About this file

This is a set of architectural, mechanical, and electrical drawings for a HVAC replacement project at Buildings 2 and 46 of the Tuscaloosa VA Medical Center. The drawings detail the demolition and new installation of HVAC systems including air handling units, fan coil units, ductwork, piping, electrical connections, and controls.

The scope includes replacing existing HVAC equipment in Building 2 (served by units 2-AHU-1, 2-AHU-2, multiple fan coil units) and Building 46 (served by unit 46-AHU-1 and multiple fan coil units), along with associated electrical and control work. The drawings provide detailed mechanical equipment schedules, demolition plans, new work plans, control sequences, and installation details. Key aspects include integration with the existing Metasys building automation system, maintaining operations during construction with minimal disruption, and phasing requirements since Building 2's hours of operation are 7:30AM-4:00PM Monday-Friday while Building 46 is unoccupied. The drawings were prepared by Specialized Engineering Solutions and issued for construction on April 26, 2023.

View the file

Other files for this federal contract opportunity

Other files attached to 679-22-106 Replace HVAC Various Buildings, newest first.
File Type Posted
Amendment 0006 36C24725R0031.pdf PDF
Attachment 0005 G -Addendum 1 Drawings.pdf PDF
Amendment 0005 36C24725R0031.pdf PDF
Attachment 0005 C - Appendix P - Building 46.pdf PDF
Attachment 0005 D - Appendix S - Building 46.pdf PDF
Attachment 0005 E- Addendum 1 Change Narrative.pdf PDF
Attachment 0005 A- Pre-Bid RFIs_Responses.pdf PDF
Attachment 0005 B - Appendix B - Building 2.pdf PDF
Attachment 0005 F- Appendix B - Building 2.pdf PDF
Attachment 0005 H-Wage DBA AL20250098.txt TXT text file
Amendment 36C24725R0031 0004.pdf PDF
Amendment 36C24725R0031 0003.pdf PDF
Amendment 36C24725R0031 0002.pdf PDF
679-22-106 -Replace HVAC Various Buildings Site Visit.pdf PDF
Amendment 36C24725R0031 0001.pdf PDF
Attachment 6 - INVOICING.docx DOCX document
Attachment 5 -DBA Number AL20240136.pdf PDF
679-22-106 Specifications.pdf PDF
Solicitation 36C24725R0031.pdf PDF
Attachment 3 - Past Performance Questionnaire -PPQ.docx DOCX document
Attachment 2 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Deviation.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:5

P

M

G001

COVER SHEET REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 AGT PCM

CONSTRUCTION

DOCUMENTS

679-22-106 TUSCALOOSA VA REPLACE HVAC, VARIOUS BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

CHIEF OF ENGINEERING: MEDICAL CENTER DIRECTOR: SAFETY MANAGER: INFECTION CONTROL: ENERGY ENGINEER:

GENERAL CONSTRUCTION NOTE:

1. THE GENERAL CONTRACTOR SHALL CONDUCT A PRE-CONSTRUCTION MEETING WITH THE COR TO IDENTIFY

AREAS WHERE AFTER HOURS WORK WILL BE REQUIRED. AREAS INCLUDE, BUT ARE NOT LIMITED TO BUILDING 2. ALL WORK THAT WILL SHUT DOWN PATIENT CARE AREAS OUTSIDE OF THE AREAS BEING ACTIVELY WORKED IN WILL BE REQUIRED TO OCCUR OUTSIDE THE BUILDING HOURS OF OPERATION.

A. BUILDING 2 HOURS OF OPERATION: 7:30AM - 4:00PM, MONDAY - FRIDAY

B. BUILDING 46 HOURS OF OPERATION: UNOCCUPIED

SHEET INDEX - ELECTRICAL - BUILDING 02

Sheet Number Sheet Name

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED100 00 - GROUND FLOOR - ELECTRICAL - DEMOLITION

ED101 01 - FIRST FLOOR - ELECTRICAL - DEMOLITION

ED102 02 - SECOND FLOOR - ELECTRICAL - DEMOLITION

EP100 00 - GROUND FLOOR - POWER

EP101 01 - FIRST FLOOR - POWER

EP102 02 - SECOND FLOOR - POWER

E700 ELECTRICAL SCHEDULES

SHEET INDEX - MECHANICAL - BUILDING 02

Sheet Number Sheet Name

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD100 00 - GROUND FLOOR - MECHANICAL - DEMOLITION

MD101 01 - FIRST FLOOR - MECHANICAL - DEMOLITION

MD102 02 - SECOND FLOOR - MECHANICAL - DEMOLITION

MH100 00 - GROUND FLOOR - DUCTWORK

MH101 01 - FIRST FLOOR - DUCTWORK

MH102 02 - SECOND FLOOR - DUCTWORK

MP100 00 - GROUND FLOOR & BASEMENT - PIPING

MP101 01 - FIRST FLOOR - PIPING

MP102 02 - SECOND FLOOR - PIPING

M500 MECHANICAL DETAILS AND CONTROLS

M600 MECHANICAL SCHEDULES

SHEET INDEX - ELECTRICAL - BUILDING 46

Sheet Number Sheet Name

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED101 ELECTRICAL DEMOLITION

EL101 FLOOR PLAN - LIGHTING

EP101 FLOOR PLAN - POWER

SHEET INDEX - MECHANICAL - BUILDING 46

Sheet Number Sheet Name

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD101 01-FIRST FIRST - MECHANICAL - DEMOLITION

MH101 01-FIRST FIRST - DUCTWORK

MP101 01-FIRST FLOOR - PIPING

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

M700 MECHANICAL CONTROLS

SHEET INDEX - GENERAL AND ARCHITECTURAL

Sheet Number Sheet Name

G001 COVER SHEET

A-101 FLOOR PLANS - DEMOLITION AND NEW WORK AND SECTIONS

04/26/2023

Revisions: Date:

1. ALL DIMENSIONS ARE MEASURED FROM FACE OF EXISTING WALL TO

THE FACE OF NEW WALL UNLESS NOTED OTHERWISE.

2. ALL NEW WORK TO BE FINISHED TO MATCH EXISTING.

3. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITION

DEMOLITION AND NEW WORK NOTES.

4.CONTRACTOR SHALL ENSURE ALL DOORS WITHIN AREAS OF WORK

SWING FREE OVER FLOORING AND TRANSITION STRIPS.

5. ALL PAINT COLORS TO BE SELECTED / APPROVED BY COR.

GENERAL NOTES

ALL NOTES MAYNOT BE APPLICABLE.

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

DEMOLITION LEGEND

A-101

MECHANICAL

STORAGE

OFFICE

TLT.

5A

TLT.

OFFICE

OFFICE

OFFICE

MULTIPURPOSE ROOM

HK

CORRIDOR

3B

VESTIBULE

CHANCEL

NAVE

CONNECTING

CORRIDOR TO

BUILDING 1

D3 D3

D3 D3 D3

D1

D4

D1

D2

D4

D2

D2

D2

D5D5

D5D5

A-101

MECHANICAL

STORAGE

OFFICE

TLT.

5A

TLT.

OFFICE

OFFICE

OFFICE

MULTIPURPOSE ROOM

HK

CORRIDOR

3B

VESTIBULE

CHANCEL

NAVE

CONNECTING

CORRIDOR TO

BUILDING 1

9 9 9

9 9

01 - FIRST FLOOR

0' - 0"

03 - Level Top of Wall 10' - 10"

02 - Level Top of Wall 9' - 1 1/2"

00_ FOUNDATION

-3' - 0"

A-101

NAVE FLOOR LEVEL

CHANCEL FLOOR LEVEL

EXISTING WOOD ARCH

EXISTING ROOF STRUCTURE

5 5

NEW HVAC DUCTWORK

REFERENCE MECHANICAL DRAWINGS

EXISTING WOOD ARCHEXISTING WOOD ARCH

6 6

EXISTING ROOF STRUCTURE

EXISTING TIMBER STRUT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT / ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street, Suite 355, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

B

IM

/2

.0

V

A T u s c a lo o s a

R e p la c e H

V A

C V a ri o u s B u ild in g /B

.2

.1

A

R C

H A

T R

IA

X

R

.r v t

/2

/2

:3

:1

P

M

A-101

FLOOR PLANS - DEMOLITION AND NEW

WORK AND SECTIONS

VA TUSCALOOSA REPLACE

HVAC, VARIOUS BUILDINGS

3701 Loop Road East, Tuscaloosa, AL 35404

679.22.106

04/26/2023 JDS TLR

CONSTRUCTION

DOCUMENTS

SEE G001

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

1/8" = 1'-0"1

FIRST FLOOR PLAN - DEMOLITION

1/8" = 1'-0"2

FIRST FLOOR PLAN - NEW WORK

8'4' 16'0

SCALE: 1/8"=1'-0"

DEMOLITION KEYNOTES

D1 REMOVE EXISTING CEILING MOUNTED HVAC SOFFIT AND SUPPORT

FRAMING. RETAIN EXISTING SUPPORT FRAMING COMPONENTS FOR

REUSE.

D2 REMOVE DOOR(S), FRAME, HARDWARE, SILL AND JAMB.

D3 EXISTING WINDOW TO REMAIN.

D4 EXISTING DOOR TO REMAIN.

D5 REMOVE EXISTING LIGHT FIXTURES (NOT SHOWN) AND RETAIN FOR

REUSE.

NEW WORK KEYNOTES

1 CLEAN EXISTING CEILING ABOVE NAVE AND CHANCEL AREAS.

2 INSTALL 3" LIGHT GAUGE Z CHANNELS - 2'-0" O.C. BETWEEN EXISTING

WOOD ARCHES.

3 APPLY LAYER OF SPRAY FOAM INSULATION OVER ENTIRE EXISTING

CEILING ABOVE NAVE AND CHANCEL AREAS.

4 INSTALL NEW 1" x 6" TONGUE AND GROOVE WOOD PLANK CEILING. PAINT

TO MATCH EXISTING.

5 REINSTALL EXISTING HVAC SOFFIT STEEL SUPPORT STRUCTURE TO

EXISTING WOOD ARCHES.

6 INSTALL NEW 1/2" PAINTED PLYWOOD PANELS FOR HVAC SOFFIT. PAINT

TO MATCH EXISTING. COORDINATE OPENINGS FOR DIFFUSERS WITH

MECHANICAL DRAWINGS.

7 INSTALL NEW STOREFRONT DOOR(S), FRAME, HARDWARE, SILL AND

JAMB TO FIT EXISTING OPENING.

8 INSTALL NEW STOREFRONT SLIDING DOOR(S), FRAME, HARDWARE, SILL

AND JAMB TO FIT EXISTING OPPENING.

9 CLEAN EXISTING WINDOWS TO REMAIN. INSTALL NEW WINDOW INFILL

SYSTEM PER MANUFACTURERS INSTRUCTIONS. BASIS OF DESIGN: CRL

FALLBROOK FIXED FRAME w/ 5/16" GLASS.

10 CLEAN AND REINSTALL EXISTING LIGHT FIXTURES.

11 SEAL ALL EXISTING PENETRATIONS IN WALL WITH EXPANDING FOAM

INSULATION.

1/4" = 1'-0"3

SECTION THRU NAVE

1 1/2" = 1'-0"4

ENLARGED SECTION @ HVAC SOFFIT

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

2'0 1'6"

SCALE: 1 1/2" = 1'-0"

4/24/2023

ELECTRICAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.

MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)

AMPERE

AMPERE FRAME

ABOVE FINISHED FLOOR

ALUMINUM

AMPERE TRIP

CEILING

CIRCUIT BREAKER

CORRELATED COLOR TEMPERATURE

COPPER

DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)

DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)

EXISTING

ELECTRICALLY OPERATED

ENERGY REDUCING MAINTENANCE SWITCH

FUSE

FULL LOAD AMPS

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT ALARM

GROUND FAULT PROTECTION

HORSEPOWER

KILOAMPERE INTERRUPTING CAPACITY

KILOVOLT AMPERE

KILOWATT

MAXIMUM

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MANUALLY OPERATED

NORMALLY CLOSED

NON-FUSED

NOT IN CONTRACT

NORMALLY OPEN

POLES

PARTIAL

RELOCATE

SHORT CIRCUIT CURRENT RATING

SURGE PROTECTIVE DEVICE

SHUNT TRIP

TYPICAL

UNLESS NOTED OTHERWISE

VOICE

WALL PHONE

WIRE

WEATHER RESISTANT

TRANSFORMER

ZONE SELECTIVE INTERLOCKING

A

AF

AFF

AL

AT

C

CB

CCT

CU

D

D

E

EO

ERMS

F

FLA

G, GFCI

GFA

GFP

HP

KAIC

KVA

KW

MAX

MCA

MCB

MIN

MLO

MO

NC

NF

NIC

NO

P

PART

R

SCCR

SPD

ST

TYP

UNO

V

W

W

WR

XFMR

ZSI

A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.

RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG

CONDUCTORS.

B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE

SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

C. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL

COST TO THE OWNER.

D. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR

INSTALLED DEVICES.

E. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS

ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND

PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.

F. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN

CABLING.

(GENERAL NOTES SHALL APPLY TO ALL SHEETS)

ELECTRICAL GENERAL NOTES:

(E) T-TAC2

12,470-277/480V

150KVA

(E) T-2 12,470V-120/208V

150KVA

EXISTING PAD-MOUNTED

UTILITY TRANSFORMER

30A/3P

30A FUSE

400A

(E) LA

175A

(E) 2-PP-GCA

120/208V, 3Ø-4W

400A MCB

(E)

2-RP-GCA

(E) PB-A

(E) BCO

175A

(E)

2-RP-1CA

100A

(E)

2-RP-2CB

225A

(E)

2-RP-CGB

200A

(E)

2-RP-2CA

100A

(E)

2-RP-2CA

30A/3P

30A FUSE

250A

(E) LA

100A

(E) 2-FP-GCA

277/480V, 3Ø-4W

250A MCB

(E)

2-LP-GCA

150A

(E)

2-LP-1CA

150A

(E)

2-LP-2CA

100A

(SPACE)

100A

(SPACE)

REMARKS: (EQUIPMENT CONNECTION SCHEDULE)

1. CONTROLS BETWEEN INDOOR AND OUTDOOR UNITS - INCLUDE CONTROL WIRING IN CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT PER MANUFACTURER'S REQUIREMENTS.

GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)

A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY WITH FLOOR PLANS. WHERE LOCATIONS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS, REFER TO MECHANICAL SHEETS. REFER TO DEFINITIONS

BELOW FOR CLARIFICATIONS OF CONNECTION REQUIREMENTS.

B. PROVIDE WIRING AND EQUIPMENT CONNECTIONS FOR INTERNAL EQUIPMENT COMPONENTS AS REQUIRED. COORDINATE REQUIREMENTS WITH MECHANICAL CONTRACTOR.

C. "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS:

• "INT" = CONTROLS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED).

D. "DISCONNECT BY" :

• "MECHANICAL" = DISCONNECT IS PROVIDED WITH MECHANICAL EQUIPMENT.

• ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR.

• "ELECTRICAL" = DISCONNECT IS FURNISHED BY ELECTRICAL CONTRACTOR. COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT FURNISHED BY MECHANICAL CONTRACTOR.

E. "DISCONNECT TYPE" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT:

• "NF" = NON-FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED. 20/1 AND SMALLER SHALL BE TOGGLE SWITCH DISCONNECT.

• "VFD" = VARIABLE FREQUENCY DRIVE CONTROLLER. LOCATE VARIABLE FREQUENCY DRIVE CONTROL TO SERVE AS THE MOTOR DISCONNECT.

• "INT" = DISCONNECT IS MANUFACTURED INTEGRAL TO THE EQUIPMENT.

• LOCATE DISCONNECT ADJACENT TO EQUIPMENT PER NEC - PROVIDE WITH STRUT MOUNTING AS REQUIRED.

• WHERE DISCONNECT SERVES OUTDOOR EQUIPMENT, PROVIDE AS NEMA-3R.

• PROVIDE DISCONNECT WITH EQUIPMENT GROUND KIT.

• DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION.

• WHERE STARTERS OR VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED.

F. "FEEDER":

• PROVIDE CONDUCTORS AND RACEWAY AS INDICATED. TYPICAL FORMAT IS: (FEEDER TAG) (NOMINAL SIZE) CONDUCTORS AND RACEWAY REQUIRED.

G. "GEN" - EQUIPMENT IS SERVED FROM A SOURCE PANEL PROVIDED WITH GENERATOR BACK-UP.

H. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF

THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:4

P

M

E000

ELECTRICAL SYMBOLS AND

ABBREVIATIONS

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

ELECTRICAL MISC SYMBOLS

PLAN SYMBOL NAME

BRANCH CIRCUIT CONCEALED IN

CEILING OR WALL

BRANCH CIRCUIT CONCEALED IN

FLOOR OR BELOW GRADE

CLEARANCE SPACE

CONDUIT BREAK

CONDUIT DOWN

CONDUIT STUB-OUT

CONDUIT UP

HOMERUN TO PANEL

G = GFCI CIRCUIT

(PART) = PARTIAL CIRCUIT

SWITCHED RECEPTACLE

ONE LINE SYMBOL

PLAN SYMBOL NAME

CONTINUATION

DISCONNECT SWITCH

GROUND BAR

GROUNDING ELECTRODE

PANEL BOARD

TRANSFORMER

UTILITY METER

ELECTRICAL EQUIPMENT

SYMBOLS

PLAN SYMBOL NAME

PANELBOARD - RECESSED

PANELBOARD - SURFACE

NO SCALE

ELECTRICAL ONE-LINE

EQUIPMENT CONNECTION SCHEDULE

MARK DESCRIPTION ROOM NAME ROOM # HP KW FLA MCA MOCP VOLTS PHASE POLES

LOAD

[VA]

CONTROL

TYPE

DISCONNECT

BY

DISCONNECT

TYPE FEEDER PANEL

CIRCUIT

NUMBER SCCR GEN REMARKS

(E) P-2-1 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 1,3 0 No 1

(E) P-2-2 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 5,7 0 No 1

(E) P-2-3 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 13,15 0 No 1

(E) P-2-4 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 9,11 0 No 1

2-AHU-1 AIR HANDLING UNIT CREDIT UNION 16B 0 0 11.2 14 25 208 3 3 4032 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 44,46,48 0 Yes -

2-AHU-2 AIR HANDLING UNIT Space 304 0 0 0 5.8 15 208 3 3 2917 INT ELEC NF (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 50,52,54 0 Yes -

2-FCU-1A FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2

2-FCU-1B FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2

2-FCU-2A FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2

2-FCU-2B FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2

2-SSAH-13A DUCTLESS SPLIT SYSTEM INDOOR IT CLOSET 13A 0 0 0 1 30 208 1 2 208 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1

2-SSCU-13A DUCTLESS SPLIT SYSTEM OUTDOOR 0 0 0 25 30 208 1 2 4900 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1

A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK.

PROVIDE DEMOLITION FOR ITEMS AS SHOWN.

B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).

C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION.

SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND CONSTRUCTION. THESE PLANS ARE BASED ON PAST PROJECT DRAWINGS AND SITE OBSERVATIONS. THE DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THESE DRAWINGS MAY NOT BE ACCURATE IN ALL AREAS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING

CONDITIONS AND IS ENCOURAGED TO REVIEW FACILITY DRAWINGS PRIOR TO THE BID DATE.

D. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL.

E. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL ELECTRICAL DEMOLITION ITEMS. DISCONNECT AND REMOVE ELECTRICAL DEVICES, EQUIPMENT AND ASSOCIATED WIRING AS REQUIRED TO ACCOMMODATE NEW WORK. IF THE CONTRACTOR IS UNCLEAR REGARDING A SPECIFIC ITEM TO REMAIN OR BE REMOVED, THE CONTRACTOR SHALL SEEK CLARIFICATION FROM THE ARCHITECT.

F. SYSTEMS SERVING ADJACENT AREAS AND ITEMS THAT REMAIN SHALL BE MAINTAINED AT ALL TIMES.

MODIFY SYSTEMS AS REQUIRED THROUGHOUT CONSTRUCTION TO MAINTAIN CONTINUITY OF SERVICE. DO

NOT INTERRUPT SERVICE WITHOUT OWNER'S PRIOR WRITTEN APPROVAL. LIMIT DURATION OF

INTERRUPTION ONLY TO THE TIME NECESSARY FOR DISCONNECTION AND IMMEDIATE RECONNECTION.

INTERRUPTION TO SERVICE DEEMED BY OWNER AS ESSENTIAL MAY REQUIRE PREMIUM TIME AND SHALL BE INCLUDED WITH THE BID. EXTREME CARE SHALL BE TAKEN BY THE CONTRACTOR TO IDENTIFY EXISTING SYSTEM COMPONENTS ASSOCIATED WITH THESE SERVICES. APPROPRIATE METHODS OF MARKING THESE SHALL OCCUR TO ELIMINATE THE POSSIBILITY OF ACCIDENTAL INTERRUPTION. FOR CONDUIT AND CABLING THAT CAN REMAIN, PROVIDE SUPPORT AS REQUIRED. RELOCATE EXISTING JUNCTION BOXES THAT

BECOME INACCESSIBLE DUE TO NEW WORK.

G. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND

LIGHTING AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.

H. PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND FUNCTIONALITY.

I. PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE

ARCHITECTURAL SPECIFICATIONS FOR MEANS AND METHODS.

J. ALL UNLABELED ELECTRICAL DEVICES WITH CIRCUITRY OR DEVICES MODIFIED DURING CONSTRUCTION

SHALL BE CIRCUIT TRACED AS NEEDED WITH A LABEL PROVIDED.

(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND ALL ELECTRICAL DEMOLITION WORK)

ELECTRICAL DEMOLITION GENERAL NOTES:

(D) SSCU-1A (D) SSCU-2B

(D) CU-16B

(D) SSCU-1B

(D) CU-18

(E) 2-RP-EM-GCB

(D) AHU-16B

(D) AHU-18

(D) FCU

1 1

(E) 2-RP-EM-GCC

(E) 2-PP-EM-GCA

(E) 2-PP-EM-GCB

(E) 2-RP-EM-GCA-B

(E) 2-FP-EM-GCA

(E) 2-FP-GCA

(E) 2-FP-SB-GCB

(E) 2-RP-EM-GCA-A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:4

P

M

ED100

00 - GROUND FLOOR - ELECTRICAL -

DEMOLITION

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

SHEET NOTES:

1. DISCONNECT EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND CONDUCTORS TO SOURCE.

LABEL EXISTING UNUSED CIRCUIT BREAKER AS SPARE. LABEL EXISTING CIRCUIT BREAKERS (INCLUDE ALL

BOX, TRIM PLATES, AND DISCONNECTS).

1/8" = 1'-0"1

00 - GROUND FLOOR - ELECTRICAL - DEMOLITION

8'4' 16'0

SCALE: 1/8"=1'-0"

TRUE NORTH

(D) SSAH-1A

(D) SSAH-1B

(E) 2-RP-EM-1CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:4

P

M

ED101

01 - FIRST FLOOR - ELECTRICAL -

DEMOLITION

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"1

01 - FIRST FLOOR - ELECTRICAL - DEMOLITION

SHEET NOTES:

1. DISCONNECT EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND CONDUCTORS TO SOURCE.

LABEL EXISTING UNUSED CIRCUIT BREAKERS AS SPARE. LABEL EXISTING CIRCUIT BREAKERS (INCLUDE ALL

BOX, TRIM PLATES, AND DISCONNECTS).

TRUE NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

(D) SSAH-2A

(D) SSAH-2B

(E) 2-RP-2CB

(E) 2-LP-2CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:4

P

M

ED102

02 - SECOND FLOOR - ELECTRICAL -

DEMOLITION

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"1

02 - SECOND FLOOR - ELECTRICAL - DEMOLITION

SHEET NOTES:

1. DISCONNECT EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND CONDUCTORS TO SOURCE.

LABEL EXISTING UNUSED CIRCUIT BREAKER AS SPARE. LABEL EXISTING CIRCUIT BREAKERS (INCLUDE ALL

BOX, TRIM PLATES, AND DISCONNECTS).

8'4' 16'0

SCALE: 1/8"=1'-0"

TRUE NORTH

A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.

CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH

ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH

ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE

ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE WORK TO INSTALL

PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.

C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.

(POWER GENERAL NOTES SHALL APPLY TO ALL SHEETS)

POWER GENERAL NOTES:

26C

OFFICE

CREDIT UNION

16A

CREDIT UNION

CREDIT UNION

8C

STORAGE

8B

CLT

CREDIT UNION

OFFICE CLERK

OFFICE STAFF

16B

CREDIT UNION

CREDIT UNION

13A

IT CLOSET

BREAK RM

12A

CREDIT SECURE

TLT.

CREDIT UNION

CG4

ENTRANCE WAY CG5

ENTRANCE WAY

STORAGE

CREDIT UNION STORAGE

CONFERENCE ROOM

OFFICE

OFFICE STAFF

26B

OFFICE

MALE TOILET

23C

ELECT / MECH

CG1

CORRIDOR

26A

OFFICE

HAC

22A

HAC

ELECTRICAL

TELE CLOSET

FEMALE TLT

1C

LOBBY

3A

WAITING RM

FEMALE TLT

8A

MECH RM 3B

CHECK-IN ROOM

7C

EXAM ROOM 4

CLERKS OFFICE

7B

EXAM ROOM

OFFICE

7A

EXAM ROOM

PSY. / EXAM

2-AHU-1

2-AHU-2

(E) 2-RP-EM-GCB

2-SSAH-13A

2-SSCU-13A

(E) 2-PP-EM-GCA

(E) 2-RP-EM-GCC

(E) 2-PP-EM-GCB

(E) 2-RP-EM-GCA-B

(E) 2-RP-EM-GCA-A

(E) 2-FP-EM-GCA

(E) 2-FP-GCA

(E) 2-FP-SB-GCB

WALL RATING LEGEND

FIRE WALL

SMOKE WALL

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:4

P

M

EP100

00 - GROUND FLOOR - POWER REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

SHEET NOTES:

1. CONNECT NEW MECHANICAL EQUIPMENT TO AVAILABLE SPACE AS SHOWN IN PANEL SCHEDULE. PROVIDE

NEW CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT IN PANEL 2-RP-EM-GCA-B. REFERENCE PANEL

SCHEDULE FOR CIRCUIT BREAKER SIZES.

1/8" = 1'-0"1

00 - GROUND FLOOR - POWER

8'4' 16'0

SCALE: 1/8"=1'-0"

A. UPDATE PANEL DIRECTORY UPON COMPLETION.

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'

- PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

58 A

SPARE CAPACITY:

25 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 225 A

CONSIDER 125% DEMAND: 75089 A

DEMAND CURRENT: 167 A

MEQ-C 5108 VA 125.00% 6385 VA DEMAND LOAD: 60071 VA

Spare 45000 VA 100.00% 45000 VA CONNECTED CURRENT: 158 A

Other 6949 VA 125.00% 8686 VA CONNECTED LOAD: 57057 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 169 A 169 A 144 A

TOTAL LOAD: 19870 VA 19870 VA 17316 VA

59 1000 VA -- 1 -- -- SPACE 60

57 1000 VA -- 1 -- -- SPACE 58

EX. LOAD -- 30 A 3

1000 VA -- 1 -- -- SPACE 56

53 SPACE -- -- 1 -- 972 VA 54

51 SPACE -- -- 1 -- 972 VA 52

49 SPACE -- -- 1 -- 972 VA

3 15 A NEW NEW 2-AHU-2

47 SPACE -- -- 1 -- 1344 VA 48

45 2554 VA 1344 VA 46

NEW 2-SSCU-13A / 2-SSAH-13A NEW 30 A 2

2554 VA 1344 VA

3 25 A NEW NEW 2-AHU-1

41 EX. LOAD -- 40 A 1 1000 VA 1000 VA 42

39 1000 VA 1000 VA 40

EX. LOAD -- 20 A 2

1000 VA 1000 VA

3 30 A -- EX. LOAD

35 EX. LOAD -- 20 A 1 1000 VA 1000 VA 36

33 EX. LOAD -- 20 A 1 1000 VA 1000 VA 34

31 EX. LOAD -- 20 A 1 1000 VA 1000 VA

3 30 A -- EX. LOAD

29 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 30

27 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 28

25 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 26

23 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 24

21 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 22

19 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 20

17 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 18

15 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 16

13 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 14

11 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 12

9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10

7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8

5 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6

3 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 4

1 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 2

CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT

NEMA ENCLOSURE:

MOUNTING: SURFACE AVAILABLE SCC (kA): PANEL POLES: 60

SERVICE RATED: INTEGRAL SPD: SECTIONS: 1

BRANCH: WIRES: 4 MCB OPTIONS:

SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 225 A

LOCATION: ELECTRICAL 20 VOLTS: 208/120 WYE MAINS TYPE: MCB

PANEL: (E) 2-RP-EM-GCA-B

TRUE NORTH

A. PANEL AIC (INTERRUPTING) RATING SHALL BE MINIMUM 120% OF THE AVAILABLE SCC (SHORT CIRCUIT CURRENT).

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'

- PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

75 A

SPARE CAPACITY:

60 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 125 A

CONSIDER 125% DEMAND: 22500 A

DEMAND CURRENT: 50 A

DEMAND LOAD: 18000 VA

MEQ-C 8000 VA 125.00% 10000 VA CONNECTED CURRENT: 44 A

Spare 8000 VA 100.00% 8000 VA CONNECTED LOAD: 16000 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 53 A 53 A 33 A

TOTAL LOAD: 6000 VA 6000 VA 4000 VA

23 SPACE -- -- 1 -- -- 1 -- -- SPACE 24

21 SPACE -- -- 1 -- -- 1 -- -- SPACE 22

19 SPACE -- -- 1 -- -- 1 -- -- SPACE 20

17 SPACE -- -- 1 -- -- 1 -- -- SPACE 18

15 1000 VA 1000 VA 16

(E) P-2-3 20 A 2

1000 VA 1000 VA

2 20 A -- EXISTING FAN COIL

11 1000 VA 1000 VA 12

(E) P-2-4 20 A 2

1000 VA 1000 VA

2 20 A -- EXISTING FAN COIL

7 1000 VA 1000 VA 8

(E) P-2-2 20 A 2

1000 VA 1000 VA

2 20 A -- EXISTING FAN COIL

3 1000 VA 1000 VA 4

(E) P-2-1 20 A 2

1000 VA 1000 VA

2 20 A -- EXISTING FAN COIL

CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT

NEMA ENCLOSURE:

MOUNTING: SURFACE AVAILABLE SCC (kA): PANEL POLES: 24

SERVICE RATED: INTEGRAL SPD: SECTIONS: 1

BRANCH: WIRES: 4 MCB OPTIONS:

SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 125 A

LOCATION: ELECTRICAL 20 VOLTS: 208/120 WYE MAINS TYPE: MLO

PANEL: (E) 2-RP-EM-GCC

113B

GROUP ROOM

Space

CORRIDOR

----1

OFFICE-1

113A

WAITING

----2

OFFICE-2

113D

OFFICE

113E

OFFICE

OFFICE

ELEVATOR

SPD SUPPLY

CLOSET 113F

119B

OFFICE

119C

OFFICE

Space

Space

119A

OFFICE

119D

OFFICE

OFFICE

TLT

117A

CLOSET

OFFICE

HOUSE KEEPING

116A

COMM

OFFICE

STORAGE

100A

TEL

STOR.

WAITING

CORRIDOR

SUPPLY

109C

PIPE CHASE 111A

109A

COPY RM

109B

CLOSET

OFFICE

OFFICE

102A

CLT

OFFICE108

OFFICE

106A

OFFICE

OFFICE

105A

OFFICE

103B

TLT

103A

CLT

TLT

OFFICE

OFFICE

(E) 2-RP-EM-1CA

2-FCU-1A

2-FCU-1B

WALL RATING LEGEND

FIRE WALL

SMOKE WALL

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:5

P

M

EP101

01 - FIRST FLOOR - POWER REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"1

01 - FIRST FLOOR - POWER

A. UPDATE PANEL DIRECTORY UPON COMPLETION.

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'

- PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

82 A

SPARE CAPACITY:

36 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 225 A

CONSIDER 125% DEMAND: 64397 A

DEMAND CURRENT: 143 A

DEMAND LOAD: 51518 VA

Spare 50000 VA 100.00% 50000 VA CONNECTED CURRENT: 142 A

Other 1214 VA 125.00% 1518 VA CONNECTED LOAD: 51214 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 147 A 138 A 142 A

TOTAL LOAD: 17607 VA 16607 VA 17000 VA

59 1000 VA -- 1 -- -- SPACE 60

57 1000 VA -- 1 -- -- SPACE 58

EX. LOAD -- 30 A 3

1000 VA -- 1 -- -- SPACE 56

53 SPACE -- -- 1 -- -- 1 -- -- SPACE 54

51 SPACE -- -- 1 -- -- 1 -- -- SPACE 52

49 SPACE -- -- 1 -- 1000 VA 1 20 A -- SPARE 50

47 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- SPARE 48

45 EX. LOAD -- 20 A 1 1000 VA 607 VA 46

43 EX. LOAD -- 20 A 1 1000 VA 607 VA

2 20 A NEW NEW 2-FCU-1A, 2-FCU-1B

41 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 42

39 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 40

37 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 38

35 1000 VA 1000 VA 1 20 A -- EX. LOAD 36

EX. LOAD -- 20 A 2

1000 VA 1000 VA 1 20 A -- EX. LOAD 34

31 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 32

29 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 30

27 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 28

25 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 26

23 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 24

21 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 22

19 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 20

17 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 18

15 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 16

13 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 14

11 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 12

9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10

7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8

5 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6

3 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 4

1 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 15 A -- EX. LOAD 2

CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT

NEMA ENCLOSURE:

MOUNTING: RECESSED AVAILABLE SCC (kA): PANEL POLES: 60

SERVICE RATED: INTEGRAL SPD: SECTIONS: 1

BRANCH: WIRES: 4 MCB OPTIONS:

SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 225 A

LOCATION: ENTRANCE WAY CG5 VOLTS: 208/120 WYE MAINS TYPE: MLO

PANEL: (E) 2-RP-EM-1CA

SHEET NOTES:

TRUE NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

GENERAL NOTES:

A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.

CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH

ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO

MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE

WORK TO INSTALL PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.

C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.

1. CONNECT NEW MECHANICAL EQUIPMENT TO AVAILABLE SPACE AS SHOWN IN PANEL SCHEDULE. PROVIDE NEW 20A CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT IN PANEL 2-RP-EM-1CA. REFERENCE PANEL

SCHEDULE FOR CIRCUIT BREAKER SIZES.

212B

OFFICE

Space

212E

WAITING RM

213D

OFFICE

213C

OFFICE

213FB

OFFICE

213A

OFFICE 213

COSAT SYCH

NURSE OFFICE

212C

OFFICE

OFFICE

OFFICE 232

ELEC. / MECH. 211A

TOILET CONGREGATE

WAITING RM

COSAT MATERIALS209

HAC

ELEVATOR

STORAGE

GROUP RM

219B

OFFICE

219D

OFFICE

219A

OFFICE

219C

OFFICE

OFFICE

OFFICE SOCIAL WORKER

KITCHEN

REHAB TECH

OFFICE REC THERAPY

CORRIDOR

CORRIDOR

STOR.

200A

TEL

Space

GROUP ROOM

207A

OFFICE

OFFICE STAFF

BREAK ROOM

TLT. FEMALE PATIENT

202A

CLT

TLT.

203A

ELEC / MECH

203B

TLT

OFFICE

CORRIDOR

205A

OFFICE

205B

OFFICE

(E) 2-RP-2CB

2-FCU-2A

2-FCU-2B

(E) 2-LP-2CA

WALL RATING LEGEND

FIRE WALL

SMOKE WALL

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:5

P

M

EP102

02 - SECOND FLOOR - POWER REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"1

02 - SECOND FLOOR - POWER

8'4' 16'0

SCALE: 1/8"=1'-0"

TRUE NORTH

SHEET NOTES:

GENERAL NOTES:

A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.

CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH

ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO

MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE

WORK TO INSTALL PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.

C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.

1. CONNECT NEW MECHANICAL EQUIPMENT TO AVAILABLE SPACE AS SHOWN IN PANEL SCHEDULE. REMOVE 60A CIRCUIT BREAKER AND PROVIDE NEW 20A/2POLE CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT

IN PANEL 2-RP-2CB. REFERENCE PANEL SCHEDULE FOR CIRCUIT BREAKER SIZES.

A. PANEL AIC (INTERRUPTING) RATING SHALL BE MINIMUM 120% OF THE AVAILABLE SCC (SHORT CIRCUIT CURRENT).

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'

- PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

65 A

SPARE CAPACITY:

65 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 100 A

CONSIDER 125% DEMAND: 15647 A

DEMAND CURRENT: 35 A

DEMAND LOAD: 12518 VA

Spare 11000 VA 100.00% 11000 VA CONNECTED CURRENT: 34 A

Other 1214 VA 125.00% 1518 VA CONNECTED LOAD: 12214 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 47 A 47 A 17 A

TOTAL LOAD: 5107 VA 5107 VA 2000 VA

11 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 12

9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10

7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8

5 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6

3 EX. LOAD -- 30 A 1 2500 VA 607 VA 4

1 EX. LOAD -- 30 A 1 2500 VA 607 VA

2 20 A NEW NEW 2-FCU-2A, 2-FCU-2B

CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT

NEMA ENCLOSURE:

MOUNTING: RECESSED AVAILABLE SCC (kA): PANEL POLES: 12

SERVICE RATED: INTEGRAL SPD: SECTIONS: 1

BRANCH: WIRES: 4 MCB OPTIONS:

SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 100 A

LOCATION: CORRIDOR 178 VOLTS: 208/120 WYE MAINS TYPE: MLO

PANEL: (E) 2-RP-2CB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:0

:4

P

M

E700

ELECTRICAL SCHEDULES REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

EQUIPMENT CONNECTION SCHEDULE

MARK DESCRIPTION ROOM NAME ROOM # HP KW FLA MCA MOCP VOLTS PHASE POLES

LOAD

[VA]

CONTROL

TYPE

DISCONNECT

BY

DISCONNECT

TYPE FEEDER PANEL

CIRCUIT

NUMBER SCCR GEN REMARKS

(E) P-2-1 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 1,3 0 No 1

(E) P-2-2 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 5,7 0 No 1

(E) P-2-3 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 13,15 0 No 1

(E) P-2-4 EXISTING PUMP 0 0 0 0 0 208 0 2 2000 - - - (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCC 9,11 0 No 1

2-AHU-1 AIR HANDLING UNIT CREDIT UNION 16B 0 0 11.2 14 25 208 3 3 4032 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 44,46,48 0 Yes -

2-AHU-2 AIR HANDLING UNIT Space 304 0 0 0 5.8 15 208 3 3 2917 INT ELEC NF (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 50,52,54 0 Yes -

2-FCU-1A FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2

2-FCU-1B FAN COIL UNIT GROUP ROOM 113B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 0 No 2

2-FCU-2A FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2

2-FCU-2B FAN COIL UNIT OFFICE 212B 0 0 0 3.7 20 208 1 2 607 MECH F 30A/1P (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 0 No 2

2-SSAH-13A DUCTLESS SPLIT SYSTEM INDOOR IT CLOSET 13A 0 0 0 1 30 208 1 2 208 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1

2-SSCU-13A DUCTLESS SPLIT SYSTEM OUTDOOR 0 0 0 25 30 208 1 2 4900 INT ELEC NF (3X) (30A) 2-#10 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 0 Yes 1

GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)

A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY WITH FLOOR PLANS. WHERE LOCATIONS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS, REFER TO MECHANICAL SHEETS. REFER TO DEFINITIONS BELOW FOR CLARIFICATIONS OF CONNECTION REQUIREMENTS.

B. PROVIDE WIRING AND EQUIPMENT CONNECTIONS FOR INTERNAL EQUIPMENT COMPONENTS AS REQUIRED. COORDINATE REQUIREMENTS WITH MECHANICAL CONTRACTOR.

C. "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS:

• "INT" = CONTROLCSS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED).

• "FA STOP" = FANS WITH CFM OF 2000 OR GREATER AND FANS SERVING DUCTS CONTAINING SMOKE DAMPERS.

• PROVIDE FIRE ALARM SYSTEM DUCT SMOKE DETECTORS AT RETURN-SIDE AND SUPPLY-SIDE OF FAN/UNIT. PROVIDE MULTIPLE DETECTORS IF REQUIRED TO ACCOMMODATE MAIN DUCT TAKE-OFFS WHERE A SINGLE DETECTOR CANNOT BE INSTALLED TO CAPTURE ALL AIRFLOW. FIRE ALARM SYSTEM SHALL SHUTDOWN FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT. PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE AT MOTOR CONTROLLER/STARTER AND CONNECT TO SHUTDOWN FAN.

D. "DISCONNECT BY" :

• "MECHANICAL" = DISCONNECT IS FURNISHED BY MECHANICAL CONTRACTOR OR PROVIDED WITH MECHANICAL EQUIPMENT.

• ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR.

E. "DISCONNECT TYPE" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT:

• "VFD" = VARIABLE FREQUENCY DRIVE CONTROLLER. LOCATE VARIABLE FREQUENCY DRIVE CONTROL TO SERVE AS THE MOTOR DISCONNECT.

• DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION.

• WHERE STARTERS OR VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED.

F. "FEEDER":

• PROVIDE CONDUCTORS AND RACEWAY AS INDICATED. TYPICAL FORMAT IS: (FEEDER TAG) (NOMINAL SIZE) CONDUCTORS AND RACEWAY REQUIRED.

G. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY

BE PROVIDED WITH 5 KA SCCR

REMARKS: (EQUIPMENT CONNECTION SCHEDULE)

1. MECHANICAL UNIT EXISTING TO REMAIN.

2. DISCONNECT SWITCH TO BE MOUNTED AND INSTALLED ADJACENT TO UNIT OR ABOVE CEILING ADJACENT TO UNIT. DISCONNECT MAY BE MOUNTED TO UNIT OR INDEPENDENTLY SUPPORTED FROM THE STRUCTURE ABOVE. REFERENCE SPECIFICATIONS FOR INSTALLATION REQUIREMENTS AND SUPPORT INFORMATION. COORDINATE LOCATION WITH

MECHANICAL CONTRACTOR.

CONTRACTOR REQUIREMENTS FOR THE

DEMOLITION OF, OR ADDITION TO, ANY PORTION

OF AIR OR HYDRONIC SYSTEMS.

COVER SHEET NOTES:

THE FOLLOWING SHALL APPLY TO ALL MECHANICAL SYSTEMS AFFECTED BY CONSTRUCTION ACTIVITIES. SYSTEMS INCLUDED BUT ARE NOT LIMITED TO HVAC, EXHAUST, EQUIPMENT, DUCTWORK, DUCTWORK ACCESSORIES, HYDRONICS, COILS, FILTERS, TEMPERATURE CONTROLS, LIFE SAFETY

CONTROLS AND PRESSURIZATION CONTROLS.

1. AIR QUALITY, QUANTITY AND PRESSURE RELATIONSHIPS SHALL COMPLY WITH THE LATEST, ANSI/ASHRAE/ASHE STANDARD 170

REQUIREMENTS.

2. COMPLY WITH THE FACILITY'S INFECTIOUS CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS.

3. MAINTAIN EXISTING AIR QUALITY REQUIREMENTS, AIR PRESSURIZATION AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS

DURING ANY RENOVATION OR CONSTRUCTION.

4. DETERMINE AND VERIFY THE AREAS SERVED BY THE AFFECTED SYSTEMS.

5. TAKE AIR AND OR/ WATER BALANCE READINGS OF THE SYSTEMS BEING AFFECTED.

6. IF THERE ARE SPACES BEING SERVED OUTSIDE OF THE DEMOLITION OR ADDITION AREA, THE FOLLOWING PROCEDURES MUST BE TAKEN:

a. TAKE AIR AND/OR WATER BALANCE READINGS AS NEEDED TO QUANTIFY THE AIR AND/OR WATER FLOWS DELIVERED TO THE

SYSTEMS OUTSIDE THE AFFECTED AREA.

b. DURING DEMOLITION, TAKE ALL NECESSARY MEASURES TO MAINTAIN THE CORRECT AIR AND/OR WATER FLOWS TO THE SYSTEMS

THAT ARE REMAINING.

c. AFTER THE COMPLETION OF DEMOLITION, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.

d. AFTER COMPLETING ANY ADDITIONS TO THE SYSTEM, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.

7. THE CONTRACTOR IS TO PROVIDE TEMPORARY AIR/AND OR WATER SYSTEMS AS NEEDED TO MAINTAIN PROPER TEMPERATURE AND

PRESSURE RELATIONSHIPS OF SPACES REQUIRED TO BE OCCUPIED DURING CONSTRUCTION.

8. ALL TEMPORARY AIR SUPPLY SYSTEMS MUST UTILIZE FINAL FILTERS THAT ARE A MINIMUM OF 90% EFFICIENT (MERV 14). FINAL FILTERS

MUST BE DOWNSTREAM OF ALL AIR SUPPLY COMPONENTS.

MECHANICAL GENERAL NOTES:

A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, AND TEMPERATURE CONTROLS WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE

SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.

B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY ENGINEER.

C. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION OF THE ADDITIONS AND REMODELING/ALTERATION OF THE EXISTING BUILDING. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. PLAN TO COMPLETE SHUTDOWNS DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. COORDINATE SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT.

TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED

TESTING.

D. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF

THE OWNER.

E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND

REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.

F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS AS "TO BE RETAINED, RELOCATED", ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR

WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS:

a. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE

MAIN WITH MATERIAL TO MATCH EXISTING.

b. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS

CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED

c. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO…