Plan_Sheets_(R).pdf
PDF 44 MB Posted
- Attached to
- MT DOT 569 (3), North of Moose Creek North
- Solicitation number
- 69056718B000024
About this file
Plan Sheets
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B. STOKES
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d m t-a b .d g n
MT DOT 569(3)
A
M
J a n u a r y
K
H a r r is o n
M il le r
C h e c k e d b y
D e s ig n e d b y
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS3
P
A u g u s t
U
S C m y fi le s p w p r o d u c ti o n d m t-a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 DOT 569(3) MT
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
VICINITY MAP
A.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-a d .d g n
MT DOT 569(3)
O c to b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
SCALE IN MILES
1 1
DEERLODGE NATIONAL FOREST
(Administered by Beaverhead National Forest)
MOUNT HAGGIN STATE
WILDLIFE MANAGEMENT AREA
DEEP LODGE CO
SILV
ER BO
W
CO
5 4
1 6 5 4 3 2 1
36353431
29 28 27 26 25
23222120
18 17
15 14 13
12111098
29 28 27 26 25
20 21 22 23
12111098
15 14 13
BEGIN PROJECT
END PROJECT569
T o A n a co n d a
DEERLODGE NATIONAL FOREST
STATE WILDLIFE MANAGEMENT AREA
m ile s m ile s
To W is e
R iv er
495+00.00
MT DOT 569(3)
314+75.00
MT DOT 569(3)
ai nrofilaC keerC ainrofilaC el tt iL ainrofilaC k e er
Celt tiL na ci remA ke er
C k ee rC
Ca lifo rn ia
Creek
S ix m ile
C re e k O re g o n C re e k
CONTINENTAL
DIVID
E
Mountain
Sugarloaf
C O
N T I N
E N
T A
L D I V I D
E
Mountain
Grassy
M
IL
L
C R E E
K
R O
A D nacire mA keerC
Fr en ch
T03N, R12W T03N, R11W
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION J SECTION K SECTION L
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
BRIDGE
CONSTRUCTION
DETAILS
EROSION
CONTROL DRAINAGE WALL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION
CHANNEL (American Creek) LPSM All ALL
A0140 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION
CHANNEL (Oregon Creek) LPSM All ALL
A0160 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION
CHANNEL (California Creek) LPSM All ALL
A0180 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 2,202 48 2,250
A0200 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 26,776 224 27,000
A0220 15705-1600 SOIL EROSION CONTROL, ABSORBENT BOOM LNFT 200 200
A0240 20101-0000 CLEARING AND GRUBBING ACRE 28.3 0.7 29.0
A0260 20301-0700 REMOVAL OF DELINEATOR EACH 10 10
A0280 20301-2400 REMOVAL OF SIGN EACH 1 1
A0300 20302-0700 REMOVAL OF FENCE LNFT 2,379 71 2,450
A0320 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0340 20310-1000 PLUG, EXISTING PIPE EACH 1 1
A0360 20401-0000 ROADWAY EXCAVATION CUYD 20,162 838 21,000
A0380 20402-0000 SUBEXCAVATION CUYD 533 27 560
A0400 20403-0000 UNCLASSIFIED BORROW CUYD 21,721 279 22,000
A0420 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS
1, TYPE C SQYD 30,736 364 31,100
A0440 20703-2000 GEOGRID, STABILIZATION SQYD 4,750 50 4,800
A0460 20801-0000 STRUCTURE EXCAVATION CUYD 140 140 Contract Quantity
A0480 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 CUYD 1,188 161 51 1,400
A0500 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED Contract Quantity
WIRE FACE SQFT 7,722 7,722
A0540 30101-2000 AGGREGATE BASE GRADING D TON 45,902 598 46,500
A0560 30202-1000 ROADWAY AGGREGATE, METHOD 1 TON 481 119 600
A0580 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX,
1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL TON 8,585 115 8,700
A0640 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 87 87
A0660 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 210 30 240
A0680 41201-0000 TACK COAT TON 23 23
A0700 55101-2200 STEEL PIPE PILE, IN PLACE (18" diameter x
3/4") LNFT 660 660
MileStone: 100% Date Completed: 01/03/19 Report Date: 01/03/19
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
3-
Ja n-
:1
PM
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-
3_ ba .x ls m
]S he et
STATE PROJECT
B.1DOT 569(3)MT
SHEET
NUMBER
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
BRIDGE
CONSTRUCTION
DETAILS
EROSION
CONTROL DRAINAGE WALL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0720 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 2
A0740 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 78 78 Contract Quantity
A0760 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB Contract Quantity
TEE GIRDER (46") LNFT 491 491
A0780 55401-1000 REINFORCING STEEL LB 4,300 4,300 Contract Quantity
A0800 55401-2000 REINFORCING STEEL, EPOXY COATED LB 4,500 4,500 Contract Quantity
A0820 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL (MDT W740) LNFT 162 162 Contract Quantity
A0840 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 12 12 Contract Quantity
A0860 60201-0600 18-INCH PIPE CULVERT LNFT 26 4 30
A0880 60201-0800 24-INCH PIPE CULVERT LNFT 586 64 650
A0900 60201-0900 30-INCH PIPE CULVERT LNFT 38 6 44
A0920 60201-2300 120-INCH PIPE CULVERT LNFT 160 10 170
A0940 60220-4450 14 FEET SPAN, 8 FEET RISE PRECAST REINFORCED
CONCRETE BOX CULVERT (headwalls and wingwalls) LNFT 106 106
A0960 60704-0000 CLEANING CULVERT IN PLACE EACH 16 16
A0980 61701-1150 GUARDRAIL SYSTEM G3 (type 2, class A, steel posts) LNFT 1,170 1,170
A1000 61702-1100 TERMINAL SECTION, TYPE G3 EACH 6 6
A1020 61707-0000 STRUCTURE TRANSITION RAILING LNFT 205 205 Contract Quantity
A1040 61901-0000 FENCE LNFT 2,583 67 2,650
A1060 61901-0000 FENCE (temporary) LNFT 2,851 49 2,900
A1080 62101-0000 MONUMENT EACH 3 3
A1100 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A1120 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 30-INCH WIDTH HOUR 40 40
A1140 62301-0000 GENERAL LABOR HOUR 60 60
A1160 62402-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH ACRE 6.7 0.3 7.0
A1180 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 4.9 4.9
A1200 62501-0000 TURF ESTABLISHMENT ACRE 11.6 0.6 12.2
A1220 62901-1300 ROLLED EROSION CONTROL PRODUCT, TYPE 5.B SQYD 1,272 28 1,300
A1240 63302-0000 SIGN SYSTEM SQFT 6 6 12
A1260 63309-0000 DELINEATOR (Design A) EACH 55 5 60
A1280 63309-0000 DELINEATOR (Design F) EACH 15 5 20
A1300 63313-0000 RUMBLE STRIP LNFT 18,025 90 18,115
A1320 63316-1000 REMOVE AND RESET SIGN EACH 6 6
A1340 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (yellow) LNFT 53,480 120 53,600
A1360 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (white) LNFT 71,310 90 71,400
A1380 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (yellow) LNFT 13,640 60 13,700
A1400 63401-0450 PAVEMENT MARKINGS, TYPE B, DOTTED (white) LNFT 710 10 720
3- Ja n-
:1
PM
MileStone: 100% Date Completed: 01/03/19 Report Date: 01/03/19 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-
3_ ba .x ls m
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.2DOT 569(3)MT
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
BRIDGE
CONSTRUCTION
DETAILS
EROSION
CONTROL DRAINAGE WALL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A1420 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A1440 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER EACH 235 235
A1460 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT
TYPE B EACH 75 75
A1480 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION EACH 2 2
A1500 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL
SYSTEM EACH 1 1
A1520 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
(pinned) LNFT 600 600
A1540 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 3,880 80 3,960
A1560 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 332 48 380
A1580 63505-1500 TEMPORARY TRAFFIC CONTROL, VEHICLE
POSITIONING GUIDES MILE 6.8 6.8
A1600 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 4,800 4,800
A1620 64703-6000 MITIGATION, FISH PASSAGE BOULDER EACH 20 4 24
A1640 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 431 44 475
A1660 64704-1700 MITIGATION, BANK STABILIZATION CUYD 2,284 46 2,330
A1680 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION 01 LPSM All ALL
3- Ja n-
:1
PM
MileStone: 100% Date Completed: 01/03/19 Report Date: 01/03/19 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 m t-
3_ ba .x ls m
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.3DOT 569(3)MT
ROUNDING DETAIL
CUT SLOPE
NO SCALE
FOOTNOTE:
CONNECTION DETAIL
SAFETY EDGE DETAIL
Refer to Clearing Limit Report for location and offsets.[2]
Saw cut vertically according to FP-14 Section 203.[1]
QUANTITIES
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-c a .d g n
MT DOT 569(3)
D e c e m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Existing surface pavement structure
See Sheet C.2 for
Saw cut elevation and cross slope
Match existing pavement
Edge of existing pavement pavement surface
Existing structure dimensions for pavement
Profile, see Typical Section [1]
ROUNDING DETAIL
FILL SLOPE
5'5'
0.25 Ø
D
D
D4
T o e o f fi ll
Top of cut
Existing ground
[1]
Va ria ble
1:4 (typ.)
Aggregate base, grading D
Aggregate base, grading D
T o p o f
C u t
5'5'
(typ.)
(typ.)
495+00.00
314+75.00
C le a r in g l im it
C le a r in g l
3" compacted depth, place in two equal lifts, tack coat between lifts
0.3 to <3 million ESAL (type III pavement roughness), " nominal maximum aggregate size,4 3" or 2
Asphalt concrete pavement, gyratory mix, NO SCALE
[1]Slope
TYPICAL SECTION
1:4
1:20
L it s
C o n s tr u c ti
[5]
[1]Slope
[2]
C o n s tr u c ti o n L im it s
C o n s tr u c ti o n L im it s it s
C o n s tr u c ti
[2
1:20[2]
[2]
FOOTNOTE:
[2]
L im it s
C o n s tr u c ti o n
[2]
C o n s tr u c ti o n L im it s
MT 569/MILL CREEK ROAD
L im it s
C o n s tr u c ti o n
[2]
386+56.11 TO 495+00.00
314+75.00 TO 385+73.11
SHEET 1 OF 3
TYPICAL SECTION
C.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-c b .d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
See sheet C.1 for location.[7]
Refer to Clearing Limit Report for location and offset.[6]
Refer to Staking Report Data Listing for station limits.[5]
Turf establishment[4] topsoil, 4-inch depth.
Placing conserved topsoil, 4-inch depth or furnishing and placing [3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Superelevate roadway as indicated in the Staking Report Data Listing.[1]
[2
C o n s tr u c ti o n L im it s
1:4
LC
Travel lane
1:4
Profile grade
Existing ground
12" compacted depth
Aggregate base, grading D, Foreslope
1' 12'
1:4
Travel lane Foreslope
12' 1'
1:4
Foreslope 5'6'10'Variable5'
Existing ground
T o e o f fi ll
Existing ground
5'Variable
T o e o f fi ll
5'
Existing ground
L im it s
C le a r in g
5' 5'Variable10'6'5'
T o p o f c u t
[3][4]
Foreslope
1:2
1:4
Foreslope
1:4
Clear zone Clear zone
1:4
[3][4]
L im it s
C le a r in g ground Existing
Clear zone
Existing ground
Clear zone
T o e o f fi ll
Clear zone
18'
18'18'
C le a r in g L im it s
1:4
Foreslope
Variable 5' Clear zone
18' c u t
T o p f u t
T o p o f c u t
T o p o f
Variable
L im it s
C le a r in g
(typ.)
L im it s
C le a r in g
(typ.)
Existing ground
(typ.) Shld Shld (typ.)
(typ.)
L im it s
C le a r in g
(typ.)
[3][4]
[3][4][3][4]
5' Variable
C le a r in g L im it s
Variable
5'
(typ.)
3" compacted depth, place in two equal lifts, tack coat between lifts
0.3 to <3 million ESAL (type III pavement roughness), " nominal maximum aggregate size,4 3" or 2
Asphalt concrete pavement, gyratory mix, 1:4
1:4
[4][3]
[4][3]
5' Variable
18'
5'
1' 1'
See Sheet C.1 for details
Saftey Edge Detail (typ.), See Sheet C.1 for details
Saftey Edge Detail (typ.), See Sheet D.1 for locations
Guardrail system G3, 18'
1' 0.75' 2' 2.5'
5'Variable
1:
Existing ground
T o e o f fi ll[
(typ.)
[3][4]
C le a r in g L im it s
See Sheet D.1 for locations
Guardrail system G3, 1'0.75'2'2.5'
5' Variable
Foreslope Foreslope
[7]class 1, type C
Seperation-stablization geotextile, 1:20 it s
C o n s tr u c ti
[2]
C o n s tr u c ti o n L im it s
FOOTNOTE:
MT 569/MILL CREEK ROAD
L im it s
C o n s tr u c ti o n
[2]
[1] Slope
[1] Slope
462+00 TO 466+30 RT
405+48 TO 411+06 RT
[2
C o n s tr u c ti o n L im it s
[2]
TYPICAL SECTION
SHEET 2 OF 3 See sheet C.1 for location.[7]
Refer to Clearing Limit Report for location and offset.[6]
Refer to Staking Report Data Listing for station limits.[5]
Turf establishment[4] topsoil, 4-inch depth.
Placing conserved topsoil, 4-inch depth or furnishing and placing[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Superelevate roadway as indicated in the Staking Report Data Listing.[1]
ALIGNMENT: MAIN01
TYPICAL SECTION
C.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-c c .d g n
MT DOT 569(3)
a n u a r y
K
H a r r is o n
K
M il le r
C h e c k e d b y
D e s ig n e d b y
1:4
Existing ground
Foreslope
5'6'10'Variable5'
T o e o f fi ll
[3][4]
Foreslope
Clear zone
Clear zone
C le a r in g L im
Foreslope
Variable 5' Clear zone
18' c u t
T o p f u t
T o p o f
L im it s
C le a r in g
(typ.)
L im it s
C le a r in g
(typ.)
Existing ground
(typ.)
Variable
1:4
[4][3]
5'
LC
Profile grade
See Sheet C.1 for details
Safety Edge Detail (typ.), 1:4
1:4
1:4
1:4
See Sheet C.1 for details
Safety Edge Detail (typ.), 12" compacted depth
Aggregate base, grading D, 1' 12'12'1'
Travel lane Travel laneShld Shld
Existing ground
Existing ground
5' 5' 5'
Foreslope
C le a r in g L im
T e o f fi ll
Clear zone
1'
Variable
18'
[4] [3]
Variable
18'
[4] [3]
18'
[7]stabilization
Geogrid, [7]class 1, type C
Seperation-stablization geotextile, Embankment
Embankment tack coat between lifts
3" compacted depth, place in two equal lifts,
0.3 to <3 million ESAL (type III pavement roughness), " nominal maximum aggregate size,4 3" or 2
Asphalt concrete pavement, gyratory mix, FOOTNOTE:
MT 569/MILL CREEK ROAD
[1]Slope [1]Slope
C o n s tr u c ti o n L im it s
[2
[2]
477+40 TO 483+98
C o n s tr u c ti o n L im it s
SHEET 3 OF 3
TYPICAL SECTION
C.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-c d .d g n
MT DOT 569(3)
S e p te m b e r
K
H a r r is o n
K
M il le r
C h e c k e d b y
D e s ig n e d b y
ALIGNMENT: MAIN01
TYPICAL SECTION
See sheet C.1 for location.[7]
Refer to Clearing Limit Report for location and offset.[6]
Refer to Staking Report Data Listing for station limits.[5]
Turf establishment[4] topsoil, 4-inch depth.
Placing conserved topsoil, 4-inch depth or furnishing and placing[3]
Construct slopes as shown in the Staking Report Data Listing.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data[1]
1:4
LC
Travel lane
Profile grade
12" compacted depth
Aggregate base, grading D, 1' 12'
1:4
Travel lane
12' 1'
1:4
Existing ground Existing ground
T o e o f fi ll
5'
Foreslope
1:4
Shld Shld
3" compacted depth, place in two equal lifts, tack coat between lifts
0.3 to <3 million ESAL (type III pavement roughness), " nominal maximum aggregate size,4 3" or 2
Asphalt concrete pavement, gyratory mix, See Sheet C.1 for details
Safety Edge Detail (typ.), See Sheet C.1 for details
Safety Edge Detail (typ.), Variable5'
Foreslope
1'
C le a r in g L im it s
[4][3]
18'
Clear Zone
T o e o f fi ll
C le a r in g L im it s
Variable
18'
[4][3]
Clear Zone
1'
[7]geotextile, class 1, type C
Seperation-stablization
[7]Geogrid, stabilization
[7]class 1, type C
Seperation-stablization geotextile, [7]Geogrid, stabilization Embankment
Embankment
SUBEXCAVATION DETAILS
[1]Slope [1]Slope
FOOTNOTE:
[2]
MT 569/MILL CREEK ROAD
SUBEXCAVATION TYPICAL SECTION
See sheet C.1 for location.[2]
Listing.
Superelevate roadway as indicated in the Staking Report Data [1]
C.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-c e .d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
ALIGNMENT: MAIN01
PROFILE
1:4
LC
Travel lane
Profile grade
12" compacted depth
Aggregate base, grading D, 1' 12'
1:4
Travel lane Foreslope
12' 1' 5'
Foreslope Shld Shld
5'
NOTE:
Geogrid, stabilization to existing ground details
See sheet C.2 for connection connection to existing ground details
See sheet C.2 for
Select borrow
TRANSITION RAMP DETAIL
Proposed surface
Excavation limits
Subexcavation
Limits
Transition ramp Transition ramp
Existing ground
3" compacted depth, place in two equal lifts, tack coat between lifts
0.3 to <3 million ESAL (type III pavement roughness), " nominal maximum aggregate size,4 3" or 2
Asphalt concrete pavement, gyratory mix, Existing ground
Proposed surface class 1, type C
Seperation-stablization geotextile, See Sheet C.1 for details
Safety Edge Detail (typ.), See Sheet C.1 for details
Safety Edge Detail (typ.), the CO.
not construct slopes steeper than 1:2 unless approved by slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slope or make roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within 4 ft of the
2.
1.
material
Conserved suitablematerial
Conserved suitable
QUANTITIES
PLAN AND PROFILE
TABULATION OF
FOOTNOTE:
See Section I for details.[1]
D.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fa .d g n
MT DOT 569(3)
a n u a r y
H a r r is
M il
C h e c k e d b y
D e s ig n e d b
GPS
F4909
CP
E4909
6225 6230
SG17-01
BH
P O
T
.1
,2
.7
+3.5
3%
+3.8
0%200' VC
K = 695
,2
.4
+3.8
0%
+0.5000%
600' VC
K = 182
SSD = 627'
N
NOTE:
1. See Sheet C.1 for connection detail.
325+00322+50320+00317+50315+00312+50
6200 6230
6205 6235
6210 6240
6215 6245
6220 6250
6225 6255
6230 6260
6235 6265
6240 6270
D.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fb .d g
MT DOT 569(3)
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
MILL CREEK ROADMT 569 /
T03N, R12W, Section 36 a n u a r y
BEGIN PROJECT
Line to be constructed Slopes stake limits
Slopes stake limits
Existing ground
Profile grade
Profile grade
Existing ground
El=6218.84
E=1071735.55
N=645336.14
Clearing limits
Clearing limits
314+75.00(MAIN01)
MT DOT 569(3)
344 CUYD (Embankment)
2,063 CUYD (Excavation)
307 CUYD (Topsoil Excavation)
CP
16101
16102
P C
.6
,2
.7
8+0.5000%
+1.500 0%
250' VC
K = 250
+0.5000%
N
MT 56
9 / M
ILL C
REEK ROAD
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
340+00337+50335+00332+50330+00327+50325+00
6235 6235
6240 6240
6245 6245
6250 6250
6255 6255
6260 6260
6265 6265
6270 6270
6275 6275
D.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fc .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Curve= C1001
D
R= 1,900.00'
T= 625.36'
L= 1,208.28' e=0.050
S e e S h e e t
H .1 f o r d e ta il s in c h p ip e c u lv e r t.
T03N, R12W, Section 36 a n u a r y
Line to be constructed
Existing ground
Profile grade
Slope stake limits
Slope stake limits
Cleaning culvert in place
334+99
Cleaning culvert in place
336+94
Clearing limits
Clearing limits
491 CUYD (Embankment)
4,340 CUYD (Excavation)
NOTE:
Temporary Construction Easement location and details.
See Section N for Right-of-Way and1.
24-inch pipe culvert
325+05
Protect monument See sheet M.1 for details
Temporary traffic contol, plastic fence, 336+00 to 339+15 LT
606 CUYD (Topsoil Excavation)
IR
CP
16103
GPS
A4909
5 6270
S G
B H
P T
.9
,2
.0
+1.500 0%
+0.8000%
500' VC
K = 714
SSD = 1791'
+0.8000%
+0.8000%
N
MT 569 / MILL CREEK ROAD
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
355+00352+50350+00347+50345+00342+50340+00
6245 6245
6250 6250
6255 6255
6260 6260
6265 6265
6270 6270
6275 6275
6280 6280
6285 6285
D.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fd .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
T
N , R
W , S e c tio n
T
N , R
W , S e c tio n a n u a r y
Line to be constructed
Slope stake limits
Slope stake limits
Existing ground
Profile grade
Cleaning culvert in place
343+15
Cleaning culvert in place
346+90
Cleaning culvert in place
351+74
Clearing limits
Clearing limits
544 CUYD (Embankment)
3,300 CUYD (Excavation)
NOTE:
Temporary Construction Easement location and details.
See Section N for Right-of-Way and1.
Protect monument
Protect monument
369 CUYD (Topsoil Excavation)
GPS
16104
CP
16105
CP
16106
S G
B H
P C
.7
,2
.3
-3.8000%
530' VC
K = 115
SSD = 499'
,2
.7
-3.8000% +3.3
830' VC
K = 116
-3.8000%
+3.3
N
MT 569
/ MILL
CREEK ROAD
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
370+00367+50365+00362+50360+00357+50355+00
6240 6240
6245 6245
6250 6250
6255 6255
6260 6260
6265 6265
6270 6270
6275 6275
6280 6280
D.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fe .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Curve= C1002
D
R= 2,850.00'
T= 668.10'
L= 1,312.51' e=0.040
T0 3N R
W S ec ti on
T0 3N R
W S ec ti on a n u a r y
S e e S e c ti o n H f o r d e ta il s b o x c u lv e r t, p r e c a s t r e in fo r c e d c o n c r e te f e e t s p a n f e e t r is
Line to be constructed
Slope stake limits
Slope stake limits , R
T
L T
, R
T
, L
T
Cleaning culvert in place
366+48
Profile grade
Existing ground
Clearing limits
Clearing limits
See Section H for details concrete box culvert precaste reinforced
14 feet span, 8 feet rise
360+19
See Section H for details
Method B, Class 3
Placed riprap, See Section M for details
Fence (temporary)
40 CUYD (Embankment) 4,274 CUYD (Embankment) 294 CUYD (Embankment)
3,664 CUYD (Excavation)
NOTE:
Temporary Construction Easement location and details.
See Section N for Right-of-Way and1.
Protect monument
Protect monument
430 CUYD (Topsoil Excavation)
16107
P T
.2
,2
.2
+3.3
% -4.1192%
860' VC
K = 115
SSD = 498'
-4.1192%
N
MT 569 / MILL CREEK ROAD
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
380+00377+50375+00372+50370+00
6260 6260
6265 6265
6270 6270
6275 6275
6280 6280
6285 6285
6290 6290
6295 6295
6300 6300
D.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-ff .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
T03N, R11W, Section 30 a n u a r y
Line to be constructed Slope stake limits
Slope stake limits
Profile grade
Cleaning culvert in place
378+27
Existing ground
Clearing limits
Clearing limits
447 CUYD (Embankment)
1,537 CUYD (Excavation)
196 CUYD (Topsoil Excavation)
(typ.)
Wingwall A
Wingwall B
Wingwall C
Wingwall D
RG3091-S
RG3091-R
RG3091-Q
RG3091-P
RG3091-O
RG3091-N
RG3091-M
RG3091-L
RG3091-K
RG3091-J
RG3091-I
RG3091-H
RG3091-G
RG3091-F
RG3091-E
RG3091-D
RG3091-C
RG3091-B
RG3091-A
REBAR LIST (3 of 3)
REBAR LIST (2 of 3)
REBAR LIST (1 of 3)
STRUCTURE TRANSITION RAILING (3 OF 3)
STRUCTURE TRANSITION RAILING (2 OF 3)
STRUCTURE TRANSITION RAILING (1 OF 3)
BRIDGE RAILING DETAILS
BRIDGE RAILING
TYPICAL SECTION/DECK PLAN
P/S GIRDER MISC. DETAILS
P/S GIRDER B THRU E
P/S GIRDER A & F
P/S GIRDER SECTIONS
ABUTMENT WINGWALLS
ABUTMENT ENDWALLS
ABUTMENT CAPS
FOUNDATION PLAN
GENERAL NOTES & ESTIMATE
PLAN & ELEVATION
CP
16109
CP
16108
B17-01
BH
B17-02
BH
SG17-04
BH
,2
.1
-4.1192%
491' VC
K = 96
,2
.7
+1.0000%
,2
.7
+1.0000%
,2
.8
+1.0000%
8.
615' VC
K = 88
6,280
0 +1.0000%
,2
.3
,2
.0
+1.0000%
8.
N
C A
LIFO
R N
IA
C
R E E K
395+00392+50390+00387+50385+00382+50380+00
6240 6275
6245 6280
6250 6285
6255 6290
6260 6295
6265 6300
6270 6305
6275 6310
6280 6315
D.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fg .d g n
MT DOT 569(3)
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
T03N, R11W, Section 30 a n u a r y
Line to be constructed
Slope stake limits
Slope stake limits
, L
T
3+
, R
T
Existing ground
Cleaning culvert in place
383+06
Cleaning culvert in place
394+50
See Section F for details
California Creek Bridge
385+73.11 to 386+56.11
Existing ground
Profile grade
Clearing limits
Clearing limits
MT 569 / MILL CREEK ROAD
S Structure transition railing
S
T
G
G G T
RT
B Bridge railing, steel, two rail (MDT W740)
SBBSST
LT
RTRTRT
STT
T
RT
BS
LTLT
SB S T T
LTLT
T
RT
See Sheet F.14-16 for details
Structure transition railing, 385+29 to 385+80, RT
See Sheet F.14-16 for details
Structure transition railing, 385+13 to 385+64, LT
See Sheet F.14-16 for details
Structure transition railing, 386+44 to 386+95, LT
See Sheet F.14-16 for details
Structure transition railing, 386+60 to 387+11, RT
See Section F for details
Begin bridge, 385+73.11
LEGEND:
Profile grade
Existing ground
Profile grade
3,819 CUYD (Embankment)
385 CUYD (Excavation) 58 CUYD (Excavation)
Terminal section, type G3
NOTE:
Temporary Construction Easement location and details.
See Section N for Right-of-Way and1.
CALIFORNIA CREEK
See Section K for Temporary Road Diversion details
Guardrail system G3 (type 2, class A, steel posts)
84 CUYD (Topsoil Excavation)
See Section J for details welded wire face, Mechanically stabilized earth wall, 386+69.42 to 389+97.42, RT see Section I for details
Terminal Section type G3, 384+63 to 385+13, LT see Section I for details
Terminal Section type G3, 383+95 to 384+45, RT see Section I for details
(type 2, class A, steel posts), Guardrail system G3
384+45 to 385+29, RT see Section I for details
Terminal Section type G3, 390+23 to 390+73, RT see Section I for details
(type 2, class A, steel posts), Guardrail system G3
387+11 to 390+23, RT see Section I for details
Terminal Section type G3, 387+79 to 388+29, LT see Section I for details
(type 2, class A, steel posts), Guardrail system G3
386+95 to 387+79, LT
94 CUYD (Topsoil Excavation)
16110 CP
16111
6325 6330
6350 6355
0 6375
P C
.2
8.
8.
,3
.8
8.
-0.4000%
960' VC
K = 114
SSD = 497'
-0.4000%
N
410+00407+50405+00402+50400+00397+50395+00
6305 6355
6310 6360
6315 6365
6320 6370
6325 6375
6330 6380
6335 6385
6340 6390
6345 6395
D.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fh .d g n
MT DOT 569(3)
K
H a r r is
M il
C h e c k e d b s ig n e d b y
Curve= C1003
D
R= 1,500.00'
T= 365.39'
L= 716.83' e=0.056
T03N, R11W, Section 30 a n u a r y
, L
T
Slope stake limits
Slope stake limitsLine to be constructed
Existing ground
Profile grade
Profile grade
Existing ground
Existing ground
Profile grade
Clearing limits
Clearing limits
MT 569 / MILL CREEK ROAD
5,524 CUYD (Embankment)
174 CUYD (Excavation) see sheet M.5-6 for details plastic fence, Temporary traffic control, 405+40 to 411+15 RT
32 CUYD (Topsoil Excavation)
16112
CP
16113
6375 6375
P T
.0
,3
.2
-0.4000%
-1.7000%
300' VC
K = 231
SSD = 980'
,3
.2
-1.7000%
+4.3
0%
700' VC
K = 116
-0.4000%
N
425+00422+50420+00417+50415+00412+50410+00
6355 6355
6360 6360
6365 6365
6370 6370
6375 6375
6380 6380
6385 6385
6390 6390
6395 6395
D.9
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fi .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
T0 3N, R
W , S ec tio n
T0 3N, R
W , S ec tio n a n u a r y
Slope stake limits
Line to be constructed
Slope stake limits
Cleaning culvert in place
412+05
Cleaning culvert in place
415+72
Cleaning culvert in place
419+01
OREGON
CREEK
Profile grade
Existing ground
MT 569 / MILL CREEK ROAD
Clearing limits
Clearing limits
S e e S e c ti o n H f o r d e ta il s in c h p ip e c u lv e r t, S e e S e c ti o n H f o r d e ta il s in c h p ip e c u lv e r t, S e e S e c ti o n H f o r d e ta il s in c h p ip e c u lv e r t, S e e S e c ti o n H f o r d e ta il s in c h p ip e c u lv e r t, See Section H for details
120-inch pipe culvert
421+94
See Section H for details
Method B, Class 3
Placed riprap
6,912 CUYD (Embankment)
303 CUYD (Excavation) 92 CUYD (Excavation)26 CUYD (Exc.)
see sheet M.7 for details plastic fence, Temporary traffic control, 418+20 to 418+60 RT see sheet M.7 for details plastic fence, Temporary traffic control, 419+15 to 421+75 LT see sheet M.5-6 for details plastic fence, Temporary traffic control, 405+40 to 411+15 RT
55 CUYD (Topsoil Excavation) 14 CUYD (Topsoil Excavation)8 CUYD (Topsoil Excavation)
16114
GPS
16115
6390 6395
+4.3
0%
,4
.6
+4.3
0%
6.
385' VC
K = 233
N
440+00437+50435+00432+50430+00427+50425+00
6380 6415
6385 6420
6390 6425
6395 6430
6400 6435
6405 6440
6410 6445
6415 6450
6420 6455
D.10
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fj .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y a n u a r y
Line to be constructed
Slope stake limits
Slope stake limits
Existing ground
Profile grade
Cleaning culvert in place
433+01
Profile grade
Existing ground
MT 569 / MILL CREEK ROAD
Clearing limits
Clearing limits
T
G T T G
LTLT
S e e s h e e t
H .1 f o r d e ta il s in c h p ip e c u lv e r t, See Section J for details earth wall, welded wire fence
Mechanically stabilized
437+81 to 443+09, LT
Terminal section, type G3
2,280 CUYD (Embankment)
517 CUYD (Excavation)
NOTE:
Temporary Construction Easement location and details.
See Section N for Right-of-Way and1.
Guardrail system Type G3 (type 2, class A, steel posts)
T0 3N, R
W , S ec tio n
T
N , R
W , S e c tio n
T0 3N, R
W , S ec tio n
T
N , R
W , S e c tio n
164 CUYD (Topsoil Excavation) see Section I for details
(Type 4, Class B, steel posts), Guardrail system G3
437+36 to 444+26, LT see Section I for details
Terminal Section, type G3, 436+88 to 437+36, LT
IRCP
16116
CP
16117
P C
.4
P T
.6
6.
,4
.6
6.
-2.8000%
850' VC
K = 97
SSD = 457'
-2.8000%
-2.8000%
N
455+00452+50450+00447+50445+00442+50440+00
6450 6465
6455 6470
6460 6475
6465 6480
6470 6485
6475 6490
6480 6495
6485 6500
6490 6505
D.11
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fk .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Curve= C1004
D
R= 3,000.00'
T= 221.01'
L= 441.23' e=0.040
T03N, R11W, Section 20 a n u a r y
Slope stake limits Line to be constructed
Existing ground
Profile grade Profile grade
Existing ground
MT 569 / MILL CREEK ROAD
Clearing limits
Clearing limits
Slope stake limits
TG
LT LT
T
G
T
S e e S e c ti o n I f o r d e ta il s
P la c e d r ip r a p m e th o d A c la s s in c h p ip e c u lv e r t, P lu g e x is ti n g p ip e
24-inch pipe culvert
443+95
Guardrail system G3 (type 2, class A, steel posts)
Terminal section, type G3 S e e S e c ti o n H f o r d e ta il s in c h p ip e c u lv e r t
1,273 CUYD (Embankment)
354 CUYD (Excavation) 51 CUYD (Excavation)
NOTE:
Temporary Construction Easement location and details.
See Section N for Right-of-Way and1.
see sheet M.9-10 for details
Temporary traffic control, plastic fence, 440+30 to 451+00 RT
107 CUYD (Topsoil Excavation) see Section I for details
(type4, class B, steel posts), Guardrail system G3
437+36 to 444+26, LT see Section J for details welded wire fence, Mechanically stabilized earh wall, 437+81 to 443+09, LT see Section I for details
Terminal Section, type G3, 444+26 to 444+76, LT see Section H for details
Placed riprap, method B, class 3, 452+93
24-inch pipe culvert
453+00
16118
CP
16119
5 P C
.5
P T
.8
,4
.8
+3.5
0%
650' VC
K = 103
+3.5
0%
,5
.4
+3.5
0%
+1.800 0%
250' VC
K = 147
SSD = 760'
+1.800 0%
+1.800 0%
N
470+00467+50465+00462+50460+00457+50455+00
6460 6485
6465 6490
6470 6495
6475 6500
6480 6505
6485 6510
6490 6515
6495 6520
6500 6525
D.12
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fl .d g
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Curve= C1005
D
R= 1,450.00'
T= 372.51'
L= 729.25' e=0.056
T03N, R11W, Section 20 a n u a r y
Existing ground
Profile grade
Slope stake limits
Line to be constructed
Cleaning culvert in place
460+58
Cleaning culvert in place
466+97
Cleaning culvert in place
469+14
Profile grade
Existing ground
Clearing limits
Slope stake limits
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
DAOR KEERC LLIM / 965 TM
1,622 CUYD (Embankment)
42 CUYD (Excavation) 227 CUYD (Excavation) see sheet M.11 for details plastic fence, Temporary traffic control, 462+00 to 466+50 RT
24 CUYD (Topsoil Excavation) 58 CUYD (Topsoil Excavation)
16120
6525 6525
,5
.2
+0.7500%
350' VC
K = 333
SSD = 1203'
,5
.2
+0.7500%
+5.
510' VC
K = 117
+0.7500%
+5.
,5
.0
+5.
525' VC
K = 114
SSD = 496'
N
485+00482+50480+00477+50475+00472+50470+00
6510 6530
6515 6535
6520 6540
6525 6545
6530 6550
6535 6555
6540 6560
6545 6565
6550 6570
D.13
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fm .d g
H a r r is
.M il
C h e c k e d b y
D e s ig n e d b y
T03N, R11W, Section 20 a n u a r y
Existing ground
Line to be constructed
Slope stake limits
Profile grade
Cleaning culvert in place
472+24
Cleaning culvert in place
476+74
MT 569 / MILL CREEK ROAD
Clearing limits
Clearing limits
Slope stake limits
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e in c h p ip e c u lv e r t, e x te n d
15 CUYD (Excavation)
3,284 CUYD (Embankment)
9 CUYD (Excavation) 35 CUYD (Excavation) see sheet M.12-13 for details plastic fence, Temporary traffic control, 477+40 to 484+00 RT see sheet M.12 for details plastic fence, Temporary traffic control, 477+40 to 482+30 LT
20 CUYD (Topsoil Excavation)
16122
P O
T
.6
+0.5000%
,5
.7
+0.5000%
+3.5
0%
350' VC
K = 117
,5
.5
+3.5
0%
+1.1747
270' VC
K = 116
SSD = 599'
,5
.9
+0.5000%
+1.1747
N
NOTE:
1. See Sheet C.1 for Connection Detail.
497+50495+00492+50490+00487+50485+00
6540 6540
6545 6545
6550 6550
6555 6555
6560 6560
6565 6565
6570 6570
6575 6575
6580 6580
D.14
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-fn .d g
H a r r is
M il le r
C h e c k e d b y
D e s ig n e d b y
T03N, R11W, Section 20 a n u a r y
END PROJECT
Line to be constructed
Slope stake limits
Existing ground
L T
Profile grade
Cleaning culvert in place
488+53
L T
El=6569.870
E=1082691.750
N=658491.391
Clearing limits
Clearing limits
Slope stake limits
MT 569 / MILL CREEK ROAD
S e e S e c ti o n H f o r d e ta il s
C le a n in g c u lv e r t in p la c e e x te n d in c h p ip e c u lv e t, 495+00.00 (MAIN01)
MT DOT 569(3)
1,257 CUYD (Embankment)
54 CUYD (Excavation) 286 CUYD (Excavation)
13 CUYD (Topsoil Excavation) 48 CUYD (Topsoil Excavation)
GPK FILE DATED July 2016
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
16101 647063.416 1071692.046 6255.936 45°58'09.408855"N 113°01'46.388888"W 6215.934 0.99926006 5/8" IR W/FHWA ALUM CAP 1.
16102 647779.774 1071903.795 6260.048 45°58'16.570896"N 113°01'43.849768"W 6220.0365 0.99925924 5/8" IR W/FHWA ALUM CAP
16103 648417.325 1072348.451 6267.832 45°58'23.058950"N 113°01'37.964513"W 6227.8169 0.99925831 5/8" IR W/FHWA ALUM CAP
16104 649346.861 1073036.443 6261.573 45°58'32.535882"N 113°01'28.821548"W 6221.5559 0.99925779 5/8" IR W/FHWA ALUM CAP
16105 649791.373 1073355.177 6259.401 45°58'37.063199"N 113°01'24.594321"W 6219.3813 0.9992575 5/8" IR W/FHWA ALUM CAP
16106 650130.868 1073791.044 6273.351 45°58'40.606334"N 113°01'18.642411"W 6233.3323 0.99925653 5/8" IR W/FHWA ALUM CAP
16107 650424.286 1074308.627 6283.488 45°58'43.731024"N 113°01'11.504534"W 6243.4723 0.99925577 5/8" IR W/FHWA ALUM CAP
16108 650720.637 1074916.901 6262.493 45°58'46.924741"N 113°01'03.084835"W 6222.4812 0.9992565 5/8" IR W/FHWA ALUM CAP
16109 651180.241 1075609.000 6282.039 45°58'51.766150"N 113°00'53.582297"W 6242.0285 0.99925515 5/8" IR W/FHWA ALUM CAP
16110 651489.278 1076262.508 6328.834 45°58'55.104688"N 113°00'44.529838"W 6288.8271 0.99925263 5/8" IR W/FHWA ALUM CAP
16111 651759.712 1076824.869 6372.124 45°58'58.021820"N 113°00'36.742566"W 6332.1197 0.99925031 5/8" IR W/FHWA ALUM CAP
16112 652232.161 1077353.829 6380.324 45°59'02.917213"N 113°00'29.555938"W 6340.3188 0.9992495 5/8" IR W/FHWA ALUM CAP
16113 652901.022 1077811.434 6374.607 45°59'09.718840"N 113°00'23.503419"W 6334.5939 0.99924919 5/8" IR W/FHWA ALUM CAP
16114 653688.493 1078292.586 6401.466 45°59'17.701050"N 113°00'17.192363"W 6361.4424 0.99924723 5/8" IR W/FHWA ALUM CAP
16115 654414.222 1078789.093 6438.651 45°59'25.080764"N 113°00'10.624333"W 6398.6179 0.99924482 5/8" IR W/FHWA ALUM CAP
16116 655045.186 1079197.836 6479.787 45°59'31.486636"N 113°00'05.238141"W 6439.7473 0.99924232 5/8" IR W/FHWA ALUM CAP
16117 655487.981 1079492.360 6484.775 45°59'35.985466"N 113°00'01.349343"W 6444.7284 0.99924169 5/8" IR W/FHWA ALUM CAP
16118 656467.329 1079973.531 6492.575 45°59'45.860512"N 112°59'55.157685"W 6452.5107 0.99924048 5/8" IR W/FHWA ALUM CAP
16119 656869.120 1080437.720 6510.244 45°59'50.029472"N 112°59'48.840533"W 6470.1741 0.99923929 5/8" IR W/FHWA ALUM CAP
16120 657364.065 1081188.478 6517.579 45°59'55.243679"N 112°59'38.525006"W 6477.5026 0.9992385 5/8" IR W/FHWA ALUM CAP
16121 657848.223 1081755.521 6543.918 46°00'00.270338"N 112°59'30.803070"W 6503.833 0.99923682 5/8" IR W/FHWA ALUM CAP
16122 658195.713 1082252.000 6554.226 46°00'03.917358"N 112°59'23.993503"W 6514.1338 0.99923602 5/8" IR W/FHWA ALUM CAP
A15 642192.063 1070143.955 6157.295 45°57'20.657229"N 113°02'05.180453"W 6117.3636 0.99926904 MT DOT ALUM CAP
A4909 648980.451 1072819.138 6275.393 45°58'28.824183"N 113°01'31.663078"W 6235.3763 0.99925745 MT DOT ALUM CAP
E4909 646230.538 1071804.636 6257.382 45°58'01.241474"N 113°01'44.264514"W 6217.3987 0.99926071 MT DOT ALUM CAP
F4909 645492.056 1071806.413 6227.172 45°57'53.956141"N 113°01'43.768315"W 6187.2038 0.99926278 MT DOT ALUM CAP
H4909 643737.636 1071495.290 6193.947 45°57'36.508020"N 113°01'47.050777"W 6154.0097 0.9992659 MT DOT ALUM CAP
PROJECT :North of Moose Creek DATE OF FIELD WORK :June 2016 DATE OF FINAL ADJUSTMENT :June 2016
PROJECT UNITS : International feet COORDINATE SYSTEM : Montana SPCS NAD83 1999
VERTICAL DATUM : NAVD88 based on Geoid99
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
N or th o f m oo se
_c on tr ol sh ee t.
xl sx ]S he et
-A ug -2
:1
W
FL
H
D S ur ve y 7/
W
FL
H D
S ur ve y
7/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.15
SHEET
NUMBER
DOT 569(3)MT
SURVEY CONTROL
NO SCALE AND TYPICAL SECTIONS
ROAD QUANTITIES
TABULATION OF APPROACH
E.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g a .d g n
MT DOT 569(3)
D e c e m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
C L o f a p p r o a c h
End pavement
P
W
Variable 60° to 90°
R
Edge of shoulder
Edge of traveled way
Edge of shoulder
TYPE 1 APPROACH
FOOTNOTE:
Saw cut according to Section 203.[1]
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
L
Existing surface
3" compacted depth
Roadway aggregate, method 1
Existing structure structure details
See Sheet C.2 for
R
TYPES 1 & 2
TYPE 2 APPROACH
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
P
3" compacted depth
Asphalt concrete pavement, type 2
Existing surface
Existing structure and tack coat
[1]Saw cut
6" compacted depth
Roadway aggregate, method 1
TYPICAL SECTION
TYPICAL SECTION
355+12, RT
APPROACH ROAD
CUYD
EXC.
CUYD
EMB.
2+50 2+00
E.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g b .d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Curve= C5001
D
R= 100.00'
T= 8.88'
L= 17.72'
P O
T
.0
P C
.9
P T
.6
P O
T
.4
,2
.1
,2
.8
-2.0000%
.0
24' VC
K = 2
,2
.0
Existing ground
ROAD
BEGIN APPROACH
2+13.00 (AR02)
355+12.11 (MAIN01) =
ROAD
END APPROACH
2+43.00 (AR02)
El=6272.13
E=1072825.12
N=649050.77
El=6274.05
E=1072848.79
N=649032.40
M T
M
I L L C
R E
E K R
O A
D traveled way
Edge of traveled way
Edge of constructed
Line to be
Slope stake limits
Clearing limits
Proposed grade
16105
N
5 1005
SCALE IN FEET
363+54.50 TO 365+01.46 LT
APPROACH ROAD
TURNOUT AND
E.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g c .d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Edge of traveled way
Line to be constructed
Edge of traveled way
R
R
Edge of pavement
'-0
R
'-0
R
MT 569 / MILL CREEK ROAD
Offset= 11.01 LT Sta.= 364+35.05 E= 1073375.81 N= 649790.56
Offset= 17.25 LT Sta.= 364+43.97 E= 1073377.90 N= 649801.28 Offset= 23.52 LT
Sta.= 364+52.92 E= 1073380.03 N= 649812.05 Offset= 25.77 LT
Sta.= 365+32.23 E= 1073436.93 N= 649868.33
Offset= 39.61 LT Sta.= 365+61.50 E= 1073449.69 N= 649898.41
Offset= 34.47 LT Sta.= 365+61.64 E= 1073453.21 N= 649894.67
Offset= 15.18 LT Sta.= 365+81.94 E= 1073481.33 N= 649893.78
Offset= 34.04 LT Sta.= 365+41.68 E= 1073438.46 N= 649880.87
Offset= 39.04 LT Sta.= 365+41.55 E= 1073435.00 N= 649884.49
Slope stake limits
16106
N
5 1005
SCALE IN FEET
369+58 LT & 369+92 RT
APPROACH ROAD
E.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g d .d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
Offset= 43.83 LT Sta.= 369+49.64 E= 1073758.12 N= 650142.84
Offset= 13.00 LT Sta.= 369+81.84 E= 1073802.26 N= 650135.13
Offset= 34.81 LT Sta.= 369+36.19 E= 1073751.86 N= 650127.73
Offset= 37.95 LT Sta.= 369+34.97 E= 1073749.07 N= 650129.64
Offset= 13.00 LT Sta.= 369+21.44 E= 1073751.87 N= 650101.34
Offset= 31.73 LT Sta.= 369+54.40 E= 1073768.86 N= 650135.48
Offset= 13.00 RT Sta.= 370+17.07 E= 1073845.96 N= 650132.42
Offset= 29.00 RT Sta.= 370+00.91 E= 1073841.10 N= 650110.29
Offset= 29.00 RT Sta.= 369+84.74 E= 1073827.68 N= 650101.57
Offset= 13.00 RT Sta.= 369+68.57 E= 1073805.48 N= 650106.12
R
16'R
R
16'R
16'
MT 569 / MIL
L CREEK ROAD
Clearing limits
Slope stake limits
Clearing limits
Slope stake limits
Edge of traveled way
Edge of traveled way
Line to be contructed
5 1005
SCALE IN FEET
393+72 RT & 394+37 LT
APPROACH ROADS
E.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g e .d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
MT 569 / MILL CREEK ROAD
Offset= 34.00 LT Sta.= 394+44.78 E= 1075951.57 N= 651339.87
Offset= 29.00 LT Sta.= 394+44.78 E= 1075953.96 N= 651335.48
Offset= 13.00 LT Sta.= 394+60.78 E= 1075975.66 N= 651329.08
Offset= 34.00 LT Sta.= 394+28.78 E= 1075937.52 N= 651332.22
Offset= 29.00 LT Sta.= 394+28.78 E= 1075939.91 N= 651327.83
Offset= 13.00 LT Sta.= 394+12.78 E= 1075933.50 N= 651306.13
Offset= 13.00 RT Sta.= 393+48.28 E= 1075889.29 N= 651252.46
Offset= 13.00 RT Sta.= 393+96.28 E= 1075931.44 N= 651275.40
Offset= 29.00 RT Sta.= 393+80.28 E= 1075925.04 N= 651253.70
Offset= 34.00 RT Sta.= 393+80.28 E= 1075927.43 N= 651249.31
Offset= 34.00 RT Sta.= 393+64.28 E= 1075913.38 N= 651241.66
Offset= 29.00 RT Sta.= 393+64.28 E= 1075910.99 N= 651246.05
Clearing limits
Slope stake limits
Clearing limits
Slope stake limits
Edge of traveled way
Line to be constructed
16111
N
5 1005
SCALE IN FEET
404+35 LT
APPROACH ROAD
P C
.2
E.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g f.
d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
MT 569 / MILL CREEK ROAD
R
R
Offset= 13.24 LT
Sta.= 404+60.60
E= 1076853.18
N= 651807.57
Offset= 29.98 LT
Sta.= 404+31.56
E= 1076820.03
N= 651808.07
Offset= 30.00 LT
Sta.= 404+09.32
E= 1076800.63
N= 651797.52
Offset= 13.00 LT
Sta.= 403+89.54
E= 1076791.39
N= 651773.13
Line to be constructed
Edge of traveled way
Edge of traveled way
Slope stake limits
Clearing limits
Existing right-of-way
C
.4
SHEET 1 OF 2
445+95 TO 448+85 LT
TURNOUT
5 1005
SCALE IN FEET
E.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g g .d g n
MT DOT 569(3)
a n u a r y
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
MT 569 / MILL CREEK ROAD
R
R
Offset= 33.00 LT
Sta.= 446+35.00
E= 1079282.63
N= 655169.23
Offset= 23.00 LT
Sta.= 446+15.00
E= 1079279.71
N= 655147.06
Offset= 13.00 LT
Sta.= 445+95.00
E= 1079276.80
N= 655124.89
Line to be constructed
Edge of traveled way
Slope stake limits
Clearing limits
Edge of traveled way
Slope stake limits
Clearing limits
Existing right-of-way see Section D for location
Temporary traffic control, plastic fence, SHEET 2 OF 2
445+95 TO 448+85 LT
TURNOUT
5 1005
SCALE IN FEET
E.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g h .d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
MT 569 / MILL CREEK ROAD
R
R
Offset= 33.00 LT
Sta.= 448+44.72
E= 1079397.34
N= 655343.19
Offset= 23.07 LT
Sta.= 448+64.77
E= 1079416.20
N= 655354.92
Offset= 13.00 LT
Sta.= 448+85.03
E= 1079435.24
N= 655366.93
Line to be constructed
Edge of traveled way
Slope stake limits
Clearing limits
Edge of traveled way see Section D for location
Temporary traffic control, plastic fence, Slope stake limits
Existing right-of-way
SCALE IN FEET
486+27 LT
APPROACH ROAD
E.9
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g i.
d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
MT 569 / MILL CREEK ROAD
Offset= 13.00 LT
Sta.= 486+62.50
E= 1082005.76
N= 658016.40
Offset= 33.00 LT
Sta.= 486+38.01
E= 1081974.20
N= 658018.43
Offset= 33.00 LT
Sta.= 486+15.00
E= 1081955.48
N= 658005.05
Offset= 13.00 LT
Sta.= 485+90.50
E= 1081947.18
N= 657974.53
R 2
R
Line to be constructed
Edge of traveled way
Slope stake limits
Clearing limits
Existing right-of-way
SCALE IN FEET
494+15 LT
APPROACH ROAD
E.10
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d m t-g j.
d g n
MT DOT 569(3)
S e p te m b e r
H a r r is
M il
C h e c k e d b y
D e s ig n e d b y
MT 569 / MILL CREEK ROAD
R
20'R
Offset= 13.00 LT
Sta.= 493+85.48
E= 1082593.95
N= 658436.79
Offset= 13.00 LT
Sta.= 494+43.48
E= 1082641.14
N= 658470.52
Offset= 33.64 LT
Sta.= 494+23.49
E= 1082612.87
N= 658475.68
Offset= 33.66 LT
Sta.= 494+05.47
E= 1082598.20
N= 658465.22
Line to be constructed
Edge of traveled way
Slope stake limits
Clearing limits see Section H for details
K. EIKERMANN NONE
GENERAL NOTES
2 B
S. BELCHER
C. ROBINSON
F.2
NO.
PROJECTSTATE
MT
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
CALIFORNIA CREEK BRIDGE
MILL CREEK ROAD
DEER LODGE COUNTY, MONTANA
DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALE
CHECKED BYDRAWN BY
R. WEHNER
DESIGNED BY
REVISIONSBYDATENO.
REVISIONS
BY
DATE
N
F
H
B id
F
L R
G
C a li f o r n ia
C r e e k
B r id g e C
A il e s D
G N
F il e s r g g n .d g n
RG3091- ofKARL EIKERMANN SEPTEMBER 2018 19
DOT 569(3)
see Section H for details
(Abut. 1 Shown. Abut. 2 Similar)
(Abut. 1 Shown. Abut. 2 Similar)
L
L L
L
L L
L
A
A
L
SECTION A-A
C Gdr. F
C Gdr. E C Gdr. D
C Gdr. C
C Gdr.