This is a set of architectural, mechanical, and electrical drawings for a HVAC replacement project at Buildings 2 and 46 of the Tuscaloosa VA Medical Center. The drawings detail the demolition and new installation of HVAC systems including air handling units, fan coil units, ductwork, piping, electrical connections, and controls.
The scope includes replacing existing HVAC equipment in Building 2 (served by units 2-AHU-1, 2-AHU-2, multiple fan coil units) and Building 46 (served by unit 46-AHU-1 and multiple fan coil units), along with associated electrical and control work. The drawings provide detailed mechanical equipment schedules, demolition plans, new work plans, control sequences, and installation details. Key aspects include integration with the existing Metasys building automation system, maintaining operations during construction with minimal disruption, and phasing requirements since Building 2's hours of operation are 7:30AM-4:00PM Monday-Friday while Building 46 is unoccupied. The drawings were prepared by Specialized Engineering Solutions and issued for construction on April 26, 2023.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:5
P
M
G001
COVER SHEET REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 AGT PCM
CONSTRUCTION
DOCUMENTS
679-22-106 TUSCALOOSA VA REPLACE HVAC, VARIOUS BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
CHIEF OF ENGINEERING: MEDICAL CENTER DIRECTOR: SAFETY MANAGER: INFECTION CONTROL: ENERGY ENGINEER:
GENERAL CONSTRUCTION NOTE:
1. THE GENERAL CONTRACTOR SHALL CONDUCT A PRE-CONSTRUCTION MEETING WITH THE COR TO IDENTIFY
AREAS WHERE AFTER HOURS WORK WILL BE REQUIRED. AREAS INCLUDE, BUT ARE NOT LIMITED TO BUILDING 2. ALL WORK THAT WILL SHUT DOWN PATIENT CARE AREAS OUTSIDE OF THE AREAS BEING ACTIVELY WORKED IN WILL BE REQUIRED TO OCCUR OUTSIDE THE BUILDING HOURS OF OPERATION.
A. BUILDING 2 HOURS OF OPERATION: 7:30AM - 4:00PM, MONDAY - FRIDAY
B. BUILDING 46 HOURS OF OPERATION: UNOCCUPIED
SHEET INDEX - ELECTRICAL - BUILDING 02
Sheet Number Sheet Name
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED100 00 - GROUND FLOOR - ELECTRICAL - DEMOLITION
ED101 01 - FIRST FLOOR - ELECTRICAL - DEMOLITION
ED102 02 - SECOND FLOOR - ELECTRICAL - DEMOLITION
EP100 00 - GROUND FLOOR - POWER
EP101 01 - FIRST FLOOR - POWER
EP102 02 - SECOND FLOOR - POWER
E700 ELECTRICAL SCHEDULES
SHEET INDEX - MECHANICAL - BUILDING 02
Sheet Number Sheet Name
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD100 00 - GROUND FLOOR - MECHANICAL - DEMOLITION
MD101 01 - FIRST FLOOR - MECHANICAL - DEMOLITION
MD102 02 - SECOND FLOOR - MECHANICAL - DEMOLITION
MH100 00 - GROUND FLOOR - DUCTWORK
MH101 01 - FIRST FLOOR - DUCTWORK
MH102 02 - SECOND FLOOR - DUCTWORK
MP100 00 - GROUND FLOOR & BASEMENT - PIPING
MP101 01 - FIRST FLOOR - PIPING
MP102 02 - SECOND FLOOR - PIPING
M500 MECHANICAL DETAILS AND CONTROLS
M600 MECHANICAL SCHEDULES
SHEET INDEX - ELECTRICAL - BUILDING 46
Sheet Number Sheet Name
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED101 ELECTRICAL DEMOLITION
EL101 FLOOR PLAN - LIGHTING
EP101 FLOOR PLAN - POWER
SHEET INDEX - MECHANICAL - BUILDING 46
Sheet Number Sheet Name
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD101 01-FIRST FIRST - MECHANICAL - DEMOLITION
MH101 01-FIRST FIRST - DUCTWORK
MP101 01-FIRST FLOOR - PIPING
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
M700 MECHANICAL CONTROLS
SHEET INDEX - GENERAL AND ARCHITECTURAL
Sheet Number Sheet Name
G001 COVER SHEET
A-101 FLOOR PLANS - DEMOLITION AND NEW WORK AND SECTIONS
04/26/2023
Revisions: Date:
1. ALL DIMENSIONS ARE MEASURED FROM FACE OF EXISTING WALL TO
THE FACE OF NEW WALL UNLESS NOTED OTHERWISE.
2. ALL NEW WORK TO BE FINISHED TO MATCH EXISTING.
3. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITION
DEMOLITION AND NEW WORK NOTES.
4.CONTRACTOR SHALL ENSURE ALL DOORS WITHIN AREAS OF WORK
SWING FREE OVER FLOORING AND TRANSITION STRIPS.
5. ALL PAINT COLORS TO BE SELECTED / APPROVED BY COR.
GENERAL NOTES
ALL NOTES MAYNOT BE APPLICABLE.
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
DEMOLITION LEGEND
A-101
MECHANICAL
STORAGE
OFFICE
TLT.
5A
TLT.
OFFICE
OFFICE
OFFICE
MULTIPURPOSE ROOM
HK
CORRIDOR
3B
VESTIBULE
CHANCEL
NAVE
CONNECTING
CORRIDOR TO
BUILDING 1
D3 D3
D3 D3 D3
D1
D4
D1
D2
D4
D2
D2
D2
D5D5
D5D5
A-101
MECHANICAL
STORAGE
OFFICE
TLT.
5A
TLT.
OFFICE
OFFICE
OFFICE
MULTIPURPOSE ROOM
HK
CORRIDOR
3B
VESTIBULE
CHANCEL
NAVE
CONNECTING
CORRIDOR TO
BUILDING 1
9 9 9
9 9
01 - FIRST FLOOR
0' - 0"
03 - Level Top of Wall 10' - 10"
02 - Level Top of Wall 9' - 1 1/2"
00_ FOUNDATION
-3' - 0"
A-101
NAVE FLOOR LEVEL
CHANCEL FLOOR LEVEL
EXISTING WOOD ARCH
EXISTING ROOF STRUCTURE
5 5
NEW HVAC DUCTWORK
REFERENCE MECHANICAL DRAWINGS
EXISTING WOOD ARCHEXISTING WOOD ARCH
6 6
EXISTING ROOF STRUCTURE
EXISTING TIMBER STRUT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT / ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street, Suite 355, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
B
IM
/2
.0
V
A T u s c a lo o s a
R e p la c e H
V A
C V a ri o u s B u ild in g /B
.2
.1
A
R C
H A
T R
IA
X
R
.r v t
/2
/2
:3
:1
P
M
A-101
FLOOR PLANS - DEMOLITION AND NEW
WORK AND SECTIONS
VA TUSCALOOSA REPLACE
HVAC, VARIOUS BUILDINGS
3701 Loop Road East, Tuscaloosa, AL 35404
679.22.106
04/26/2023 JDS TLR
CONSTRUCTION
DOCUMENTS
SEE G001
PLAN NORTH
8'4' 16'0
SCALE: 1/8"=1'-0"
1/8" = 1'-0"1
FIRST FLOOR PLAN - DEMOLITION
1/8" = 1'-0"2
FIRST FLOOR PLAN - NEW WORK
8'4' 16'0
SCALE: 1/8"=1'-0"
DEMOLITION KEYNOTES
D1 REMOVE EXISTING CEILING MOUNTED HVAC SOFFIT AND SUPPORT
FRAMING. RETAIN EXISTING SUPPORT FRAMING COMPONENTS FOR
REUSE.
D2 REMOVE DOOR(S), FRAME, HARDWARE, SILL AND JAMB.
D3 EXISTING WINDOW TO REMAIN.
D4 EXISTING DOOR TO REMAIN.
D5 REMOVE EXISTING LIGHT FIXTURES (NOT SHOWN) AND RETAIN FOR
REUSE.
NEW WORK KEYNOTES
1 CLEAN EXISTING CEILING ABOVE NAVE AND CHANCEL AREAS.
2 INSTALL 3" LIGHT GAUGE Z CHANNELS - 2'-0" O.C. BETWEEN EXISTING
WOOD ARCHES.
3 APPLY LAYER OF SPRAY FOAM INSULATION OVER ENTIRE EXISTING
CEILING ABOVE NAVE AND CHANCEL AREAS.
4 INSTALL NEW 1" x 6" TONGUE AND GROOVE WOOD PLANK CEILING. PAINT
TO MATCH EXISTING.
5 REINSTALL EXISTING HVAC SOFFIT STEEL SUPPORT STRUCTURE TO
EXISTING WOOD ARCHES.
6 INSTALL NEW 1/2" PAINTED PLYWOOD PANELS FOR HVAC SOFFIT. PAINT
TO MATCH EXISTING. COORDINATE OPENINGS FOR DIFFUSERS WITH
MECHANICAL DRAWINGS.
7 INSTALL NEW STOREFRONT DOOR(S), FRAME, HARDWARE, SILL AND
JAMB TO FIT EXISTING OPENING.
8 INSTALL NEW STOREFRONT SLIDING DOOR(S), FRAME, HARDWARE, SILL
AND JAMB TO FIT EXISTING OPPENING.
9 CLEAN EXISTING WINDOWS TO REMAIN. INSTALL NEW WINDOW INFILL
SYSTEM PER MANUFACTURERS INSTRUCTIONS. BASIS OF DESIGN: CRL
FALLBROOK FIXED FRAME w/ 5/16" GLASS.
10 CLEAN AND REINSTALL EXISTING LIGHT FIXTURES.
11 SEAL ALL EXISTING PENETRATIONS IN WALL WITH EXPANDING FOAM
INSULATION.
1/4" = 1'-0"3
SECTION THRU NAVE
1 1/2" = 1'-0"4
ENLARGED SECTION @ HVAC SOFFIT
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
2'0 1'6"
SCALE: 1 1/2" = 1'-0"
4/24/2023
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPERE
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
CEILING
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
COPPER
DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WALL PHONE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
C
CB
CCT
CU
D
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
W
WR
XFMR
ZSI
A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.
RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG
CONDUCTORS.
B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE
SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
C. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
D. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR
INSTALLED DEVICES.
E. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
F. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
(E) T-TAC2
12,470-277/480V
150KVA
(E) T-2 12,470V-120/208V
150KVA
EXISTING PAD-MOUNTED
UTILITY TRANSFORMER
30A/3P
30A FUSE
400A
(E) LA
175A
(E) 2-PP-GCA
120/208V, 3Ø-4W
400A MCB
(E)
2-RP-GCA
(E) PB-A
(E) BCO
175A
(E)
2-RP-1CA
100A
(E)
2-RP-2CB
225A
(E)
2-RP-CGB
200A
(E)
2-RP-2CA
100A
(E)
2-RP-2CA
30A/3P
30A FUSE
250A
(E) LA
100A
(E) 2-FP-GCA
277/480V, 3Ø-4W
250A MCB
(E)
2-LP-GCA
150A
(E)
2-LP-1CA
150A
(E)
2-LP-2CA
100A
(SPACE)
100A
(SPACE)
REMARKS: (EQUIPMENT CONNECTION SCHEDULE)
1. CONTROLS BETWEEN INDOOR AND OUTDOOR UNITS - INCLUDE CONTROL WIRING IN CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT PER MANUFACTURER'S REQUIREMENTS.
GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)
A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY WITH FLOOR PLANS. WHERE LOCATIONS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS, REFER TO MECHANICAL SHEETS. REFER TO DEFINITIONS
BELOW FOR CLARIFICATIONS OF CONNECTION REQUIREMENTS.
B. PROVIDE WIRING AND EQUIPMENT CONNECTIONS FOR INTERNAL EQUIPMENT COMPONENTS AS REQUIRED. COORDINATE REQUIREMENTS WITH MECHANICAL CONTRACTOR.
C. "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS:
• "INT" = CONTROLS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED).
D. "DISCONNECT BY" :
• "MECHANICAL" = DISCONNECT IS PROVIDED WITH MECHANICAL EQUIPMENT.
• ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR.
• "ELECTRICAL" = DISCONNECT IS FURNISHED BY ELECTRICAL CONTRACTOR. COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT FURNISHED BY MECHANICAL CONTRACTOR.
E. "DISCONNECT TYPE" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT:
• "NF" = NON-FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED. 20/1 AND SMALLER SHALL BE TOGGLE SWITCH DISCONNECT.
• "VFD" = VARIABLE FREQUENCY DRIVE CONTROLLER. LOCATE VARIABLE FREQUENCY DRIVE CONTROL TO SERVE AS THE MOTOR DISCONNECT.
• "INT" = DISCONNECT IS MANUFACTURED INTEGRAL TO THE EQUIPMENT.
• LOCATE DISCONNECT ADJACENT TO EQUIPMENT PER NEC - PROVIDE WITH STRUT MOUNTING AS REQUIRED.
• WHERE DISCONNECT SERVES OUTDOOR EQUIPMENT, PROVIDE AS NEMA-3R.
• PROVIDE DISCONNECT WITH EQUIPMENT GROUND KIT.
• DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION.
• WHERE STARTERS OR VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED.
F. "FEEDER":
• PROVIDE CONDUCTORS AND RACEWAY AS INDICATED. TYPICAL FORMAT IS: (FEEDER TAG) (NOMINAL SIZE) CONDUCTORS AND RACEWAY REQUIRED.
G. "GEN" - EQUIPMENT IS SERVED FROM A SOURCE PANEL PROVIDED WITH GENERATOR BACK-UP.
H. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF
THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:4
P
M
E000
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
ELECTRICAL MISC SYMBOLS
PLAN SYMBOL NAME
BRANCH CIRCUIT CONCEALED IN
CEILING OR WALL
BRANCH CIRCUIT CONCEALED IN
FLOOR OR BELOW GRADE
CLEARANCE SPACE
CONDUIT BREAK
CONDUIT DOWN
CONDUIT STUB-OUT
CONDUIT UP
HOMERUN TO PANEL
G = GFCI CIRCUIT
(PART) = PARTIAL CIRCUIT
SWITCHED RECEPTACLE
ONE LINE SYMBOL
PLAN SYMBOL NAME
CONTINUATION
DISCONNECT SWITCH
GROUND BAR
GROUNDING ELECTRODE
PANEL BOARD
TRANSFORMER
UTILITY METER
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
PANELBOARD - RECESSED
PANELBOARD - SURFACE
NO SCALE
ELECTRICAL ONE-LINE
EQUIPMENT CONNECTION SCHEDULE
MARK DESCRIPTION ROOM NAME ROOM # HP KW FLA MCA MOCP VOLTS PHASE POLES
LOAD
[VA]
CONTROL
TYPE
DISCONNECT
BY
DISCONNECT
TYPE FEEDER PANEL
CIRCUIT
NUMBER SCCR GEN REMARKS
(E) P-2-1 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 1,3 0 No 1
(E) P-2-2 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 5,7 0 No 1
(E) P-2-3 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 13,15 0 No 1
(E) P-2-4 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 9,11 0 No 1
2-AHU-1 AIR HANDLING UNIT CREDIT UNION 16B 0 0 11.2 14 25 208 3 3 4032 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 44,46,48 0 Yes -
2-AHU-2 AIR HANDLING UNIT Space 304 0 0 0 5.8 15 208 3 3 2917 INT ELEC NF (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 50,52,54 0 Yes -
2-FCU-1A FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2
2-FCU-1B FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2
2-FCU-2A FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2
2-FCU-2B FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2
2-SSAH-13A DUCTLESS SPLIT SYSTEM INDOOR IT CLOSET 13A 0 0 0 1 30 208 1 2 208 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1
2-SSCU-13A DUCTLESS SPLIT SYSTEM OUTDOOR 0 0 0 25 30 208 1 2 4900 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1
A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK.
PROVIDE DEMOLITION FOR ITEMS AS SHOWN.
B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).
C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION.
SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND CONSTRUCTION. THESE PLANS ARE BASED ON PAST PROJECT DRAWINGS AND SITE OBSERVATIONS. THE DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THESE DRAWINGS MAY NOT BE ACCURATE IN ALL AREAS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING
CONDITIONS AND IS ENCOURAGED TO REVIEW FACILITY DRAWINGS PRIOR TO THE BID DATE.
D. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL.
E. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL ELECTRICAL DEMOLITION ITEMS. DISCONNECT AND REMOVE ELECTRICAL DEVICES, EQUIPMENT AND ASSOCIATED WIRING AS REQUIRED TO ACCOMMODATE NEW WORK. IF THE CONTRACTOR IS UNCLEAR REGARDING A SPECIFIC ITEM TO REMAIN OR BE REMOVED, THE CONTRACTOR SHALL SEEK CLARIFICATION FROM THE ARCHITECT.
F. SYSTEMS SERVING ADJACENT AREAS AND ITEMS THAT REMAIN SHALL BE MAINTAINED AT ALL TIMES.
MODIFY SYSTEMS AS REQUIRED THROUGHOUT CONSTRUCTION TO MAINTAIN CONTINUITY OF SERVICE. DO
NOT INTERRUPT SERVICE WITHOUT OWNER'S PRIOR WRITTEN APPROVAL. LIMIT DURATION OF
INTERRUPTION ONLY TO THE TIME NECESSARY FOR DISCONNECTION AND IMMEDIATE RECONNECTION.
INTERRUPTION TO SERVICE DEEMED BY OWNER AS ESSENTIAL MAY REQUIRE PREMIUM TIME AND SHALL BE INCLUDED WITH THE BID. EXTREME CARE SHALL BE TAKEN BY THE CONTRACTOR TO IDENTIFY EXISTING SYSTEM COMPONENTS ASSOCIATED WITH THESE SERVICES. APPROPRIATE METHODS OF MARKING THESE SHALL OCCUR TO ELIMINATE THE POSSIBILITY OF ACCIDENTAL INTERRUPTION. FOR CONDUIT AND CABLING THAT CAN REMAIN, PROVIDE SUPPORT AS REQUIRED. RELOCATE EXISTING JUNCTION BOXES THAT
BECOME INACCESSIBLE DUE TO NEW WORK.
G. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND
LIGHTING AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.
H. PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND FUNCTIONALITY.
I. PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE
ARCHITECTURAL SPECIFICATIONS FOR MEANS AND METHODS.
J. ALL UNLABELED ELECTRICAL DEVICES WITH CIRCUITRY OR DEVICES MODIFIED DURING CONSTRUCTION
SHALL BE CIRCUIT TRACED AS NEEDED WITH A LABEL PROVIDED.
(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND ALL ELECTRICAL DEMOLITION WORK)
ELECTRICAL DEMOLITION GENERAL NOTES:
(D) SSCU-1A (D) SSCU-2B
(D) CU-16B
(D) SSCU-1B
(D) CU-18
(E) 2-RP-EM-GCB
(D) AHU-16B
(D) AHU-18
(D) FCU
1 1
(E) 2-RP-EM-GCC
(E) 2-PP-EM-GCA
(E) 2-PP-EM-GCB
(E) 2-RP-EM-GCA-B
(E) 2-FP-EM-GCA
(E) 2-FP-GCA
(E) 2-FP-SB-GCB
(E) 2-RP-EM-GCA-A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:4
P
M
ED100
00 - GROUND FLOOR - ELECTRICAL -
DEMOLITION
REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
SHEET NOTES:
1. DISCONNECT EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND CONDUCTORS TO SOURCE.
LABEL EXISTING UNUSED CIRCUIT BREAKER AS SPARE. LABEL EXISTING CIRCUIT BREAKERS (INCLUDE ALL
BOX, TRIM PLATES, AND DISCONNECTS).
1/8" = 1'-0"1
00 - GROUND FLOOR - ELECTRICAL - DEMOLITION
8'4' 16'0
SCALE: 1/8"=1'-0"
TRUE NORTH
(D) SSAH-1A
(D) SSAH-1B
(E) 2-RP-EM-1CA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:4
P
M
ED101
01 - FIRST FLOOR - ELECTRICAL -
DEMOLITION
REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"1
01 - FIRST FLOOR - ELECTRICAL - DEMOLITION
SHEET NOTES:
1. DISCONNECT EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND CONDUCTORS TO SOURCE.
LABEL EXISTING UNUSED CIRCUIT BREAKERS AS SPARE. LABEL EXISTING CIRCUIT BREAKERS (INCLUDE ALL
BOX, TRIM PLATES, AND DISCONNECTS).
TRUE NORTH
8'4' 16'0
SCALE: 1/8"=1'-0"
(D) SSAH-2A
(D) SSAH-2B
(E) 2-RP-2CB
(E) 2-LP-2CA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:4
P
M
ED102
02 - SECOND FLOOR - ELECTRICAL -
DEMOLITION
REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"1
02 - SECOND FLOOR - ELECTRICAL - DEMOLITION
SHEET NOTES:
1. DISCONNECT EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND CONDUCTORS TO SOURCE.
LABEL EXISTING UNUSED CIRCUIT BREAKER AS SPARE. LABEL EXISTING CIRCUIT BREAKERS (INCLUDE ALL
BOX, TRIM PLATES, AND DISCONNECTS).
8'4' 16'0
SCALE: 1/8"=1'-0"
TRUE NORTH
A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.
CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH
ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH
ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE
ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE WORK TO INSTALL
PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.
C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.
(POWER GENERAL NOTES SHALL APPLY TO ALL SHEETS)
POWER GENERAL NOTES:
26C
OFFICE
CREDIT UNION
16A
CREDIT UNION
CREDIT UNION
8C
STORAGE
8B
CLT
CREDIT UNION
OFFICE CLERK
OFFICE STAFF
16B
CREDIT UNION
CREDIT UNION
13A
IT CLOSET
BREAK RM
12A
CREDIT SECURE
TLT.
CREDIT UNION
CG4
ENTRANCE WAY CG5
ENTRANCE WAY
STORAGE
CREDIT UNION STORAGE
CONFERENCE ROOM
OFFICE
OFFICE STAFF
26B
OFFICE
MALE TOILET
23C
ELECT / MECH
CG1
CORRIDOR
26A
OFFICE
HAC
22A
HAC
ELECTRICAL
TELE CLOSET
FEMALE TLT
1C
LOBBY
3A
WAITING RM
FEMALE TLT
8A
MECH RM 3B
CHECK-IN ROOM
7C
EXAM ROOM 4
CLERKS OFFICE
7B
EXAM ROOM
OFFICE
7A
EXAM ROOM
PSY. / EXAM
2-AHU-1
2-AHU-2
(E) 2-RP-EM-GCB
2-SSAH-13A
2-SSCU-13A
(E) 2-PP-EM-GCA
(E) 2-RP-EM-GCC
(E) 2-PP-EM-GCB
(E) 2-RP-EM-GCA-B
(E) 2-RP-EM-GCA-A
(E) 2-FP-EM-GCA
(E) 2-FP-GCA
(E) 2-FP-SB-GCB
WALL RATING LEGEND
FIRE WALL
SMOKE WALL
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:4
P
M
EP100
00 - GROUND FLOOR - POWER REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
SHEET NOTES:
1. CONNECT NEW MECHANICAL EQUIPMENT TO AVAILABLE SPACE AS SHOWN IN PANEL SCHEDULE. PROVIDE
NEW CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT IN PANEL 2-RP-EM-GCA-B. REFERENCE PANEL
SCHEDULE FOR CIRCUIT BREAKER SIZES.
1/8" = 1'-0"1
00 - GROUND FLOOR - POWER
8'4' 16'0
SCALE: 1/8"=1'-0"
A. UPDATE PANEL DIRECTORY UPON COMPLETION.
GENERAL REMARKS:
CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'
- PROVIDE CIRCUIT BREAKER WITH RED MARKING
OPTIONS:
58 A
SPARE CAPACITY:
25 %
FEEDER AVAILABLE:
EQUIPMENT AMPS: 225 A
CONSIDER 125% DEMAND: 75089 A
DEMAND CURRENT: 167 A
MEQ-C 5108 VA 125.00% 6385 VA DEMAND LOAD: 60071 VA
Spare 45000 VA 100.00% 45000 VA CONNECTED CURRENT: 158 A
Other 6949 VA 125.00% 8686 VA CONNECTED LOAD: 57057 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 169 A 169 A 144 A
TOTAL LOAD: 19870 VA 19870 VA 17316 VA
59 1000 VA -- 1 -- -- SPACE 60
57 1000 VA -- 1 -- -- SPACE 58
EX. LOAD -- 30 A 3
1000 VA -- 1 -- -- SPACE 56
53 SPACE -- -- 1 -- 972 VA 54
51 SPACE -- -- 1 -- 972 VA 52
49 SPACE -- -- 1 -- 972 VA
3 15 A NEW NEW 2-AHU-2
47 SPACE -- -- 1 -- 1344 VA 48
45 2554 VA 1344 VA 46
NEW 2-SSCU-13A / 2-SSAH-13A NEW 30 A 2
2554 VA 1344 VA
3 25 A NEW NEW 2-AHU-1
41 EX. LOAD -- 40 A 1 1000 VA 1000 VA 42
39 1000 VA 1000 VA 40
EX. LOAD -- 20 A 2
1000 VA 1000 VA
3 30 A -- EX. LOAD
35 EX. LOAD -- 20 A 1 1000 VA 1000 VA 36
33 EX. LOAD -- 20 A 1 1000 VA 1000 VA 34
31 EX. LOAD -- 20 A 1 1000 VA 1000 VA
3 30 A -- EX. LOAD
29 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 30
27 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 28
25 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 26
23 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 24
21 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 22
19 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 20
17 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 18
15 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 16
13 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 14
11 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 12
9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10
7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8
5 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6
3 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 4
1 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 2
CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT
NEMA ENCLOSURE:
MOUNTING: SURFACE AVAILABLE SCC (kA): PANEL POLES: 60
SERVICE RATED: INTEGRAL SPD: SECTIONS: 1
BRANCH: WIRES: 4 MCB OPTIONS:
SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 225 A
LOCATION: ELECTRICAL 20 VOLTS: 208/120 WYE MAINS TYPE: MCB
PANEL: (E) 2-RP-EM-GCA-B
TRUE NORTH
A. PANEL AIC (INTERRUPTING) RATING SHALL BE MINIMUM 120% OF THE AVAILABLE SCC (SHORT CIRCUIT CURRENT).
GENERAL REMARKS:
CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'
- PROVIDE CIRCUIT BREAKER WITH RED MARKING
OPTIONS:
75 A
SPARE CAPACITY:
60 %
FEEDER AVAILABLE:
EQUIPMENT AMPS: 125 A
CONSIDER 125% DEMAND: 22500 A
DEMAND CURRENT: 50 A
DEMAND LOAD: 18000 VA
MEQ-C 8000 VA 125.00% 10000 VA CONNECTED CURRENT: 44 A
Spare 8000 VA 100.00% 8000 VA CONNECTED LOAD: 16000 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 53 A 53 A 33 A
TOTAL LOAD: 6000 VA 6000 VA 4000 VA
23 SPACE -- -- 1 -- -- 1 -- -- SPACE 24
21 SPACE -- -- 1 -- -- 1 -- -- SPACE 22
19 SPACE -- -- 1 -- -- 1 -- -- SPACE 20
17 SPACE -- -- 1 -- -- 1 -- -- SPACE 18
15 1000 VA 1000 VA 16
(E) P-2-3 20 A 2
1000 VA 1000 VA
2 20 A -- EXISTING FAN COIL
11 1000 VA 1000 VA 12
(E) P-2-4 20 A 2
1000 VA 1000 VA
2 20 A -- EXISTING FAN COIL
7 1000 VA 1000 VA 8
(E) P-2-2 20 A 2
1000 VA 1000 VA
2 20 A -- EXISTING FAN COIL
3 1000 VA 1000 VA 4
(E) P-2-1 20 A 2
1000 VA 1000 VA
2 20 A -- EXISTING FAN COIL
CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT
NEMA ENCLOSURE:
MOUNTING: SURFACE AVAILABLE SCC (kA): PANEL POLES: 24
SERVICE RATED: INTEGRAL SPD: SECTIONS: 1
BRANCH: WIRES: 4 MCB OPTIONS:
SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 125 A
LOCATION: ELECTRICAL 20 VOLTS: 208/120 WYE MAINS TYPE: MLO
PANEL: (E) 2-RP-EM-GCC
113B
GROUP ROOM
Space
CORRIDOR
----1
OFFICE-1
113A
WAITING
----2
OFFICE-2
113D
OFFICE
113E
OFFICE
OFFICE
ELEVATOR
SPD SUPPLY
CLOSET 113F
119B
OFFICE
119C
OFFICE
Space
Space
119A
OFFICE
119D
OFFICE
OFFICE
TLT
117A
CLOSET
OFFICE
HOUSE KEEPING
116A
COMM
OFFICE
STORAGE
100A
TEL
STOR.
WAITING
CORRIDOR
SUPPLY
109C
PIPE CHASE 111A
109A
COPY RM
109B
CLOSET
OFFICE
OFFICE
102A
CLT
OFFICE108
OFFICE
106A
OFFICE
OFFICE
105A
OFFICE
103B
TLT
103A
CLT
TLT
OFFICE
OFFICE
(E) 2-RP-EM-1CA
2-FCU-1A
2-FCU-1B
WALL RATING LEGEND
FIRE WALL
SMOKE WALL
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:5
P
M
EP101
01 - FIRST FLOOR - POWER REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"1
01 - FIRST FLOOR - POWER
A. UPDATE PANEL DIRECTORY UPON COMPLETION.
GENERAL REMARKS:
CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'
- PROVIDE CIRCUIT BREAKER WITH RED MARKING
OPTIONS:
82 A
SPARE CAPACITY:
36 %
FEEDER AVAILABLE:
EQUIPMENT AMPS: 225 A
CONSIDER 125% DEMAND: 64397 A
DEMAND CURRENT: 143 A
DEMAND LOAD: 51518 VA
Spare 50000 VA 100.00% 50000 VA CONNECTED CURRENT: 142 A
Other 1214 VA 125.00% 1518 VA CONNECTED LOAD: 51214 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 147 A 138 A 142 A
TOTAL LOAD: 17607 VA 16607 VA 17000 VA
59 1000 VA -- 1 -- -- SPACE 60
57 1000 VA -- 1 -- -- SPACE 58
EX. LOAD -- 30 A 3
1000 VA -- 1 -- -- SPACE 56
53 SPACE -- -- 1 -- -- 1 -- -- SPACE 54
51 SPACE -- -- 1 -- -- 1 -- -- SPACE 52
49 SPACE -- -- 1 -- 1000 VA 1 20 A -- SPARE 50
47 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- SPARE 48
45 EX. LOAD -- 20 A 1 1000 VA 607 VA 46
43 EX. LOAD -- 20 A 1 1000 VA 607 VA
2 20 A NEW NEW 2-FCU-1A, 2-FCU-1B
41 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 42
39 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 40
37 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 38
35 1000 VA 1000 VA 1 20 A -- EX. LOAD 36
EX. LOAD -- 20 A 2
1000 VA 1000 VA 1 20 A -- EX. LOAD 34
31 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 32
29 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 30
27 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 28
25 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 26
23 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 24
21 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 22
19 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 20
17 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 18
15 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 16
13 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 14
11 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 12
9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10
7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8
5 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6
3 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 4
1 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 15 A -- EX. LOAD 2
CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT
NEMA ENCLOSURE:
MOUNTING: RECESSED AVAILABLE SCC (kA): PANEL POLES: 60
SERVICE RATED: INTEGRAL SPD: SECTIONS: 1
BRANCH: WIRES: 4 MCB OPTIONS:
SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 225 A
LOCATION: ENTRANCE WAY CG5 VOLTS: 208/120 WYE MAINS TYPE: MLO
PANEL: (E) 2-RP-EM-1CA
SHEET NOTES:
TRUE NORTH
8'4' 16'0
SCALE: 1/8"=1'-0"
GENERAL NOTES:
A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.
CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH
ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO
MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE
WORK TO INSTALL PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.
C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.
1. CONNECT NEW MECHANICAL EQUIPMENT TO AVAILABLE SPACE AS SHOWN IN PANEL SCHEDULE. PROVIDE NEW 20A CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT IN PANEL 2-RP-EM-1CA. REFERENCE PANEL
SCHEDULE FOR CIRCUIT BREAKER SIZES.
212B
OFFICE
Space
212E
WAITING RM
213D
OFFICE
213C
OFFICE
213FB
OFFICE
213A
OFFICE 213
COSAT SYCH
NURSE OFFICE
212C
OFFICE
OFFICE
OFFICE 232
ELEC. / MECH. 211A
TOILET CONGREGATE
WAITING RM
COSAT MATERIALS209
HAC
ELEVATOR
STORAGE
GROUP RM
219B
OFFICE
219D
OFFICE
219A
OFFICE
219C
OFFICE
OFFICE
OFFICE SOCIAL WORKER
KITCHEN
REHAB TECH
OFFICE REC THERAPY
CORRIDOR
CORRIDOR
STOR.
200A
TEL
Space
GROUP ROOM
207A
OFFICE
OFFICE STAFF
BREAK ROOM
TLT. FEMALE PATIENT
202A
CLT
TLT.
203A
ELEC / MECH
203B
TLT
OFFICE
CORRIDOR
205A
OFFICE
205B
OFFICE
(E) 2-RP-2CB
2-FCU-2A
2-FCU-2B
(E) 2-LP-2CA
WALL RATING LEGEND
FIRE WALL
SMOKE WALL
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:5
P
M
EP102
02 - SECOND FLOOR - POWER REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"1
02 - SECOND FLOOR - POWER
8'4' 16'0
SCALE: 1/8"=1'-0"
TRUE NORTH
SHEET NOTES:
GENERAL NOTES:
A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.
CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH
ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO
MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE
WORK TO INSTALL PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.
C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.
1. CONNECT NEW MECHANICAL EQUIPMENT TO AVAILABLE SPACE AS SHOWN IN PANEL SCHEDULE. REMOVE 60A CIRCUIT BREAKER AND PROVIDE NEW 20A/2POLE CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT
IN PANEL 2-RP-2CB. REFERENCE PANEL SCHEDULE FOR CIRCUIT BREAKER SIZES.
A. PANEL AIC (INTERRUPTING) RATING SHALL BE MINIMUM 120% OF THE AVAILABLE SCC (SHORT CIRCUIT CURRENT).
GENERAL REMARKS:
CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'
- PROVIDE CIRCUIT BREAKER WITH RED MARKING
OPTIONS:
65 A
SPARE CAPACITY:
65 %
FEEDER AVAILABLE:
EQUIPMENT AMPS: 100 A
CONSIDER 125% DEMAND: 15647 A
DEMAND CURRENT: 35 A
DEMAND LOAD: 12518 VA
Spare 11000 VA 100.00% 11000 VA CONNECTED CURRENT: 34 A
Other 1214 VA 125.00% 1518 VA CONNECTED LOAD: 12214 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 47 A 47 A 17 A
TOTAL LOAD: 5107 VA 5107 VA 2000 VA
11 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 12
9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10
7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8
5 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6
3 EX. LOAD -- 30 A 1 2500 VA 607 VA 4
1 EX. LOAD -- 30 A 1 2500 VA 607 VA
2 20 A NEW NEW 2-FCU-2A, 2-FCU-2B
CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT
NEMA ENCLOSURE:
MOUNTING: RECESSED AVAILABLE SCC (kA): PANEL POLES: 12
SERVICE RATED: INTEGRAL SPD: SECTIONS: 1
BRANCH: WIRES: 4 MCB OPTIONS:
SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 100 A
LOCATION: CORRIDOR 178 VOLTS: 208/120 WYE MAINS TYPE: MLO
PANEL: (E) 2-RP-2CB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com
SEE G00104/26/2023
B
IM
/2
.0
V
A T u s c a lo o s a R e p la c e
H V
A C
V a ri o u s B u ild in g
/6
.2
.1
B
M
E P
.r v t
/2
/2
:0
:4
P
M
E700
ELECTRICAL SCHEDULES REPLACE HVAC VARIOUS
BUILDINGS
3701 Loop Road, Tuscaloosa, AL 35404
679.22.106
04/26/2023 CGH SUB
CONSTRUCTION
DOCUMENTS
EQUIPMENT CONNECTION SCHEDULE
MARK DESCRIPTION ROOM NAME ROOM # HP KW FLA MCA MOCP VOLTS PHASE POLES
LOAD
[VA]
CONTROL
TYPE
DISCONNECT
BY
DISCONNECT
TYPE FEEDER PANEL
CIRCUIT
NUMBER SCCR GEN REMARKS
(E) P-2-1 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 1,3 0 No 1
(E) P-2-2 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 5,7 0 No 1
(E) P-2-3 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 13,15 0 No 1
(E) P-2-4 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 9,11 0 No 1
2-AHU-1 AIR HANDLING UNIT CREDIT UNION 16B 0 0 11.2 14 25 208 3 3 4032 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 44,46,48 0 Yes -
2-AHU-2 AIR HANDLING UNIT Space 304 0 0 0 5.8 15 208 3 3 2917 INT ELEC NF (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 50,52,54 0 Yes -
2-FCU-1A FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2
2-FCU-1B FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2
2-FCU-2A FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2
2-FCU-2B FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2
2-SSAH-13A DUCTLESS SPLIT SYSTEM INDOOR IT CLOSET 13A 0 0 0 1 30 208 1 2 208 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1
2-SSCU-13A DUCTLESS SPLIT SYSTEM OUTDOOR 0 0 0 25 30 208 1 2 4900 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1
GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)
A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY WITH FLOOR PLANS. WHERE LOCATIONS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS, REFER TO MECHANICAL SHEETS. REFER TO DEFINITIONS BELOW FOR CLARIFICATIONS OF CONNECTION REQUIREMENTS.
B. PROVIDE WIRING AND EQUIPMENT CONNECTIONS FOR INTERNAL EQUIPMENT COMPONENTS AS REQUIRED. COORDINATE REQUIREMENTS WITH MECHANICAL CONTRACTOR.
C. "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS:
• "INT" = CONTROLCSS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED).
• "FA STOP" = FANS WITH CFM OF 2000 OR GREATER AND FANS SERVING DUCTS CONTAINING SMOKE DAMPERS.
• PROVIDE FIRE ALARM SYSTEM DUCT SMOKE DETECTORS AT RETURN-SIDE AND SUPPLY-SIDE OF FAN/UNIT. PROVIDE MULTIPLE DETECTORS IF REQUIRED TO ACCOMMODATE MAIN DUCT TAKE-OFFS WHERE A SINGLE DETECTOR CANNOT BE INSTALLED TO CAPTURE ALL AIRFLOW. FIRE ALARM SYSTEM SHALL SHUTDOWN FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT. PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE AT MOTOR CONTROLLER/STARTER AND CONNECT TO SHUTDOWN FAN.
D. "DISCONNECT BY" :
• "MECHANICAL" = DISCONNECT IS FURNISHED BY MECHANICAL CONTRACTOR OR PROVIDED WITH MECHANICAL EQUIPMENT.
• ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR.
E. "DISCONNECT TYPE" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT:
• "VFD" = VARIABLE FREQUENCY DRIVE CONTROLLER. LOCATE VARIABLE FREQUENCY DRIVE CONTROL TO SERVE AS THE MOTOR DISCONNECT.
• DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION.
• WHERE STARTERS OR VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED.
F. "FEEDER":
• PROVIDE CONDUCTORS AND RACEWAY AS INDICATED. TYPICAL FORMAT IS: (FEEDER TAG) (NOMINAL SIZE) CONDUCTORS AND RACEWAY REQUIRED.
G. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY
BE PROVIDED WITH 5 KA SCCR
REMARKS: (EQUIPMENT CONNECTION SCHEDULE)
1. MECHANICAL UNIT EXISTING TO REMAIN.
2. DISCONNECT SWITCH TO BE MOUNTED AND INSTALLED ADJACENT TO UNIT OR ABOVE CEILING ADJACENT TO UNIT. DISCONNECT MAY BE MOUNTED TO UNIT OR INDEPENDENTLY SUPPORTED FROM THE STRUCTURE ABOVE. REFERENCE SPECIFICATIONS FOR INSTALLATION REQUIREMENTS AND SUPPORT INFORMATION. COORDINATE LOCATION WITH
MECHANICAL CONTRACTOR.
CONTRACTOR REQUIREMENTS FOR THE
DEMOLITION OF, OR ADDITION TO, ANY PORTION
OF AIR OR HYDRONIC SYSTEMS.
COVER SHEET NOTES:
THE FOLLOWING SHALL APPLY TO ALL MECHANICAL SYSTEMS AFFECTED BY CONSTRUCTION ACTIVITIES. SYSTEMS INCLUDED BUT ARE NOT LIMITED TO HVAC, EXHAUST, EQUIPMENT, DUCTWORK, DUCTWORK ACCESSORIES, HYDRONICS, COILS, FILTERS, TEMPERATURE CONTROLS, LIFE SAFETY
CONTROLS AND PRESSURIZATION CONTROLS.
1. AIR QUALITY, QUANTITY AND PRESSURE RELATIONSHIPS SHALL COMPLY WITH THE LATEST, ANSI/ASHRAE/ASHE STANDARD 170
REQUIREMENTS.
2. COMPLY WITH THE FACILITY'S INFECTIOUS CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS.
3. MAINTAIN EXISTING AIR QUALITY REQUIREMENTS, AIR PRESSURIZATION AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS
DURING ANY RENOVATION OR CONSTRUCTION.
4. DETERMINE AND VERIFY THE AREAS SERVED BY THE AFFECTED SYSTEMS.
5. TAKE AIR AND OR/ WATER BALANCE READINGS OF THE SYSTEMS BEING AFFECTED.
6. IF THERE ARE SPACES BEING SERVED OUTSIDE OF THE DEMOLITION OR ADDITION AREA, THE FOLLOWING PROCEDURES MUST BE TAKEN:
a. TAKE AIR AND/OR WATER BALANCE READINGS AS NEEDED TO QUANTIFY THE AIR AND/OR WATER FLOWS DELIVERED TO THE
SYSTEMS OUTSIDE THE AFFECTED AREA.
b. DURING DEMOLITION, TAKE ALL NECESSARY MEASURES TO MAINTAIN THE CORRECT AIR AND/OR WATER FLOWS TO THE SYSTEMS
THAT ARE REMAINING.
c. AFTER THE COMPLETION OF DEMOLITION, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.
d. AFTER COMPLETING ANY ADDITIONS TO THE SYSTEM, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.
7. THE CONTRACTOR IS TO PROVIDE TEMPORARY AIR/AND OR WATER SYSTEMS AS NEEDED TO MAINTAIN PROPER TEMPERATURE AND
PRESSURE RELATIONSHIPS OF SPACES REQUIRED TO BE OCCUPIED DURING CONSTRUCTION.
8. ALL TEMPORARY AIR SUPPLY SYSTEMS MUST UTILIZE FINAL FILTERS THAT ARE A MINIMUM OF 90% EFFICIENT (MERV 14). FINAL FILTERS
MUST BE DOWNSTREAM OF ALL AIR SUPPLY COMPONENTS.
MECHANICAL GENERAL NOTES:
A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, AND TEMPERATURE CONTROLS WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE
SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.
B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY ENGINEER.
C. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION OF THE ADDITIONS AND REMODELING/ALTERATION OF THE EXISTING BUILDING. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. PLAN TO COMPLETE SHUTDOWNS DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. COORDINATE SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT.
TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED
TESTING.
D. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF
THE OWNER.
E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND
REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.
F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS AS "TO BE RETAINED, RELOCATED", ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR
WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS:
a. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE
MAIN WITH MATERIAL TO MATCH EXISTING.
b. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS
CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED
c. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .