About this file

This document contains bid submittal instructions for the Madison County Mass Transit District's Alton Driver Relief Facility project (No. 26-1-24600R1), a federally funded construction project in Illinois. The project involves constructing an 872-square-foot building addition to an existing facility at 600 Piasa Street in Alton, Illinois, featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space. The addition will connect to an existing 785-square-foot building and match existing architectural elements including block CMU walls, brick veneer, cast stone details, and a slate roof. Site improvements include new parking stalls, patio modifications, a concrete ramp, and new access control and video surveillance systems. Bids must be submitted electronically through the Bonfire portal (mct-act.bonfirehub.com) by the specified deadline, with public bid opening at the Madison County Transit Administration Building in Pontoon Beach, Illinois. The as-read bid tabulation will be publicly available within 24 hours of the bid deadline.

Bidders must submit required forms in PDF or Excel format, including the Solicitation and Offer Form, Bid Price Form, and all required certifications (Federal Tax Liability and Convictions, Lobbying, Buy America, and McCain National Defense Authorization Act compliance). A bid bond or certified check equal to five percent of the total bid price is required, with checks to be received in a sealed envelope prior to the bid deadline. Bids may not be withdrawn for 90 days after opening without the Owner's written consent. The lowest responsive bidder must submit pre-award information including the project manager's qualifications, implementation schedule, IDOT prequalification documentation, subcontractor list, references, and financial information demonstrating capacity to finance and maintain cash flow. Contractors must be IDOT prequalified for applicable work categories at the time of bid opening. The Owner reserves the right to reject any and all bids and will notify bidders of any subcontractor disapprovals within a reasonable timeframe.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Madison County Mass Transit District Alton Driver Relief Facility No. 26-1-24600R1

Bid Submittal Instructions Page 1 of 2

VOLUME 2 BID SUBMITTAL INSTRUCTIONS

BSI 1 Bid Opening

Bids will be publicly opened and read out loud at the bid deadline.

The as-read bid tabulation will be publicly available in the project’s Supporting Documents section of the Bonfire portal within 24 hours of the bid deadline. The winning bidder and amount will also be publicly available on Bonfire once an award, if any, is made.

Public bid opening location: Madison County Transit Administration Building 1 Transit Way Pontoon Beach, IL 62040

BSI 2 Bid Delivery and Acceptance Information:

The Madison County Mass Transit District (the Owner) requires that bids be submitted electronically via the Bonfire portal at mct-act.bonfirehub.com. Bids will be time and date stamped by the Bonfire portal. Bids submitted in any manner other than through the Bonfire portal will not be accepted. As a condition of bid responsiveness, the following completed forms and requested information are required by the bid deadline.

Bidder must use the Owner’s supplied forms.

BSI 3 Requested Information for Bid Submittal FORMS THAT MUST BE IN PDF or EXCEL FORMAT AND UPLOADED TO THE BONFIRE PORTAL:

The following forms must be uploaded to the bonfire portal and be in the format as instructed in Bonfire.

Bidder must use the Owner’s supplied forms. These forms can be signed manually or electronically.

1. Solicitation and Offer Form. The person signing the bid on behalf of the bidder must be the duly authorized representative of the bidder and have the requisite authority to do so.

2. Bid Price Form.

Enter the Total Bid Price (Grand Total) in Bonfire’s electronic bid table.

3. Certifications. All of the certifications must be completed and submitted.

a) Federal Tax Liability and Convictions Certification

b) Lobbying Certification

c) Buy America Certification - – The Bidder or Proposer must submit to the Owner the appropriate Buy America Certification for this FTA-funded contract. Bids that are not accompanied by a properly completed Buy America certification are subject to the provisions of 49 CFR 661.13 and may be rejected as nonresponsive. For more information, please see the FTA’s Buy America webpage at: https://www.transit.dot.gov/buyamerica.

d) Certification of Compliance with the John S. McCain National Defense Authorization Act

4. Bid Bond. Bidders shall furnish a bid guaranty in the form of a bid bond, or certified treasurer’s or cashier’s check issued by a responsible bank or trust company, made payable to the Madison County Mass Transit District. The amount of such guaranty shall be equal to five percent (5%) of the total bid price. If furnishing a check, the original check must be received in a sealed envelope by a member of the Owner’s procurement department prior to the bid deadline or the bid will be deemed non-responsive.

In submitting this bid, it is understood and agreed by bidder that the Owner reserves the right to reject any and all bids, or part of any bid, and it is agreed that the Bid may not be withdrawn for a period of [90] days subsequent to the opening of bids, without the written consent of the Owner.

It is also understood and agreed that if the undersigned bidder should withdraw any part or all of his/her bid within [90] days after the bid opening without the written consent of the Owner, or refuse or be unable to enter into this Contract as provided above, or refuse or be unable to furnish https://mct-act.bonfirehub.com/ https://www.transit.dot.gov/buyamerica

Madison County Mass Transit District Alton Driver Relief Facility No. 26-1-24600R1

Bid Submittal Instructions Page 2 of 2 adequate and acceptable Performance and Payment Bonds, or refuse or be unable to furnish adequate and acceptable insurance, as provided herein, it shall forfeit its bid guaranty to the extent the Owner’s damages occasioned by such withdrawal, or refusal, or inability to enter into an agreement, or provide adequate security thereof.

It is further understood and agreed that to the extent the defaulting bidder's bid guaranty shall prove inadequate to fully recompense the Owner for the damages occasioned by default, then the undersigned bidder agrees to indemnify the Owner and pay over to the Owner the difference between the bid guarantee and the Owner’s total damages so as to make the Owner whole.

The bidder understands that any material alteration of the above of any of the material contained herein, other than that requested will render the bid non-responsive.

BSI 4 Addenda If any addenda to the solicitation have been issued, you will be asked to confirm your receipt of each addendum on Bonfire.

BSI 5 Pre-Award Information

PRE-AWARD INFORMATION TO BE SUBMITTED BY THE LOWEST RESPONSIVE BIDDER.

As part of the bid evaluation process, the forms and information listed below will be used in the Owner’s review of responsibility for the bidder being considered for award. This information is only required from the lowest responsive bidder, or subsequently identified lowest responsive bidder, and is NOT due at the bid deadline. Upon the Owner’s request, this information shall be submitted electronically via the Bonfire portal at mct-act.bonfirehub.com. The Owner requests that this information be submitted within one (1) business day of the request:

1. Project Manager – Provide the name, qualifications and experience of the project manager.

2. Project Implementation Schedule - List major milestones to meet the substantial completion requirement.

3. Contractor Prequalification with IDOT. Bidders must be IDOT prequalified or use IDOT prequalified subcontracts for the work categories identified on the form. Bidder/subs must be prequalified at the time of the bid opening in order to be eligible to bid and work on this project. The form provided must be used to indicate the proposed company(s) that will be used to perform the respective work categories.

4. List of Subcontractors (including subs proposed for IDOT prequalified work). The Owner’s approval of all subcontractors and supplier is required prior to contract award. The Owner will notify the bidder within a reasonable time if any of the proposed subcontractors will not be approved along with the relevant reasons. In order to assist the Owner in its evaluation of bidder’s qualifications, the bidder must supply to the Owner a detailed list of all proposed subcontractors. Any subcontractor or supplier receiving pre-award approval must be utilized by the contractor for the portion of the work for which they were approved. The Owner will generally not entertain any post-award substitutes of any such subcontractor or supplier in the absence of compelling circumstances to do so.

5. References. Provide references on the provided form unless the Bidder indicates with an “X” that they have performed services for the Owner within the last five years.

6. Financial Information - Provide a statement of the bidder’s financial condition relative to the performance of this project, specifically addressing capacity to finance and maintain cash flow for contract duration.

[End of document] https://mct-act.bonfirehub.com/