This Invitation for Bids (IFB) document, issued November 3, 2026, is from the Madison County Mass Transit District (MCT) for the Alton Driver Relief Facility project located at 600 Piasa St., Alton, Illinois. The project involves construction of an 872-square-foot building addition featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space connected to an existing 785-square-foot building. Construction will incorporate block CMU walls, brick veneer, cast stone banding and sills, glass block windows, cast stone wall caps, and a slate roof over light-gauge metal trusses. Site improvements include new parking stalls along a brick retaining wall, modifications to existing concrete and brick patio, a new concrete ramp, access control and video surveillance systems, modifications to existing mechanical space, and an outdoor mechanical enclosure for HVAC equipment. A mandatory pre-bid meeting and site tour will be held November 12, 2026, at 9:00 AM CST at MCT's administration building in Pontoon Beach, Illinois. Questions and substitution requests are due by November 18, 2026, at 1:00 PM CST, with an anticipated addendum issued November 24, 2026. Bids must be submitted electronically through the Bonfire portal by December 3, 2026, at 2:00 PM CST, with public opening and reading following at the same location. Contract award is anticipated December 18, 2026, with notice to proceed anticipated January 15, 2027. The contract is a firm fixed lump sum with substantial completion required within 330 calendar days of notice to proceed.

This federally funded project receives financial assistance from the Federal Transit Administration under the U.S. Department of Transportation. Award will be made to the lowest responsive and responsible bidder based on Total Bid Price. A bid guarantee of five percent of the total bid price is required, and bids remain firm for 90 calendar days from the bid deadline. The successful bidder must comply with Buy America regulations, Equal Employment Opportunity laws, Davis-Bacon prevailing wage requirements, and Illinois Prevailing Wage Act provisions. A Project Labor Agreement must be executed before notice to proceed is issued. The successful bidder must deliver three signed contracts, proof of insurance, a performance bond, and a payment bond within two weeks of the Notice of Intent to Award. Allowances totaling $36,000 are included in the bid price, consisting of $25,000 for Ameren Service Upgrade and $11,000 for local, state, and federal permits and fees. The project is subject to Disadvantaged Business Enterprise participation requirements under 49 CFR Part 26, and the Owner maintains the right to reject any or all bids and cancel the procurement.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BIDS (IFB)

Issued November 3, 2026

Alton Driver Relief Facility

MCT Project No. 26-1-24600R1

1 TRANSIT WAY

PONTOON BEACH, IL 62040

Telephone (618) 797-4600

Madison County Mass Transit District Alton Driver Relief Facility No. 26-1-24600R1

Introduction and Bid Summary Page 1 of 7

TABLE OF CONTENTS

VOLUME 1 INTRODUCTION AND BID SUMMARY

INTRO 1 INVITATION

INTRO 2 DATE, TIME AND PLACE OF BID OPENING

INTRO 3 PROCUREMENT SCHEDULE

INTRO 4 OWNER’S PROCUREMENT REPRESENTATIVE

INTRO 5 PRE-BID MEETING AND PROJECT SITE TOUR

INTRO 6 BASIS OF CONTRACT AWARD

INTRO 7 TYPE AND TERM OF CONTRACT

INTRO 8 QUESTIONS AND APPROVED EQUAL / SUBSTITUTION REQUESTS

INTRO 9 AMENDMENTS TO THIS SOLICITATION

INTRO 10 BIDDER’S TERMS AND CONDITIONS

INTRO 11 EXECUTION OF CONTRACT

INTRO 12 PROJECT LABOR AGREEMENT

INTRO 13 RESPONSIVE AND RESPONSIBLE BIDDER

INTRO 14 WITHDRAWAL OF BID

INTRO 15 ORGANIZATIONAL CONFLICT OF INTEREST

INTRO 16 OWNER’S TAX STATUS

INTRO 17 LAW GOVERNING

INTRO 18 CONSIDERATION OF OFFERS

INTRO 19 FREEDOM OF INFORMATION (FOIA)

INTRO 20 REPRESENTATIONS AND CERTIFICATIONS

INTRO 21 SINGLE BID RESPONSE

INTRO 22 PROTEST PROCEDURES

INTRO 23 CONTRACTOR DBE SPECIAL PROVISION

INTRO 24 ALLOWANCES

VOLUME 2 BID SUBMITTAL INSTRUCTIONS

VOLUME 3 BID SUBMITTAL FORMS

VOLUME 4 SAMPLE CONTRACT

VOLUME 5 PROJECT MANUAL

A. TECHNICAL SPECIFICATIONS

B. DRAWINGS

Prospective bidders are advised the only valid sources to receive this IFB and addenda is at mct-act.bonfirehub.com or provided directly from MCT. Other sources have not been authorized for distribution. Bidders are responsible for acknowledging all issued addenda with their bid.

https://mct-act.bonfirehub.com/

Introduction and Bid Summary Page 2 of 7

VOLUME 1 INTRODUCTION AND BID SUMMARY

INTRO 1 Invitation Firms are invited to submit a sealed bid to the Madison County Mass Transit District (hereinafter “Owner” or “MCT”) through its Bonfire portal at mct-act.bonfirehub.com until the bid deadline 2:00 PM CST on December 3, 2026, for the Alton Driver Relief Facility project, at which time electronic bids will be publicly opened and read aloud in the Owner’s administration building board room located at 1 Transit Way, Pontoon Beach, Illinois 62040. This IFB is a rebid of a cancelled procurement. Bids will be time and date stamped by the Bonfire portal. Bids submitted in any manner other than through the Bonfire portal will not be accepted. A pre-bid meeting and site tour will be conducted on November 12, 2026 at 9:00 AM CST. Bidders and subcontractors are encouraged to attend.

This federally funded project is located at 600 Piasa St., Alton, IL 62002. Construction includes an 872-square-foot building addition featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space. The addition will be connected to an existing 785-square-foot building containing two restrooms and a mechanical room and will be constructed to match the existing structure with block CMU walls, brick veneer, cast stone banding and sills, glass block windows, and cast stone wall caps, with a slate roof over light-gauge metal trusses. Site improvements will include new parking stalls along a brick retaining wall, modifications to the existing concrete and brick patio, and a new concrete ramp. The scope also includes new access control and video surveillance for the new addition and adjacent bus station structure, requiring modifications to the existing mechanical space, as well as the construction of an outdoor mechanical enclosure to house HVAC equipment, together with all incidental and collateral work necessary to complete the project in accordance with the plans and specifications.

Vendors must be registered in Bonfire to download the IFB documents; registration is free at mct-act.bonfirehub.com. The document takers (plan holders) list is available in the Bonfire portal. All issued IFB addenda and communications will be transmitted through the Bonfire portal.

Financial assistance for this project is being provided in part by the Federal Transit Administration (FTA) which is under the jurisdiction of the United States Department of Transportation (USDOT). The successful bidder will be required to comply with Buy America regulations, all applicable Equal Employment Opportunity laws and regulations and the prevailing wage rates pursuant to the Davis-Bacon Act as well as the prevailing wage rates pursuant to the Illinois Prevailing Wage Act (820 ILCS 130/1-12).

It is the policy of the USDOT that Disadvantaged Business Enterprises (DBE) as defined in 49 CFR Part 26 shall have an equal opportunity to participate in the performance of contracts financed in whole or in part with Federal funds. In this regard, the Owner and its contractors and subcontractors shall take all necessary and reasonable steps in accordance with 49 CFR Part 26 to ensure that small businesses, including DBEs, have an equal opportunity to compete on and perform on this contract.

Substantial completion to be achieved within 330 calendar days of notice to proceed.

A bid guarantee in the amount of five percent (5%) of the bidder’s Total Bid Price must accompany a bid to ensure that the bidder will honor its bid upon acceptance.

Bids shall remain firm for a period of 90 calendar days from the final due date for bids.

INTRO 2 Date, Time and Place of Bid Opening Electronic bids will be publicly opened and read out loud. Bid deadline:

Date: December 3, 2026 Time: 2:00 PM CST

Place: Madison County Transit Administration Building Board Room

1 Transit Way Pontoon Beach, IL 62040 https://mct-act.bonfirehub.com/

Introduction and Bid Summary Page 3 of 7

INTRO 3 Procurement Schedule Bidders are advised that the Owner will make a good faith effort to adhere to the following schedule for this procurement.

Date Milestone

November 3, 2026 IFB issued

November 12, 2026 Pre-Bid meeting at 9:00 AM CST

November 18, 2026 Deadline for questions and substitution requests at 1:00 PM CST

November 24, 2026 Anticipated issuance of addendum with answers to questions (if any)

December 3, 2026 Bid deadline at 2:00 PM CST

December 18, 2026 Anticipated notice of intent to award a contract

January 15, 2027 Anticipated contract award and notice to proceed

The Owner shall be under no obligation to comply with the procurement schedule shown above, provided that all prospective bidders or other interested parties known to the Owner shall be notified equally of changes made to this schedule by the Owner within a reasonable time after such changes are made. In no event shall any bidder have any redress to the Owner, be it financial or otherwise, in the event that the Owner alters this schedule in any way.

INTRO 4 Owner’s Procurement Representative Name: Thomas White Title: Project Control Specialist Email: mctbid@mct.org

INTRO 5 Pre-Bid Meeting and Project Site Tour A non-mandatory pre-bid meeting will be held at the Owner’s headquarters, on the date and time stated in “Procurement Schedule”, for the purpose of responding to questions and clarifying the contents of this IFB.

Attendance is not required; however, bidders are encouraged to attend if they wish to ask questions concerning the scope of work or selection process.

• In-person: MCT administration building board room, 1 Transit Way, Pontoon Beach, IL 62040.

• Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2334487747980368?p=nMeIUfZsBLfm9et4cq Meeting ID: 233 448 774 798 036 8 Passcode: an93Rk3d

• Site tour: A site tour of the Owner’s headquarters will take place immediately following the meeting.

An addendum will be issued which will include the minutes of the pre-bid meeting. Bidders are reminded that any changes to the IFB will be by written addenda only. Nothing stated at the pre-bid meeting will change or qualify in any way any of the provisions in the IFB and shall not be binding on the Owner unless provided in an addendum.

INTRO 6 Basis of Contract Award Contract award, if any, shall be made to the lowest responsive and responsible bidder as determined by the Total Bid Price (Grand Total). The Total Bid Price must include all costs to the bidder for materials, labor, equipment, supervision, delivery, unloading, handling of material and equipment on site, and any and all items of expense, fees, permits, taxes, bonds, duties, overhead and profit for the full and complete performance of the work as set forth in the IFB. Acceptance of any bid and contract award is subject to approval of the Owner’s Board of Trustees. Bids must be for the contract as a whole.

mailto:mctbid@mct.org https://teams.microsoft.com/meet/2334487747980368?p=nMeIUfZsBLfm9et4cq

Introduction and Bid Summary Page 4 of 7

INTRO 7 Type and Term of Contract Firm fixed lump sum contract. Substantial completion shall be achieved within 330 calendar days of notice-to-proceed.

INTRO 8 Questions and Approved Equal / Substitution Requests Questions and substitution requests are due in accordance with the date and time listed in “Procurement Schedule”. If there are further questions related to critical and/or contradictory items that come up after this time period, these questions should be submitted to the Owner’s procurement representative without delay so that the Owner can address any issues found prior to the bid deadline. Questions and other communications must be submitted through the Bonfire portal at mct-act.bonfirehub.com.

The specifications contained in this IFB indicate the Owner’s specific preferences. Descriptions of products in the specifications are not intended to unduly restrict competition. Wherever particular brands, manufacturers or product names are used, they are included solely for the purpose of establishing a description of the minimum quality of the item. Such references should not be construed as advocating or prescribing the use of any particular brand, item or product. Minor variances to the specifications will be considered by the Owner and will be evaluated based on the respective quality and condition of such variance and the degree to which it may affect performance in the Owner’s application. In the Owner’s sole judgment, determinations will be made based on the best interest of the Owner; such decisions will be considered final. The Owner approved variance will be made known to all bidders via addenda. Requests submitted with a bid will be rejected.

Any bidder who desires that the Owner consider any deviation to the technical specifications, brand, manufacturer or product descriptions contained in this IFB must submit a request for clarification / interpretation / substitution that must include, at a minimum, the following information: request number, bidder name and contact information, IFB specification section/page/article reference or drawing/detail reference, type of clarification requested, detailed request and rationale for request, and any relevant attachments. All pertinent information concerning the brand, manufacturer or product, together with appropriate justification for its use, must be included with the bidder request. Failure to request a deviation for a particular stated Owner preference shall be construed that the bidder intends to comply with the Owner’s desire in every respect.

Substitution requests must come from Prime bidders/contractors; substitution requests from subassemblers/subcontractors/suppliers will not be reviewed.

INTRO 9 Amendments to this Solicitation Any or all changes, additions, or clarifications in connection with this IFB shall be issued by the Owner in the form of written addenda posted at mct-act.bonfirehub.com. Bidder must acknowledge all addenda issued as part of their bid submittal through the Bonfire portal and on the Solicitation and Offer Form (IFB Volume 3, Block 18). Oral comments, responses and/or representations shall not be binding upon the Owner.

INTRO 10 Bidder’s Terms and Conditions Bidder imposed terms and conditions submitted with their bid which conflict with this solicitation are considered counter offers and, as such, may cause the bid to be rejected. Terms or conditions that a bidder would like to have considered by the Owner should be submitted according to the requirements of “Questions and Approved Equal / Substitution Requests”.

INTRO 11 Execution of Contract The acceptance of a bid for a pending award, if made, shall be evidenced in writing by a Notice of Intent to Award delivered to the successful bidder. Within two weeks after the Notice of intent to Award is issued, the successful bidder shall deliver to the Owner three (3) signed contracts, proof of insurance, a performance bond, and a payment bond. Failure to fulfill this requirement within the specified time is cause for non-award of the contract and forfeiture of the bid guaranty. After receipt of acceptable documentation from the successful bidder and expiration of the bid protest period, then a notice of award, fully executed contract, and Notice to Proceed can be issued by the Owner.

Introduction and Bid Summary Page 5 of 7

INTRO 12 Project Labor Agreement The successful bidder shall execute a Project Labor Agreement (PLA) for this project and must provide a copy to the Owner before the Notice-to-Proceed can be issued. An example of the PLA is provided at mct-act.bonfirehub.com.

INTRO 13 Responsive and Responsible Bidder All bids received in accordance with the requirements stated in this solicitation shall be screened initially in order to confirm the responsiveness of the written bid, including minimum qualifications, if any.

A responsive bid complies with all material aspects of the solicitation, both as to the method and timeliness of submission, and as to the substance of any resulting contract. The Owner shall ensure that all bids received prior to the deadline stated in the solicitation contain all required forms, signatures, attachments, and other information as specified herein. Bids that do not comply with all material aspects of the solicitation will be rejected as non-responsive.

A responsible bidder is an individual, firm or team that exhibits adequate organization, financial condition, personnel qualifications, facilities, record of past performance, and other characteristics necessary to carry out work related to this solicitation with a high degree of quality and timeliness.

INTRO 14 Withdrawal of Bid The Bonfire portal permits an electronically submitted bid to be withdrawn prior to the final bid deadline.

After the bid deadline, no bid may be withdrawn for the period of time stated in Solicitation and Offer Form.

Negligence on the part of a bidder in preparing its bid shall not confer a right of withdrawal after the bid deadline.

INTRO 15 Organizational Conflict of Interest Unless specifically exempted from the conditions of this provision by the Owner, any Owner contractor, subcontractor, subsidiary, or other entity which is legally related and which develops or drafts specifications, requirements, statements of work, or solicitations, is excluded from competing for the directly ensuing procurement.

INTRO 16 Owner’s Tax Status The Owner is a governmental entity exempt from the payment of applicable Retailer’s Occupation Tax, Service Occupation Tax, Use Tax, Service Use Tax; the Owner’s Illinois governmental exemption certificate number is E99897751 expiring on 03/01/2030.

INTRO 17 Law Governing Bidder shall recognize that all applicable Federal and State laws, including, but not limited to the Illinois Prevailing Wage Act, certifications, municipal ordinances, and rules and regulations of all authorities having jurisdiction over the services to be provided shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full. All matters of law pertaining to this Contract shall be governed by, and construed according to, the laws of the State of Illinois, excluding, however, choice of laws principles.

INTRO 18 Consideration of Offers The Owner shall not be obligated to award a contract solely on the basis of any response made to this IFB, nor does the Owner intend to, nor will it be obligated to pay for the information solicited or obtained. the Owner maintains the right, but shall be under no obligation, to award a contract to the responsive and responsible bidder whose offer is deemed by the Owner to be most advantageous. The Owner reserves the right:

a) To reject any offer and to remove from mailing lists for future procurements the names of any firm or team engaging in collusive or other unlawful practices.

b) To award contract(s) without discussion based upon the initial offers.

Introduction and Bid Summary Page 6 of 7

c) To waive informalities and minor irregularities in offers received if it believes there is a sound documented business reason for doing so, and to negotiate matters of contractor performance and other matters prior to awarding a contract.

d) To reject any offer if, in the Owner’s sole discretion, the offer is incomplete, the offer is not responsive to the requirements of this solicitation, the bidder does not meet the qualification requirements set forth herein, if any, or it is otherwise determined to be in the best interest of the Owner to reject the offer.

e) To supplement, amend, substitute, or otherwise modify the terms of this solicitation at any time prior to the execution of a final contract.

f) To accept or reject any or all of the items in any offer and award a contract for the whole or only a part of any offer if the Owner determines, in its sole discretion, that it is in the Owner’s best interest to do so.

g) To reject the offer of any bidder that, in the Owner’s sole judgment, has been delinquent or unfaithful in the performance of any contract with the Owner, is financially or technically incapable or is otherwise deemed to not be a responsible bidder/proposer.

h) To waive any informality, defect, non-responsiveness and/or deviation from this solicitation that is not, in the Owner’s sole judgment, material to the offer.

i) To permit or reject, at the Owner’s sole discretion, amendments (including information inadvertently omitted), modifications, alterations, and/or corrections to offers by one or more of the bidders or proposers following bid or proposal submission.

j) To request additional or clarifying information.

k) To investigate the qualifications of any and all individuals and firms under consideration, to confirm any part of the information furnished in an offer, and to require further evidence of managerial, financial, or professional capabilities which are considered necessary for the successful performance of work described in this solicitation.

l) To cancel the procurement at any time during the process if it appears that the offers received are not suitable for any reason whatsoever.

m) To reject offers that are materially unbalanced, i.e., that contain high unit prices for some items and/or low unit prices for other items.

n) To evaluate offers based on unit prices which will govern over extended prices.

o) To award this contract to a single or multiple service providers deemed to best meet the Owner’s specifications and needs.

p) To award tie bids by drawing lots.

INTRO 19 Freedom of Information (FOIA) Access to the Owner’s government records is governed by the Illinois Freedom of Information Act (5 ILCS 140/1). To the extent allowed by law, all bids and supporting documents shall become public information held in custody of the Owner after the bid deadline. The bidder shall be responsible for ensuring that confidential commercial or financial information, trade secrets or proprietary information — with such determinations to be made by the Owner in its sole discretion — bears appropriate notices relating to its confidential character.

INTRO 20 Representations and Certifications By submitting a bid, the bidder certifies the following:

a) It has notified a surety company that they are submitting a bid for work to be performed on the project.

b) It has no direct or indirect pecuniary or proprietary interest, and that it shall not acquire any interest which conflicts in any manner or degree with the work required to be performed and/or provided under this contract, and that it shall not employ any person or agent having any such interest. In the event that the successful bidder, its agents, employees or representatives hereafter acquire such a conflict of interest, the successful bidder shall immediately disclose such interest to the Owner and immediately take action to eliminate the conflict or to withdraw from this contract, as the Owner may require.

c) No person or selling agency except bona fide employees or designated agents or representatives of bidder or proposer has been employed or retained to solicit or secure this contract with an understanding that a commission, percentage, brokerage, or contingent fee would be paid; and no gratuities in the form of entertainment, gifts or otherwise were offered or given by bidder or any of its

Introduction and Bid Summary Page 7 of 7 agents, employees or representatives, to any official, member or employee of the Owner or other governmental agency with a view toward securing this contract or securing favorable treatment with respect to the awarding or amending, or the making of any determination with respect to the performance required under, a contract with the Owner.

d) The number and amount of other contracts and awards pending which the bidder is or will be obligated to perform, now and during the course of this project, will not interfere with or hinder the timely prosecution of work.

e) The bid price has been arrived at independently, without consultation, communications, or agreement for the purpose of restricting competition.

f) It has not offered any money or other valuable thing to any person to induce them not to bid or propose on this project, or as recompense for his not having bid or propose on this project.

g) It will pay, and require each subcontractor to pay, laborers and mechanics employed directly upon the site of the work no less than the local prevailing wages and fringe benefits paid on projects of similar character.

h) The bidder is properly organized and qualified to do business in the State of Illinois and has any and all approvals, registration, and licenses to do business in the State and with the Owner and that the person executing the bid/proposal on behalf of the bidder is the duly authorized representative of the bidder/proposer and has the requisite authority to do so.

i) It acknowledges receipt of the IFB to include the project manual and drawings directly from the Owner; other sources are invalid.

j) It has examined the site and bidding documents, and shall be responsible for performing all work specifically required by all parts of the bidding and contract documents, including drawings and specifications for the entire project even though such work may be included as related requirements specified in other Divisions or Sections.

k) It will accomplish the work in accordance with the contract.

l) It has read and understands the terms and conditions set forth in this solicitation and agrees to them with no exceptions.

m) It will comply with the requirements of 2 C.F.R. part 180, subpart C, as supplemented by 2 C.F.R. part

1200, while this offer is valid and throughout the period of any contract that may arise from this offer.

INTRO 21 Single Bid Response In the event that only one responsive and responsible bid is received in response to this IFB, the Owner may require assistance from the single bidder in the preparation of a bid price analysis, in order to determine whether the single bid received by the Owner is fair and reasonable.

INTRO 22 Protest Procedures Any protest initiated by a protesting party concerning procurement actions will be administered in accordance with the agency’s Protest Procedures, which are available at www.mct.org/procurement.

INTRO 23 Contractor DBE Special Provision Not Applicable

INTRO 24 Allowances The successful Bidder shall be required to coordinate and complete all work associated with the allowances identified below, in accordance with the Contract Documents, applicable permits, and governing federal, state, and local requirements. The Contractor shall be responsible for administering, tracking, and documenting all allowance expenditures and providing supporting documentation to the Owner for review and approval.

The Contractor shall be responsible for all costs associated with the use of these allowances, including any required coordination, applications, fees, labor, materials, and administrative costs, except as specifically provided herein. The permits are listed below with their associated estimated cost for bidding purposes.

• Ameren Service Upgrade: $25,000

• Local, State, and/or Federal Permits/Fees: $11,000

• Total of the above allowances: $36,000

[End of document] http://www.mct.org/procurement

INTRO 1 Invitation
INTRO 2 Date, Time and Place of Bid Opening
INTRO 3 Procurement Schedule
INTRO 4 Owner’s Procurement Representative
INTRO 5 Pre-Bid Meeting and Project Site Tour
INTRO 6 Basis of Contract Award
INTRO 7 Type and Term of Contract
INTRO 8 Questions and Approved Equal / Substitution Requests
INTRO 9 Amendments to this Solicitation
INTRO 10 Bidder’s Terms and Conditions
INTRO 11 Execution of Contract
INTRO 12 Project Labor Agreement
INTRO 13 Responsive and Responsible Bidder
INTRO 14 Withdrawal of Bid
INTRO 15 Organizational Conflict of Interest
INTRO 16 Owner’s Tax Status
INTRO 17 Law Governing
INTRO 18 Consideration of Offers
INTRO 19 Freedom of Information (FOIA)
INTRO 20 Representations and Certifications
INTRO 21 Single Bid Response
INTRO 22 Protest Procedures
INTRO 23 Contractor DBE Special Provision
INTRO 24 Allowances