Waterway_Hydraulics_Memo.pdf

PDF 221 KB Posted

Attached to
MT DOT 569 (3), North of Moose Creek North
Solicitation number
69056718B000024
Issued by

About this file

Waterway_Hydraulics_Memo

View the file

Other files

File Type Posted
Bid_Opening_Summary.pdf PDF
A003.pdf PDF
A002.pdf PDF
Q&A_02-22-19.pdf PDF
Q&A_02-19-19.pdf PDF
Q&A_02-14-19.pdf PDF
Amendment_A001.pdf PDF
Q&A_02-11-19.pdf PDF
Q&A_02-07-19.pdf PDF
Q&A_02-01-19.pdf PDF
Q&A_01-28-19.pdf PDF
Plan_Sheets_(R).pdf PDF
mt-56903_XS_MAIN01(r2).pdf PDF
MT_North_of_Moose_Creek_North_Pave_Memo_FINAL.pdf PDF
mt-56903_XS_DETOUR01.pdf PDF
SWPPP_MT_DOT_569(3)_North_of_Moose_Creek_North.pdf PDF
California_Creek_Bridge_Inspection_Report.pdf PDF
California_Creek_As-built.pdf PDF
Attachment_2-_Site_Photographs.pdf PDF
2016-04-25_Proj_002-490L_Bridge_Lead_Paint_Testing_Report_w_Attachments.pdf PDF
2016-04-25_Proj_002-490_Bridge_Asbestos_Inspection_Report_wAtts.pdf PDF
North_of_moose_controlsheet.xlsx XLSX spreadsheet
Attachment_2_-_LBP_Sample_Lab_Report.pdf PDF
GM_31-17_North_Moose_Creek_Preliminary_Foundation_Recommendations__FINAL_1.pdf PDF
GR_23-18_MT_DOT_569(3)_Final_Geotechnical_Report.pdf PDF
GM18-18_Final_Bridge_Foundation_Recommendations_August_2018.pdf PDF
GM19-17_North_Moose_Creek_Subsurface_Investigation_and_Prelim_Recomm_FINAL.pdf PDF
California_Creek_Preliminary_Bridge_TS&L_Report.pdf PDF
Attachment_1_-_Asbestos_Lab_Reports.pdf PDF
mt-56903_Earthwork_MAIN01.pdf PDF
Plan_Request_Form.pdf PDF
IFB_Moose_Creek.pdf PDF
Attachment_1-_Site_Photographs_Lead.pdf PDF
mt-56903_Earthwork_DETOUR01.pdf PDF
Prelim_Letter_Moose_Creek_North.pdf PDF
PROJECT_DESCRIPTION_Moose_Creek.pdf PDF
Preliminary_Plans.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661-3801

CALIFORNIA CREEK BRIDGE

WATERWAY DESIGN HYDRAULICS MEMO

To: Keith Wong, WFLHD Project Manager From: James Neighorn, P.E., WFLHD Hydraulics Engineer Date: September 15, 2016 Project: MT DOT 569(3) – North of Moose Creek North

Background

Montana Department of Transportation is replacing the bridge at California Creek. Western Federal Lands Highway Division (WFLHD) is designing the bridges. Recommendations for the initial waterway width, skew angle, and minimum bridge low chord elevations.

Recommendations

Minimum low chord elevation (project datum) 6257.0 feet.

32-foot waterway width, assuming spill-through abutment with 2(h):1(v) slopes, and 20-foot channel width.

The angle between bridge centerline and channel centerline is 45 degrees. Abutments and bridge deck constructed using a 45 degree skew may be difficult and increase cost. Consider using a 30 degree skew and lengthening the bridge to avoid constructing the new abutments over the existing bridge abutments.

The centerline of channel crosses the centerline of road at Northing 650912.75, Easting 1075237.02.

Utilize riprap class 2, 2 feet thick to protect the embankment slopes.

Attachments: Bridge Hydraulics & Scour Analysis Summary

To: By: James Neighorn, P.E.

Project: MT DOT 569(3) - North of Moose Creek North WFLHD Hydraulics Engineer

Bridge: Date:

BRIDGE STRUCTURE SUMMARY

Low Chord Elevation 6257.0 feet (Project Datum)

Minimum Design Freeboard 3.0 feet above the 50-year flood (Needed for woody debris passage.

Stream Bottom Elevation 6251.4 feet and extensive beaver activity.)

Clearance to Stream Bot. 5.6 feet

Waterway Width 32 feet

Skew 45 degrees relative to stream

Bridge/Stream CL Sta Bridge Start Bridge End

Abutment Type Spill-through, clear span, no piers.

HYDRAULIC & HYDROLOGIC SUMMARY

Flood Frequency Yr 2 10 25 50 100 500

Exceedance Probability % 50 10 4 2 1 0.2

Discharge cfs 93 278 322 369 487

Modeled Water Surface Elevation *** Elev 6253.1 6253.8 6254.0 6254.1 6254.4

Elevation Datum Conversion Ft 0.0 0.0 0.0 0.0 0.0

Project Water Surface Elevation Elev 6253.1 6253.8 6254.0 6254.1 6254.4

Clearance above WS Ft 3.9 3.2 3.0 2.9 2.6

Existing Water Surface Elevation *** Elev 6253.6 6253.8 6255.0 6255.3 6255.6

Predicted Flood Rise Ft -0.5 0.0 -1.0 -1.2 -1.2

Design Flow Velocity Ft/sec 2.4 3.8 4.1 4.4 4.9

Scour Base Elevation (Channel Thalweg) Elev

Contraction Scour Depth Ft

Stream Degradation Depth Ft

Left Abutment Scour Depth Ft

Right Abutment Scour Depth Ft

Total Left Abutment Scour Elevation Elev* 0.0 0.0

Total Right Abutment Scour Elevation Elev 0.0 0.0

Pier Scour Depth Ft NA NA

Total Pier Scour Elevation Elev* NA NA

Streambed material grain size (inches) D100 D50 D15

Scour Design Basis

Project Elevation Datum

RECOMMENDED SCOUR COUNTERMEASURES

Type

Top Elevation 2655.0 Slope (H:V) 2:1

Bottom Elevation 2649.4 Toe Width (Ft) 4

Thick (Ft) 2 min Toe Thickness (Ft) 2

Riprap Design Basis

NAVD88 GEOID99

Riprap, Class 2 (FP-14)

HEC-23

BRIDGE HYDRAULICS & SCOUR ANALYSIS SUMMARY

Keith Wong, WFLHD Project Manager

9/15/2016California Creek

California Creek Bridge Hydraulics Summary.xls

California Creek

FOUNDATION SUMMARY

GEOTECHNICAL SUMMARY

STREAM PLAN & PROFILE STABILITY

The active channel width is 20 feet. OHW is approximately 1.5 feet. Stream gradient is 1.5 percent upstream and downstream. There is extensive beaver activity upstream which has caused the creek to migrate and avulse over a 300 foot wide flood plain. No beaver activity was observed immediately downstream. However, there is potential for beavers to create dams downstream of the bridge. This can potenially increasing water levels up to 1 to 2 foot at the bridge.

Large woody debris recruitment and transports potential is low. Debris flow potential is low. Banks are heavily vegetated and moderately stable. The stable floodplain banks limit channel migration. The cobble and gravel bed appears to be stable with a moderate to low potential for degradation.

To be completed.

To be completed.

California Creek Bridge Hydraulics Summary.xls

N

PLAN

ELEVATION

Q Vel.

500Q

100Q

50Q

2Q

SLOPE PROTECTION

WS ELEV.

SCALE IN FEET

4020010

TYPE: Riprap

F lo w proposed channel

Bottom edge of stream channel

Centerline proposed

El. = 6257.0

Min. low chord

Placed Riprap, Class 2

El. 6255.0

El. 6249.4 centerline

El. = 6251.4 @ road

Proposed channel bottom at road centerline

Existing ground

El. = 6254.0

50-yr WS

Centerline

Proposed Roadway

DEPTH: 2.0 ft.

SLOPE: 2(h):1(v)

)500); --- ft. (Q100TOTAL SCOUR EL: --- ft. (Q

STATE PROJECT

NUMBER

SHEET

MT

C a li fo r n ia C r e e k B r id g e P r e li m in a r y L in e a n d G r a d e .d g n

I n t_ ft

D

C h e c k e d b y

J .N e ig h o r n

D e s ig n e d b y

PLAN AND PROFILE

CALIFORNIA CREEK BRIDGE

0 50 100-50-100-150

CLASS: 2

TOP EL.: 6255.0 ft.

BOTTOM EL.: 6249.4 ft.

REMARKS: Scour to be determined.

at road centerline

Approximate finish grade

6254.4

6254.1

6254.0

6253.1

5.9

5.1

4.7

2.4

4'

B o tt o m W id th

C h a n n e l

F lo w

DOT 569(3)

CL

Channel Bottom El. = 6251.4

N 650912.75, E 1075237.02