6-IFB 26-1-24600R1 Vol 3 Pre-Award Information.pdf
PDF 434 KB Posted
- Attached to
- Alton Driver Relief Facility (Rebid)
- Solicitation number
- 26-1-24600R1
- Issued by
- Madison County, Illinois
About this file
This is a Pre-Award Information document required by the Madison County Mass Transit District (MCT) for the Alton Driver Relief Facility project (IFB 26-1-24600R1). The document outlines the responsibility requirements that must be fulfilled by the bidder selected for award prior to contract execution. Key submission requirements include identification of the Project Manager with qualifications and experience documentation, a detailed Project Implementation Schedule, and verification that the bidder and all proposed subcontractors maintain current IDOT prequalification in their respective work categories (specifically Work Category 12 for Drainage and Work Category 17 for Concrete Construction) at the time of bid opening. The pre-award phase serves as the evaluation period following the bid due date but prior to formal contract award, during which MCT will verify the selected bidder's capacity and qualifications to perform the federally funded construction project.
The document requires submission of a comprehensive list of all subcontractors, including full contact information, firm age, DBE/WBE/SBE certifications, gross receipt ranges, NAICS codes, assigned work tasks, and estimated work values. Additionally, the bidder must provide project references from similar construction projects completed within the preceding five years, including agency contact information and project descriptions, unless the bidder has previously performed work for MCT within the last five years. Financial documentation is mandatory and must include audited financial statements with auditor's opinion, accounting firm financial statements with review or compilation letters, and/or tax returns covering a minimum of two fiscal years, demonstrating the bidder's financial condition, capacity to finance the project, and ability to maintain adequate cash flow throughout the contract duration. Upon MCT's request, the bidder must also provide evidence of financial surety establishing performance and financial capabilities as represented in the bid proposal.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Madison County Mass Transit District
This information is required upon MCT’s request as a matter of responsibility after the due date for bids but prior to contract award.
Project Manager
Name:
Qualifications, experience, past projects, and number of years as a project manager
Project Implementation Schedule
Contractor Prequalification with IDOT
Bidders and subcontractors must be IDOT prequalified in their respective work categories at the time of the bid opening in order to be eligible to work on this project. Provide the name of each company that is proposed to perform the following IDOT work categories:
Work Category Bidder or subcontractor proposed to perform the work
12 Drainage
17 Concrete Construction
PRE-AWARD INFORMATION
This information/form only required from the bidder being considered for award.
Alton Driver Relief Facility No. 26-1-24600R1
Pre-Award Information
List of Subcontractors
Full name of subcontractor, address, city, state, ZIP, phone #
Age of Firm
DBE,
WBE,
or SBE
Gross receipts of firm
NAICS Codes and Work Tasks to be
Assigned
Total estimated value of work Sample subcontractor One Unknown Ave.
MCT Village, IL 0000 123-456-7890
22 years DBE ___ under $500,000 ___ $500,000 to $1 mil _X_ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
238140 - masonry work $x,xxx
1.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
2.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
3.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
4.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
5.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
6.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
7.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
8.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
9.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
10.
___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil
DBE = Disadvantaged Business Enterprise WBE = Woman Business Enterprise SBE = Small Business Enterprise
References
Provide project descriptions, contact names and telephone numbers of similar construction projects completed by your company during the preceding five (5) years. Use additional sheets as required. MCT may randomly select and contact supplied references. Reference research may include but not be limited to the following areas of interest: Overall quality of product/services; adherence to specifications; and overall satisfaction of corrective action concerning warranty/defects.
____ Place “x” here if the Bidder has performed services for the Owner within the last five years; references are not required if this box is checked.
Reference Agency Name: _______________________________________________________________________ Address: _______________________________________________________________________
Telephone: _______________________________________________________________________ E-mail: _______________________________________________________________________ Project Dates: _______________________________________________________________________ Project Budget: _______________________________________________________________________ Project Description:
Reference Agency Name: _______________________________________________________________________ Address: _______________________________________________________________________
Telephone: _______________________________________________________________________ E-mail: _______________________________________________________________________ Project Dates: _______________________________________________________________________ Project Budget: _______________________________________________________________________ Project Description:
Reference Agency Name: _______________________________________________________________________ Address: _______________________________________________________________________
Telephone: _______________________________________________________________________ E-mail: _______________________________________________________________________ Project Dates: _______________________________________________________________________ Project Budget: _______________________________________________________________________ Project Description:
Financial Information
Provide a statement of the bidder’s financial condition relative to the performance of this project, specifically addressing capacity to finance and maintain cash flow for contract duration. Upon MCT’s request, the bidder shall provide evidence of financial surety that fully establishes the performance and financial capabilities represented in the bidder’s offer. As appropriate for your organizational structure, include the following information for a minimum of the last two (2) fiscal years (or since commencement of operations, if less than two (2) years):
• Audited financial statements including auditor’s opinion and notes to the financial statements,
• Financial statements prepared by an accounting firm including the accountant’s review letter,
• Financial statements compiled by an accounting firm including the accountant’s compilation letter, and/or
• Tax returns.
| y1Pre-Award Information |
| Project Manager |
| Project Implementation Schedule |
| Contractor Prequalification with IDOT |
| y2List of Subcontractors |
| List of Subcontractors |
| y3References |
| References |
| y4Financial Information |
| Financial Information |
| Bidder or subcontractor proposed to perform the workDrainage: |
| Bidder or subcontractor proposed to perform the workConcrete Construction: |
| Text1: |
| Text2: |
| Text3: |
| Sub11: |
| undefined: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil: |
| undefined_2: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_2: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_2: |
| undefined_3: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_3: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_3: |
| undefined_4: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_4: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_4: |
| undefined_5: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_5: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_5: |
| undefined_6: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_6: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_6: |
| undefined_7: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_7: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_7: |
| undefined_8: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_8: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_8: |
| undefined_9: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_9: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_9: |
| DBE Disadvantaged Business Enterprise: |
| 238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_10: |
| xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_10: |
| Sub12: |
| Sub13: |
| Sub14: |
| Sub15: |
| Sub16: |
| Sub17: |
| Sub18: |
| Sub19: |
| Sub110: |
| undefined1: |
| undefined_21: |
| undefined_31: |
| undefined_41: |
| undefined_51: |
| undefined_61: |
| undefined_71: |
| undefined_81: |
| undefined_91: |
| DBE Disadvantaged Business Enterprise2: |
| Check Box22: Off |
| Check Box21: Off |
| Check Box24: Off |
| Check Box23: Off |
| Check Box25: Off |
| Check Box32: Off |
| Check Box31: Off |
| Check Box34: Off |
| Check Box33: Off |
| Check Box35: Off |
| Check Box42: Off |
| Check Box41: Off |
| Check Box44: Off |
| Check Box43: Off |
| Check Box45: Off |
| Check Box52: Off |
| Check Box51: Off |
| Check Box54: Off |
| Check Box53: Off |
| Check Box55: Off |
| Check Box62: Off |
| Check Box61: Off |
| Check Box64: Off |
| Check Box63: Off |
| Check Box65: Off |
| Check Box72: Off |
| Check Box71: Off |
| Check Box74: Off |
| Check Box73: Off |
| Check Box75: Off |
| Check Box82: Off |
| Check Box81: Off |
| Check Box84: Off |
| Check Box83: Off |
| Check Box85: Off |
| Check Box92: Off |
| Check Box91: Off |
| Check Box94: Off |
| Check Box93: Off |
| Check Box95: Off |
| Check Box102: Off |
| Check Box101: Off |
| Check Box104: Off |
| Check Box103: Off |
| Check Box105: Off |
| Check Box112: Off |
| Check Box111: Off |
| Check Box114: Off |
| Check Box113: Off |
| Check Box115: Off |
| are not required if this box is checked: |
| Agency Name: |
| Address 1: |
| Address 2: |
| Telephone 1: |
| Telephone 2: |
| Project Dates: |
| Project Budget: |
| Agency Name_2: |
| Address 1_2: |
| Address 2_2: |
| Telephone 1_2: |
| Telephone 2_2: |
| Project Dates_2: |
| Project Budget_2: |
| Agency Name_3: |
| Address 1_3: |
| Address 2_3: |
| Telephone 1_3: |
| Telephone 2_3: |
| Project Dates_3: |
| Project Budget_3: |
| Decsription 1: |
| Decsription 2: |
| Decsription 3: |
File details come from the government source that posted it. Updated .