Attachment 0005 D - Appendix S - Building 46.pdf
PDF 1 MB Posted
- Attached to
- 679-22-106 Replace HVAC Various Buildings Federal contract opportunity
- Solicitation number
- 36C24725R0031
About this file
This document is an Appendix S for Building 46 at the VAMC Tuscaloosa, containing XRF (X-Ray Fluorescence) Testing Data and Photographic Documentation for lead-based paint (LBP) inspection. The testing was conducted on July 2-3, 2014 by Safety Environmental Laboratories, Inc. for SELC Project #2014-1107, using a Niton XLP 700-303A analyzer.
The XRF testing data includes 87 readings across various interior and exterior components of Building 46, such as walls, ceilings, doors, window sills, and structural elements. The action level was set at 1.00 mg/cm², with most readings being negative for lead content. However, several exterior components showed positive lead-based paint results, including handrails (7.30 and 2.40 mg/cm²), a decorative wooden grill (6.60 mg/cm²), metal door and frame (7.40 and 12.00 mg/cm²), and a downspout base (1.10 mg/cm²). The photographic documentation visually captures the damaged and peeling lead-based paint on various building surfaces, supporting the XRF testing findings.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX S
BUILDING 46
CHAPEL
INCLUDED IN APPENDIX S:
S‐1 – XRF Testing Data Sheets
S‐2 – XRF Testing Location Plans
S‐3 – Photographic Documentation
APPENDIX S‐1
XRF Testing Data Sheets
XRF TESTING DATA
VAMC TUSCALOOSA
BUILDING 46
3701 PELHAM LOOP ROAD EAST
TUSCALOOSA, AL 35404
SELC PROJECT #: 2014‐1107
NITON XLP 700‐303A
Serial #21385
Reading Lead
Number (mg/cm2)
1 7/2/2014 10:46 1.49* 2 7/2/2014 10:50 0.90 3 7/2/2014 10:51 1.10 4 7/2/2014 10:51 1.20 23 7/2/2014 14:19 Ceiling Concrete A Intact White Interior 1 Bldg 46 NP Negative 0.00 24 7/2/2014 14:22 Wall CMU D Intact Beige Interior 1 Bldg 46 NP Negative 0.04 25 7/2/2014 14:25 Arch Plaster D Intact Brown Interior 1 Bldg 46 NP Negative 0.03 26 7/2/2014 14:25 Arch Plaster B Intact Brown Interior 1 Bldg 46 NP Negative 0.02 27 7/2/2014 14:26 Window Sill Wood D Intact White Interior 1 Bldg 46 NP Negative 0.01 28 7/2/2014 14:28 Wall Panel Wood C Intact Gray Interior 1 Bldg 46 NP Negative 0.01 29 7/2/2014 14:28 Ceiling Wood C Intact Beige Interior 1 Bldg 46 NP Negative 0.01 30 7/2/2014 14:29 Ceiling Wood C Intact Beige Interior 1 Bldg 46 NP Negative 0.01 31 7/2/2014 14:30 Duct Cover Wood A Intact White Interior 1 Bldg 46 NP Negative 0.01 32 7/2/2014 14:30 Duct Cover Wood C Intact White Interior 1 Bldg 46 NP Negative 0.00 33 7/2/2014 14:31 Door Wood D Intact Brown Interior 1 Bldg 46 NP Negative 0.04 34 7/2/2014 14:32 Door Frame Metal D Intact Brown Interior 1 Bldg 46 NP Negative 0.04 35 7/2/2014 14:35 Door Frame Metal A Intact Cream Interior Corridor 5 Bldg 46 NP Negative 0.00 36 7/2/2014 14:36 Wall CMU B Intact Cream Interior Corridor 5 Bldg 46 NP Negative 0.50 37 7/2/2014 14:38 Door Metal B Intact Gray Interior Rm 6 Bldg 46 NP Negative 0.03 38 7/2/2014 14:38 Door Frame Metal B Intact Gray Interior Rm 6 Bldg 46 NP Negative 0.02 39 7/2/2014 14:41 Window Sill Wood D Intact White Interior Rm 8 Bldg 46 NP Negative 0.03 40 7/2/2014 14:42 Closet Door Wood C Intact Gray Interior Rm 8 Bldg 46 NP Negative 0.03 41 7/2/2014 14:42 Closet Door Frame Metal C Intact Gray Interior Rm 8 Bldg 46 NP Negative 0.03 42 7/2/2014 14:44 Closet Door Frame Metal D Intact Gray Interior Rm 11 Bldg 46 NP Negative 0.01 43 7/2/2014 14:44 Closet Door Wood D Intact Gray Interior Rm 11 Bldg 46 NP Negative 0.08 44 7/2/2014 14:45 Wall CMU A Intact White Interior Rm 11 Bldg 46 NP Negative ‐0.21 45 7/2/2014 14:45 Wall CMU A Intact White Interior Rm 11 Bldg 46 NP Negative ‐0.26 46 7/2/2014 14:47 Wall CMU C Intact White Interior Rm 10 Bldg 46 NP Negative 0.17
ResultsColor Location Room Building Inspector
Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573
Date & Time Component Substrate Side Condition
ACTION LEVEL = 1.00 mg/cm2
BUILDING 46
3701 PELHAM LOOP ROAD EAST
TUSCALOOSA, AL 35404
SELC PROJECT #: 2014‐1107
NITON XLP 700‐303A
Serial #21385
Reading Lead
Number (mg/cm2) ResultsColor Location Room Building InspectorDate & Time Component Substrate Side Condition
47 7/2/2014 14:48 Floor Concrete Intact Gray Interior Rm 10 Bldg 46 NP Negative 0.03 48 7/2/2014 14:49 Radiator Cover Metal C Intact White Interior Rm 10 Bldg 46 NP Negative 0.01 49 7/2/2014 14:50 Window Sill Wood C Intact White Interior Rm 9 Bldg 46 NP Negative 0.07 50 7/2/2014 14:51 Closet Door Wood A Intact White Interior Rm 9 Bldg 46 NP Negative 0.03 51 7/2/2014 14:52 Closet Door Frame Metal A Intact White Interior Rm 9 Bldg 46 NP Negative 0.06 52 7/2/2014 14:54 Floor Concrete A Intact Gray Interior Rm 5a Bldg 46 NP Negative 0.00 53 7/2/2014 14:55 Floor Concrete A Intact Gray Interior Rm 12 Bldg 46 NP Negative 0.00 54 7/2/2014 14:59 Wall Gypsum Board B Intact White Interior Rm 3 Bldg 46 NP Negative 0.00 55 7/2/2014 14:59 Wall Gypsum Board B Intact White Interior Rm 3 Bldg 46 NP Negative 0.01 56 7/2/2014 15:07 Floor Concrete B Poor Gray Interior Rm 4 Bldg 46 NP Negative 0.05 57 7/2/2014 15:08 Handrail Metal D Intact Yellow Interior Rm 4 Bldg 46 NP Positive 7.30 58 7/2/2014 15:09 Handrail Metal D Intact Yellow Interior Rm 4 Bldg 46 NP Positive 2.40 59 7/2/2014 15:37 Equipment Stand Concrete A Intact Yellow Interior Rm 4 Bldg 46 NP Negative 0.09 60 7/2/2014 15:37 Equipment Stand Concrete A Intact Yellow Interior Rm 4 Bldg 46 NP Negative 0.11 61 7/2/2014 15:39 Structural Steel Metal A Intact Black Interior Rm 4 Bldg 46 NP Negative 0.00 62 7/2/2014 15:39 Structural Steel Metal A Intact Black Interior Rm 4 Bldg 46 NP Negative 0.00 63 7/2/2014 15:39 Structural Steel Metal A Intact Black Interior Rm 4 Bldg 46 NP Negative 0.00 64 7/2/2014 15:41 Door Metal B Intact Gray Interior Rm 4 Bldg 46 NP Negative 0.06 65 7/2/2014 15:41 Door Frame Metal B Intact Gray Interior Rm 4 Bldg 46 NP Negative 0.01 66 7/2/2014 15:58 0.90 67 7/2/2014 16:00 1.00 68 7/2/2014 16:01 0.90 69 7/3/2014 8:22 1.39* 70 7/3/2014 8:49 0.80 71 7/3/2014 8:49 1.10 72 7/3/2014 8:50 0.90 73 7/3/2014 9:00 Ceiling Concrete A Intact White Exterior Bldg. 46 NP Null 0.03 74 7/3/2014 9:00 Ceiling Concrete A Intact White Exterior Bldg. 46 NP Negative 0.02
Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573
Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573
Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573
BUILDING 46
3701 PELHAM LOOP ROAD EAST
TUSCALOOSA, AL 35404
SELC PROJECT #: 2014‐1107
NITON XLP 700‐303A
Serial #21385
Reading Lead
Number (mg/cm2) ResultsColor Location Room Building InspectorDate & Time Component Substrate Side Condition
75 7/3/2014 9:04 Sign Metal A Intact Black Exterior Bldg. 46 NP Positive 1.40 76 7/3/2014 9:11 Decorative Grill Wood A Peeling White Exterior Bldg. 46 NP Positive 6.60
77 7/3/2014 9:21 Downspout Factory Coated Aluminum
B Intact White Exterior Bldg. 46 NP Negative 0.00
78 7/3/2014 9:22 Downspout Base Metal B Poor Black Exterior Bldg. 46 NP Positive 1.10 79 7/3/2014 9:30 Door Metal B Poor White Exterior Bldg. 46 NP Positive 7.40 80 7/3/2014 9:30 Door Frame Metal B Poor White Exterior Bldg. 46 NP Positive 12.00 81 7/3/2014 9:37 Soffit Wood A Peeling White Exterior Bldg. 46 NP Positive 16.60 82 7/3/2014 9:37 Fascia Wood A Peeling White Exterior Bldg. 46 NP Negative 0.02 83 7/3/2014 9:39 Fascia Wood A Peeling White Exterior Bldg. 46 NP Positive 7.50 84 7/3/2014 9:47 Window Lintel Metal A Peeling White Exterior Bldg. 46 NP Negative 0.00 85 7/3/2014 9:48 Window Lintel Metal A Peeling White Exterior Bldg. 46 NP Null 1.10 86 7/3/2014 9:49 Window Lintel Metal C Peeling Silver Exterior Bldg. 46 NP Positive 2.40 87 7/3/2014 9:55 Door Frame Metal D Poor White Exterior Bldg. 46 NP Positive 5.40 134 7/3/2014 13:31 1.10 135 7/3/2014 13:33 1.00 136 7/3/2014 13:35 1.00
* = Reading numbers 1 and 69 are internal diagnostic readings that do not represent lead content on any items.
Null = Incomplete test due to instrument movement or early trigger release.
Readings 5 ‐22 from 7/2/14 and 88 ‐ 133 from 7/3/14 apply to Buildings 13, 14, 25, 27, and 28. Please see corresponding building tables for this data.
Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573
Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573 Calibrate Acceptable Range, 0.8 ‐ 1.2, SRM 2573
APPENDIX S‐2
XRF Testing Location Plans
APPENDIX S‐3
Photographic Documentation
Building 46
SELC Project # 2014-1107 Page 1
Photograph 1 Damaged LPB on wooden decorative grill.
Photograph 3 Damage LBP on metal down spout base – typical.
Photograph 4 Damaged LBP on metal door and frame to
Room 4.
Photograph 2 Damaged / peeling LPB on wooden decorative grill.
Building 46
SELC Project # 2014-1107 Page 2
Photograph 6 Damaged / peeling LPB on wooden soffit and fascia – typical.
Photograph 5 Damaged / peeling LPB on wooden soffit and fascia – typical.
Photograph 7 Damaged / peeling LPB on exterior metal door frame – typical.
NO PHOTOGRAPH
| APPENDIX S COVER SHEET B46 |
| Appendix S Divider Pages |
File details come from the government source that posted it. Updated .