6 8Infection Control Permit_revised.pdf

PDF 258 KB Posted

Attached to
Replace Linear Accelerator at Greater Los Angeles VAHCS Federal contract opportunity
Solicitation number
36C25821B0004
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document contains an infection control permit and a related federal contract opportunity. The infection control permit is for a project to replace a linear accelerator at the Greater Los Angeles VA Healthcare System located in building 500. It provides details on the location and duration of the project, contractors performing the work, and addresses various safety, environmental and infection control requirements.

The related federal contract opportunity is a solicitation to completely prepare the site for building operations including demolition, coordinate with equipment providers, and furnish labor and materials to replace the existing linear accelerator. The contractor shall renovate rooms, add a control room, mechanical room and data server room, replace ceiling and flooring, rewire, install new air and electrical systems, ductwork, drywall, finishes, casework and paint. The contractor will also coordinate with equipment providers to remove the existing equipment and install the new linear accelerator and patient lift. The Department of Veterans Affairs Veterans Health Administration VISN 22 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Linear Accelerator at Greater Los Angeles VAHCS, newest first.
File Type Posted
Sign in Sheet for 11 Jan Site Walk Linear Accelerator.pdf PDF
36C25821B0004 0002.pdf PDF
36C25821B0004 0001 RFI Amendment.pdf PDF
36C25821B0004.pdf PDF
Wage Rate Determination CA20200022.docx DOCX document
Atch 1 Self Performance Calculations.pdf PDF
6 4Radixact Full Set.pdf PDF
Contractor Background Investigation Request Form (May 2019).pdf PDF
of0306.pdf PDF
VA0710.pdf PDF
6 2 Drawings 2 of 2.pdf PDF
6 3Specification CSI 121.pdf PDF
6 1 Drawings1 of 2.pdf PDF
Self Certification of Continuous Service.pdf PDF
Fingerprint Record Prep Sheet BLANK.PDF PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 3/14/2019

Infection Control Permit

Location of Construction: Project Start Date:

Project Coordinator: Estimated Duration:

Contractor Performing Work: Telephone:

Supervisor: Email:

Project or Work Order #

Description of project: (Choose only one.) Demolition Construction Renovation Repairs

Yes No Will there be noise generated that will impact a department adjacent to, above, or below the work area?

a. If so, these departments must be notified.

b. How are you going to reduce the noise to an acceptable level?

Will there be vibration generated that will impact a department adjacent to, above, or below the work area?

a. If so, these departments must be notified each time this type of work will be performed.

b. How are you going to reduce the vibration to an acceptable level?

Are Emergency Procedures in place and posted on each job for accidental events that could greatly impact Patient Care or Life Safety to the facility? Included in these procedures are such things as:

• Emergency telephone numbers of key departments.

• A plan that describes where main valves, switches, and controls are for the area in case of an emergency.

• A plan for unexpected outages.

Are any of the following environmental hazards present?

Will hazardous chemicals be used on this project? How will fumes and odors be controlled? MSDS Sheets are required.

Is asbestos abatement required on this job? If so, notify Safety and FES at the activation.

Will there be hot work done on this project? If there are, then a hot work permit must be posted on the job site. All hot work must have a fire watch assigned to each area while the hot work is being performed.

Will there be a Confined Space Entry required on this project? If so, the Medical Center’s confined space entry program must be followed.

Yes No Will any of the following systems be out of service at any time during the project?

• Fire alarm (If out for more than 4 hours, Interim Life Safety Measures must be implemented.)

• Sprinkler (If out for more than 4 hours, Interim Life Safety Measures must be implemented.)

• E lec t r i ca l

• Domestic water

• O xy ge n

• S e w a g e

• H V A C

VHAWLAPhanT Typewritten Text Building 500, Ground floor

VHAWLAPhanT Typewritten Text

TOM PHAN

VHAWLAPhanT Typewritten Text

TBD/ UNKNOWN

VHAWLAPhanT Typewritten Text

TBD/ UNKNOWN

VHAWLAPhanT Typewritten Text

691 CSI 121

VHAWLAPhanT Typewritten Text

TBD/ UNKNOWN

VHAWLAPhanT Typewritten Text

180 DAYS

VHAWLAPhanT Typewritten Text

TBD/ UNKNOWN

VHAWLAPhanT Typewritten Text

TBD/ UNKNOWN

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text X

VHAWLAPhanT Typewritten Text X

VHAWLAPhanT Typewritten Text X

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT x

Will there be any work that will require activation of the Interim Life Safety Measures during this project? Some things that trigger ILSM's to be implemented are but not limited to:

• Any work that impacts an EXIT or stairs,

• Any work that impacts major breaches in a fire or smoke wall, (penetration permit required)

• Taking the main fire protection system out of service (sprinkler),

• Taking the main fire alarm system out of service,

• Taking the "area" fire or fire alarm systems out of service for more than 4 hours within a 24-hour period.

Implementation of the ILSM requires a fire watch and the ILSM forms to be completed (forms are to be obtained from the

Medical Center Fire Department).

Will work affect exit routes from occupied areas adjacent to work site?

Will project affect traffic patterns in area? If yes, explain plan.

The following must be completed prior to any construction activities.

• Separation wall must be constructed prior to project beginning.

• Fire protection systems must remain intact.

• Provide extra fire extinguishers in work areas.

• Maintain exit lights in work area.

• Maintain negative air in construction area (24/7) through duration of project.

• There cannot be any return air from within the construction area to the rest of the building.

• Redirect exiting not to go through construction area.

• Put signs on doors into construction area "Construction Area – Do Not Enter."

• Maintain daily logs and keep a current Hot Work Permit.

• Place tacky mats at doors exiting construction area.

• All debris removal must be by covered cart.

• Maintain clean and orderly work area.

• How will this project affect the departments above, below, and adjacent to this project?

Air Quality and Infection Control

The construction activity types are defined by the amount of dust that is generated, the duration of the activity, and the amount of shared HVAC systems. Contact CVAMC's Safety Office and Infection Preventionist if any activity is questionable under these guidelines.

Yes No Will dust be generated during this project?

If yes, explain location of and plan for interim dust barriers or attach floor plan with barriers clearly marked.

Will debris removal be necessary? If yes, explain plan for debris removal and control.

Negative airflow ventilation and filtration in place and assessed for effectiveness.

Exhaust fans in place and functioning.

Is supply duct to area closed and HEPA filtration unit in place and functioning in adjacent patient care area?

Will work be done in a sterile area? If so, how are you going to maintain sterile atmosphere in work area and access to and from work area?

Type A Inspections and Non-Invasive Activities or Small scale, Short duration Activities

Yes No Removal of ceiling tiles for visual inspection (limited to <25% of total area)

Painting (limited sanding to <10% of area)

Wall covering—Describe work to be done:

Electrical trim work. Describe:

Minor plumbing. Describe:

Type B Small scale, short duration activities that create minimal dust.

Yes No Installation of telephone and computer cabling

Access to chase spaces

Sanding of walls for painting or wall covering (minor repairs—not sanding for drywall finishing)

Type C Any work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies.

Yes No Sanding of walls-(>50% of surface area)-drywall finishing

Removal of ❑floor coverings ❑ceiling tile ❑casework (>50% of surface area) Describe:

% Describe: Cutting of walls or ceiling. Describe:

New wall construction

Minor ductwork or electrical work above ceilings

Major cabling activities

Activity cannot be completed within a single work shift

Type D Major demolition and construction projects.

Yes No Will require heavy demolition or removal of a complete ceiling system

New construction

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT Typewritten Text x

VHAWLAPhanT

STOP! DO NOT FILL BELOW, FOR INFECTION CONTROL USE ONLY.

Note: If you email this form to one of the Infection Control Practitioners, please follow-up with a phone call to IC to ensure it was received (310-268-3715). Do not leave a message.

Risk Levels

Group 1 Lowest Risk Group 2 Medium Risk Group 3 Medium-High Risk Group 4 Highest Risk

Office Areas Ambulatory Care Emergency room Operating Rooms, Clean and Soiled

Non-patient Care Radiology/MRI Utility Areas

Areas Day Surgery Supply, Processing or Distribution

PACU Areas/DSU

All Intensive Care Units Cardiovascular Procedure Areas

Nuclear Medicine Cardiac Cath and Angioplasty Areas

Admission Procedure Rooms

PT, Pool/Water Therapy Isolation Rooms

Housekeeping Closets Dialysis

Dietary Storage Cardiology

Food Preparation Areas Anesthesia and Pump Areas

Canteens Pharmacy Admixture Area

Laboratories Interstitials in Group 3

Endoscopy Areas Interstitials in Group 4

Respiratory Therapy Patient Units: (Mental Health, Medicine, Rehab)

CONSTRUCTION ACTIVITY (from previous page) Check type of activity

INFECTION CONTROL RISK GROUP (see above) Check risk group

TYPE A: Inspection, non-invasive activity GROUP 1: Lowest Risk

TYPE B: Small scale, short duration projects; minimal dust GROUP 2: Medium Risk

TYPE C: Activity generates moderate to high levels of dust, requiring >1 work shift for completion;

demolition or removal of any fixed bldg components or assemblies

GROUP 3: High Risk

TYPE D: Major duration and construction activities Requiring consecutive work shifts

GROUP 4: Highest Risk

CLASSIFICATION OF REQUIRED PREVENTIVE MEASURES

CONSTRUCTION ACTIVITY-

TYPE

"A"

TYPE

"B"

TYPE

"C"

TYPE

"D"

INFECTION CONTROL

RISK GROUP

Group I I I II III/IV

Group 2 I I III IV

Group 3 II III III/IV IV

Group 4 III III/IV III/IV IV

An Infection Control Construction Permit is required for any work done in Class III or IV. Refer to shaded area on Classification of Required Prevention Measures above. In addition, for in-house electricians, plumbers, etc., permits are required for any work that produces dust or penetrates a barrier (including ceiling tile removal) in Group 3 or Group 4 within Risk Levels section above.

x

VHAWLAPhanT

CLASS I 1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

CLASS II

1. Provide active means to prevent air-borne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Wipe surfaces with disinfectant.

6. Contain construction waste before and during transport in tightly covered containers.

7. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

8. Place dust mat at entrance and exit of work area as needed.

9. Remove or isolate HVAC system in areas where work is being performed.

CLASS III

1. Obtain infection control permit before construction begins.

2. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.

3. Complete all critical barriers before construction begins.

4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

5. Contain construction waste before and during transport in tightly covered containers.

cleaned.

6. Seal holes, pipes, conduits, etc. appropriately.

7. Place dust mat at entrance and exit of work area. Replace as needed.

8. Do not remove barriers from work area until completed project is inspected by Safetly and Epidemiology Depts. and thoroughly cleaned.

After work is completed:

9. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

10. Remove isolation of HVAC system.

Class IV

7 .

1. Obtain infection control permit before construction begins.

2. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

3. Complete all critical barriers or implement control cube method before construction begins.

4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

5. Seal holes, pipes, conduits, and punctures appropriately.

6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

7. All personnel entering work site are required to wear shoe covers.

8. Contain construction waste before and during transport in tightly covered containers. Cover transport receptacles or carts. Tape covering.

9. Do not remove barriers from work area until completed project is inspected by Safety and Epidemiology Depts. And thoroughly cleaned.

After work is completed:

10. Vacuum work area with HEPA filtered vacuums.

11. Wet mop with disinfectant.

12. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

13. Remove isolation of HVAC system.

Additional concerns for all classes:

1. Maintain manpower and equipment including dust mops, wet mops, brooms, buckets, and clean wiping rags for cleaning fine dust from floors and adjacent occupied areas.

2. Contain work areas outside of construction barriers, including spaces above ceilings, with full height polyethylene sheet barrier, tightly taped.

3. Clean up dust tracked outside of construction area immediately.

4. Temporary construction barriers and closures above ceiling must be dust tight.

5. Removal of debris must be in covered containers.

Additional Requirements or Concerns:

Outside Contractors must abide by VA-WLA contract regarding TB skin testing as well as the requirement to have evidence that each contract worker had education and training in infection control measures.

Inside contractors (employees) may watch the film on the Infection Control SharePoint site at http://vaww.portal.gla.med.va.gov/sites/QMNew/IC/default.aspx.

Permit Request By Infection Practitioner Approval

Date: Date:

http://vaww.portal.gla.med.va.gov/sites/QMNew/IC/default.aspx

VHAWLASILVAFA

Text Box

Highlight