Amendment A003.pdf
PDF 1 MB Posted
- Attached to
- WA Jeff 91420(1), Upper Hoh River Road Phase 2
- Solicitation number
- 69056719B000003
About this file
This amendment modifies a solicitation for the WA Jeff 91420(1), Upper Hoh River Road Phase 2 project. Key details include:
-
The solicitation number is 69056719B000003 issued by the Department of Transportation Federal Highway Administration.
-
The amendment revises bid schedules, contract clauses, plans and drawings to remove Pay Item No. 61707-0000 from Schedules C and D, add Section 556 covering bridge railing, and revise allowance quantities and roadside barrier quantities on sheet I.1.
-
Bidders are instructed to submit revised pages with their response.
-
The amendment number is A003 and the effective date is December 30, 2020. No response deadline is specified but bidders must acknowledge the amendment prior to the hour and date specified in the original solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Upper Hoh.pdf | ||
| QA_01-07-2021.pdf | ||
| Amendment A005.pdf | ||
| QA_01-06-2021.pdf | ||
| QA_01-05-2021.pdf | ||
| Amendment A004.pdf | ||
| QA_12-31-2020.pdf | ||
| Amendment A002.pdf | ||
| QA_12-22-2020.pdf | ||
| Amendment A001.pdf | ||
| Amendment A001.pdf | ||
| A001 Tower Cr Bridge sheet pile plans.pdf | ||
| A001 Tower Cr Bridge construction plans.pdf | ||
| QA_12-10-2020.pdf | ||
| QA_12-09-2020.pdf | ||
| QA_12-07-2020.pdf | ||
| QA_12-02-2020.pdf | ||
| IFB Upper Hoh.pdf | ||
| wa-a2013020-Final_Plans.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 12/30/2020 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056719B000003
9B. DATED (SEE ITEM 11)
11/30/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA JEFF 91420(1), Upper Hoh River Road Phase 2
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A003, dated 12/30/2020 WA JEFF 91420(1) Solicitation No. 69056719B000003 Upper Hoh River Road Phase
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Pages A-7 through A-31. Revises entire bid schedule to remove Pay Item No. 61707-0000 from Schedules C and D.
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
Page iv, SCR Table of Contents. Adds Section 556.
Pages F-23a through F-23b, Section 556, Bridge Railing. Add requirements.
Page H-126, Section H, Permits. Revises page.
Page H-127 through H-132, Section H, Permits. Removes pages.
PLANS
Plan Sheets B.1 through B.10. Revises all Sheets to remove Pay Item No. 61707-0000 from Schedules C and D; and add Allowance Column.
Plan Sheet I.1. Revises Table for Roadside Barrier Quantities, and Adds Footnote 1.
ENCLOSURES
Pages:
A-7 through A-31 / iv / F-23a through F-23b / H-126 through H-132
Plan Sheets:
B.1 through B.10 / I.1
Notice to Bidders: Please submit revised pages A-7 through A-31 with your bid.
A-7
BID SCHEDULE
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.
When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:WA JEFF 91420(1)
Project Name:Upper Hoh River Road Phase 2 Revised by Amendment A003
A-8
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL LPSM $___LPSM_____ $____________
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE
660 LNFT $____________ $____________
A0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK)
7 EACH $____________ $____________
A0180 20101-0000 CLEARING AND GRUBBING
0.3 ACRE $____________ $____________
A0200 20301-1900 REMOVAL OF PIPE CULVERT (60 - INCH DIAMETER)
1 EACH $____________ $____________
A0220 20315-0000 SAWCUTTING PAVEMENT
42 LNFT $____________ $____________
A0240 20401-0000 ROADWAY EXCAVATION
390 CUYD $____________ $____________
A0260 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C
100 SQYD $____________ $____________
A0280 20810-0000 SHORING AND BRACING
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-9
A0300 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
110 CUYD $____________ $____________
A0320 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6
1,740 CUYD $____________ $____________
A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2
630 TON $____________ $____________
A0360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
140 TON $____________ $____________
A0380 41201-0000 TACK COAT
0.30 TON $____________ $____________
A0400 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (20-FT SPAN x 18-FT RISE)
40 LNFT $____________ $____________
A0420 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
A0440 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
20 HOUR $____________ $____________
A0460 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
A0480 62502-0000 TURF ESTABLISHMENT
1,560 SQYD $____________ $____________
A0500 62632-0000 PLANTINGS (POLE PLANTINGS)
ALL LPSM $___LPSM_____ $____________
A0520 62901-0000 ROLLED EROSION CONTROL PRODUCT
1,560 SQYD $____________ $____________
A0540 63309-0900 DELINEATOR, TYPE FLEXIBLE (BROWN)
6 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-10
A0560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
1,080 LNFT $____________ $____________
A0580 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
1,080 LNFT $____________ $____________
A0600 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
(YELLOW)
3 EACH $____________ $____________
A0620 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
A0640 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
45 EACH $____________ $____________
A0660 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
26 EACH $____________ $____________
A0680 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
4 EACH $____________ $____________
A0700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
4 EACH $____________ $____________
A0720 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
26 EACH $____________ $____________
A0740 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A0760 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
2 EACH $____________ $____________
A0780 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
2 EACH $____________ $____________
A0800 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
990 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-11
A0820 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (PERIMETER)
680 LNFT $____________ $____________
A0840 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
318 SQFT $____________ $____________
A0860 63504-2000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS AND
LETTERS (STOP LINE)
48 SQFT $____________ $____________
A0880 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
2,580 HOUR $____________ $____________
A0900 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,820 HOUR $____________ $____________
A0920 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
224 DAY $____________ $____________
A0940 64703-8000 MITIGATION, BANK STABILIZATION (WOOD BUFFER w/ DOLOSSE)
29 EACH $____________ $____________
A0960 64704-1000 MITIGATION, STREAMBED MATERIAL
630 CUYD $____________ $____________
A0980 64704-1700 MITIGATION, BANK STABILIZATION (COARSE WOODY DEBRIS)
11,600 CUYD $____________ $____________
A1000 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (FLOW DIVERSION)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
A-12
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
B0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
B0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL LPSM $___LPSM_____ $____________
B0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE
660 LNFT $____________ $____________
B0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK)
7 EACH $____________ $____________
B0180 20101-0000 CLEARING AND GRUBBING
0.3 ACRE $____________ $____________
B0200 20301-1900 REMOVAL OF PIPE CULVERT (60 - INCH DIAMETER)
1 EACH $____________ $____________
B0220 20315-0000 SAWCUTTING PAVEMENT
42 LNFT $____________ $____________
B0240 20401-0000 ROADWAY EXCAVATION
390 CUYD $____________ $____________
B0260 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C
100 SQYD $____________ $____________
B0280 20810-0000 SHORING AND BRACING
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
A-13
B0300 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
110 CUYD $____________ $____________
B0320 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6
1,740 CUYD $____________ $____________
B0340 30202-2000 ROADWAY AGGREGATE, METHOD 2
630 TON $____________ $____________
B0360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
140 TON $____________ $____________
B0380 41201-0000 TACK COAT
0.30 TON $____________ $____________
B0400 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (20-FT SPAN x 18-FT RISE)
40 LNFT $____________ $____________
B0420 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
B0440 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
20 HOUR $____________ $____________
B0460 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
B0480 62502-0000 TURF ESTABLISHMENT
1,560 SQYD $____________ $____________
B0500 62632-0000 PLANTINGS (WETLAND BUFFER ENHANCEMENT PLANTING MIX)
ALL LPSM $___LPSM_____ $____________
B0520 62632-0000 PLANTINGS (POLE PLANTINGS)
ALL LPSM $___LPSM_____ $____________
B0540 62632-0000 PLANTINGS (CHANNEL HABITAT PRESERVATION - POLE PLANTING)
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
A-14
B0560 62632-0000 PLANTINGS (WETLAND CREATION PLANTING MIX)
ALL LPSM $___LPSM_____ $____________
B0580 62901-0000 ROLLED EROSION CONTROL PRODUCT
1,560 SQYD $____________ $____________
B0600 63309-0900 DELINEATOR, TYPE FLEXIBLE (BROWN)
6 EACH $____________ $____________
B0620 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
1,080 LNFT $____________ $____________
B0640 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
1,080 LNFT $____________ $____________
B0660 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
(YELLOW)
3 EACH $____________ $____________
B0680 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
B0700 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
45 EACH $____________ $____________
B0720 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
26 EACH $____________ $____________
B0740 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
4 EACH $____________ $____________
B0760 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
4 EACH $____________ $____________
B0780 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
26 EACH $____________ $____________
B0800 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
A-15
B0820 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
2 EACH $____________ $____________
B0840 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
2 EACH $____________ $____________
B0860 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
990 LNFT $____________ $____________
B0880 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (PERIMETER)
680 LNFT $____________ $____________
B0900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
318 SQFT $____________ $____________
B0920 63504-2000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS AND
LETTERS (STOP LINE)
48 SQFT $____________ $____________
B0940 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
2,680 HOUR $____________ $____________
B0960 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
1,820 HOUR $____________ $____________
B0980 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
224 DAY $____________ $____________
B1000 64701-1000 MITIGATION, WETLANDS MITIGATION
ALL LPSM $___LPSM_____ $____________
B1020 64703-8000 MITIGATION, BANK STABILIZATION (WOOD BUFFER w/ DOLOSSE)
29 EACH $____________ $____________
B1040 64703-8000 MITIGATION, BANK STABILIZATION (CHANNEL HABITAT PRESERVATION -
CHANNEL PLUG)
24 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
A-16
B1060 64704-1000 MITIGATION, STREAMBED MATERIAL
630 CUYD $____________ $____________
B1080 64704-1700 MITIGATION, BANK STABILIZATION (CHANNEL HABITAT PRESERVATION -
COARSE WOODY DEBRIS)
1,680 CUYD $____________ $____________
B1100 64704-1700 MITIGATION, BANK STABILIZATION (COARSE WOODY DEBRIS)
11,600 CUYD $____________ $____________
B1120 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (CHANNEL HABITAT
PRESERVATION - FLOW DIVERSION)
ALL LPSM $___LPSM_____ $____________
B1140 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (FLOW DIVERSION)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Alternate
A-17
C0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C0060 15215-4000 SURVEY AND STAKING, PERMANENT MONUMENT AND MARKER
(PROPERTY CORNER)
1 EACH $____________ $____________
C0080 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
C0100 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0120 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
C0140 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL LPSM $___LPSM_____ $____________
C0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE
2,680 LNFT $____________ $____________
C0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK)
14 EACH $____________ $____________
C0200 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK)
17 EACH $____________ $____________
C0220 20101-0000 CLEARING AND GRUBBING
2.5 ACRE $____________ $____________
C0240 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
C0260 20301-1900 REMOVAL OF PIPE CULVERT (60 - INCH DIAMETER)
1 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
A-18
C0280 20301-1900 REMOVAL OF PIPE CULVERT (18-INCH DIAMETER)
1 EACH $____________ $____________
C0300 20301-2400 REMOVAL OF SIGN
6 EACH $____________ $____________
C0320 20302-1200 REMOVAL OF GUARDRAIL
229 LNFT $____________ $____________
C0340 20304-2000 REMOVAL OF BRIDGE
ALL LPSM $___LPSM_____ $____________
C0360 20315-0000 SAWCUTTING PAVEMENT
86 LNFT $____________ $____________
C0380 20401-0000 ROADWAY EXCAVATION
5,480 CUYD $____________ $____________
C0400 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C
1,299 SQYD $____________ $____________
C0420 20801-0000 STRUCTURE EXCAVATION
245 CUYD $____________ $____________
C0440 20803-0000 STRUCTURAL BACKFILL
200 CUYD $____________ $____________
C0460 20810-0000 SHORING AND BRACING
ALL LPSM $___LPSM_____ $____________
C0480 21101-1000 ROADWAY OBLITERATION, METHOD 1
780 SQYD $____________ $____________
C0500 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
110 CUYD $____________ $____________
C0520 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
1,377 CUYD $____________ $____________
C0540 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6
1,740 CUYD $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
A-19
C0560 25210-0000 ROCKERY
1,465 SQFT $____________ $____________
C0580 25701-0500 CONTRACTOR FURNISHED SOIL NAIL RETAINING WALL DESIGN
ALL LPSM $___LPSM_____ $____________
C0600 25902-0000 SOIL NAIL RETAINING WALL
1,465 SQFT $____________ $____________
C0620 30202-2000 ROADWAY AGGREGATE, METHOD 2
4,570 TON $____________ $____________
C0640 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
1,060 TON $____________ $____________
C0660 41201-0000 TACK COAT
2.00 TON $____________ $____________
C0680 55101-2200 STEEL PIPE PILE, IN PLACE
785 LNFT $____________ $____________
C0700 55104-1000 DYNAMIC PILE LOAD TEST
2 EACH $____________ $____________
C0720 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
40 CUYD $____________ $____________
C0740 55201-0800 STRUCTURAL CONCRETE, CLASS D (AE)
37 CUYD $____________ $____________
C0760 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 2
59 SQYD $____________ $____________
C0780 55235-0000 EXPANSION JOINTS
58 LNFT $____________ $____________
C0800 55302-2700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER, 53-INCH
595 LNFT $____________ $____________
C0820 55401-1000 REINFORCING STEEL
5,100 LB $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
A-20
C0840 55401-2000 REINFORCING STEEL, EPOXY COATED
5,150 LB $____________ $____________
C0860 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL
356 LNFT $____________ $____________
C0880 55901-0000 MEMBRANE WATERPROOFING
350 SQYD $____________ $____________
C0900 56401-1000 BEARING DEVICE, ELASTOMERIC
10 EACH $____________ $____________
C0920 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (20-FT SPAN x 18-FT RISE)
40 LNFT $____________ $____________
C0940 61701-4650 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B STEEL POSTS
100 LNFT $____________ $____________
C0960 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
4 EACH $____________ $____________
A003 C0980 61707-0000 STRUCTURE TRANSITION RAILING
84 LNFT $____________ $____________
C1000 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
C1020 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
20 HOUR $____________ $____________
C1040 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
C1060 62502-0000 TURF ESTABLISHMENT
10,800 SQYD $____________ $____________
C1080 62632-0000 PLANTINGS (CHANNEL HABITAT PRESERVATION - POLE PLANTING)
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Upper Hoh River Road Phase 2 A003 Revised by Amendment A003
A-21
C1100 62632-0000 PLANTINGS (POLE PLANTINGS)
ALL LPSM $___LPSM_____ $____________
C1120 62632-0000 PLANTINGS (WETLAND CREATION PLANTING MIX)
ALL LPSM $___LPSM_____ $____________
C1140 62632-0000 PLANTINGS (WETLAND BUFFER ENHANCEMENT PLANTING MIX)
ALL LPSM $___LPSM_____ $____________
C1160 62901-0000 ROLLED EROSION CONTROL PRODUCT
10,800 SQYD $____________ $____________
C1180 63302-0000 SIGN SYSTEM
37 SQFT $____________ $____________
C1200 63309-0900 DELINEATOR, TYPE FLEXIBLE (BROWN)
31 EACH $____________ $____________
C1220 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
7,230 LNFT $____________ $____________
C1240 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
1,080 LNFT $____________ $____________
C1260 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
(YELLOW)
3 EACH $____________ $____________
C1280 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
8 EACH $____________ $____________
C1300 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
73 EACH $____________ $____________
C1320 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
52 EACH $____________ $____________
C1340 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
8 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
A-22
C1360 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
8 EACH $____________ $____________
C1380 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
59 EACH $____________ $____________
C1400 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
C1420 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
4 EACH $____________ $____________
C1440 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
4 EACH $____________ $____________
C1460 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,670 LNFT $____________ $____________
C1480 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (PERIMETER)
4,260 LNFT $____________ $____________
C1500 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
565 SQFT $____________ $____________
C1520 63504-2000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS AND
LETTERS (STOP LINE)
96 SQFT $____________ $____________
C1540 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
3,760 HOUR $____________ $____________
C1560 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
2,360 HOUR $____________ $____________
C1580 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
303 DAY $____________ $____________
C1600 64701-1000 MITIGATION, WETLANDS MITIGATION
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
A-23
C1620 64703-8000 MITIGATION, BANK STABILIZATION (WOOD BUFFER w/ DOLOSSE)
29 EACH $____________ $____________
C1640 64703-8000 MITIGATION, BANK STABILIZATION (CHANNEL HABITAT PRESERVATION -
CHANNEL PLUG)
24 EACH $____________ $____________
C1660 64704-1000 MITIGATION, STREAMBED MATERIAL
1,288 CUYD $____________ $____________
C1680 64704-1700 MITIGATION, BANK STABILIZATION (COARSE WOODY DEBRIS)
11,600 CUYD $____________ $____________
C1700 64704-1700 MITIGATION, BANK STABILIZATION (CHANNEL HABITAT PRESERVATION -
COARSE WOODY DEBRIS)
1,680 CUYD $____________ $____________
C1720 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (CHANNEL HABITAT
PRESERVATION - FLOW DIVERSION)
ALL LPSM $___LPSM_____ $____________
C1740 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (FLOW DIVERSION)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type:Alternate
A-24
D0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
D0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
D0060 15215-4000 SURVEY AND STAKING, PERMANENT MONUMENT AND MARKER
(PROPERTY CORNER)
1 EACH $____________ $____________
D0080 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
D0100 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
D0120 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
D0140 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL LPSM $___LPSM_____ $____________
D0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE
5,070 LNFT $____________ $____________
D0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK)
53 EACH $____________ $____________
D0200 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK)
40 EACH $____________ $____________
D0220 20101-0000 CLEARING AND GRUBBING
5.6 ACRE $____________ $____________
D0240 20301-0300 REMOVAL OF BOX CULVERT
1 EACH $____________ $____________
D0260 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
Bid Schedule Schedule:D Schedule Type:Alternate
A-25
D0280 20301-1900 REMOVAL OF PIPE CULVERT (60 - INCH DIAMETER)
1 EACH $____________ $____________
D0300 20301-1900 REMOVAL OF PIPE CULVERT (18-INCH DIAMETER)
1 EACH $____________ $____________
D0320 20301-2400 REMOVAL OF SIGN
8 EACH $____________ $____________
D0340 20302-1200 REMOVAL OF GUARDRAIL
229 LNFT $____________ $____________
D0360 20304-2000 REMOVAL OF BRIDGE
ALL LPSM $___LPSM_____ $____________
D0380 20315-0000 SAWCUTTING PAVEMENT
128 LNFT $____________ $____________
D0400 20401-0000 ROADWAY EXCAVATION
17,260 CUYD $____________ $____________
D0420 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C
1,948 SQYD $____________ $____________
D0440 20801-0000 STRUCTURE EXCAVATION
265 CUYD $____________ $____________
D0460 20803-0000 STRUCTURAL BACKFILL
685 CUYD $____________ $____________
D0480 20810-0000 SHORING AND BRACING
ALL LPSM $___LPSM_____ $____________
D0500 21101-1000 ROADWAY OBLITERATION, METHOD 1
1,440 SQYD $____________ $____________
D0520 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
110 CUYD $____________ $____________
D0540 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
2,126 CUYD $____________ $____________
Bid Schedule Schedule:D Schedule Type:Alternate
A-26
D0560 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6
1,740 CUYD $____________ $____________
D0580 25210-0000 ROCKERY
1,465 SQFT $____________ $____________
D0600 25701-0500 CONTRACTOR FURNISHED SOIL NAIL RETAINING WALL DESIGN
ALL LPSM $___LPSM_____ $____________
D0620 25902-0000 SOIL NAIL RETAINING WALL
1,465 SQFT $____________ $____________
D0640 30202-2000 ROADWAY AGGREGATE, METHOD 2
8,770 TON $____________ $____________
D0660 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
1,970 TON $____________ $____________
D0680 41201-0000 TACK COAT
4.00 TON $____________ $____________
D0700 55101-2200 STEEL PIPE PILE, IN PLACE
1,630 LNFT $____________ $____________
D0720 55104-1000 DYNAMIC PILE LOAD TEST
4 EACH $____________ $____________
D0740 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
80 CUYD $____________ $____________
D0760 55201-0800 STRUCTURAL CONCRETE, CLASS D (AE)
74 CUYD $____________ $____________
D0780 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 2
118 SQYD $____________ $____________
D0800 55235-0000 EXPANSION JOINTS
116 LNFT $____________ $____________
D0820 55302-2700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER, 53-INCH
1,190 LNFT $____________ $____________
Bid Schedule Schedule:D Schedule Type:Alternate
A-27
D0840 55401-1000 REINFORCING STEEL
10,010 LB $____________ $____________
D0860 55401-2000 REINFORCING STEEL, EPOXY COATED
10,300 LB $____________ $____________
D0880 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL
712 LNFT $____________ $____________
D0900 55901-0000 MEMBRANE WATERPROOFING
700 SQYD $____________ $____________
D0920 56401-1000 BEARING DEVICE, ELASTOMERIC
20 EACH $____________ $____________
D0940 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (20-FT SPAN x 18-FT RISE)
40 LNFT $____________ $____________
D0960 61701-4650 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B STEEL POSTS
200 LNFT $____________ $____________
D0980 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
8 EACH $____________ $____________
A003 D1000 61707-0000 STRUCTURE TRANSITION RAILING
168 LNFT $____________ $____________
D1020 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
D1040 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
20 HOUR $____________ $____________
D1060 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
D1080 62502-0000 TURF ESTABLISHMENT
28,350 SQYD $____________ $____________
Bid Schedule Schedule:D Schedule Type:Alternate
Project Name:Upper Hoh River Road Phase 2 A003 Revised by Amendment A003
A-28
D1100 62632-0000 PLANTINGS (CHANNEL HABITAT PRESERVATION - POLE PLANTING)
ALL LPSM $___LPSM_____ $____________
D1120 62632-0000 PLANTINGS (WETLAND CREATION PLANTING MIX)
ALL LPSM $___LPSM_____ $____________
D1140 62632-0000 PLANTINGS (WETLAND BUFFER ENHANCEMENT PLANTING MIX)
ALL LPSM $___LPSM_____ $____________
D1160 62632-0000 PLANTINGS (POLE PLANTINGS)
ALL LPSM $___LPSM_____ $____________
D1180 62901-0000 ROLLED EROSION CONTROL PRODUCT
28,350 SQYD $____________ $____________
D1200 63302-0000 SIGN SYSTEM
55 SQFT $____________ $____________
D1220 63309-0900 DELINEATOR, TYPE FLEXIBLE (BROWN)
43 EACH $____________ $____________
D1240 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
13,400 LNFT $____________ $____________
D1260 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
1,080 LNFT $____________ $____________
D1280 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
(YELLOW)
3 EACH $____________ $____________
D1300 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
12 EACH $____________ $____________
D1320 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
107 EACH $____________ $____________
D1340 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
77 EACH $____________ $____________
Bid Schedule Schedule:D Schedule Type:Alternate
A-29
D1360 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
12 EACH $____________ $____________
D1380 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
12 EACH $____________ $____________
D1400 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
91 EACH $____________ $____________
D1420 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
D1440 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
6 EACH $____________ $____________
D1460 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
6 EACH $____________ $____________
D1480 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
2,450 LNFT $____________ $____________
D1500 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (PERIMETER)
4,260 LNFT $____________ $____________
D1520 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
812 SQFT $____________ $____________
D1540 63504-2000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS, SYMBOLS AND
LETTERS (STOP LINE)
144 SQFT $____________ $____________
D1560 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
4,740 HOUR $____________ $____________
D1580 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
2,850 HOUR $____________ $____________
D1600 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
376 DAY $____________ $____________
Bid Schedule Schedule:D Schedule Type:Alternate
A-30
D1620 64701-1000 MITIGATION, WETLANDS MITIGATION
ALL LPSM $___LPSM_____ $____________
D1640 64703-8000 MITIGATION, BANK STABILIZATION (CHANNEL HABITAT PRESERVATION -
CHANNEL PLUG)
24 EACH $____________ $____________
D1660 64703-8000 MITIGATION, BANK STABILIZATION (WOOD BUFFER w/ DOLOSSE)
29 EACH $____________ $____________
D1680 64704-1000 MITIGATION, STREAMBED MATERIAL
1,493 CUYD $____________ $____________
D1700 64704-1700 MITIGATION, BANK STABILIZATION (COARSE WOODY DEBRIS)
11,600 CUYD $____________ $____________
D1720 64704-1700 MITIGATION, BANK STABILIZATION (CHANNEL HABITAT PRESERVATION -
COARSE WOODY DEBRIS)
1,680 CUYD $____________ $____________
D1740 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (FLOW DIVERSION)
ALL LPSM $___LPSM_____ $____________
D1760 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (CHANNEL HABITAT
PRESERVATION - FLOW DIVERSION)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:D Schedule Type:Alternate
A-31
Bid Schedule Schedule: A, B, C, & D
Project No: WA JEFF 91420(1) Project Name: Upper Hoh River Road Phase 2
BID SCHEDULE SUMMARY
SCHEDULE SCHEDULE AMOUNT
Schedule A (Pages A-8 through A-11) $ _________________________
Schedule B (Pages A-12 through A-16) $ _________________________
Schedule C (Pages A-17 through A-23) $ _________________________
Schedule D (Pages A-24 through A-30) $ _________________________
Submitted by: __________________________________
Revised by Amendment A003 iv DIVISION 100
Special Contract Requirements Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2
DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS
Section 403. — ASPHALT CONCRETE ........................................................................... F-12
DIVISION 550 BRIDGE CONSTRUCTION
Section 551. — DRIVEN PILES ......................................................................................... F-14 Section 552. — STRUCTURAL CONCRETE ................................................................... F-17 Section 553. — PRESTRESSED CONCRETE................................................................... F-22 Section 554. — REINFORCING STEEL ............................................................................ F-23 Section 556. — BRIDGE RAILING ................................................................................. F-23a
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 601. — MINOR CONCRETE STRUCTURES...................................................... F-24 Section 602. — CULVERTS AND DRAINS ..................................................................... F-25 Section 617. — GUARDRAIL ............................................................................................ F-26 Section 622. — RENTAL EQUIPMENT ............................................................................ F-27 Section 623. — GENERAL LABOR .................................................................................. F-28 Section 625. — TURF ESTABLISHMENT ....................................................................... F-29 Section 626. — PLANTS, TREES, SHRUBS, VINES, AND GROUNDCOVERS .......... F-32 Section 633. — PERMANENT TRAFFIC CONTROL ...................................................... F-34 Section 634. — PERMANENT PAVEMENT MARKINGS .............................................. F-35 Section 635. — TEMPORARY TRAFFIC CONTROL ..................................................... F-36 Section 647. — ENVIRONMENTAL MITIGATION (ADDED SECTION) .................... F-38 Section 648 — STEEL BINDING CHAIN (ADDED SECTION) ..................................... F-43
DIVISION 700 MATERIAL
Section 703. — AGGREGATE ............................................................................................ G-1 Section 705. — ROCK ......................................................................................................... G-5 Section 710. — FENCE AND GUARDRAIL ...................................................................... G-7 Section 713. — ROADSIDE IMPROVEMENT MATERIAL ............................................ G-8 Section 717. — STRUCTURAL METAL ......................................................................... G-13
F-23a DIVISION 550
Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2
Section 556. — BRIDGE RAILING
Description
556.01 Add the following:
This work also consists of furnishing and installing structure transition railing (thrie beam transition).
Material
556.02 Add the following to the material list:
Guardrail 617
Construction Requirements
556.03 General. Add the following:
Install structure transition railing according to Section 617.
556.10 Acceptance. Add the following:
Structure transition railing will be evaluated according to Section 617.
F-23b DIVISION 550
Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2
(This page intentionally left blank)
Reserved
H-126
Permits Project: WA JEFF 91420(1), Upper Hoh River Road Phase 2
(This page intentionally left blank.)
H-127
FIRE PREVENTION AND SUPPRESSION PLAN
H-128
(This page intentionally left blank.)
H-129
FIRE PROTECTION AND SUPPRESSION
The following requirements pertain to normal level non-heightened fire restriction periods. More restrictive requirements will be required in the event of more active fire seasons.
1. Fire Control
The Contractor shall, independently and in cooperation with the Jefferson County, take all reasonable action to prevent and suppress fires in the project area. Independent initial action shall be prompt and shall include the use of all personnel and equipment available in the project area.
2. Fire Precautions
Specific fire precautionary measures are as follows:
a. Smoking and Open Fires
Smoking shall be permitted only at the option of the Contractor. The Contractor shall not allow open fires on the project area, open fires are not allowed within Olympic National Forest.
Unless restricted by State Law or Federal Regulation, smoking shall be permitted only in such portions of the project area that are free of flammable material. Smokers are required to discard extinguished cigars and cigarette butts in an appropriate non-flammable container. Under no circumstances shall butts be discarded on the road or roadside.
b. Fire Extinguishers and Equipment, on Trucks, Tractors, etc.
All power-driven equipment operated by the Contractor, except portable fire pumps, shall be equipped with one fire extinguisher having a UL rating of at least 5 B, C, and one “D” handled or long handled round pointed shovel, size “O” or larger. In addition, each motor patrol, truck and passenger-carrying vehicle shall be equipped with a double-bit axe or Pulaski, 3½ pounds or larger.
Equipment shall be kept in serviceable condition and shall be readily available.
c. Power Saws
Each gasoline power saw operator shall be equipped with a pressurized chemical fire extinguisher of not less than 8-ounce capacity by weight, and one long handled round point shovel, size “O” or larger. The extinguisher shall be kept in possession of the saw operator at all times. The shovel shall be accessible to the operator within 1 minute.
H-130
d. Grinding, Oxyacetylene cutting and welding
One 5 gallon bladder bag is required at each job site location where these activities are being conducted.
e. Extinguishers
One refill for each type or one extra extinguisher sufficient to replace each size extinguisher required on equipment shall be safely stored in the fire tool box or other agreed upon place on the project area that is protected and readily available.
f. Spark Arresters and Mufflers
Each internal combustion engine shall be equipped with a spark arrester meeting appropriate Society of Automotive Engineers (SAE) recommend Practice J335(b) and J350(a) as now or hereafter amended unless it is:
(1) Equipped with a turbine-driven exhaust supercharger such as the turbo charger. There shall be no exhaust bypass.
(2) A passenger carrying vehicle or light truck, or medium truck up to 40,000GW, used on roads and equipped with a factory designed muffler complete with baffles and with an exhaust system in good working condition.
(3) A heavy duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.
Exhaust equipment described in this Subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.
g. Tank Truck
The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water during yarding, loading, land clearing, right of way clearing and mechanical treatment of slash.
A tank truck or trailer will not be required if power saw falling and bucking is the only operation.
Such tank truck or trailer shall be maintained in a serviceable condition and located within 10 minutes, round trip, from each project area during fire period and closed season.
H-131
The tank truck or trailer shall be equipped with a pump capable of discharging 20 gallons of water per minute, using a ¼-inch nozzle tip, through a 50 foot length of rubber lined hose. In addition, 500 feet of serviceable fabric jacket rubber lined hose of not less than 1 inch outside diameter, fitted with a nozzle capable of discharging a straight stream of ¼-inch diameter spray pattern, shall be immediately available for use. The tank, pump and at least 250 feet of hose and nozzle shall be connected and ready for use at all times.
If a trailer is used, it shall be equipped with a hitch to facilitate prompt movement. A serviceable tow vehicle shall be immediately available for attachment to the trailer and must meet the time requirements stated above. Such truck or trailer shall be equipped to operate for a minimum of 8 hours. Tank truck or trailer shall be available from the start of work to the end of the Fire Watch/Fire Security service.
h. Communications
The Contractor shall provide adequate 2-way communication facilities to report a fire to the Olympic National Forest within 15 minutes of detection. Report fires to the Olympic National Forest at 360-374-6522. FCC Regulations prohibit commercial use of Citizen Band (CB) radios (CBs are not considered adequate 2-way communications).
Communications shall be operable during all periods of contract operation.
3. Fire Tools
The Contractor shall furnish serviceable fire fighting tools at each job site location where activities are being conducted in a readily accessible fire tool box or compartment of sound construction with a hinged lid and hasp so arranged that the box can be secured or sealed. The box shall be red and marked "Fire Tools" in letters at least 1 inch high. It shall contain a minimum of:
(a) 2 axes or Pulaskis with a 32-inch handle;
(b) 3 adze eye hoes. One Pulaski may be substituted for one adze eye hoe;
(c) 3 long handled, round point shovels, size “O” or larger.
H-132
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L SECTION M A003
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
EROSION/
SEDIMENT
CONTROL
BRIDGE DRAINAGE
ROADSIDE
FEATURES
SOIL NAIL
RETAINING
WALL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
MITIGATION ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION
CHANNEL LPSM All ALL
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 600 60 660
A0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 6 1 7
A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.3 0.3
A0200 20301-1900 REMOVAL OF PIPE CULVERT (60 - INCH DIAMETER) EACH 1 1
A0220 20315-0000 SAWCUTTING PAVEMENT LNFT 42 42
A0240 20401-0000 ROADWAY EXCAVATION CUYD 347 43 390
A0260 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C SQYD 100 100
A0280 20810-0000 SHORING AND BRACING LPSM All ALL
A0300 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 100 10 110
A0320 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6 CUYD 1,740 1,740
A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 575 55 630
A0360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 130 10 140
A0380 41201-0000 TACK COAT TON 0.26 0.04 0.30
A0400 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT
(20-FT SPAN x 18-FT RISE) LNFT 40 40
A0420 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0440 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT HOUR 20
A0460 62301-0000 GENERAL LABOR HOUR 20
A0480 62502-0000 TURF ESTABLISHMENT SQYD 1,404 156 1,560
A0500 62632-0000 PLANTINGS (POLE PLANTINGS) LPSM All ALL
A0520 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 1,404 156 1,560
A0540 63309-0900 DELINEATOR, TYPE FLEXIBLE (BROWN) EACH 6 6
A0560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 980 100 1,080
A0580 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 980 100 1,080
A0600 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE,
BI-DIRECTIONAL REFLECTIVE (YELLOW) EACH 3 3
A0620 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A0640 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 45 45
A0660 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 26 26
A0680 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
A EACH 4 4
A003 Revised by Amendment A003 Amendment Review Date: 12/29/20 Report Date: 12/29/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-D ec
-2
:2
PM
Remarks and/or
Determination of Estimated
Quantity
Pay Item Description Unit
Estimated Quantities
C
U se rs \C lin to n.
C ho y\ D es kt op \P
S& E
R ev ie w
E ng in ee r\ R ev ie w s\ W
A J
EF
F
0( 1)
U pp er
H oh
R iv er R oa d
Ph as e 2\
Am en dm en ts \A
3\
[B -S he et s.
xl sm ]S he et
STATE PROJECT
B.1JEFF 91420(1)WA
SHEET
NUMBER
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L SECTION M A003
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
EROSION/
SEDIMENT
CONTROL
BRIDGE DRAINAGE
ROADSIDE
FEATURES
SOIL NAIL
RETAINING
WALL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
MITIGATION ALLOWANCE
Bid
Schedule
A0700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
B EACH 4 4
A0720 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE
C EACH 26 26
A0740 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE
CHANGEABLE MESSAGE SIGN EACH 2 2
A0760 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION EACH 2 2
A0780 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL
SYSTEM EACH 2 2
A0800 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 990 990
A0820 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
(PERIMETER) LNFT 620 60 680
A0840 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 318 318
A0860 63504-2000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS,
SYMBOLS AND LETTERS (STOP LINE) SQFT 48 48
A0880 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 2,580 2,580
A0900 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 1,820 1,820
A0920 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR DAY 224 224
A0940 64703-8000 MITIGATION, BANK STABILIZATION (WOOD BUFFER
w/ DOLOSSE) EACH 29 29
A0960 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 630 630
A0980 64704-1700 MITIGATION, BANK STABILIZATION (COARSE WOODY
DEBRIS) CUYD 11,600 11,600
A1000 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (FLOW
DIVERSION) LPSM All ALL
Pay Item Description Unit
Estimated Quantities Remarks and/or Determination of Estimated
Quantity
-D ec -2
:2
PM
A003 Revised by Amendment A003 Amendment Review Date: 12/29/20 Report Date: 12/29/20
C
U se rs \C lin to n.
C ho y\ D es kt op \P
S& E
R ev ie w
E ng in ee r\ R ev ie w s\ W
A J
EF
F
0( 1)
U pp er
H oh
R iv er R oa d
Ph as e 2\
Am en dm en ts \A
3\
[B -S he et s.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
STATE PROJECT
B.2JEFF 91420(1)WA
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L SECTION M A003
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
EROSION/
SEDIMENT
CONTROL
BRIDGE DRAINAGE
ROADSIDE
FEATURES
SOIL NAIL
RETAINING
WALL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
MITIGATION ALLOWANCE
Bid
Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION
CHANNEL LPSM All ALL
B0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 600 60 660
B0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 6 1 7
B0180 20101-0000 CLEARING AND GRUBBING ACRE 0.3 0.3
B0200 20301-1900 REMOVAL OF PIPE CULVERT (60 - INCH DIAMETER) EACH 1 1
B0220 20315-0000 SAWCUTTING PAVEMENT LNFT 42 42
B0240 20401-0000 ROADWAY EXCAVATION CUYD 347 43 390
B0260 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1,
TYPE C SQYD 100 100
B0280 20810-0000 SHORING AND BRACING LPSM All ALL
B0300 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 100 10 110
B0320 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6 CUYD 1,740 1,740
B0340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 575 55 630
B0360 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 130 10 140
B0380 41201-0000 TACK COAT TON 0.26 0.04 0.30
B0400 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT
(20-FT SPAN x 18-FT RISE) LNFT 40 40
B0420 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 20
B0440 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT HOUR 20
B0460 62301-0000 GENERAL LABOR HOUR 20
B0480 62502-0000 TURF ESTABLISHMENT SQYD 1,404 156 1,560
B0500 62632-0000 PLANTINGS (WETLAND BUFFER ENHANCEMENT
PLANTING MIX) LPSM All ALL
B0520 62632-0000 PLANTINGS (POLE PLANTINGS) LPSM All ALL
B0540 62632-0000 PLANTINGS (CHANNEL HABITAT PRESERVATION -
POLE PLANTING) LPSM All ALL
B0560 62632-0000 PLANTINGS (WETLAND CREATION PLANTING MIX) LPSM All ALL
B0580 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 1,404 156 1,560
B0600 63309-0900 DELINEATOR, TYPE FLEXIBLE (BROWN) EACH 6 6
B0620 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 980 100 1,080
B0640 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 980 100 1,080
B0660 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE,
BI-DIRECTIONAL REFLECTIVE (YELLOW) EACH 3 3
Pay Item Description Unit
Estimated Quantities Remarks and/or…