6-IFB 26-1-24600R1 Vol 3 Pre-Award Information.pdf

PDF 434 KB Posted

Attached to
Alton Driver Relief Facility (Rebid)
Solicitation number
26-1-24600R1
Issued by
Madison County, Illinois

About this file

This is a Pre-Award Information document required by the Madison County Mass Transit District (MCT) for the Alton Driver Relief Facility project (IFB 26-1-24600R1). The document outlines the responsibility requirements that must be fulfilled by the bidder selected for award prior to contract execution. Key submission requirements include identification of the Project Manager with qualifications and experience documentation, a detailed Project Implementation Schedule, and verification that the bidder and all proposed subcontractors maintain current IDOT prequalification in their respective work categories (specifically Work Category 12 for Drainage and Work Category 17 for Concrete Construction) at the time of bid opening. The pre-award phase serves as the evaluation period following the bid due date but prior to formal contract award, during which MCT will verify the selected bidder's capacity and qualifications to perform the federally funded construction project.

The document requires submission of a comprehensive list of all subcontractors, including full contact information, firm age, DBE/WBE/SBE certifications, gross receipt ranges, NAICS codes, assigned work tasks, and estimated work values. Additionally, the bidder must provide project references from similar construction projects completed within the preceding five years, including agency contact information and project descriptions, unless the bidder has previously performed work for MCT within the last five years. Financial documentation is mandatory and must include audited financial statements with auditor's opinion, accounting firm financial statements with review or compilation letters, and/or tax returns covering a minimum of two fiscal years, demonstrating the bidder's financial condition, capacity to finance the project, and ability to maintain adequate cash flow throughout the contract duration. Upon MCT's request, the bidder must also provide evidence of financial surety establishing performance and financial capabilities as represented in the bid proposal.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Madison County Mass Transit District

This information is required upon MCT’s request as a matter of responsibility after the due date for bids but prior to contract award.

Project Manager

Name:

Qualifications, experience, past projects, and number of years as a project manager

Project Implementation Schedule

Contractor Prequalification with IDOT

Bidders and subcontractors must be IDOT prequalified in their respective work categories at the time of the bid opening in order to be eligible to work on this project. Provide the name of each company that is proposed to perform the following IDOT work categories:

Work Category Bidder or subcontractor proposed to perform the work

12 Drainage

17 Concrete Construction

PRE-AWARD INFORMATION

This information/form only required from the bidder being considered for award.

Alton Driver Relief Facility No. 26-1-24600R1

Pre-Award Information

List of Subcontractors

Full name of subcontractor, address, city, state, ZIP, phone #

Age of Firm

DBE,

WBE,

or SBE

Gross receipts of firm

NAICS Codes and Work Tasks to be

Assigned

Total estimated value of work Sample subcontractor One Unknown Ave.

MCT Village, IL 0000 123-456-7890

22 years DBE ___ under $500,000 ___ $500,000 to $1 mil _X_ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

238140 - masonry work $x,xxx

1.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

2.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

3.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

4.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

5.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

6.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

7.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

8.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

9.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

10.

___ under $500,000 ___ $500,000 to $1 mil ___ $1 mil to $2 mil ___ $2 mil to $5 mil ___ above $5 mil

DBE = Disadvantaged Business Enterprise WBE = Woman Business Enterprise SBE = Small Business Enterprise

References

Provide project descriptions, contact names and telephone numbers of similar construction projects completed by your company during the preceding five (5) years. Use additional sheets as required. MCT may randomly select and contact supplied references. Reference research may include but not be limited to the following areas of interest: Overall quality of product/services; adherence to specifications; and overall satisfaction of corrective action concerning warranty/defects.

____ Place “x” here if the Bidder has performed services for the Owner within the last five years; references are not required if this box is checked.

Reference Agency Name: _______________________________________________________________________ Address: _______________________________________________________________________

Telephone: _______________________________________________________________________ E-mail: _______________________________________________________________________ Project Dates: _______________________________________________________________________ Project Budget: _______________________________________________________________________ Project Description:

Reference Agency Name: _______________________________________________________________________ Address: _______________________________________________________________________

Telephone: _______________________________________________________________________ E-mail: _______________________________________________________________________ Project Dates: _______________________________________________________________________ Project Budget: _______________________________________________________________________ Project Description:

Reference Agency Name: _______________________________________________________________________ Address: _______________________________________________________________________

Telephone: _______________________________________________________________________ E-mail: _______________________________________________________________________ Project Dates: _______________________________________________________________________ Project Budget: _______________________________________________________________________ Project Description:

Financial Information

Provide a statement of the bidder’s financial condition relative to the performance of this project, specifically addressing capacity to finance and maintain cash flow for contract duration. Upon MCT’s request, the bidder shall provide evidence of financial surety that fully establishes the performance and financial capabilities represented in the bidder’s offer. As appropriate for your organizational structure, include the following information for a minimum of the last two (2) fiscal years (or since commencement of operations, if less than two (2) years):

• Audited financial statements including auditor’s opinion and notes to the financial statements,

• Financial statements prepared by an accounting firm including the accountant’s review letter,

• Financial statements compiled by an accounting firm including the accountant’s compilation letter, and/or

• Tax returns.

y1Pre-Award Information
Project Manager
Project Implementation Schedule
Contractor Prequalification with IDOT
y2List of Subcontractors
List of Subcontractors
y3References
References
y4Financial Information
Financial Information
Bidder or subcontractor proposed to perform the workDrainage:
Bidder or subcontractor proposed to perform the workConcrete Construction:
Text1:
Text2:
Text3:
Sub11:
undefined:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil:
undefined_2:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_2:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_2:
undefined_3:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_3:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_3:
undefined_4:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_4:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_4:
undefined_5:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_5:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_5:
undefined_6:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_6:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_6:
undefined_7:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_7:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_7:
undefined_8:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_8:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_8:
undefined_9:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_9:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_9:
DBE Disadvantaged Business Enterprise:
238140 masonry workunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_10:
xxxxunder 500000 500000 to 1 mil 1 mil to 2 mil 2 mil to 5 mil above 5 mil_10:
Sub12:
Sub13:
Sub14:
Sub15:
Sub16:
Sub17:
Sub18:
Sub19:
Sub110:
undefined1:
undefined_21:
undefined_31:
undefined_41:
undefined_51:
undefined_61:
undefined_71:
undefined_81:
undefined_91:
DBE Disadvantaged Business Enterprise2:
Check Box22: Off
Check Box21: Off
Check Box24: Off
Check Box23: Off
Check Box25: Off
Check Box32: Off
Check Box31: Off
Check Box34: Off
Check Box33: Off
Check Box35: Off
Check Box42: Off
Check Box41: Off
Check Box44: Off
Check Box43: Off
Check Box45: Off
Check Box52: Off
Check Box51: Off
Check Box54: Off
Check Box53: Off
Check Box55: Off
Check Box62: Off
Check Box61: Off
Check Box64: Off
Check Box63: Off
Check Box65: Off
Check Box72: Off
Check Box71: Off
Check Box74: Off
Check Box73: Off
Check Box75: Off
Check Box82: Off
Check Box81: Off
Check Box84: Off
Check Box83: Off
Check Box85: Off
Check Box92: Off
Check Box91: Off
Check Box94: Off
Check Box93: Off
Check Box95: Off
Check Box102: Off
Check Box101: Off
Check Box104: Off
Check Box103: Off
Check Box105: Off
Check Box112: Off
Check Box111: Off
Check Box114: Off
Check Box113: Off
Check Box115: Off
are not required if this box is checked:
Agency Name:
Address 1:
Address 2:
Telephone 1:
Telephone 2:
Project Dates:
Project Budget:
Agency Name_2:
Address 1_2:
Address 2_2:
Telephone 1_2:
Telephone 2_2:
Project Dates_2:
Project Budget_2:
Agency Name_3:
Address 1_3:
Address 2_3:
Telephone 1_3:
Telephone 2_3:
Project Dates_3:
Project Budget_3:
Decsription 1:
Decsription 2:
Decsription 3: