4-TB2718-RCM - Attachment D - RFP Evaluation Scoresheet.pdf

PDF 126 KB Posted

Attached to
RFP - Construction Manager/General Contractor for Career Technical Center
Solicitation number
TB2718-RCM
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is an RFP Evaluation Scoresheet for the Salt Lake City School District's solicitation for Construction Manager/General Contractor (CM/GC) services for a Career Technical Center renovation project. The project involves substantial renovations to the former Riley Elementary School site located at 1410 South 800 West in Salt Lake City, Utah. The evaluation framework establishes a comprehensive scoring methodology to assess vendor proposals based on technical qualifications and pricing.

The evaluation scoresheet allocates 800 points (80% weighting) to technical criteria and 200 points (20% weighting) to price evaluation, for a total possible score of 1,000 points. Technical evaluation categories include company experience and management plan, qualifications of key personnel, approach to preconstruction phase, approach to construction phase, approach to closeout and warranty phase, project references, and self-performed work considerations, among other factors. Price evaluation components assessed across Attachment C include preconstruction fees, construction management fees, construction supervision costs, general conditions, bonding costs, change order markups, weather allowance, site security allowance, and owner contingency. A minimum mandatory requirement threshold of 75% (600 points) must be achieved in the technical evaluation for a proposal to remain eligible. The scoresheet utilizes a standardized 0-10 point scale for technical criteria (where 0 indicates failure to address requirements and 10 indicates excellence) and a 0-5 point scale for price criteria, enabling consistent evaluation across all submitted proposals. The evaluation committee is permitted to utilize half-point increments as deemed appropriate during assessment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT: This document is intended to be a draft and should not be returned to the Purchasing Department. Please return this document to the evaluation committee This document is not subject to GRAMA pursuant to Utah Administrative Code R33-7-702(2).

RFP

Section

Evaluation (Pass/Fail)

1 2.2 2 2.2 3 2.2 4 2.2 5 2.2 6 2.2

RFP

Section

Evaluator Score (0-10)

Criteria Weight

% of Tech Criteria

Points Possible Points Earned

1 2.3(A) 4 5.0% 40 0 2 2.3(B) 8 10.0% 80 0 3 2.3(C)

3a 2.3(C) 7.2 9.0% 72 0 3b 2.3(C) 12 15.0% 120 0 3c 2.3(C) 6.4 8.0% 64 0 3d 2.3(C) 8 10.0% 80 0 3e 2.3(C) 8 10.0% 80 0 4 2.3(D) 4.8 6.0% 48 0 5 2.3(E) 4.8 6.0% 48 0 6 2.3(F) 4 5.0% 40 0 7 2.3(G) 4 5.0% 40 0 8 2.3(H)

8a 2.3(H) 2.4 3.0% 24 0 8b 2.3(H) 6.4 8.0% 64 0

100% 800 0

RFP

Section

Min Percent

Min Points Required

Points Earned

Percent Earned Evaluation

4.2 75% 600 0 0%

RFP

Section

Evaluator Score (0-5)

Criteria Weight

% of Price Points

Points Possible Points Earned

1 Attach C 3 15.0% 30 0 2 Attach C 5 25.0% 50 0 3 Attach C 5 25.0% 50 0 4 Attach C 5 25.0% 50 0 5 Attach C 0.4 2.0% 4 0 6 Attach C 1.6 8.0% 16 0

100% 200 0

Percent of Total

Points Possible

Points Earned

80% 800 0 20% 200 0

100% 1,000 0

10 = Excellent, the proposal addresses all aspects of the requirements, with exceptional support and

Current Licensing

Availability for In-Person Interviews

Bonding and Insurance Termination or Debarment Certifications

Page Limitation

Required Technical Point Threshold

- Approach to Preconstruction Phase

- Approach to Construction Phase

- Approach to Closeout and Warranty Phase

- Project References

- Key Personnel References

Total Evaluation Points Total Cost Evaluation Points Total Technical Evaluation Points

Total Evaluation Points

Price Evaluation

Preconstruction Fee Construction Management Fee Construction Supervision Cost General Conditions Cost of Bonds Change Order Markups

- Approach to Subcontractor Selection Process

- Approach to Project Schedule Correction

References Self Performed Work

Weather Allowance Site Security Allowance Owner Contingency

Construction Manager/General Contractor for Career Technical Center

RFP Evaluation Scoresheet

Firm Name:

Evaluator:

Date:

1-4 = Unsatisfactory, the proposal has major gaps in addressing some or all of the requirements of the RFP or has serious deficiencies in support or detail for multiple requirements.

5-7 = Substandard, the proposal does not address all of the requirements or criteria in the RFP or does not provide sufficient support or detail to address all of them.

Solicitation # TB2718-RCM

Scores will be assigned as follows:

0 = Fail, the proposal does not answer or address the requirement

Qualifications of Key Personnel

Scoreable Technical Criteria

Company Experience

Management Plan

7.5 = Pass, the proposal addresses all requirements with sufficient support and detail for each requirement.

8 = Good, the proposal addresses all aspects of the requirements, with ample support and detail for each requirement.

9 = Great, the proposal addresses all aspects of the requirements, with abundant support and detail for each requirement.

NOTE: the evaluation committee may also utilize half points (i.e. 1.5, 2.5, 3.5, etc) where it deems appropriate

Minimum Mandatory Requirements

Adherence to Utah Procurement Code Requirements When

Score Sheet

File details come from the government source that posted it. Updated .