About this file

These documents are construction drawings for a VA project to replace HVAC systems in Buildings 2 and 46 at the Tuscaloosa VA Medical Center. The comprehensive set of architectural, mechanical, and electrical drawings details the complete renovation, including demolition and installation of new equipment such as air handling units, fan coil units, ductwork, piping, and electrical systems. The project involves removing existing HVAC infrastructure and replacing it with new Trane equipment, including 46-AHU-1 (a 4,500 CFM air handling unit), multiple fan coil units (46-FCU-1 through 46-FCU-8), and associated mechanical and electrical components.

The drawings specify detailed requirements for installation, including sequence of operations for the air handling unit, control sequences, piping schematics, and electrical connections. The project is fully documented with plans for ground, first, and second floors, covering demolition and new work across multiple disciplines. The drawings are dated April 26, 2023, with an addendum on March 28, 2025, and indicate the work will maintain continuous building operations, with specific guidelines for minimizing disruption to the VA facility during construction.

View the file

Other files for this federal contract opportunity

Other files attached to 679-22-106 Replace HVAC Various Buildings, newest first.
File Type Posted
Amendment 0006 36C24725R0031.pdf PDF
Amendment 0005 36C24725R0031.pdf PDF
Attachment 0005 A- Pre-Bid RFIs_Responses.pdf PDF
Attachment 0005 B - Appendix B - Building 2.pdf PDF
Attachment 0005 F- Appendix B - Building 2.pdf PDF
Attachment 0005 H-Wage DBA AL20250098.txt TXT text file
Attachment 0005 C - Appendix P - Building 46.pdf PDF
Attachment 0005 D - Appendix S - Building 46.pdf PDF
Attachment 0005 E- Addendum 1 Change Narrative.pdf PDF
Amendment 36C24725R0031 0004.pdf PDF
Amendment 36C24725R0031 0003.pdf PDF
Amendment 36C24725R0031 0002.pdf PDF
679-22-106 -Replace HVAC Various Buildings Site Visit.pdf PDF
Amendment 36C24725R0031 0001.pdf PDF
Attachment 6 - INVOICING.docx DOCX document
Attachment 5 -DBA Number AL20240136.pdf PDF
679-22-106 Specifications.pdf PDF
Solicitation 36C24725R0031.pdf PDF
Attachment 3 - Past Performance Questionnaire -PPQ.docx DOCX document
Attachment 2 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Deviation.pdf PDF
Attachment 1 - Experience Modification Rate Form.pdf PDF
679-22-106_Drawings.pdf PDF
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

04/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:1

P

M

G001

COVER SHEET REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 AGT PCM

CONSTRUCTION

DOCUMENTS

679-22-106 TUSCALOOSA VA REPLACE HVAC, VARIOUS BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

CHIEF OF ENGINEERING: MEDICAL CENTER DIRECTOR: SAFETY MANAGER: INFECTION CONTROL: ENERGY ENGINEER:

GENERAL NOTES:

1. THE GENERAL CONTRACTOR SHALL CONDUCT A PRE-CONSTRUCTION MEETING WITH THE COR TO IDENTIFY AREAS WHERE AFTER HOURS WORK WILL BE REQUIRED. AREAS INCLUDE, BUT ARE NOT LIMITED TO BUILDING 2. ALL WORK THAT WILL SHUT DOWN PATIENT CARE AREAS OUTSIDE OF THE AREAS BEING ACTIVELY WORKED IN WILL BE

REQUIRED TO OCCUR OUTSIDE THE BUILDING HOURS OF OPERATION.

A. BUILDING 2 HOURS OF OPERATION: 7:30AM - 4:00PM, MONDAY - FRIDAY

B. BUILDING 46 HOURS OF OPERATION: UNOCCUPIED

2. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNERS AS TO THE LIMITATIONS OF THE WORK AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR/VA AND THE CONTRACTOR BEFORE

THE START OF THE WORK.

3. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM THE BASIS OF DESIGN PRODUCT.

PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO WORK. PRODUCTS FROM OTHER MANUFACTURER'S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR

PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

4. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A

COMPLETE, INTEGRATED AND UNIFIED WHOLE.

5. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATIONS FROM THE COR/VA PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE RESONABLY INFERRED, THE CONTRACTOR

SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANITY OF WORK.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS (BOTH EXPOSED AND CONCEALED) AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS. NOTIFY THE COR/VA PRIOR TO PROCEEDING WITH THE WORK.

7. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION. MECHANICAL DUCTWORK & EQUIPMENT SHALL HAVE PRIORITY OVER OTHER DISIPLINES FOR INSTALLATIONS & ROUTING. COORDINATE UTILITIES, SO THAT

THEY ARE INSTALLED IN AND ORDERLY AND UNIFORM MANNER.

8. COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES.

9. CONTRACTOR IS REPONSIBLE FOR OBTAINING ALL CONSTRUCTION PERMITS.

10. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING, AND ACCESS FOR COR/VA REVIEW AND APPROVAL.

11. PROVIDE STRUCTURAL SUPPORTS ABOVE CEILING WHERE REQUIRED FOR CEILING HUNG EQUIPMENT.

12. PROVIDE SEALANT AT ALL INTERSECTIONS / JOINTS BETWEEN DIFFERENT MATERIALS.

13. ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A COMPLETE PROJECT SHALL BE PROVIDED

AND INSTALLED BY THE CONTRACTOR (UNO).

14. DRAWINGS SCALES INDICATED ARE FOR REFERENCE ONLY, WRITTEN DIMENSIONS SHALL GOVERN.

15. PROTECT EXISTING ITEMS, EQUIPMENT, FINISHES, ETC. TO REMAIN. REPAIR / REPLACE / RESTORE, CONDITIONS

THAT ARE DAMAGED OR DISTURBED AS A RESULT OF DEMOLITION OR NEW WORK.

16. CONTRACTOR SHALL MINIMIZE DOWNTIME ASSOCIATED WITH SCHEDULED SHUTDOWNS. COORDINATE WITH

COR/VA.

17. CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL MEASURES TO SAFELY PERFORM ROAD CLOSURES, DETOURS, OR OTHER DISRUPTIONS TO VEHICULAR TRAFFIC.

18. CONTRACTOR SHALL SCHEDULE ALL UTILITY INTERRUPTIONS WITH THE PROJECT COR AT LEAST FOUR (4) WEEKS IN ADVANCE. UTILITY INTERRUPTIONS MAY REQUIRE OVERTIME WORK FOR ALL TRADES INVOLVED, AND SHALL BE

PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE VA.

SHEET INDEX - ELECTRICAL - BUILDING 02

Sheet Number Sheet Name

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED100 00 - GROUND FLOOR - ELECTRICAL - DEMOLITION

ED101 01 - FIRST FLOOR - ELECTRICAL - DEMOLITION

ED102 02 - SECOND FLOOR - ELECTRICAL - DEMOLITION

EP100 00 - GROUND FLOOR - POWER

EP101 01 - FIRST FLOOR - POWER

EP102 02 - SECOND FLOOR - POWER

E700 ELECTRICAL SCHEDULES

SHEET INDEX - MECHANICAL - BUILDING 02

Sheet Number Sheet Name

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD100 00 - GROUND FLOOR - MECHANICAL - DEMOLITION

MD101 01 - FIRST FLOOR - MECHANICAL - DEMOLITION

MD102 02 - SECOND FLOOR - MECHANICAL - DEMOLITION

MH100 00 - GROUND FLOOR - DUCTWORK

MH101 01 - FIRST FLOOR - DUCTWORK

MH102 02 - SECOND FLOOR - DUCTWORK

MP100 00 - GROUND FLOOR & BASEMENT - PIPING

MP101 01 - FIRST FLOOR - PIPING

MP102 02 - SECOND FLOOR - PIPING

M500 MECHANICAL DETAILS AND CONTROLS

M600 MECHANICAL SCHEDULES

SHEET INDEX - ELECTRICAL - BUILDING 46

Sheet Number Sheet Name

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED101 ELECTRICAL DEMOLITION

EL101 FLOOR PLAN - LIGHTING

EP101 FLOOR PLAN - POWER

SHEET INDEX - MECHANICAL - BUILDING 46

Sheet Number Sheet Name

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD101 01-FIRST FIRST - MECHANICAL - DEMOLITION

MH101 01-FIRST FIRST - DUCTWORK

MP101 01-FIRST FLOOR - PIPING

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

M700 MECHANICAL CONTROLS

SHEET INDEX - GENERAL AND ARCHITECTURAL

Sheet Number Sheet Name

.G001 COVER SHEET

A-101 FLOOR PLANS - DEMOLITION AND NEW WORK AND SECTIONS

A-102 GROUND FLOOR DEMOLITION AND NEW WORK PLANS

A-103 FIRST FLOOR DEMOLITION AND NEW WORK PLANS

A-104 SECOND FLOOR DEMOLITION AND NEW WORK PLANS

Revisions: Date:

04/26/2023

ADDENDUM #1 03-28-2025

B2_A-102 GROUND FLOOR DEMOLITION AND NEW WORK PLANS

B2_A-103 FIRST FLOOR DEMOLITION AND NEW WORK PLANS

B2_A-104 SECOND FLOOR DEMOLITION AND NEW WORK PLANS

B46_A-101 FLOOR PLANS - DEMOLITION AND NEW WORK AND SECTIONS

B46_A-501 DETAILS

03/28/2025

UP

UP

UP

UP

UP

OFFICE STAFF

OFFICE CLERK

B

C R

E D

IT

U

N

IO

N

CREDIT UNION

16A

CREDIT UNION

CREDIT UNION

CREDIT UNION

CREDIT UNION

13A

IT CLOSET

BREAK RM

12A

CREDIT SECURE

STORAGE

CREDIT UNION

STORAGE

8A

MECH RM

3A

WAITING RM

CLT

S T

O R

A G

E

TLT.

C G

E

N T

R A

N C

E W

A Y

7C

EXAM ROOM

7B

EXAM ROOM

7A

EXAM ROOM

PSY. / EXAM

OFFICE

CLERKS OFFICE

3B

CHECK-IN ROOM

1C

LOBBY

F

E M

A

LE

T

LT

STAIR

FEMALE TLT

26A

OFFICE

26B

OFFICE

O

F F

IC

E

S T

A F

F 26C

OFFICE

OFFICE

CONFERENCE ROOM

MALE TOILET

23C

ELECT / MECH

23B

ELECTRICAL / MECH

HAC

22A

HAC

TELE CLOSET

ELECTRICAL

CG5

ENTRANCE WAY

C G

C

O R

R

ID

O R

E

LE

V A

T O

R

SMOKEWALL

FIREWALL - VERIFY IN FIELD

D1 D2

OFFICE STAFF

OFFICE CLERK

B

C R

E D

IT

U

N

IO

N

CREDIT UNION

16A

CREDIT UNION

CREDIT UNION

CREDIT UNION

CREDIT UNION

13A

IT CLOSET

BREAK RM

12A

CREDIT SECURE

STORAGE

CREDIT UNION

STORAGE

8A

MECH RM

3A

WAITING RM

CLT

S T

O R

A G

E

TLT.

C G

E

N T

R A

N C

E W

A Y

7C

EXAM ROOM

7B

EXAM ROOM

7A

EXAM ROOM

PSY. / EXAM

OFFICE

CLERKS OFFICE

3B

CHECK-IN ROOM

1C

LOBBY

F

E M

A

LE

T

LT

STAIR

FEMALE TLT

26A

OFFICE

26B

OFFICE

O

F F

IC

E

S T

A F

F 26C

OFFICE

OFFICE

CONFERENCE ROOM

MALE TOILET

23C

ELECT / MECH

23B

ELECTRICAL / MECH

HAC

22A

HAC

TELE CLOSET

ELECTRICAL

CG5

ENTRANCE WAY

C G

C

O R

R

ID

O R

E

LE

V A

T O

R

SMOKEWALL

FIREWALL - VERIFY IN FIELD

V.I.F.

A-102

EXISTING EXTERIOR WALL

EXISTING COLUMN

8"

VERIFY IN FIELD. SEE NEW WORK KEYNOTE #1

1 5/8" METAL STUDS @ 1'-4" O.C. MAX.

5/8" GYP. WALL BOARD

EXISTING CONSTRUCTION TO REMAIN

NEW WORK LEGEND

NEW CONSTRUCTION - EXTEND TO UNDERSIDE OF STRUCTURE

ABOVE

1. ALL DIMENSIONS ARE MEASURED FROM FACE OF EXISTING WALL TO

THE FACE OF NEW WALL UNLESS NOTED OTHERWISE.

2. ALL NEW WORK TO BE FINISHED TO MATCH EXISTING UNLESS NOTED

OTHERWISE.

3. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITION

DEMOLITION AND NEW WORK NOTES.

4.CONTRACTOR SHALL ENSURE ALL DOORS WITHIN AREAS OF WORK

SWING FREE OVER FLOORING AND TRANSITION STRIPS.

5. ALL PAINT COLORS TO BE SELECTED / APPROVED BY COR OR VA

INTERIOR DESIGNER.

6. EXISTING FLOORING MATERIALS TO BE COVERED AND PROTECTED

DURING DEMOLITION AND NEW CONSTRUCTION.

GENERAL NOTES

ALL NOTES MAY NOT BE APPLICABLE.

NOTES:

1. INSTALL LINE SET COVER SIMILAR TO SHOWN AT ALL LOCATIONS WHERE PIPING PROTRUDES FROM BUILDING.

2. COVER SHOULD BE PLASTIC BY DiversiTech, OR EQUIVALENT.

3. ANCHOR PER MANUFACTURERS INSTRUCTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT / ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street, Suite 355, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

B

IM

/2

.0

V A

T u s c a lo o s a

R e p la c e H

V A

C V a ri o u s B u ild in g

/B

.2

.1

A

R C

H A

T R

IA

X

R

.r v t

/2

/2

:3

:4

A

M

A-102

GROUND FLOOR DEMOLITION AND

NEW WORK PLANS

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 EHH TLR

CONSTRUCTION

DOCUMENTS

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

1/8" = 1'-0"1

GROUND FLOOR PLAN - DEMO

1/8" = 1'-0"2

GROUND FLOOR PLAN - NEW

8'4' 16'0

SCALE: 1/8"=1'-0"

1" = 1'-0"3

ENLARGED PLAN @ NEW PIPE CHASE

NTS

LINE SET COVERS

DEMOLITION KEYNOTES

D1 CUT AND REMOVE EXISTING VINYL WALL COVERING ON CHASE WALL.

DEMOLISH GYPSUM WALL BOARD AND FRAMING OF CHASE WALL AS

REQUIRED TO EXPOSE EXISTING HVAC PIPING. REFERENCE MEP

DRAWINGS FOR DEMOLITION NOTES.

D2 REMOVE PORTION OF EXISTING ACT CEILING AND GRID AS REQUIRED TO

DEMO CHASE WALL.

D3 REMOVE EXISTING WALL MOUNTED FCU. REFERENCE MECHANICAL

DRAWINGS. REMOVE PORTION OF GYPSUM WALL BOARD AS REQUIRED

TO REMOVE EXISTING HVAC PIPING AND FOR INSTALLATION OF NEW

PIPING.

NEW WORK KEYNOTES

1 CONSTRUCT NEW METAL STUD AND GYPSUM BOARD VERTICAL PIPE

CHASES. SEE DETAIL ON A-102. CHASE SIZE TO BE DETERMINED IN THE

FIELD BASED ON PIPING LOCATION. NEW CHASE TO COVER AREA OF

DEMOLISHED CHASE AND EXTEND 6" MIN. ABOVE ACT CEILING GRID.

PREP AND FINISH GYPSUM WALL BOARD SURFACE FOR PAINT. PAINT TO

BE SELECTED AND APPROVED BY VA INTERIOR DESIGNER. REFERENCE

MECHANICAL DRAWINGS FOR NEW PIPING NOTES.

2 PATCH / REPAIR WALLS AS REQUIRED FOR ANY DAMAGE CAUSED DURING

DEMOLITION AND INSTALLATION OF FCU AND PIPING. PREP AND FINISH

GYPSUM WALL BOARD SURFACE FOR PAINT. PAINT ENTIRE WALL WITH

BENJAMIN MOORE SEA REFLECTION 1664.

3 REVISE ACT CEILING GRID AND REPLACE TILES AS NEEDED TO FIT WITH

NEW PIPE CHASES. CEILING TILES TO MATCH EXISTING.

4 PATCH AND/OR REPAIR EXISTING EXTERIOR WALL AS REQUIRED IN

LOCATION(S) OF REMOVED REFRIGERANT PIPING. MATCH EXISTING.

5 PROVIDE AND INSTALL NEW LINE COVERS OVER NEW REFRIGERANT

LINES. COORDINATE LOCATION WITH MEP DRWINGS. SEE NOTES AND

PHOTO ON THIS SHEET.

03.28.2025

Revision Number

Revisions: Date:

1 ADDEDUM #1 03/28/2025

ALL KEYNOTES MAY NOT BE APPLICABLE TO THIS SHEET.

UPUP

UP UP

UP

UPUP

UP113A

WAITING

OFFICE

CORRIDOR

113D

OFFICE

113E

OFFICE

SPD SUPPLY

SUPPLY

109B

OFFICE

WAITING

OFFICE

106A

OFFICE

OFFICE 105

OFFICE

105A

OFFICE

OFFICE

OFFICE

STAIR

OFFICE

119D

OFFICE

119C

OFFICE

119A

OFFICE

OFFICE

7A

C

LO

S E

T

116A

COMM

STORAGE

CORRIDOR

C O

R R

ID

O

R

E

LE

V A

T O

R

119B

OFFICE

TLT

OFFICE

100A

TEL

STOR.

CORRIDOR

C

LO

S E

T

F 111

CLOSET

113B

GROUP ROOM

OFFICE

OFFICE

OFFICE

TLT

103A

CLT

103B

TLT

102A

CLT

109A

COPY RM

P

IP

E C

H A

S E

A

HOUSE KEEPING

SMOKEWALL

FIREWALL - VERIFY IN FIELD

D3

D3

113A

WAITING

OFFICE

CORRIDOR

113D

OFFICE

113E

OFFICE

SPD SUPPLY

SUPPLY

109B

OFFICE

WAITING

OFFICE

106A

OFFICE

OFFICE 105

OFFICE

105A

OFFICE

OFFICE

OFFICE

STAIR

OFFICE

119D

OFFICE

119C

OFFICE

119A

OFFICE

OFFICE

7A

C

LO

S E

T

116A

COMM

STORAGE

CORRIDOR

C O

R R

ID

O

R

E

LE

V A

T O

R

119B

OFFICE

TLT

OFFICE

100A

TEL

STOR.

CORRIDOR

C

LO

S E

T

F 111

CLOSET

113B

GROUP ROOM

OFFICE

OFFICE

OFFICE

TLT

103A

CLT

103B

TLT

102A

CLT

109A

COPY RM

P

IP

E C

H A

S E

A

HOUSE KEEPING

SMOKEWALL

FIREWALL - VERIFY IN FIELD

EXISTING CONSTRUCTION TO REMAIN

NEW WORK LEGEND

NEW CONSTRUCTION - EXTEND TO UNDERSIDE OF STRUCTURE

ABOVE

1. ALL DIMENSIONS ARE MEASURED FROM FACE OF EXISTING WALL TO

THE FACE OF NEW WALL UNLESS NOTED OTHERWISE.

2. ALL NEW WORK TO BE FINISHED TO MATCH EXISTING UNLESS NOTED

OTHERWISE.

3. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITION

DEMOLITION AND NEW WORK NOTES.

4.CONTRACTOR SHALL ENSURE ALL DOORS WITHIN AREAS OF WORK

SWING FREE OVER FLOORING AND TRANSITION STRIPS.

5. ALL PAINT COLORS TO BE SELECTED / APPROVED BY COR OR VA

INTERIOR DESIGNER.

6. EXISTING FLOORING MATERIALS TO BE COVERED AND PROTECTED

DURING DEMOLITION AND NEW CONSTRUCTION.

GENERAL NOTES

ALL NOTES MAY NOT BE APPLICABLE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT / ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street, Suite 355, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

B

IM

/2

.0

V A

T u s c a lo o s a

R e p la c e H

V A

C V a ri o u s B u ild in g

/B

.2

.1

A

R C

H A

T R

IA

X

R

.r v t

/2

/2

:3

:4

A

M

A-103

FIRST FLOOR DEMOLITION AND NEW

WORK PLANS

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

03/28/2025 EHH TLR

CONSTRUCTION

DOCUMENTS

Approver

1/8" = 1'-0"1

FIRST FLOOR PLAN - DEMO

1/8" = 1'-0"2

FIRST FLOOR PLAN - NEW

8'4' 16'0

SCALE: 1/8"=1'-0"

DEMOLITION KEYNOTES

D1 CUT AND REMOVE EXISTING VINYL WALL COVERING ON CHASE WALL.

DEMOLISH GYPSUM WALL BOARD AND FRAMING OF CHASE WALL AS

REQUIRED TO EXPOSE EXISTING HVAC PIPING. REFERENCE MEP

DRAWINGS FOR DEMOLITION NOTES.

D2 REMOVE PORTION OF EXISTING ACT CEILING AND GRID AS REQUIRED TO

DEMO CHASE WALL.

D3 REMOVE EXISTING WALL MOUNTED FCU. REFERENCE MECHANICAL

DRAWINGS. REMOVE PORTION OF GYPSUM WALL BOARD AS REQUIRED

TO REMOVE EXISTING HVAC PIPING AND FOR INSTALLATION OF NEW

PIPING.

NEW WORK KEYNOTES

1 CONSTRUCT NEW METAL STUD AND GYPSUM BOARD VERTICAL PIPE

CHASES. SEE DETAIL ON A-102. CHASE SIZE TO BE DETERMINED IN THE

FIELD BASED ON PIPING LOCATION. NEW CHASE TO COVER AREA OF

DEMOLISHED CHASE AND EXTEND 6" MIN. ABOVE ACT CEILING GRID.

PREP AND FINISH GYPSUM WALL BOARD SURFACE FOR PAINT. PAINT TO

BE SELECTED AND APPROVED BY VA INTERIOR DESIGNER. REFERENCE

MECHANICAL DRAWINGS FOR NEW PIPING NOTES.

2 PATCH / REPAIR WALLS AS REQUIRED FOR ANY DAMAGE CAUSED DURING

DEMOLITION AND INSTALLATION OF FCU AND PIPING. PREP AND FINISH

GYPSUM WALL BOARD SURFACE FOR PAINT. PAINT ENTIRE WALL WITH

BENJAMIN MOORE SEA REFLECTION 1664.

3 REVISE ACT CEILING GRID AND REPLACE TILES AS NEEDED TO FIT WITH

NEW PIPE CHASES. CEILING TILES TO MATCH EXISTING.

4 PATCH AND/OR REPAIR EXISTING EXTERIOR WALL AS REQUIRED IN

LOCATION(S) OF REMOVED REFRIGERANT PIPING. MATCH EXISTING.

5 PROVIDE AND INSTALL NEW LINE COVERS OVER NEW REFRIGERANT

LINES. COORDINATE LOCATION WITH MEP DRWINGS. SEE NOTES AND

PHOTO ON THIS SHEET.

8'4' 16'0

SCALE: 1/8"=1'-0"

03.28.2025

Revision Number

Revisions: Date:

1 ADDEDUM #1 03/28/2025

UP

UP

UP

UP

UP

UP

EXISTING CONSTRUCTION TO REMAIN

NEW WORK LEGEND

NEW CONSTRUCTION - EXTEND TO UNDERSIDE OF STRUCTURE

ABOVE

1. ALL DIMENSIONS ARE MEASURED FROM FACE OF EXISTING WALL TO

THE FACE OF NEW WALL UNLESS NOTED OTHERWISE.

2. ALL NEW WORK TO BE FINISHED TO MATCH EXISTING UNLESS NOTED

OTHERWISE.

3. REFERENCE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITION

DEMOLITION AND NEW WORK NOTES.

4.CONTRACTOR SHALL ENSURE ALL DOORS WITHIN AREAS OF WORK

SWING FREE OVER FLOORING AND TRANSITION STRIPS.

5. ALL PAINT COLORS TO BE SELECTED / APPROVED BY COR OR VA

INTERIOR DESIGNER.

6. EXISTING FLOORING MATERIALS TO BE COVERED AND PROTECTED

DURING DEMOLITION AND NEW CONSTRUCTION.

GENERAL NOTES

ALL NOTES MAY NOT BE APPLICABLE.

COSAT SYCH

NURSE OFFICE

212E

WAITING RM

OFFICE

OFFICE

TOILET CONGREGATE

COSAT MATERIALS

WAITING RM

207A

OFFICE

GROUP ROOM

BREAK ROOM

OFFICE

205B

OFFICE

205A

OFFICE

TLT. FEMALE PATIENT

OFFICE STAFF

STAIRS

OFFICE REC THERAPY

219C

OFFICE

219D

OFFICE

219A

OFFICE

REHAB TECH

STORAGE

C O

R R

ID

O

R

E

LE

V A

T O

R

219B

OFFICE

OFFICE SOCIAL

WORKER

200A

TEL

STOR.

CORRIDOR

E

LE

C

/ M E

C H

1A 209

HAC

212B

OFFICE

213D

OFFICE

212C

OFFICE

3A

E

LE

C

M E

C H

203B

TLT

202A

CLT

E

LE

C

/ M E

C H

9A

KITCHEN

TLT.

213C

OFFICE

213FB

OFFICE

213A

OFFICE

OFFICE

GROUP RM

C O

R R

ID

O

R

SMOKEWALL

FIREWALL - VERIFY IN FIELD

D3

D3

COSAT SYCH

NURSE OFFICE

212E

WAITING RM

OFFICE

OFFICE

TOILET CONGREGATE

COSAT MATERIALS

WAITING RM

207A

OFFICE

GROUP ROOM

BREAK ROOM

OFFICE

205B

OFFICE

205A

OFFICE

TLT. FEMALE PATIENT

OFFICE STAFF

STAIRS

OFFICE REC THERAPY

219C

OFFICE

219D

OFFICE

219A

OFFICE

REHAB TECH

STORAGE

C O

R R

ID

O

R

E

LE

V A

T O

R

219B

OFFICE

OFFICE SOCIAL

WORKER

200A

TEL

STOR.

CORRIDOR

E

LE

C

/ M E

C H

1A 209

HAC

212B

OFFICE

213D

OFFICE

212C

OFFICE

3A

E

LE

C

M E

C H

203B

TLT

202A

CLT

E

LE

C

/ M E

C H

9A

KITCHEN

TLT.

213C

OFFICE

213FB

OFFICE

213A

OFFICE

OFFICE

GROUP RM

C O

R R

ID

O

R

SMOKEWALL

FIREWALL - VERIFY IN FIELD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT / ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street, Suite 355, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

B

IM

/2

.0

V A

T u s c a lo o s a

R e p la c e H

V A

C V a ri o u s B u ild in g

/B

.2

.1

A

R C

H A

T R

IA

X

R

.r v t

/2

/2

:3

:5

A

M

A-104

SECOND FLOOR DEMOLITION AND

NEW WORK PLANS

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

03/28/2025 EHH TLR

CONSTRUCTION

DOCUMENTS

DEMOLITION KEYNOTES

D1 CUT AND REMOVE EXISTING VINYL WALL COVERING ON CHASE WALL.

DEMOLISH GYPSUM WALL BOARD AND FRAMING OF CHASE WALL AS

REQUIRED TO EXPOSE EXISTING HVAC PIPING. REFERENCE MEP

DRAWINGS FOR DEMOLITION NOTES.

D2 REMOVE PORTION OF EXISTING ACT CEILING AND GRID AS REQUIRED TO

DEMO CHASE WALL.

D3 REMOVE EXISTING WALL MOUNTED FCU. REFERENCE MECHANICAL

DRAWINGS. REMOVE PORTION OF GYPSUM WALL BOARD AS REQUIRED

TO REMOVE EXISTING HVAC PIPING AND FOR INSTALLATION OF NEW

PIPING.

NEW WORK KEYNOTES

1 CONSTRUCT NEW METAL STUD AND GYPSUM BOARD VERTICAL PIPE

CHASES. SEE DETAIL ON A-102. CHASE SIZE TO BE DETERMINED IN THE

FIELD BASED ON PIPING LOCATION. NEW CHASE TO COVER AREA OF

DEMOLISHED CHASE AND EXTEND 6" MIN. ABOVE ACT CEILING GRID.

PREP AND FINISH GYPSUM WALL BOARD SURFACE FOR PAINT. PAINT TO

BE SELECTED AND APPROVED BY VA INTERIOR DESIGNER. REFERENCE

MECHANICAL DRAWINGS FOR NEW PIPING NOTES.

2 PATCH / REPAIR WALLS AS REQUIRED FOR ANY DAMAGE CAUSED DURING

DEMOLITION AND INSTALLATION OF FCU AND PIPING. PREP AND FINISH

GYPSUM WALL BOARD SURFACE FOR PAINT. PAINT ENTIRE WALL WITH

BENJAMIN MOORE SEA REFLECTION 1664.

3 REVISE ACT CEILING GRID AND REPLACE TILES AS NEEDED TO FIT WITH

NEW PIPE CHASES. CEILING TILES TO MATCH EXISTING.

4 PATCH AND/OR REPAIR EXISTING EXTERIOR WALL AS REQUIRED IN

LOCATION(S) OF REMOVED REFRIGERANT PIPING. MATCH EXISTING.

5 PROVIDE AND INSTALL NEW LINE COVERS OVER NEW REFRIGERANT

LINES. COORDINATE LOCATION WITH MEP DRWINGS. SEE NOTES AND

PHOTO ON THIS SHEET.

1/8" = 1'-0"1

SECOND FLOOR PLAN - DEMO

1/8" = 1'-0"2

SECOND FLOOR PLAN - NEW

8'4' 16'0

SCALE: 1/8"=1'-0"

8'4' 16'0

SCALE: 1/8"=1'-0"

03.28.2025

Revision Number

Revisions: Date:

1 ADDEDUM #1 03/28/2025

ELECTRICAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.

MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)

AMPERE

AMPERE FRAME

ABOVE FINISHED FLOOR

ALUMINUM

AMPERE TRIP

CEILING

CIRCUIT BREAKER

CORRELATED COLOR TEMPERATURE

COPPER

DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)

DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)

EXISTING

ELECTRICALLY OPERATED

ENERGY REDUCING MAINTENANCE SWITCH

FUSE

FULL LOAD AMPS

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT ALARM

GROUND FAULT PROTECTION

HORSEPOWER

KILOAMPERE INTERRUPTING CAPACITY

KILOVOLT AMPERE

KILOWATT

MAXIMUM

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MANUALLY OPERATED

NORMALLY CLOSED

NON-FUSED

NOT IN CONTRACT

NORMALLY OPEN

POLES

PARTIAL

RELOCATE

SHORT CIRCUIT CURRENT RATING

SURGE PROTECTIVE DEVICE

SHUNT TRIP

TYPICAL

UNLESS NOTED OTHERWISE

VOICE

WALL PHONE

WIRE

WEATHER RESISTANT

TRANSFORMER

ZONE SELECTIVE INTERLOCKING

A

AF

AFF

AL

AT

C

CB

CCT

CU

D

D

E

EO

ERMS

F

FLA

G, GFCI

GFA

GFP

HP

KAIC

KVA

KW

MAX

MCA

MCB

MIN

MLO

MO

NC

NF

NIC

NO

P

PART

R

SCCR

SPD

ST

TYP

UNO

V

W

W

WR

XFMR

ZSI

A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.

RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG

CONDUCTORS.

B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE

SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

C. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL

COST TO THE OWNER.

D. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR

INSTALLED DEVICES.

E. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS

ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND

PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.

F. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN

CABLING.

(GENERAL NOTES SHALL APPLY TO ALL SHEETS)

ELECTRICAL GENERAL NOTES:

(E) T-TAC2

12,470-277/480V

150KVA

(E) T-2 12,470V-120/208V

150KVA

EXISTING PAD-MOUNTED

UTILITY TRANSFORMER

30A/3P

30A FUSE

400A

(E) LA

175A

(E) 2-PP-GCA

120/208V, 3Ø-4W

400A MCB

(E)

2-RP-GCA

(E) PB-A

(E) BCO

175A

(E)

2-RP-1CA

100A

(E)

2-RP-2CB

225A

(E)

2-RP-CGB

200A

(E)

2-RP-2CA

100A

(E)

2-RP-2CA

30A/3P

30A FUSE

250A

(E) LA

100A

(E) 2-FP-GCA

277/480V, 3Ø-4W

250A MCB

(E)

2-LP-GCA

150A

(E)

2-LP-1CA

150A

(E)

2-LP-2CA

100A

(SPACE)

100A

(SPACE)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:0

P

M

E000

ELECTRICAL SYMBOLS AND

ABBREVIATIONS

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

FIRE ALARM SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

DETECTOR - SYSTEM DUCT

SMOKE DETECTOR

PROVIDE SYSTEM DUCT SMOKE DETECTOR IN ACCESSIBLE LOCATION. PROVIDE REMOTE STATUS INDICATOR AND

TEST STATION AND COORDINATE ASSOCIATED MOUNTING LOCATION WITH OWNER.

ELECTRICAL MISC SYMBOLS

PLAN SYMBOL NAME

BRANCH CIRCUIT CONCEALED IN

CEILING OR WALL

BRANCH CIRCUIT CONCEALED IN

FLOOR OR BELOW GRADE

CLEARANCE SPACE

CONDUIT BREAK

CONDUIT DOWN

CONDUIT STUB-OUT

CONDUIT UP

HOMERUN TO PANEL

G = GFCI CIRCUIT

(PART) = PARTIAL CIRCUIT

SWITCHED RECEPTACLE

ONE LINE SYMBOL

PLAN SYMBOL NAME

CONTINUATION

DISCONNECT SWITCH

GROUND BAR

GROUNDING ELECTRODE

PANEL BOARD

TRANSFORMER

UTILITY METER

ELECTRICAL EQUIPMENT

SYMBOLS

PLAN SYMBOL NAME

PANELBOARD - RECESSED

PANELBOARD - SURFACE

NO SCALE

ELECTRICAL ONE-LINE

Revisions: Date:

ADDENDUM #1 03/28/2025

kschwendenman Rectangle kschwendenman Text Box

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:0

P

M

E700

ELECTRICAL SCHEDULES REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

EQUIPMENT CONNECTION SCHEDULE

MARK DESCRIPTION ROOM NAME ROOM # HP KW FLA MCA MOCP VOLTS PHASE POLES

LOAD

[VA]

CONTROL

TYPE

DISCONNECT

BY

DISCONNECT

TYPE FEEDER PANEL

CIRCUIT

NUMBER SCCR GEN REMARKS

2-AHU-1 AIR HANDLING UNIT CREDIT UNION 16B 0 0 11.2 14 25 208 3 3 4076 DDC, FA STOP DIV 26 NF 30/3 (2) (20A) 3-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 44,46,48 10 Yes 2

2-AHU-2 AIR HANDLING UNIT Space 301 0 0 4.6 5.8 15 208 3 3 1674 DDC DIV 26 NF 30/3 (2) (20A) 3-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 50,52,54 10 Yes 2

2-FCU-1A FAN COIL UNIT GROUP ROOM 113B 0 0 1.1 2.3 15 208 1 2 219 DDC MANUFACTURER INT (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 5 Yes 2

2-FCU-1B FAN COIL UNIT GROUP ROOM 113B 0 0 1.1 2.3 15 208 1 2 219 DDC MANUFACTURER INT (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-EM-1CA 44,46 5 Yes 2

2-FCU-2A FAN COIL UNIT OFFICE 212B 0 0 1.1 2.3 15 208 1 2 219 DDC MANUFACTURER INT (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 5 Yes 2

2-FCU-2B FAN COIL UNIT OFFICE 212B 0 0 1.1 2.3 15 208 1 2 219 DDC MANUFACTURER INT (2X) (20A) 2-#12 CU, #12 CU GND - 3/4"C. (E) 2-RP-2CB 2,4 5 Yes 2

2-SSAH-13A DUCTLESS SPLIT SYSTEM INDOOR IT CLOSET 13A 0 0 3 1 30 208 1 2 69 INT MANUFACTURER INT REMARK 1 (E) 2-RP-EM-GCA-B 43,45 5 Yes 1

2-SSCU-13A DUCTLESS SPLIT SYSTEM OUTDOOR 0 0 27 34 56 208 1 2 4900 REMARK 1 DIV 26 NF 60/2 (4X) (40A) 2-#8 CU, #10 CU GND - 3/4"C. (E) 2-RP-EM-GCA-B 43,45 5 Yes 1

GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)

• EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY WITH FLOOR PLANS. WHERE LOCATIONS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS, REFER TO MECHANICAL SHEETS. REFER TO DEFINITIONS BELOW FOR CLARIFICATIONS OF CONNECTION REQUIREMENTS.

• PROVIDE WIRING AND EQUIPMENT CONNECTIONS FOR INTERNAL EQUIPMENT COMPONENTS AS REQUIRED. COORDINATE REQUIREMENTS WITH MECHANICAL CONTRACTOR.

• "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS:

• "INT" = CONTROLS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED).

• "FA STOP" = FANS WITH CFM OF 2000 OR GREATER AND FANS SERVING DUCTS CONTAINING SMOKE DAMPERS.

• PROVIDE FIRE ALARM SYSTEM DUCT SMOKE DETECTORS AT RETURN-SIDE AND SUPPLY-SIDE OF FAN/UNIT. PROVIDE MULTIPLE DETECTORS IF REQUIRED TO ACCOMMODATE MAIN DUCT TAKE-OFFS WHERE A SINGLE DETECTOR CANNOT BE INSTALLED TO CAPTURE ALL AIRFLOW. FIRE ALARM SYSTEM SHALL SHUTDOWN FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT. PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE AT MOTOR CONTROLLER/STARTER AND CONNECT TO SHUTDOWN FAN.

• "DDC" = CONTROL SIGNAL FROM TEMPERATURE CONTROL SYSTEM PROVIDED BY MECHANICAL CONTRACTOR OR TEMPERATURE CONTROLS CONTRACTOR.

• "DISCONNECT BY" :

• "MECHANICAL" = DISCONNECT IS FURNISHED BY MECHANICAL CONTRACTOR OR PROVIDED WITH MECHANICAL EQUIPMENT.

• ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR.

• "MANUFACTRTUER" = DISCONNECT IS FURNISHED BY EQUIPMENT MANUFACTERUER. ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY EQUIPMENT MANUFACTERUER.

• "DISCONNECT TYPE" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT:

• "VFD" = VARIABLE FREQUENCY DRIVE CONTROLLER. LOCATE VARIABLE FREQUENCY DRIVE CONTROL TO SERVE AS THE MOTOR DISCONNECT.

• DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION.

• WHERE STARTERS OR VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED.

• "FEEDER":

• PROVIDE CONDUCTORS AND RACEWAY AS INDICATED. TYPICAL FORMAT IS: (FEEDER TAG) (NOMINAL SIZE) CONDUCTORS AND RACEWAY REQUIRED.

• "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY

BE PROVIDED WITH 5 KA SCCR

REMARKS: (EQUIPMENT CONNECTION SCHEDULE)

1. CONTROLS BETWEEN INDOOR AND OUTDOOR UNITS - INCLUDE CONTROL WIRING IN CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT PER MANUFACTURER'S REQUIREMENTS.

2. NEW MECHANICAL EQUIPMENT SHALL BE CONTROLLED BY AN EXISTING BMS SYSTEM.

Revisions: Date:

ADDENDUM #1 03/28/2025

kschwendenman Rectangle kschwendenman

A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK.

PROVIDE DEMOLITION FOR ITEMS AS SHOWN.

B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).

C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION.

SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND CONSTRUCTION. THESE PLANS ARE BASED ON PAST PROJECT DRAWINGS AND SITE OBSERVATIONS. THE DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THESE DRAWINGS MAY NOT BE ACCURATE IN ALL AREAS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING

CONDITIONS AND IS ENCOURAGED TO REVIEW FACILITY DRAWINGS PRIOR TO THE BID DATE.

D. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL.

E. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL ELECTRICAL DEMOLITION ITEMS. DISCONNECT AND REMOVE ELECTRICAL DEVICES, EQUIPMENT AND ASSOCIATED WIRING AS REQUIRED TO ACCOMMODATE NEW WORK. IF THE CONTRACTOR IS UNCLEAR REGARDING A SPECIFIC ITEM TO REMAIN OR BE REMOVED, THE CONTRACTOR SHALL SEEK CLARIFICATION FROM THE ARCHITECT.

F. SYSTEMS SERVING ADJACENT AREAS AND ITEMS THAT REMAIN SHALL BE MAINTAINED AT ALL TIMES.

MODIFY SYSTEMS AS REQUIRED THROUGHOUT CONSTRUCTION TO MAINTAIN CONTINUITY OF SERVICE. DO

NOT INTERRUPT SERVICE WITHOUT OWNER'S PRIOR WRITTEN APPROVAL. LIMIT DURATION OF

INTERRUPTION ONLY TO THE TIME NECESSARY FOR DISCONNECTION AND IMMEDIATE RECONNECTION.

INTERRUPTION TO SERVICE DEEMED BY OWNER AS ESSENTIAL MAY REQUIRE PREMIUM TIME AND SHALL BE INCLUDED WITH THE BID. EXTREME CARE SHALL BE TAKEN BY THE CONTRACTOR TO IDENTIFY EXISTING SYSTEM COMPONENTS ASSOCIATED WITH THESE SERVICES. APPROPRIATE METHODS OF MARKING THESE SHALL OCCUR TO ELIMINATE THE POSSIBILITY OF ACCIDENTAL INTERRUPTION. FOR CONDUIT AND CABLING THAT CAN REMAIN, PROVIDE SUPPORT AS REQUIRED. RELOCATE EXISTING JUNCTION BOXES THAT

BECOME INACCESSIBLE DUE TO NEW WORK.

G. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND

LIGHTING AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.

H. PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND FUNCTIONALITY.

I. PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE

ARCHITECTURAL SPECIFICATIONS FOR MEANS AND METHODS.

J. ALL UNLABELED ELECTRICAL DEVICES WITH CIRCUITRY OR DEVICES MODIFIED DURING CONSTRUCTION

SHALL BE CIRCUIT TRACED AS NEEDED WITH A LABEL PROVIDED.

(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND ALL ELECTRICAL DEMOLITION WORK)

ELECTRICAL DEMOLITION GENERAL NOTES:

(D) SSCU-1A (D) SSCU-2B

(D) CU-16B

(D) SSCU-1B

(D) CU-18

(E) 2-RP-EM-GCB

(D) AHU-16B

(D) AHU-18

(D) FCU

1 1

(E) 2-RP-EM-GCC

(E) 2-PP-EM-GCA

(E) 2-PP-EM-GCB

(E) 2-RP-EM-GCA-B

(E) 2-FP-EM-GCA

(E) 2-FP-GCA

(E) 2-FP-SB-GCB

(E) 2-RP-EM-GCA-A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:0

P

M

ED100

00 - GROUND FLOOR - ELECTRICAL -

DEMOLITION

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

SHEET NOTES:

1. DISCONNECT EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND CONDUCTORS TO SOURCE.

LABEL EXISTING UNUSED CIRCUIT BREAKER AS SPARE.

1/8" = 1'-0"1

00 - GROUND FLOOR - ELECTRICAL - DEMOLITION

8'4' 16'0

SCALE: 1/8"=1'-0"

TRUE NORTH

Revisions: Date:

ADDENDUM #1 03/28/2025

kschwendenman Rectangle kschwendenman

(D) SSAH-1A

(D) SSAH-1B

(E) 2-RP-EM-1CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:0

P

M

ED101

01 - FIRST FLOOR - ELECTRICAL -

DEMOLITION

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"1

01 - FIRST FLOOR - ELECTRICAL - DEMOLITION

SHEET NOTES:

1. DISCONNECT EXISTING MECHANICAL EQUIPMENT. DEMO CONDUCTORS TO SOURCE PANEL. RETAIN CONDUIT

FOR REUSE. LABEL EXISTING UNUSED CIRCUIT BREAKERS AS SPARE.

TRUE NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

Revisions: Date:

ADDENDUM #1 03/28/2025

kschwendenman Rectangle kschwendenman

(D) SSAH-2A

(D) SSAH-2B

(E) 2-RP-2CB

(E) 2-LP-2CA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:0

P

M

ED102

02 - SECOND FLOOR - ELECTRICAL -

DEMOLITION

REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"1

02 - SECOND FLOOR - ELECTRICAL - DEMOLITION

SHEET NOTES:

1. DISCONNECT EXISTING MECHANICAL EQUIPMENT. DEMO CONDUCTORS TO SOURCE PANEL. RETAIN CONDUIT

FOR REUSE. LABEL EXISTING UNUSED CIRCUIT BREAKERS AS SPARE.

8'4' 16'0

SCALE: 1/8"=1'-0"

TRUE NORTH

Revisions: Date:

ADDENDUM #1 03/28/2025

kschwendenman Rectangle kschwendenman

A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.

CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH

ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH

ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE

ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE WORK TO INSTALL

PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.

C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.

(POWER GENERAL NOTES SHALL APPLY TO ALL SHEETS)

POWER GENERAL NOTES:

26C

OFFICE

CREDIT UNION

16A

CREDIT UNION

CREDIT UNION

8C

STORAGE

8B

CLT

CREDIT UNION

OFFICE CLERK

OFFICE STAFF

16B

CREDIT UNION

CREDIT UNION

13A

IT CLOSET

BREAK RM

12A

CREDIT SECURE

TLT.

CREDIT UNION

CG4

ENTRANCE WAY CG5

ENTRANCE WAY

STORAGE

CREDIT UNION STORAGE

CONFERENCE ROOM

OFFICE

OFFICE STAFF

26B

OFFICE

MALE TOILET

23C

ELECT / MECH

CG1

CORRIDOR

26A

OFFICE

HAC

22A

HAC

ELECTRICAL

TELE CLOSET

FEMALE TLT

1C

LOBBY

3A

WAITING RM

FEMALE TLT

8A

MECH RM 3B

CHECK-IN ROOM

7C

EXAM ROOM 4

CLERKS OFFICE

7B

EXAM ROOM

OFFICE

7A

EXAM ROOM

PSY. / EXAM

2-AHU-1

2-AHU-2

(E) 2-RP-EM-GCB

2-SSAH-13A

2-SSCU-13A

(E) 2-PP-EM-GCA

(E) 2-RP-EM-GCC

(E) 2-PP-EM-GCB

(E) 2-RP-EM-GCA-B

(E) 2-RP-EM-GCA-A

(E) 2-FP-EM-GCA

(E) 2-FP-GCA

(E) 2-FP-SB-GCB

WALL RATING LEGEND

FIRE WALL

SMOKE WALL

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:0

P

M

EP100

00 - GROUND FLOOR - POWER REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

SHEET NOTES:

1. CONNECT NEW MECHANICAL EQUIPMENT TO MEW BREAKER AS SHOWN IN PANEL SCHEDULE. PROVIDE NEW

CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT IN PANEL 2-RP-EM-GCA-B. REFERENCE PANEL

SCHEDULE FOR CIRCUIT BREAKER SIZES.

2. TIE NEW DUCT MOUNTED SMOKE DETECTOR TO THE EXISTING FIRE ALARM CONTROL PANEL FOR THE BUILDING. DEVICE TO BE 100% COMPATIBLE WITH THE EXISTING SIMPLEX 4100 SERIES CAMPUS SYSTEM.

COORDINATE WITH JCI CONTACT FOR ADDITIONAL INFORMATION.

1/8" = 1'-0"1

00 - GROUND FLOOR - POWER & LOW VOLTAGE

8'4' 16'0

SCALE: 1/8"=1'-0"

A. UPDATE PANEL DIRECTORY UPON COMPLETION.

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'

- PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

66 A

SPARE CAPACITY:

29 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 225 A

CONSIDER 125% DEMAND: 71446 A

DEMAND CURRENT: 159 A

Spare 45000 VA 100.00% 45000 VA DEMAND LOAD: 57157 VA

Other 5750 VA 125.00% 7188 VA CONNECTED CURRENT: 155 A

MEQ-NC 4969 VA 100.00% 4969 VA CONNECTED LOAD: 55719 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 165 A 165 A 141 A

TOTAL LOAD: 19401 VA 19401 VA 16917 VA

59 1000 VA -- 1 -- -- SPACE 60

57 1000 VA -- 1 -- -- SPACE 58

EX. LOAD -- 30 A 3

1000 VA -- 1 -- -- SPACE 56

53 SPACE -- -- 1 -- 558 VA 54

51 SPACE -- -- 1 -- 558 VA 52

49 SPACE -- -- 1 -- 558 VA

3 15 A NEW NEW 2-AHU-2

47 SPACE -- -- 1 -- 1359 VA 48

45 2485 VA 1359 VA 46

NEW 2-SSCU-13A / 2-SSAH-13A NEW 35 A 2

2485 VA 1359 VA

3 25 A NEW NEW 2-AHU-1

41 EX. LOAD -- 40 A 1 1000 VA 1000 VA 42

39 1000 VA 1000 VA 40

EX. LOAD -- 20 A 2

1000 VA 1000 VA

3 30 A -- EX. LOAD

35 EX. LOAD -- 20 A 1 1000 VA 1000 VA 36

33 EX. LOAD -- 20 A 1 1000 VA 1000 VA 34

31 EX. LOAD -- 20 A 1 1000 VA 1000 VA

3 30 A -- EX. LOAD

29 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 30

27 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 28

25 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 26

23 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 24

21 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 22

19 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 20

17 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 18

15 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 16

13 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 14

11 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 12

9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10

7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8

5 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6

3 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 4

1 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 2

CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT

NEMA ENCLOSURE:

MOUNTING: SURFACE AVAILABLE SCC (kA): PANEL POLES: 60

SERVICE RATED: INTEGRAL SPD: SECTIONS: 1

BRANCH: WIRES: 4 MCB OPTIONS:

SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 225 A

LOCATION: ELECTRICAL 20 VOLTS: 208/120 WYE MAINS TYPE: MCB

PANEL: (E) 2-RP-EM-GCA-B

TRUE NORTH

1 1

Revisions: Date:

ADDENDUM #1 03/28/2025

kschwendenman Rectangle kschwendenman

113B

GROUP ROOM

Space

CORRIDOR

----1

OFFICE-1

113A

WAITING

----2

OFFICE-2

113D

OFFICE

113E

OFFICE

OFFICE

ELEVATOR

SPD SUPPLY

CLOSET 113F

119B

OFFICE

119C

OFFICE

Space

Space

119A

OFFICE

119D

OFFICE

OFFICE

TLT

117A

CLOSET

OFFICE

HOUSE KEEPING

116A

COMM

OFFICE

STORAGE

100A

TEL

STOR.

WAITING

CORRIDOR

SUPPLY

109C

PIPE CHASE 111A

109A

COPY RM

109B

CLOSET

OFFICE

OFFICE

102A

CLT

OFFICE108

OFFICE

106A

OFFICE

OFFICE

105A

OFFICE

103B

TLT

103A

CLT

TLT

OFFICE

OFFICE

(E) 2-RP-EM-1CA

2-FCU-1A

2-FCU-1B

WALL RATING LEGEND

FIRE WALL

SMOKE WALL

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

Specialized Engineering Solutions 1300 Baxter Street. Suite 230, Charlotte, NC 28204 T: (704) 348-3097 www.specializedeng.com

SEE G00104/26/2023

B

IM

/2

.0

V

A T u s c a lo o s a R e p la c e

H V

A C

V a ri o u s B u ild in g

/6

.2

.1

B

M

E P

.r v t

/2

/2

:3

:0

P

M

EP101

01 - FIRST FLOOR - POWER REPLACE HVAC VARIOUS

BUILDINGS

3701 Loop Road, Tuscaloosa, AL 35404

679.22.106

04/26/2023 CGH SUB

CONSTRUCTION

DOCUMENTS

1/8" = 1'-0"1

01 - FIRST FLOOR - POWER

A. UPDATE PANEL DIRECTORY UPON COMPLETION.

GENERAL REMARKS:

CIRCUIT BREAKER OPTIONS SUFFIX: 'S' OR 'ST' - PROVIDE SHUNT TRIP CIRCUIT BREAKER / 'G' OR 'GFCI' - PROVIDE GFCI CIRCUIT BREAKER / 'GFP' - PROVIDE GFP CIRCUIT BREAKER / 'ERMS' - ENERGY REDUCING MAINTENANCE SWITCH / 'ZSI' - ZONE SELECTIVE INTERLOCKING / 'L' - PROVIDE CIRCUIT BREAKER WITH LOCKING PROVISIONS / 'R'

- PROVIDE CIRCUIT BREAKER WITH RED MARKING

OPTIONS:

85 A

SPARE CAPACITY:

37 %

FEEDER AVAILABLE:

EQUIPMENT AMPS: 225 A

CONSIDER 125% DEMAND: 63184 A

DEMAND CURRENT: 140 A

DEMAND LOAD: 50548 VA

Spare 50000 VA 100.00% 50000 VA CONNECTED CURRENT: 140 A

Other 438 VA 125.00% 548 VA CONNECTED LOAD: 50438 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS

TOTAL AMPS: 144 A 135 A 143 A

TOTAL LOAD: 17219 VA 16219 VA 17000 VA

59 1000 VA -- 1 -- -- SPACE 60

57 1000 VA -- 1 -- -- SPACE 58

EX. LOAD -- 30 A 3

1000 VA -- 1 -- -- SPACE 56

53 SPACE -- -- 1 -- -- 1 -- -- SPACE 54

51 SPACE -- -- 1 -- -- 1 -- -- SPACE 52

49 SPACE -- -- 1 -- 1000 VA 1 20 A -- SPARE 50

47 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- SPARE 48

45 EX. LOAD -- 20 A 1 1000 VA 219 VA 46

43 EX. LOAD -- 20 A 1 1000 VA 219 VA

2 15 A NEW NEW 2-FCU-1A, 2-FCU-1B

41 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 42

39 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 40

37 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 38

35 1000 VA 1000 VA 1 20 A -- EX. LOAD 36

EX. LOAD -- 20 A 2

1000 VA 1000 VA 1 20 A -- EX. LOAD 34

31 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 32

29 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 30

27 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 28

25 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 26

23 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 24

21 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 22

19 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 20

17 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 18

15 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 16

13 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 14

11 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 12

9 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 10

7 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 8

5 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 6

3 EX. LOAD -- 20 A 1 1000 VA 1000 VA 1 20 A -- EX. LOAD 4

1 EX. LOAD -- 15 A 1 1000 VA 1000 VA 1 15 A -- EX. LOAD 2

CKT CIRCUIT DESCRIPTION OPT RATING POLES A B C POLES RATING OPT CIRCUIT DESCRIPTION CKT

NEMA ENCLOSURE:

MOUNTING: RECESSED AVAILABLE SCC (kA): PANEL POLES: 60

SERVICE RATED: INTEGRAL SPD: SECTIONS: 1

BRANCH: WIRES: 4 MCB OPTIONS:

SUPPLY FROM: (E) 2-PP-EM-GCA PHASES: 3 MCB/MLO RATING: 225 A

LOCATION: ENTRANCE WAY CG5 VOLTS: 208/120 WYE MAINS TYPE: MLO

PANEL: (E) 2-RP-EM-1CA

SHEET NOTES:

TRUE NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

GENERAL NOTES:

A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS.

CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH

ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

B. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO

MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE

WORK TO INSTALL PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.

C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.

1. CONNECT NEW MECHANICAL EQUIPMENT TO NEW BREAKER AS SHOWN IN PANEL SCHEDULE. PROVIDE NEW CONDUCTORS IN EXISTING CONDUIT AND NEW 15A CIRCUIT BREAKER FOR NEW MECHANICAL EQUIPMENT IN

PANEL 2-RP-EM-1CA. REFERENCE PANEL SCHEDULE FOR CIRCUIT BREAKER SIZES.

Revisions: Date:

ADDENDUM #1 03/28/2025

kschwendenman Rectangle kschwendenman

212B

OFFICE

Space

212E

WAITING RM

213D

OFFICE

213C

OFFICE

213FB

OFFICE

213A

OFFICE 213

COSAT SYCH

NURSE OFFICE

212C

OFFICE

OFFICE

OFFICE 232

ELEC. / MECH. 211A

TOILET CONGREGATE

WAITING RM

COSAT MATERIALS209

HAC

ELEVATOR

STORAGE

GROUP RM

219B

OFFICE

219D

OFFICE

219A

OFFICE

219C

OFFICE

OFFICE

OFFICE SOCIAL WORKER

KITCHEN

REHAB TECH

OFFICE REC THERAPY

CORRIDOR

CORRIDOR

STOR.

200A

TEL

Space

GROUP ROOM

207A

OFFICE

OFFICE STAFF

BREAK ROOM

TLT. FEMALE PATIENT

202A

CLT

TLT.

203A

ELEC / MECH

203B

TLT

OFFICE

CORRIDOR

205A

OFFICE

205B

OFFICE

(E) 2-RP-2CB

2-FCU-2A

2-FCU-2B

(E) 2-LP-2CA

WALL RATING LEGEND

FIRE WALL

SMOKE WALL

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FOR OFFICIAL USE ONLY (FOUO)

FOR OFFICIAL USE ONLY (FOUO)

NC Engineering License No.: P-0214 NC Architectural License No.: 51254