This amendment modifies the solicitation for the WA Jeff 91420(1) Upper Hoh River Road Phase 2 project to revise requirements for turf establishment. The project owner, the Department of Transportation Federal Highway Administration, seeks to establish permanent vegetation on finished slopes and ditches using a hydraulic method. The turf establishment mixture consists of seed, fertilizer, bonded fiber mulch, and biotic soil amendment to be applied in two passes at specified rates. Equipment must reach slopes up to 100 feet high and seeding may be done by hand in inaccessible areas. Fertilizer must contain minimum percentages of nutrients. Seeding and mulching rates are also revised. The deadline for acknowledgment of this amendment is not extended.

View the file

Other files

File Type Posted
Bid Opening Summary_Upper Hoh.pdf PDF
QA_01-07-2021.pdf PDF
QA_01-06-2021.pdf PDF
QA_01-05-2021.pdf PDF
Amendment A004.pdf PDF
QA_12-31-2020.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_12-22-2020.pdf PDF
Amendment A001.pdf PDF
Amendment A001.pdf PDF
A001 Tower Cr Bridge sheet pile plans.pdf PDF
A001 Tower Cr Bridge construction plans.pdf PDF
QA_12-10-2020.pdf PDF
QA_12-09-2020.pdf PDF
QA_12-07-2020.pdf PDF
QA_12-02-2020.pdf PDF
IFB Upper Hoh.pdf PDF
wa-a2013020-Final_Plans.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A005 1/7/2021 N/A See Box 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056719B000003

9B. DATED (SEE ITEM 11)

11/30/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA JEFF 91420(1), Upper Hoh River Road Phase 2

Amendment A001 is issued to revise the following:

SPECIAL CONTRACT REQUIREMENTS

Pages F-29 through F-31, Section 625, Turf Establishment. Revises Subsections 625.06A(a), 625.06, and 625.08.

ENCLOSURES: Pages F-29 through F-31

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

F-29 DIVISION 600

Special Contract Requirements Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2

Section 625. — TURF ESTABLISHMENT

01/01/14–FP14

Construction Requirements

625.03 General. Delete the text of this Subsection and substitute the following:

Do not apply turf establishment during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable. Apply turf establishment to finished slopes and ditches within the following dates (dates inclusive).

(a) September 1, 2021 to October 15, 2021.

(b) September 1, 2022 to October 15, 2022.

(c) September 1, 2023 to September 8, 2023 (October 15, 2023 if the contract duration is extended beyond the specified fixed completion date).

625.06A Turf Establishment, Hydraulic Method. (Added Subsection).

(a) Turf establishment mixture. The permanent turf establishment mixture is composed of the following components:

Component Application Rate

Seed conforming to Subsection 713.04 12.5 30 pounds pure live seed per slurry unit

Fertilizer conforming to Subsection 625.06 75 15 pounds per slurry unit

Bonded fiber mulch (BFM) with 9-month minimum life conforming to Subsection 625.08

475 pounds per slurry unit (includes tracer as recommended by the manufacturer)

Biotic Soil Amendment (BSA) conforming to Subsection 713.23

1250 pounds per slurry unit

A slurry unit consists of approximately 1000 gallons of water plus the specified turf establishment material. Four slurry units contain the material to cover one acre.

(b) Equipment. Use hydro-type equipment capable of providing a uniform application using water as the carrying agent. Do not use hydro-type equipment with gear driven pumps, which can damage the seed. Equipment must be capable of reaching cut slopes a minimum of 100 feet high. Seed areas inaccessible to seeding equipment by hand.

Revised by Amendment A005

F-30 DIVISION 600

Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2

(c) Application. Do not blend soil amendments before placing in the hydro-type equipment.

Mix and apply the slurry mixture products in accordance with the manufacturer’s recommendations. Apply the slurry mixture within 30 minutes of adding the seed to the slurry mixture. Apply in two applications placing no more than 50% of the mixture at any one application. Adjust application rate to avoid sloughing or washing away the mixture on steep slopes. Apply from opposite directions, to ensure the highest level of coverage, effectiveness, and performance. Moisten stabilization areas prior to applying the slurry mixture but do not apply slurry mixture during periods of excessive rainfall.

625.06 Fertilizing. Add the following.

Furnish fertilizer for turf establishment with the following minimum percentages of available nutrients:

20N:20 P:10K 16N:45P:7K

Each ingredient is acceptable up to 5 percent over the minimum requirements.

Potassium need not be present but will be allowed.

Formulate the 20:20:10 16:45:7 fertilizer from urea-formaldehyde compounds. The maximum activity index is 50.

625.07 Seeding. Add the following:

Seed conforming to Subsection 713.04.

Hydraulic method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add a tracer material consisting of either wood or grass cellulose fiber mulch to the water. Apply the tracer material at a rate of 400 pounds per acre (450 kilograms per hectare) to provide visible evidence of uniform application. Add the seed to the water slurry no more than 30 minutes before application. Seed by hand areas inaccessible to seeding equipment.

625.08 Mulching. Amend as follows:

Delete the second and third paragraphs of paragraph (b) and substitute the following:

Use Bonded Fiber Mulch (BFM), is 100 percent biodegradable, and is composed of 100 percent recycled, thermally refined (within a pressurized vessel) virgin wood fibers, crimped interlocking biodegradable fibers, mineral activators and wetting agents (including high-viscosity colloidal polysaccharides, cross-linked biopolymers, and water absorbents). The BFM shall be phytosanitized, free from plastic netting, and when cured forms an intimate bond with the soil surface to create a continuous, porous, absorbent and flexible erosion resistant blanket that allows for rapid germination and accelerated plant growth. Apply at a rate of 475 pounds per slurry unit concurrent with seeding and fertilizing application. This rate does not apply to mulch for tracer applied under Subsection 625.07(b), Seeding, Hydraulic Method.

F-31 DIVISION 600

Project: WA JEFF 91420(1) Upper Hoh River Road Phase 2

Add the following

Apply canfor wood cellulose eco fiber mulch in upland applications at a rate of 1800 pounds per acre (2040 kilograms per hectare). Apply or grass straw wood cellulose fiber mulch in wetland applications at a rate of 1500 2000 pounds per acre (1700 2267 kilograms per hectare).

Apply bonded fiber matrix hydraulic mulch at a minimum rate of 3000 pounds per acre (3400 kilograms per hectare). Apply so no hole in the matrix is greater than 0.04 inches (1 millimeter). Apply so that no gaps exist between the matrix and the soil.