6-TB2718-RCM - Attachment C - Price Schedule.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
RFP - Construction Manager/General Contractor for Career Technical Center
Solicitation number
TB2718-RCM
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is a price schedule attachment for a Request for Proposals issued by the Salt Lake City School District (SLCSD) for Construction Manager/General Contractor (CM/GC) services related to the construction of a Career Technical Center (CTC). The project involves substantial renovations to the former Riley Elementary School site located at 1410 South 800 West, Salt Lake City, Utah. Vendors are required to submit proposals in the specified format through the Bonfire system, with all questions and official communications conducted exclusively through that platform or authorized addenda. The SLCSD emphasizes strict adherence to submission requirements and format specifications, reserving the right to reject non-responsive proposals.

The Fixed Limit of Construction Cost (FLCC) for this project is established at a maximum of $32,000,000. The price schedule requires vendors to propose costs for preconstruction fees, construction management fees, construction supervision costs, and general conditions as either fixed fees or percentages of the FLCC. Additional pricing components include bond costs, which may not exceed 1 percent of the FLCC. CM/GC change order markups are capped at 5 percent, while subcontractor change order markups are limited to 10 percent. The SLCSD has mandated specific fee structures that may not be altered by vendors. The SLCSD, design team, and awarded CM/GC are expected to collaborate throughout the project to maintain construction costs within the established FLCC limit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Construction Manager/General Contractor for Career Technical Center
Solicitation # TB2718-RCM
PRICE SCHEDULE

The Fixed Limit of Construction Cost (FLCC) for this project is a maximum of $32,000,000 (thirty two million dollars). The SLCSD, the design team, and the awarded CM/GC shall work together to keep the cost of construction, as represented in the design, within the FLCC.

Vendor Name:

DescriptionPercentage of FLCC
Proposed by VendorAmount Proposed

by Vendor

Preconstruction FeeFixed Fee --->
Construction Management Fee$ - 0
Construction Supervision Cost$ - 0
General Conditions$ - 0
TOTAL$ - 0
DescriptionPercentage of FLCC
Proposed by VendorAmount Proposed

by Vendor Cost of Bonds $ - 0 ** May not exceed 1%

Description Proposed Percentage Markup

CM/GC Change Order Markup** May not exceed 5%
Subcontractor Change Order Markup** May not exceed 10%

** THIS FEE WAS MANDATED BY THE SLCSD AND MAY NOT BE ALTERED.

Reference RFP Section 2.4