paragraph:
Submit an accident prevention plan for implementing safety and health standards at the Preconstruction Conference. Use the Government furnished Form WFLHD-28, Guide Outline of Contractor's Accident Prevention Plan.
107.10 Environmental Protection. Amend as follows:
(c) Dirt, plant, and foreign material. Delete the text of the first paragraph and substitute the following:
Remove dirt, plant, and foreign material from vehicles and equipment before entry into Project Site. Prevent introduction of noxious weeds and non-native plant species into the work site.
Follow applicable Federal land management agency requirements and state requirements.
Maintain cleaning and inspection records. Clean hauling vehicles before their initial entry;
subsequent entries will not require cleaning unless requested. Notify the CO a minimum of 48 hours before entry to allow for inspection.
(d) Clearances for Contractor-selected, noncommercial areas.
Delete this Subsection and substitute the following:
(d) Other requirements.
Comply with the following requirements:
(1) Perform work from 2 hours after sunrise to 2 hours before sunset within the following dates (dates inclusive).
(a) April 1, 2021 to September 23, 2021.
(b) April 1, 2022 to September 23, 2022.
(c) April 1, 2023 to September 8, 2023 (September 23, 2023 if the contract duration is extended beyond the specified fixed completion date).
(2) Do not remove trees from April 1 to August 31 (dates inclusive) unless otherwise approved by CO.
(3) Install temporary barriers to protect existing trees, plants, and root zones.
(4) If active bird nests are identified during clearing operations, immediately suspend operations and notify the CO; and continue operations in other approved areas. The CO will notify the Contractor when operations may resume at the discovery site.
(5) Notify the CO within 24 hours of locating a threatened or endangered species that is dead, injured, or sick. Provide the CO date, time, precise location of the injured animal or carcass, and any other pertinent information. Do not unnecessarily disturb any evidence associated with the specimen.
Revised by Amendment A002
F-6
Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2
DIVISION 250
SLOPE REINFORCEMENT
AND RETAINING WALLS
Section 251. — RIPRAP
11/05/15– FP-14
Construction Requirements
251.03 General. Add the following:
Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework.
251.07 Acceptance. Delete Table 251-1 and substitute the following Table 251-1:
Measurement
251.08 . Add the following:
Measure Class 6 riprap by the cubic yard (cubic meter) according to Subsection 109.02(c)(2).
F-40 DIVISION 600
Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2 compactor, each pass completely covering the placed layer surface. Shape the top layer so it is similar in appearance and texture to the natural streambed.
647.09 Wood material. Wood material includes deflector-log bundles with dolos, deflector-log bundles without dolos, deflector rootwads, and coarse woody debris. Minimize damage to roots and trunks during construction.
(a) Deflector-Log Bundles Deflector logs have no rootwads and are to be assembled into log bundles. Each log bundle consists of 1 to 4 logs. Each deflector-log bundle must have a total volume between 110 and 150 cubic feet.
(b) Deflector-Log Bundles with Dolos. Attach one dolos to the mid-span of each deflector-log bundle with one steel binding chain as shown on plans. Comply with Section 648 for the steel binding chain.
(c) Deflector-Log Bundles without Dolos. Attach one steel binding chain to the mid-span of each deflector-log bundle as shown on plans. Comply with Section 648 for the steel binding chain.
(d) Deflector Rootwad. Deflector rootwads are single logs with attached rootwads.
(e) Coarse Woody Debris. Coarse woody debris is branches, limbs, twigs, and other residue.
Identify on sequencing plan submitted to CO for approval;
(1) Temporary access/work pad installation.
(2) Fish removal.
(3) Excavation.
(4) Wood material placement.
(5) Sediment and turbidity control.
(6) Rewatering.
CO will review completed wood material placement. CO may direct the contractor to adjust placed wood at contractor’s expense. CO may direct the contractor to add wood material at contract price.
647.10 Placing Engineered Log Jam (ELJ) Unit. Each ELJ unit consists of materials and quantities shown on the plans.25 deflector-log bundles with dolos, 14 deflector rootwads, and 300 cubic-yards coarse woody debris. Each ELJ unit is approximately 75 to 80 feet long, 20 feet wide at the channel bottom, and 20 to 23 feet high. Construct ELJ’s at locations shown on the plans.
Locate ELJ unit bottom backside edge against current stream bank toe. Excavate and conserve streambed material as needed for setting ELJ unit bottom within 1 foot of nearest water surface elevation. Orient the elements as shown on the plans.
F-42 DIVISION 600
Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2
Channel Plug unit top and sides. Set the Channel Plug unit top minimum 5 feet above the floodplain ground surface.
647.12 Placing Wood Material and Dolosse. When moving, placing, or repositioning wood material or dolosse do not use the steel binding chain around the log-dolos bundle for lifting. Use appropriate and safe lifting gear. When moving or placing dolos-log bundles, suspending the dolos by the steel binding chain from the log bundle is not allowed.
647.13 Acceptance. Material and construction of items will be evaluated under 106.02.
Measurement
647.14 Measure the Section 647 items listed in the bid schedule according to Subsection 109.02.
Measure volume for Mitigation Bank Stabilization (Course Woody Debris) according to Subsection 109.02(c)(2).
Payment
647.15 The accepted quantities will be paid at the contract price per unit of measurement for the Section 647 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
14102
14101
14102
14105
CP
CP
CP
CP
CP
14106
98362
Port Angeles, WA
P.O. Box 3068
Hoh River Trust
Sectio n 24 T
27N, R1 2W
Sectio n 25 T
27N, R1 2W
UP
T
T T
UP
98504-7014
Olympia, WA
P.O. Box 47014
Dept. of Natural Resources
State of Washington
N
N
9+00 TO 39+00
PLAN AND PLAN
SCHEDULE A (SITE C.1 & C.2)
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c p w w o r k d w a a fb .d g n
WA JEFF 91420 (1)
P
M
D e c e m b e r
C
C o n r a d
C h e c k e d b y
D e s ig n e d b y
Temporary work pad
Wood Buffer with Dolosse unit
See Section M
Wetland mitigation
SCHEDULE B
FOOTNOTE:
of installing the construction fence
Included in the construction limits for purpose[1]
Existing edge of pavement
Existing edge of pavement
Existing edge of pavement
15+09
SCHEDULE A
WA JEFF 91420(1)
E=816,530.079
N=318,249.436
E= 814989.626
N= 318060.883
LEGEND
SUSPEND PROJECT
Existing edge of pavement
See S ection
H for deta ils
9+00 to 15+09 Ba nk St abiliz ation RT (Sit e C1)
See Section H for details
30+74 to 53+44 Bank Stabilization RT (Site C1 & C.2)
Do not disturb
RESUME PROJECT
30+74
SCHEDULE A
WA JEFF 91420(1)
BEGIN PROJECT
8+65
SCHEDULE A
WA JEFF 91420(1)
E= 814,346.092
N= 318,080.507
[1]Construction fencing (perimeter)
Revised by Amendment A002
Construction limits
Construction limits
CP
14106
14107
UP
UP
UP
T T T
TT
T
98331-9470
Forks, WA
4193 Upper Hoh Road
Peterson, Gary L. & Charlotte
98504-7014
Olympia, WA
P.O. Box 47014
Dept. of Natural Resources
State of Washington
001 003
98331-9470
Forks, WA
4193 Upper Hoh Road
Peterson, Gary L. & Charlotte
003 003
S e c tio n
T
N , R
W
S e c tio n
T
N , R
W
N
N
39+00 TO 54+00
PLAN AND PLAN
SCHEDULE A SITE (C.1 & C.2)
Temporary work pad
Wood Buffer with Dolosse unit
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a a fc .d g n
WA JEFF 91420 (1)
D e c e m b e r
C o n r
C h e c k e d b y
D e s ig n e d b y
See Sheet D.5 for plan and profile
48+30
SCHEDULE A
50+75
SCHEDULE A
El=265.60
E=818,129.598
N=317,597.046
El=263.75
E=818,305.660
N=317,426.689
E=818,505.089
N=317,246.711
LEGEND
See Section H for details
30+74 to 53+44 Bank Stabilization RT (Site C1 & C2)
See Section H for details
30+74 to 53+44 Bank Stabilization RT (Site C1 & C2)
END MP 4.0 AOP
See Section H for details
Precast concrete culvert
49+49.1 MP 4.0 AOP
edge of pavement
Existing edge of pavement
Existing
53+44
SCHEDULE A
WA JEFF 91420(1)
BEGIN MP 4.0 AOP
2 Revised by Amendment A002
SUSPEND PROJECT
Construction Limits
Construction Limits
14107
TT
UP
UP
T
98331-9470
Forks, WA
4193 Upper Hoh Road
Peterson, Gary L. & Charlotte
53+0051+5050+0048+5047+00
CUYD
EXC.
CUYD
EMB.
S h e e t
C e ll p w w o r k d w a a fd .d g n
A
M a y
0CUYD
EXC.
CUYD
EMB.
53+0051+5050+0048+5047+00
D.5
STATE PROJECT
NUMBER
SHEET
S h e e t
C p w w o r k d w a a fd .d g n
WA JEFF 91420(1)
M a y
C o n r
C h e c k e d b y
D e s ig n e d b y
CONNECTION DETAIL
D
T= 127.53'
R= 4,522.00' e= Normal Crown
L= 255.00'
N
P T
.3
P C
C
.3
P C
.8
BEGIN MP 4.0 AOP
EL= 265.60
E= 818,129.598
N= 317,597.046
48+30
SCHEDULE A
WA JEFF 91420(1)
SSD = 530'
K = 35
77' VC
-1.5361%
.4
210' VC
K = 117
+0.2611%
-1.5361%
Temporary work pad
Wood Buffer with Dolosse unit
END MP 4.0 AOP
EL= 263.75
E= 818,305.660
N= 317,426.689
50+75
SCHEDULE A
WA JEFF 91420(1)
Profile grade paved surface
Existing for pavement structure
See Section C
Proposed existing pavement
Saw cut
See Connection Detail this sheet
Saw cut existing pavement
Slope stake limits constructed
Line to be edge of pavement
Proposed
See Connection Detail this sheet
Saw cut existing pavement edge of pavement
Existing
Clearing limits
Slope stake limits edge of pavement
Proposed
Proposed shoulder
Proposed shoulder
Clearing limits
Existing ground
S e e S e c ti o n H
P r e c a s t c o n c r e te b o x A
O P c u lv e r t
I n s ta ll
F T s p a n x
F T r is
R m o v e e x is ti n g d ia c u lv e r t
Slope stake limits
LEGEND
Construction Limits2
Revised by Amendment A0022
14204
98368-0920
Port Townsend, WA
P.O. Box 1220
Jefferson County
98362
Port Angeles, WA
P.O. Box 3068
Hoh River Trust
S e c ti o n
T
N
R
W
CUYD
EXC.
CUYD
EMB.
88+0085+0079+00
325 325
330 330
340 340
345 345
350 350
355 355
360 360
365 365
80+00 81+00 82+00 83+00 84+00 86+00 87+00
320 320
D.7
STATE PROJECT
NUMBER
SHEET
S h e e t
C m y fi le s p w p r o d u c ti o n d w a a ff .d g n
WA JEFF 91420(1)
J u n e
C o n r
C h e c k e d b y
D e s ig n e d b y
CONNECTION DETAIL
D
R= 340.00'
L= 185.55' e= 0.060
T= 95.15'
P C
.5
P T
.1
.6
+1.1367%
-6.0547%
.7
-6.0547%
+2.4152
SSD = 255'
K = 29
210' VC
K = 42
354' VC
N
TC-4
TP
TC-3
TP
.6
Temporary work pad
Wood Buffer with Dolosse unit
85+00
SCHEDULE C (TOWER CREEK)
WA JEFF 91420(1)
existing pavement
Saw cut paved surface
Existing for pavement structure
See Section C
Proposed
El=331.882
E=833,967.476
N=315,476.235
Existing ground
Profile grade
See Connection Detail this sheet
Saw cut existing pavement
Line to be constructed edge of pavement
Proposed edge of pavement
Existing stake limits
Slope
Clearing limits
Slope stake limits
Clearing limits edge of pavement
Proposed of pavement
Existing edge
Proposed edge of road edge of road Proposed
Proposed shoulder
Proposed shoulder
Proposed shoulder of road shoulder of road
Proposed
See Sheets E.1, E.3
Construct approach 80+96
2,193 271
28 295
Roadway obliteration
78+13to 81+34 RT
LEGEND
SUSPEND PROJECT
Construction Limits2
Revised by Amendment A0022
14204
98368-0920
Port Townsend, WA
P.O. Box 1220
Jefferson County
98362
Port Angeles, WA
P.O. Box 3068
Hoh River Trust
S e ct io n
T
N R
W
P C
.5
P T
.1
N
TC-3
TP
79+40 to 83+52
PLAN
SCHEDULE A (SITE C4)
Temporary work pad
Wood Buffer with Dolosse unit
D.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a a fg .d g n
WA JEFF 912420(1)
D e c e m b e r
C h e c k e d b y
D e s ig n e d b y
)4C etiS( TR noitazilibats knaB 25+38 ot 04+97
E=833471.626
N=315237.981
RESUME PROJECT
79+40
SCHEDULE A
WA JEFF 91420(1)
E=833827.279
N=315428.815
SUSPEND PROJECT
83+52
SCHEDULE A
WA JEFF 91420(1)
sliated rof H noitceS eeS
LEGEND
Construction limits2
Revised by Amendment A0022
14101
14102
CP
CP
CP
14105
CP
14105
260 260
255 255
260 26
260 260
275275
285 285
285 285
0 290
300 300
UP
98504-7014
Olympia, WA
P.O. Box 47014
Dept. of Natural Resources
State of Washington
UP
T
T T
UP
98362
Port Angeles, WA
P.O. Box 3068
Hoh River Trust
N
N 1
9+00 TO 39+00
CONTROL PLAN
EROSION/SEDIMENT
SUSPEND PROJECT
BEGIN PROJECT
8+65
SCHEDULE A
WA JEFF 91420(1)
LEGEND:
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d w a a d b .d g n
WA JEFF 91420 (1)
D e c e m b e r
C o n r
C h e c k e d b y
D e s ig n e d b y
HOH RIVER
HOH RIVER
Inlet Protection
Filter Rock Check Dam
Silt Fence
Flow Arrow
Rolled Erosion Control Product
Turf Establishment with
Roadway Obliteration
Temporary Work Pad
Bank Stabilization
Bank stabilization
Temporary work pad
Bank stabilization
Temporary work pad edge of pavement
Existing edge of pavement
Existing
15+09
SCHEDULE A
WA JEFF 91420(1)
RESUME PROJECT
30+74
SHEDULE A
WA JEFF 91420(1)
2 Revised by amendment A002
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A002 |
File details come from the government source that posted it. Updated .