MT DOT 569 (3), North of Moose Creek North, Deer Lodge County, Montana
The work consists of asphalt concrete paving, aggregate base, grading, drainage and bridge replacement as well as other small items of work. Bridge replacement includes construction of a single span, 83-foot long precast, prestressed concrete decked bulb tee girder bridge. Abutments are founded on steel piles. The work includes demolition of the existing timber bridge before construction of the new structure.
Project length: 3.404 miles
Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5 million to $7 million
Location: 15 miles south of Anaconda DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 One Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control, Temporary Diversion Channel LPSM 157 Soil Erosion & Sediment Control, Fiber Roll 30,000 LNFT
DIVISION 200 – Earthwork 201 Clearing & Grubbing 34 ACRE 203 Removal of Structures & Obstructions (Existing Bridge) LPSM 204 Excavation 21,000 CY 204 Embankment 16,000 CUYD 208 Structure Excavation 140 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 560 CUYD 253 Gabions & Revet Mattresses 520 SQFT 255 Mechanically Stabilized Earth Walls (retaining walls) 9,200 SQFT
DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 One Schedule
DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 46,500 TON 302 Minor Crushed Aggregate 370 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 9,100 TON 403 Asphalt Concrete 70 TON 412 Asphalt Tack Coat (asphalt surface treatment) 23 TON
DIVISION 550 – Bridge Construction 551 Driven Piles 624 LNFT 552 Structural Concrete (concrete – major structures) 77 CUYD 553 Prestressed Concrete 491 LNFT 554 Reinforcing Steel 10,000 LB 556 Bridge Railing 162 LNFT 564 Bearing Devices 12 EACH
DIVISION 600 – Incidental Construction 602 Culverts 740 LNFT 602 Culverts, 120-Inch 180 LNFT 602 Culverts, 16 Feet Span, 8 feet rise precast reinforced concrete box culvert 100 LNFT 607 Cleaning, Relaying, & Repairing Existing Drainage Structures 17 617 Guardrail 850 LNFT 619 Fences, Gates, Cattle Guards & Bollard Posts 2,600 LNFT 622 Rental Equipment Yes 623 General Labor Yes 624 Topsoil (landscaping & related items) 23 ACRE 625 Turf Establishment (indicate seeding or mulching separately) 22 ACRE 633 Permanent Traffic Control (traffic control devices) 12 SQFT 633 Permanent Traffic Control, Rumble Strip 18,115 LNFT 634 Permanent Pavement Markings (traffic pavement markings) 140,000 LNFT 635 Temporary Traffic Control – Flagger 4,800 FXHR 650 Temporary Diversions LPSM
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
| DIVISION 550 – Bridge Construction |