This solicitation is seeking a contractor to replace a linear accelerator at the Greater Los Angeles Veterans Affairs Health Care System. The selected contractor will be responsible for demolishing the existing linear accelerator, preparing the site for installation of a new linear accelerator to be provided by Accuray Radixact, and coordinating with Accuray to install the new system. Additional requirements include renovating rooms for the linear accelerator, control room, mechanical room, and data server room. The contractor must also replace ceiling, flooring, and wiring; install new HVAC, ductwork, drywall, finishes, and casework; revise the fire protection system; provide a ceiling-mounted patient lift; and perform structural bracing and foundation work. Electrical power, controls, security, and communications systems must be provided for the lift, linear accelerator, and associated equipment. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 22, with responses due by the date specified in the solicitation number 36C25821B0004.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign in Sheet for 11 Jan Site Walk Linear Accelerator.pdf | ||
| 36C25821B0004 0002.pdf | ||
| 36C25821B0004 0001 RFI Amendment.pdf | ||
| 6 8Infection Control Permit_revised.pdf | ||
| of0306.pdf | ||
| VA0710.pdf | ||
| 36C25821B0004.pdf | ||
| Wage Rate Determination CA20200022.docx | DOCX document | |
| Atch 1 Self Performance Calculations.pdf | ||
| 6 4Radixact Full Set.pdf | ||
| Contractor Background Investigation Request Form (May 2019).pdf | ||
| Self Certification of Continuous Service.pdf | ||
| Fingerprint Record Prep Sheet BLANK.PDF | ||
| 6 2 Drawings 2 of 2.pdf | ||
| 6 3Specification CSI 121.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
REVISION 1 11/02/20
REVISION 2 11/24/20
GENERAL NOTES GENERAL FIRE AND LIFE SAFETY NOTESGENERAL DIMENSIONING NOTES GENERAL PAINTING NOTES
GENERAL SEALANT / CAULKING NOTES
GENERAL DEMOLITION AND PHASING NOTES
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
5'- 0"
2"
3'- 4" 4'-
0"
R E
4'- 0"
4'- 0"
3'- 4"
5'- 0"
IN
4'-0"
2'- 1"2'-
4"2'-
4"
1'-
1'-
3'- " 1'-0"
3'-0"
1'-
2'-
2'-
IN
1'- "
3'- 4" 3'-
" 4'- 0"
2'-
5/
3'-
1'- 5"
" IN
1 " IN 1 "
5'-
12" IN
3'-4"
3/ " 1'-0 1/ "
1'- 0"
3'- 0"
2'-
2'-
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
18'-0"
2'- 6"
'-6
5'-
6"
'-6
'-6
'-0
'-0
'-6
'-0
SS IV N EROO
ESIVE
-O S
RRIER OOR
RRIER
E V
E E I E
IR I R ION
NI
OR
E
EI
IN
ES
S O
E
3'-8"
E OR R
OOR INE
EI IN S S E S
S E E
E IS IN S R RE
IRE R E S I O
REVEN S INS
RIOR O ONS R ION
IN
IS
E
OO
R
O N
ER
SI
E O
S R
RE
VE
RI
OO
R
O
OO
R
EI
RENOV E S RIN ER S S E
IN ERS I I EVE
IN ERS I I EVE
IRE R E S I O
REVEN S INS
RIOR O ONS R ION
IRE R E S I O
REVEN S INS
RIOR O ONS R ION
E EN E O E
ONS R ION RE N
20'-0" E ON
B500 KEY PLAN
I E EN IN E ION ON RO RIS SSESS EN
I R RO E RES S ER E RE ER OS
N E ES V E I EN ER I R N N S
IRE E E ON R IN O I ER
RE RESEN IVE OR
OOR IN E E O I ION/ ONS R ION E RIS
O R VE N IN ERI I E S E E S RES
I S I E OR IN ERIOR OORS E
O E ONS R ION SI E S E OS E S ER
E I S N
O IN IN E ION ON RO ER I RIOR O
E INNIN OR
E ONE O R IRE R E ONS R ION RRIERS
S E ONS R E RIOR O E INNIN O ER
OR
E ONS R N EROO EN R N ES O
ONS R ION RE S N RE IRE
ONS R ION ERSONNE O SS RO IS
ROO O E V E I E V E NER
RIOR O E VIN E SI E
IRE RO E ION S S E S S RE IN N ION
OR O IE RE S ON E OOR
ROVI E IRE E IN IS ERS IN ONS R ION
RE S REVIE I OR N V S E RO
IN IN E I I S IN ONS R ION RE
I IN IN NE IVE IR RESS RE IN ONS R ION
RE I ES 24/ E ER O IE OR NO
RO O R ION O RO E SIN E
E I E IR I R ION NI S
ONS R ION RE S RE IN ISO E RO
E O ER RE S O E E I EN ER NO
RE RN IR OR E S S SS IN O E RE S
O SI E E ONS R ION RE ISO E V
S S E I IN ONS R ION RE O REVEN
ON IN ION O E IS IN S S E
RE IRE E I EN ER ERSONNE IEN S
N VISI ORS SO E O NO E I RO E
ONS R ION RE ROVI E SI NS ON OORS IN O
E ONS R ION RE RE S " ONS R ION
RE - O NO EN ER"
ENER ON R OR S IN IN I O S
N EE RREN O OR ER I ON SI E
S S E E OORS IN O E
ONS R ION RE N S E ONI ORE O
E S RE E RE IN E E IVE
N IN IN E N N OR ER ONS R ION RE
E RIS RE OV S E IN OVERE R S
N /OR ON INERS
O SE O ES N RES N ENE R IONS
RO I ES N ON I S RO RI E N
I E I E O IN IN S RO E ION N
NE IVE IR RESS RE
IN IN S IN N E I EN IN IN S
O S E O S ROO S E S N E N
I IN R S OR E NIN INE S RO OORS
N EN O IE RE S N S R E
O SI E O ONS R ION RE S E E NE
I E I E
ER O E ION O OR V ONS R ION
RE I E I ERE V S E O I
ISIN E N RE OVE ONS R ION RRIERS
ON ROV OR RE IR N E
RO ONS R ION RRIER RE OV N RE OVE
ISO ION O V S S E
R ONS R ION RRIERS S NO E RE OVE
N I RO E IS O E E N INS E E V
S E ERSONNE IN E ION ON RO RO N
OR
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
S E 1
IDENTIFY THE E OF CONSTRUCTION PROJECT
ACTIVITY (TYPE A–D)
TYPE A: INS E ION N NONINV SIVE IVI IES
TYPE B: S -S E S OR - R ION IVI IES
RE E INI S
TYPE C: OR ENER ES O ER E O
I EVE O S OR RE IRES E O I ION OR
RE OV O N I E I IN O ONEN S OR
SSE IES
TYPE D: OR E O I ION N ONS R ION
RO E S
S E 2
I EN I E PATIENT RISK GROUPS I E
E E
I ORE N ONE RIS RO I E E E
SE E E I ER RIS RO
S E 3
E IEN RIS RO O E I
I I ES I E NNE ONS R ION
RO E E ON E O O IN
RI O IN E SS O RE IONS I II
III OR IV OR EVE O IN E ION ON RO
IVI IES RE IRE
STEP 4: I EN I E RE S S RRO N IN E RO E
RE SSESSIN O EN I I
E O OVE NOR SO E S ES
RIS RO
STEP 5: I EN I S E I I SI E O IVI OR E E
IEN ROO S E I ION ROO N SO ON
STEP 6: I EN I ISS ES RE E O VEN I ION
IN N E E RI IN ER S O E
O RREN E O RO E O ES
STEP 7. I EN I ON IN EN E S RES SIN RIOR
SSESS EN ES O RRIERS OR E E
SO I S S I E I R ION E RE IRE
STEP 8. ONSI ER O EN I RIS O ER E IS
ERE RIS E O O RO ISIN S R R
IN E RI OR E E EI IN ROO
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 9. OR O RS N OR I E OR E ONE
RIN NON- IEN - RE O RS
STEP 10. O NS O OR E E N ER O
ISO ION/NE IVE IR O ROO S
STEP 11. O E NS O OR E RE IRE N ER
N E O N - S IN SIN S
STEP 12. OES E IN E ION REVEN ION N ON RO
S REE I E INI N ER O SIN S OR
IS RO E VERI INS I I I E INES
INS I E I ESI N N ONS R ION I E INES
OR ES N RE
STEP 13. OES E IN E ION REVEN ION N ON RO
S REE I E NS RE IVE O E N N
SOI E I I ROO S
STEP 14. N O IS SS E O O IN ON IN EN
ISS ES I E RO E E OR E E R I
O O SE EE IN E RIS RE OV O N EN
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
7/28/2020
EXP. 12/31/2020
B500 KEY PLAN
KEY PLAN
KEYED NOTES:
SHEET NOTES:
7/28/2020
EXP. 12/31/2020
B500 KEY PLAN
KEY PLAN
KEYED NOTES:
SHEET NOTES:
7/28/2020
EXP. 12/31/2020
4'-0" 8'-0" 16'-0"
18" IN
12" IN 4" IN
N E
1/8" 1'-0"
V N-1 101R101
'-0" R 3'-11"
99 91
INE
SEE / -
SEE / -
ABBREVIATIONS
E REE
S/ IN S
I E ER
OS E
N E
O N R INE
℄ EN ER INE
E E E ION N E
E E RI SE
O INE
I EN I
INI I EN
O EN INE
NO E
O O E
⅊ RO ER INE
E SS OOR
/ IR ON I ION
/ NI IR ON I IONIN NI
/E R I E /EN INEER
ERI N R I E R
N RERS SSO I ION
N OR O ER ORIN
R I E R RRIERS
RE E SE O RSE
S IR RE S I
S ES OS E EN OR S I
ON RE E
IR IR I RE ER
I ERI N ON RE E INS I E
S R ESS OOR
S R ESS OOR
S N ESS NE
SR IN ON OR S EE
REIN OR E
S O S I
O S I EI IN I E
RE R IN
ERI NS I IS I I IES
O I OOR OSER
I ION
N I ION
ESIVE
EN OININ OR
S E
IN INIS R ION
O I OOR O O
O O I OOR O ER OR
OVE INIS E O N ER
OVE INIS E OOR
OVE INIS E R E
S OVE INIS E S
ERI N S SSO I ION
SSO I E ENER ON R ORS
R RE E
ORI VIN RIS I ION
R N OR
IR N IN NI
I ERI N INS I E O R I E S
IS ERI N INS I E O S EE
ONS R ION
IN
ERN E
NO ERN E N ER
IN
O S I ERI
ERE
O N
NO NO I E
NSI ERI N N ION S N R S
INS I E
N N ENN
ESS NE RO
RO I E
ERI N OO SSO I ION
ROVE
RO RO I E
R EN
R S RE IRE
RR RRES OR
R R I E R I E R
S S ES OS
SI R I E 'S S E EN
INS R ION
S R O I S RIN ER
S S
SSN SSO I ION
S ERI N SO IE OR ES IN N
ERI S
EN
O I E ER INE
S O I R NS ER S I
O O I I I R
V IO VIS
VE VEN E
V VER E
I S E
I R I E R OO OR IN
INS I E
ERI N OO RESERVERS'
SSO I ION
S ERI N E IN SO IE
O S I RE EN
SE INE O O
E SS OOR
SE E
ON
EN
E IN O R
O R
O R EE OO
E RI E NSION OIN
EV EVE
I ER'S R RE
N RER'S SSO I ION
I R I O IN OORS
I I INO S
IN
I
I IN
N E
V O EV R
E OR EN R
O O R O O O
R E ROO O O RE IS ER
R R IN
R RI IN
R S RI IN OIS
R E RIN
R E RIN E
R R E
R RON E
S SE EN
N E EEN
S E
R I - ROO IN
E SI S NNE
ON S ON RE E
E SS OOR
O EN ER O EN ER
INE
EI IN EN ION SS
SIN ORNER E IR I
RE ER
E EN I IO S ER O R
I EN I E ER ON R OR
S IE INS E
V OSE IR I E EVISION
O N ER O ISE
ONS R ION O EN S
ON R O EN S EI IN
I SER
E E EN
E S E EN S ER
ER ER I
ON R OR RNIS E
/ I ON R OR RNIS E /
ON R OR INS E
/OI ON R OR RNIS E /O NER
INS E
O N ER S IN
I EE ER IN E
O - OR E E R IN
S I EE ER SE ON
EN ER O R VI ORNER R
R N ER
S ER I E S R R
IN NI S
I ER
O R E E I
R ER
E
I S IRON
I S -IN- E
IR IR E
IR IR R
ONS R ION OIN OR ON RO
OIN
EN ER INE
IN
EI IN
EI IN EI
R E R
S RE EN I E ER
I EN I E ER
ONS R ION N E EN
ORR E E I E
ORR E E I E R
ON RE E SONR NI
N ON I
N S ON ENS E
NR ORNER
N R O N ER
O R ON ONO I E ER I I E O
O N E NO OR O N
O R ON IO I E
O E NO / E
O O N
O O ON
O O IN ION O INE
O O NI ION
O O ONEN
ON ON RE E
ON R ON RE E OOR
ON ON ENSER OR ON I ION
ON ON EREN E
ONN ONNE ONNE ION
ONS R ONS R ION
ON ON IN E
ON R ON R OR ON R ION
OOR OOR IN E
OR ON R IN O I ERS
RE RESEN IVE
ORR ORRI OR
NON-REIN OR E ON RE E I E
RI I E O
RS O RESSI E
R E
R IR R S R I
RS O RO E S EE
RSI ON RE E REIN OR IN S EE
INS I E
S ON RE E SE ER/S R E
S ON RE E S S O
S SIN
SI ONS R ION S E I I IONS
INS I E
S O N ER S N
S SE EN
S SE OR
ER I I E RREN
R NS OR ER OO IN O ER
ER I I E SE
ER I I E OOR
O IN
R EN ER ON O R OO IN O ER
RE RN
R ON RO
V E E EVISION
O ER
INE NI E ER
I EE
IN I IN
I R
R R IN
O ER
I R ER RRIER
R O ER RE RN
IN ER
IN ER O
E OR ENN N I
E SS OOR
E I E R I IRE RI
O E
O E E
IRE RREN
IVERSION I E
E E REE
E E E E
E O E O I ION
E E R EN
E E I
RIN IN O N IN
I I E IRON
I I E ER
I I ON I R
I I R I ON
I I EREN E OR I SER
I I ENSION
IR IRE ION
IS IS ENSER
IS IS N E
IV IVI E OR IVISION
E O
R ER
N O N
IS RI ION
O O EN
O IR O S IR
O O EN
R OOR R IN RESSIN ROO OR
RIVE
R OOR OSER
R R OOR R E
R O N OOR O ENIN
S O NS O S OR R IN E
S R RE
S N ESI N
IS S ER O ES I ER
IS
RIN IN ER IS ENSER
R IN
R I ER
E E S
E E SS E OOR
E E
E E E S NO E
E EN ERIN IR E ER RE
E E E E S N
E E I IEN
E S E ERIOR INIS S S E
E E S RI E
EI S E ERIOR INS ION N INIS
S S E
E E NSION OIN
E E EV ION
E S E S O ERI
E E E E RI
E E R O E E RI OOR O ENER
E EV E EV OR
E ER E ER EN
E ER S R E ER EN S O ER
E E E RI E I IN
EN EN OS RE
EN R EN INEER
ENVIR ENVIRON EN
E/ E E O VE E N
E ENVIRON EN RO E ION
EN
E E ENE RO ENE IENE
ONO ER
E O E ER EN O ER O
E S E N E O S RENE O R
INS ION
E E E S E S E
E I E I EN
E IV E IV EN
ER E S RE IS ER
ER E IS IN ROO R IN
ES ES E OR ES EON
ES ES OR
ES E SE EN
ES ES E I
ES ES I E
E N SO OR OR E E ER
EV EV OR IVE
E E
E E E RI ER OO ER
E S E E S S ION
E E S
E IS E IS IN
E E NSION OR E OSE
E E NSION O
E E NSION OIN
E S R E IS IN R E
E E ERIOR E ERN OR
E IN IS ER
E R E ERIOR R E
REN EI E E IRE SE
I ER
IRE R
RI
IRE R O
OR
I I I
S S I S S I O R
O OOR E NO
OR
OOR R IN IRE ER
IRE E R EN ONNE ION
N O N ION
N O N ION
E IRE E IN IS ER
E IRE E IN IS ER INE
INIS E
E INIS OOR E EV ION
E E RNI RE I RE N E I EN
E E S RE S IRE
R N
IRE OSE INE
S E INE S RE
EI R I ION
S E OO S RE
I I RE
I I E
IN INIS
IN R INIS OOR
IN R INIS R E
IN INIS OO
I I RE
E OIN
OOR INE OOR S IN O
INE
S S IN
O IN
E E I E
OORIN
R OOR
R IN OOR INIS
R S OOR SIN
OR ORES EN
OR I ORES EN I RE
OR
- OR O
O INIS E O ENIN
O E O ON RE E OR E O R
O E O INIS
O E O SONR
4 O R
OS E O S OR E O S
O N O N IN
O E O
IRE RO E ION OR IRE ROO
ROS ROO R N
EE ER IN E
S EE ER SE ON
R IRE R IN IRE RESIS N OR
R E
R SN S IN RI SIN
RE RE EN
R R IN
R I ER REIN OR E O ES ER OR
I ER SS REIN OR E S I
R REE ER
S E ER S E I I ION SI E
S NR S ENER
EE OR OO
OO IN
R RRIN
RN RNIS OR RNI RE
RE
IRE ER
RI OVERIN
RO N S INE R
E OR S SSO I ION
ON V NI E
V V NI OR V NI E
V S V NI E S EE
R R
ENER ON R OR E
O IN
R R R R I
EN ENER OR ENER OR
I RO N IN ERR
RO N E SONR NI
R SS- I ER-REIN OR E ON RE E
R SS- I ER-REIN OR E S
R SS- I ER-REIN OR E S I
I V NI E IRON
SS
- E O -
- E O - I E
SS O
E IN E OO
R R E
R RO N OOR
R N R NI E
R R IN
S S S E IN O R
S V NI E S EE E
S E S R R NI
RO
R R N EE
ER
RO N ER
S O R S
S O R
S S S ER
I EI I I IER
I RESS RE S I IN E
O SE EE IN I S OSE
R O S ERI S
OSE I
O O ORE N I E
O O ORE OO OOR
R R N R O R
NR R ENER
O I ENSI OVER
R E ER
R RE
R OO
E I E I IEN R I E IR
I ER
E E ON
I RE EN
R N ER
S ORN S I
I I IN ENSI IS R E
O O E
O O E OOR
O O E OOR N R E
O O E R E
N R N R I
O O O EN
ORI ORI ON
OS OS I
I RESS RE I OIN
ORSE O ER
S I RESS RE SO I
E R ERS
R O R
S E -S REN ENE SS OR
I S REN
SE O SE
S O SE EE IN
S OIS
EI
V E IN VEN I IN N IR
ON I IONIN
V E V
O ER E
R N
R R I
ER
I IN ERS E I OR O EN
O INER I
I IN OOR IR I
I IN ERN ION I IN O E
I I EN I I ION INSI E I E ER OR
IN ERIOR ESI N
I NO I EN I I ION N ER
IE INVER E EV ION
I I IN ION
I IN ER E I E E ON I
IN IN E
IN IN E EN EN OR IN S RI
IN O IN OR ION
INS INS ION
IN IN ERIOR
IN ER O IN ER O NI ION
IN IN ERN ION
INV INVER
I IN E RO E ION
IR IN S RI RESIN SE OORIN
IR INVER E ROO E R NE
SSE
I INS N NEO S ER E ER
N NI OR
- O N ION O
NI OR OSE
N ION
OIN
S OIS
I O
EENE'S E EN S ER
I N RIE OR NO E O N
I O R
N I ONE ON
I I EN
O NO O
I E
V I OVO
V I OVO - ERE
I O
N E O VER EN EN O
RVE
I IN RRES OR
OR OR
ER
IN E
IN E SS
N R
V V OR
R ER
S O N
E OVERE
R O - E RIN
R E ER
E I E I IN IO E
INE R EE OO
E N
R E N REVERSE
R E N REVERSE EN E
R IO
I I R R
IN INE R
INO INO E
I I I
R O ER
R R O ER ROO
S O S ER
E INE IVE O
ON E ORI ON
V ON E VER I
S I ES ONE
N S N S E
R IVIN ROO
R R E
RV O VERE ROO VEN
S S
/S I ERS ER SE ON
I I E
I EI
I IN
N I NIN
V EN O VER I RVE
V O VERE
VR O VER
I EI ON RE E
I I EI INS IN ON RE E
R ER
E ER E
INE
R INE ROO
IN IN EN N E
N N
S SONR
ERI
V S ER N ENN E EVISION S S E
I
INE O
E ORNER E
E E
E E NI EN INEER
E S E S RE
E E NI
E R E NI ROO
E E I E I
E E E E ONE
E E INE
E E R NE
E O E OR N
E E NINE
I INIS
N RE
N RIN
R N RER
R RE N RER'S RE O EN ION
N E EN
N O E
I I RO ONE
I I E I S I I R S N R
IN INI IN E
IN IN E INI
IRR IRROR
IS IS E NEO S
I I ER
R R ER
E
O IN O IN
O IN ON
I OR
I I E ER
E R NE ER ROO IN
O SONR O ENIN OR O OR
O ER E
O O E O I OR O E
O I O I IE I EN
ON ONI OR
O R O R
E I RESS RE
R OIS RE RESIS N
S INE S RE OR O SIN
/S E ERS ER SE ON
O N E
O N IN
E
ION
I RO VE
E R NE ER ROO IN
N NOR
N NO I E
N N ION SSO I ION O
R I E R E
N RERS
N N R
N N ION
N NOISE RI ERI NON- ORROSIVE
N O NON O S I E
N NOSE O N R
NE NOR E S
NE N ION E E RI O E
NE NE IVE
NE N ION E E RI
N RERS SSO I ION
NE NE R
N N ION IRE O E
N N ION IRE RO E ION
SSO I ION
NI NO IN ON R
NO N ER
NO NO IN
N S NO IN I E SI E
NR NOISE RE ION
NR NOISE RE ION OE I IEN
NR N ION ROO IN ON R ORS
SSO I ION
NR NON-RE OV E
NS N RRO S I E
N S NO O S E
N N ER
N NOR ES
O/O O O O
O O EN
O O SI E IR OR OVER
O ON EN ER
O OI IR I RE ER
O O
O O ON
O O SI E I E ER O SI E
I ENSION
O O SI E I ENSION O SI E
I E ER
O / I O NER RNIS E / ON R OR
INS E
O OVER O R IN
O O I E
O /OI O NER RNIS E /O NER INS E
O OVER N OVER E
O R OVER E OI IN OOR
O O OSI E N
O N O ENIN
O O OSI E
O R O ER E
O O ION
OR O ER IN ROO OR O SI E
R I S
OR OR N N E OR OVER O ROO
R IN
OR OR NI
ORI ORI IN
ORN ORN EN
OS O EN SI E R IN
OS O ION S E N E
INIS R ION
OV OVER E
O O E O O N E
I E O E
S ES
I RESS
R R E OR R E
R R R R R I
ERN
S ON O
R I E O R
IE E O R ON E OR
OR N E EN
OR N E EN SSO I ION
RE S ON RE E
ON RE E VE EN
ER IS ENSER
O N S ER I OO
OR N E EN S ER
E E ES
EN ENE R E
EN EN N
ER ER OR E
ERI ERI E ER
ER ER EN I R
E O R R R
O O O O R
S I I S E S RE
I OIN O IN ERSE ION
IV OS IN I OR V VE
RE OR E OIN I ER
E
RO ER INE E
E SS
S I IN E
S S ER OR S I
S S ER OVERE
IN
OO
IN E E
NE NE I
N NE
N IN
O OS O I E R SE OR ER
O R SE OR ER OS O I E
O O E ENE S I
R IR
R S RE S
RE RE RI E
RE IN RE INIS
RE I RE I IN R
RE RE R ION
RESS RESS RE
REV REVIO S
RI RI R
R R IN
R RE O E
RO RO E
RO RO ER
RV RESS RE RE IE V VE
S S I
S O N S ER S RE OO
SI O N S ER S RE IN
IN NE I E RESS RE
RE E OIN O N EN
ER O E IS ENSER
N R I ION
V O VIN ORI E S I OIN
O VER I RVE
V VIN
VI OIN O VER I IN ERSE ION
V OIN O VER I N EN
V VE EN
R O ER
I SS R N E
I ON RO
R RR
RR I E
RR I E SE
RR I E OOR
R R ER
N I R N I
R R I S RISER R ER RE RN
R RE RN IR
R R I OR R I S
R RESI IEN SE OR R ER SE
R RO E OO
R REIN OR E RI SONR
R R R ER
R RE O E ON RO
R RE E E EI IN N
REIN OR E ON RE E I E
R VR RE EIVER
R RO OR ROO R IN
RE RE ESSE
RE RE EIVE
RE RE E E
RE RE N E
RE RE IN
RE RE EREN E OR RE RI ER OR
RE R RE R OR RE RI ER ION
RE RE IS ER RE OR
REIN REIN OR E
RE RE IR
RE RE E
RE RE IRE
RE RE IRE
RESI RESI IEN
RESI RESI IEN I E
RE RE RN
REV REVISION
R R IO RE EN ROO RE RN
N
R ROO IN
R I RE ES OR IN OR ION
R RE ES OR RO OS
R S RI I V NI E S EE
R RI N
R RE E OI
R S RO N E INE S RE
R R RI N REVERSE
R S RO N E OO S RE
RI R ER INS E
R ROO E ER
R R I IN
R ROO
RN RO N
RO RO O ENIN
RO RI O
R REVO IONS ER IN E
RS RO S N
RS RESI IEN S EE OORIN
R RI
RV ROO VEN
RVS REVERSE
RV RESI IEN VIN I E
R RE OO
R R IN ER E ER
S SE ON SO S NI R SE ER
S R RE
S S IR
S V S V E S S E
S N S NI R SE ER
S S S EN E O S I I E
S S S EN E O S I I E EI IN
S S S O
S S S RENE IEN S RENE
S S R S S R E
S S IN OE I IEN OR SO I ORE
S S OO S E E
S E S E E S E S E I
S S ER
S RN S REEN
S S R R I E
S SO I ORE OO OOR
S S O R IN S S O E E E OR
OR SO IS ENSER
S SI IN
SE SO E S
SE SE ION
SE SE EN
SE SE E
SE SE R E
S S RE OO EE
S SO OO
S S RI E
S S I IN SS OOR
1 SIN E SE
S SIN E
S S EE
S R S O ER
S R S O ER E
S R S O ER R IN
S S EE
S S EE E S IN
S S E IN
S V S E VIN
SI SI I R
S S ORE OIN
S I S EE OIS INS I E
S S E
S S S EN E EENE'S E EN
S ER
S S I S S O E
S ORI ON S I IN IN O
S S I IN
S N SE N
S S EE E
S S NI R O E
S S O E
SN S NI R N IN IS ENSER
SN INS SO N INS ION
SN S NI R N IN IS OS NI
S S I RESS RE SIN E O E
S S S EN E S ER EI IN
S SIN E O E O E RO
S E S E I I ION
S R S RIN ER
S R S E ER
S S SIN E O E SIN E RO
S S
S S RE
S IN S RE IN
S S RE R
SR S RE IS ER
SS S NI R SE ER OR SERVI E SIN
SS S IN ESS S EE
S S IRS S REE SIN E RO
S S ION
S SO N R NS ISSION SS
S S N R
S I S I ENER
S S EE
S S S EE OIS
S N S EE IN E
S S EE E
S R S EE ROO E
S S EE E
S R S EE R SS
S N S S IN ESS
S OR S OR E
S R S RIN ERS
S R S R R
S R S S R R S EE
S S S I E S R S R E
S S OR
S S S S EN
S S S S EN E EI IN
S S I SI E
S S I O R
S R S IN OOR
S R S I E R
S S O S N S N E I S S S S E
RE I E O N EN
O N O O
ON E N ROOVE
I E N ERI S
RO O OR O E R
O O R
I E O N I O ERI
E E ONE ON RO NE
E ER RE ON RO NE
R I ON RO N
O E IS ENSER
E E NI
E E E ONE
E E ER RE OR E OR R
ER ERR O
ER ER IN
O E S
RE
ER ER
I NESS
RES RES O
RS RES O
R RO
R O RO O
O R
E ERE
E ERE SS
N R E NOR
O O O
O N O O O N ION
O O O E
O O O SONR
O O O R E
OS O O S EE
O O O
OI E ER IS ENSER
OI E ER O ER
R O E R O RE IS ER
R NS R NSO R NSI ION
R NS IN R NS REN OO INIS
R RE E
S ENSI E S REN E S EE O
O S EE O O S ONE O O
S
S ER OS
V E EVISION
I
E R NS ER OE I IEN
N ER
N ER OOR
N ER O N ER REE ER
R N ER O N ER RE RI ER OR
E N ER RO N E E RI
N N ER RO N
N ER RO N E E ONE
NI E ER
N ER RI ERS OR ORIES
I E
N IN N INIS
NO N ESS NO E O ER ISE
ON N ESS O ER ISE NO E
S NIN ERR I E O ER S
R RIN
I I I
V R VIO E
V VO VEN V VE
V VO RE
V V
V R V RIES
V VIN SE
V V RNIS RI VI RI IE V
S IE ON R OR INS E
V VIN O OSI ION I E VI RI IE
I E
VE VE I E
VEN VEN I ION
VER VER I
VES VES I E
V VIN E O S I I E
VI VI INI
VI VI EO
VI VERI IN IE
VNR VENEER
VO VO I E OR NI O O N
VO VO E
VO VO E
V VENEER S ER
V I VER I OIN O IN ERSE ION
V O VER I OIN O RVE
V O VER I OIN O N EN
VR V OR RE R ER
VS VEN S
V R VEN RO ROO
VV V S IE INS E
V VIN OVERIN
V VIN RI
I E ES I S E ER
IRE
/ I /O I O
RR RR N
E
OO O IN
OVERIN OR ER OSE
N ER OSE N
R ER I ER
ER OO ER N
OO IN O I ENSION
IN O
I E N E
RI
R OO R E
S OO RRIN S RI S
ER E ER
SE RE O SE
ER EVE
E E
IRE ES
O O
ER ROO IN E ER ROO
ER RESS RE RO
ER ROO E R NE
R E ER RESIS N
S E ERS RI S E S ER
S R E ERS O
S INS O
EI
I E SE
I E
E E IRE RI
R E ROSS R E
R R NS OR ER
S E R E O S RENE O R
INS ION
-S R E IS IN S R RE
R R E R
ON RE E SE ION
R N R I
ON RE E SONR NI S
RI
RI I INS ION SE ION
S EE SE ION
IN SE ION
OO INIS SE ION
ER INIS SE ION
E R OR SE ION
O S I I E EI IN 24 24
O S I I E EI IN 24 48
B500 KEY PLAN
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
5'-0"
7"
'-3
6'-1"
4A
'-0
6A8
12 13
E ORAR A
E O IS E A I RE OR RNIS IN
E IS IN A I RE OR RNIS IN
NE A
AREA NO IN S O E
ON RA I I
E O IS E RNI RE OR E I EN SA VA E O
O NER
A I INES IN I A E E IS IN ONS R ION O
RE AIN
RE OVE A E IS IN ONS R ION IN I A E
O AS E INES
EA ON RA OR S A A AN RE AIR A
O ENIN S VOI S OR ENE RA IONS E E
INS A A ION OR ONS R ION O E I EN
I IN S ON I AN O ER A ER RES
OR A E IS IN ONS R ION IN I A E O E
SAVE AN REINS A E RO E I E S RO
A A E RIN AN IN AN ONS R ION
O ERA IONS S ORE O SI E O ONS R ION
AREA IN AN IN OOR R EA ER I
ON I IONE A I I
GENERAL
DEMOLITION NOTES:
B500 KEY PLAN
SCHEDULE OF EXISTING FINISHES
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
20'-7 1/2"
11 1/2"
20552055
A5082A5075
S140
A1011
A5077
0535 0205 0205
R7000
A5082A5106
A1012
A5077
A5082
A5075
A5
E ORAR A
E O IS E A I RE OR RNIS IN
E IS IN A I RE OR RNIS IN
NE A
AREA NO IN S O E
ON RA I I
E O IS E RNI RE OR E I EN SA VA E O
O NER
B500 KEY PLAN
SCHEDULE OF EXISTING FINISHES
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
4'- 0"
9'-0"
8'-0" 9'-0"
9'-0"
B500 KEY PLAN
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2 flooring will
0688B
0688A06
A4
N A
N A
N A
A4
4'- 9 7
/8" 5'-
1/
4"
7'- 9"
6'-2 1/2"
10'-2 5/8"
A4
A4
2'-6" 4'-0" 4'-0" 2'-6"
14 4
1 4
RO N OOR
IN ERS I IA
308' - 6"
01 IRS OOR
319' - 7 3/4"
00 RO N OOR
299' - 0"
RO N OOR
IN ERS I IA
308' - 6"
B I E BASE EN
69' - 4 1/4"
00 RO N OOR
IN ERS I IA
308' - 6"
1'-2" 1'-2"
1'- 6"
E ORAR A
E O IS E A I RE OR RNIS IN
E IS IN A I RE OR RNIS IN
NE A
AREA NO IN S O E
ON RA I I
E O IS E RNI RE OR E I EN SA VA E O
O NER
A1000
B500 KEY PLAN
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
8'-0" 9'-0"
9'-0"
9'-0"
8'-4"
10'-0"
14151415
A1
7'- 9"
10'-2 5/8"
2'- 3 1
/2"
5'- 0"
8'-10"
A O S I A I E EI IN 24 24
A O S I A I E EI IN 24 48
OOR O ENIN / E I S IER
12'-8"
B500 KEY PLAN
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
-0'-10"
-0'-11 1/2"
0'-0"
3 1/4"
2"
1'-2" 3'-1 1/4" 3'-1 1/4" 1'-2"
1'- 0"
1'- 1 3
/8" 1'-
1 3 /8"
1'-
2'-0"
3'- 0"
6'- 0 7
/8"
2'- 2 5
/8" 1'- 7 1
/4"
3'- 0 1
/2"
3'-8 1/4" 3'-8 1/4"
1'-4 3/4"
5'- 7 5
/8"
2'- 1 3
/8" 2'-
3/
8"
5'- 0 3
/4"
4'-3 1/4" 4'-3 1/4"
8'-6 1/2"
6'-
1/ 2"
2'-0"
-0'-11 1/2"
0'-0"
-0'-10"
1'-0"
4" 4"
B500 KEY PLAN
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
A-402
F60689
M1801
A6330
M1825
10'-4 3/4"
F4 X4112
A1015
CT020
F2000
F0275
M1801M1801 F0275 F0275
CT020
A5145 A5145
F2
8'-4 3/4"
'-0
1/ 8"
2'-0"
2'- 0"
2'- 0"
2'- 6"
CT020
8'- 4"
A1015
F2000
C0044
C06M0
M1801 M1801
2'- 6"
1'- 6"
2'-6"2'-6"2'-6"1'-0" 7'-6"
C 030 C 030 C 030
6'- 6"
A-402 C62
X1415
A6330
C1
C4
M3072
M0506 A5106
A1203
F0360
X1415
M4255
A6
X1415
A5077
X1415
X8700
F2020
A5145
F2250
2'-0"
2'-0"
X1415
X1
M0506
AN E A
F3200
9'- 0"
7'- 0"
2'-6 3/4"
2'-
2'-
4 3 /4"
4"
2'-9" 2'-3"
A1000
A-402E2
E6
E4
E1
R7000
F0535
F0425
F0425
F0425
F0425X1170
A5082A5106
F0205 F0205
F0795
F0205
CT020
2'- 6"
8'- 4"
M1825
M1801 X4112
C0044
C06M0
C0044
X4112 A6330
2'-
CT020
2'-6" 2'-6" 2'-6" 2'-6" 2'-6"
2'- 6"
1'- 6"
2'- 6"
6'- 6"
C 030 C 030 C 030 C 030
10'-0"
X1415
C03 0M
C 030M C 030M
C03 0M
C 030M C 030M C 030M
A1203 C 030
C 030M
X8700 C04 0
A5082 A5075
AN E A
2'-6" 2'-6"
7'- 0"
2'- 1"
7'- 6 1
/4"
2'-6 5/8" 2'-6"
2'- 6"
2'- 0"
2'-
5'-0 5/8"
C02 0M
C02 0M
2'- 0"
2'- 2"
2'-
2'-6" 2'-3" 2'-3" 2'-3" 2'-3" 4'-9" 5'-0" 6'-9"
A5106M0506
A1203
A5
X1415
X8
AN E A
F3200
F0535
9'- 7 3
/8" 06
A6330
X8
0 X1
4'-5"
2'-
2'-
5'-0"
8'- 4"
6'- 0"
F3200
CT020
F0230
M1801
B500 KEY PLAN
NTSF1 ISOMETRIC OF CONTRO ROOM
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
RE
FE
R
TO
E
LE
VA
TI
ON
F
OR
H
EI
GH
T
5"
1'- 6"
45 000 6"
3"
61 000
1'-4"
RE
FE
R
TO
E
LE
VA
TI
ON
F
OR
H
EI
GH
T
2"
1'-7"
7" 7"
RE
FE
R
TO
E
LE
VA
TI
ON
F
OR
H
EI
GH
T
8"
3"
1'-3"
61 000
6" 3'-
2" 3'-
0" 4"
2'- 1"
2'-0"
SI E S LASH S-1
BAC S LASH S-1
SOLI S RFACE CO NTER
TO S-1 ITH INTEGRAL
SIN
EX OSE EN
TO HAVE F LL
FINISHE SI E
ANEL L-1
REMOVABLE
FRONT ANEL
FINISHE IN
L-1 ANEL
EASE E GE
SOLI S RFACE S-1
METAL BLOC ING
BLOC ING AS RE IRE
BLOC ING AS
RE IRE
ALL AS SCHE LE
FINISHE FLOOR
2'- 4 3
/8" 4"
E E
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
HE
IG
HT
2" WIDTH 2"
4"
T4"
HE
IG
HT
2" WIDTH 2"
HE
IG
HT
SI
LL
2"
2"
4'-
E10"E
2'- 9"
3'- 7"
1'-0" 3"
N
2'- 1"
4'- 3"
1'-0" 4"
N4 R
2"
1/2" 1/2"VARIES
SEE LAN
4" 2"
1/2
1/2
E10
HE
IG
HT
2" WIDTH 2"
E10
2"
6"
3" 2-1/2" 3/8" CONTIN O S
STEEL ANGLE - INSTALL STEEL
CLI ANGLES AT FLOOR AND
STR CT RE ABOVE
SHEET LEAD W/ E AL
THIC NESS TO AD ACENT WALL
1/4" STEEL S ACER
-WELD TO STEEL ANGLE AND
HOLLOW METAL FRAME
LEAD LINED DOOR AS SCHED LED
2"
1/2" 1/2"VARIES
SEE LAN
2"
1/2"
VARIES
SEE LAN 1/2"
1/2
VA
RI
ES
SE
E
LA
N 1/2
4" 2"
WINDOW SCHEDULE
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
3/4"
3 1/2" CORNER
OINT STRI S
METAL ST D WALL 1 3/4" INTERMEDIATE
OINT STRI S
1 ATTACH OINT STRI S TO ST DS
2 SCREW G BD TO ST DS THR TABS -SEE
FIGS 1 2 3 BELOW
3 BE S RE TABS ARE IMBEDDED IN G BD SO
NORMAL TA ING AND S AC LING CAN OCC R
LEAD LINED
G S M BOARD
ANEL FIG 1 FIG 2 FIG 3
WRA ALL CABLES
WIRES ETC
ROTR DING FROM
BOX/RACEWA WITH
LEAD
OVERLA SHEET LEAD
WITH G S M BOARD
B MINIM M 1"
LEAD WRA ING M ST
EXTEND BE OND OINT
WHERE A DIRECT LINE OF
SIGHT INTO THE ROOM IS
IM OSSIBLE
FIG D
THIS LENGTH A ROX
E ALS HEIGHT OF
O ENINGLEAD LINED G S M
BOARD
THIS ORTION OF LEAD
M ST OVERLA LEAD ON
INSIDE OF ST D
LEAD LINED G S M BOARD
FIG A
FIG C
FIG B
ALTERNATIVE METHOD WHEN
ATTACHING BOX ATTACH LEAD AT
SAME INSTANCE
THIS ORTION OF SHEET
LEAD TO BE FOLDED OVER
OR NDER BOX/RACEWA
OVERLA ING ALL FOLDS
E E
E
NOTE
THESE DETAILS A L TO
ALL ENETRATIONS IN
LEAD LINED WALLS
ELECTRICAL
O TLET
1/2"
1/2"
9 1/4"
1'- 5"
5 1 /4"
3'- 8 1
/2"
1"
1"
1'-0"
1'- 6"
1"
1"
(TYPE N) DIRECT APPLIED
1 ARTITIONS ARE DISTING ISHED ON FLOOR LANS B S MBOL
DESIGNATION GRA HIC DESIGNATION OR A COMBINATION OF BOTH
DESIGNATIONS SOME ARTITION T ES SHOWN ON THIS SHEET MA NOT BE
SED ON THIS RO ECT
2 ALL WALLS NOT DESIGNATED WITH A GRA HIC OR TAG TO BE T E A IF
NCLEAR CONTACT ARCHITECT
3 "METAL ST DS" INDICATED ON THIS SHEET FOR INTERIOR ARTITIONS
REFER TO THOSE S ECIFIED IN SECTION 09 22 16 - NON STR CT RAL METAL
FRAMING REFER TO S ECIFICATIONS FOR ADDITIONAL CRITERIA S CH AS
MINIM M ST D S ACING MINIM M GA GE AND ERMISSIBLE DEFLECTION
LIMITS SEE SECTION 05 41 04 LOAD BEARING METAL ST D S STEM FOR
FRAMING THAT IS O TSIDE THE SCO E OF 09 22 16 AND ASTM C754 S CH AS
LONG HEADERS CANTILEVERED WALLS TALL WALLS WAL ABLE CEILINGS
AND THEIR S ORTS WALLS EXCEEDING S AN TABLES AND OTHER N S AL
FRAMING CONDITIONS
4 SO ND TRANSMISSION CLASS STC IS A RATING S STEM THAT DESCRIBES
THE ABILIT OF AN ASSEMBL TO RED CE THE TRANSMISSION OF SO ND
CONFIG RE SO ND-RATED WALL ASSEMBLIES ACCORDING TO THE MINIM M
RE IREMENTS STI LATED IN THE STC TESTS LISTED STC RATINGS LISTED
ARE BASED ON LABORATOR TESTING AND ARE NOT INDICATIVE OF RES LTS
IN FIELD
5. REFER TO SECTION 09 29 00 FOR ACO STIC SEALANTS
6 SO ND ATTEN ATION BATTS SAB ARE S ECIFIED IN SECTION 09 29 00
WHERE SAB ARE INDICATED THE SHALL EXTEND CONTIN O SL FROM
FLOOR TO STR CT RE ABOVE
7 ARTITIONS ARE INDICATED WITH CONVENTIONAL G S M WALLBOARD
N O GRADE TO REMI M T ES OF WALLBOARD I E MOIST RE-
RESISTANT TILE-BAC ER BOARD ACO STICALL ENHANCED ETC BASED ON
THEIR LOCATION AND ACCORDING TO RE IREMENTS OF SECTION 09 29 00
8. SEALANTS INDICATED MA BE FOR FIRE RATING SMO E RATING AIR
RESS RE CONTAINMENT ACO STIC RATING VERMIN CONTROL MOVEMENT
CRAC CONTROL AND/OR BIOLOGICAL CONTAINMENT SEALANT OINTS ARE
TO BE SI ED FOR EX ECTED MOVEMENT OF OINT WITH
EX ANSION/CONTRACTION CA ACIT OF SEALANT MATERIAL TO MAINTAIN
THE INTEGRIT OF THE SEAL FOR THESE A LICABLE ARAMETERS SEE
S ECIFICATION SECTION 07 92 00 FOR INTERIOR OINT SEALANTS
9 REFER TO SECTION 07 84 00 FOR HEAD-OF-WALL FIRESTO ING AND
SEALING OF THR -WALL ENETRATIONS
10 "LINE OF STR CT RE" INDICATED FOR EACH ARTITION IS DIAGRAMATIC
ONL AND DOES NOT INDICATE EXACT CONSTR CTION CONDITIONS OR
GEOMETR
11 ALL DIMENSIONS ARE FROM FACE TO FACE OR CENTERLINE TO
CENTERLINE N O REFER TO ARTITION MATRICES FOR ARTITION WIDTH
DIMENSIONS NLESS INDICATED TO BE SHOWN ON LAN
12 LEAD LINING RE IREMENTS ARE S ECIFIED IN SECTION 09 29 00 WHERE
LEAD LINING IS INDICATED IN LAN LEAD LINING IS TO BE LACED ON
RADIOGRA HIC SIDE OF ROOM AND TO EXTEND TO 7'-0" A F F N O LEAD
THIC NESS TO BE S ECIFIED B OWNER'S H SICIST RE ORT
13 AT LEAD LINED ARTITIONS THAT ARE ALSO FIRE RATED REFER TO FIRE
L FIRE RESISTANCE TEST 419 430 OR 439
14. FIRE RESISTANT AND FIRE RESISTANT SMO E BARRIER RATINGS ARE TO
CONTIN E THRO GH ALL O ENINGS IN RATED ARTITIONS
15 SMO E RESISTANT FIRE RESISTANT AND FIRE RESISTANT SMO E
BARRIER ARTITIONS SHALL EXTEND AND SEAL TO INSIDE FACE OF EXTERIOR
SHEATHING INCL DING EXTENSIONS THRO GH SOFFITS
16 REFER TO THE TOILET ACCESSORIES SHEET AND CASEWOR SHEET FOR
MO NTING DETAIL INFORMATION
17 REFER TO SHEET A-721 AND A-722 FOR ADDITIONAL ARTITION DETAILS
AND FRAMING INFORMATION
THE T ICAL ARTITION TAG S MBOL DESIGNATION HAS TWO CHARACTERS
THE FIRST CHARACTER IS A LETTER INDICATING THE ARTITITON T E THE
SECOND CHARACTER IS A N MERIC INDICATION OF THE ST D OR CM WIDTH
IF A " " S MBOL IS SHOWN AS THE FIRST CHARACTER THIS INDICATES THE
ARTITION DOES NOT HAVE SO ND ATTEN ATION IN SOME INSTANCES AN
ADDITIONAL CHARACTER OR "MODIFIER" MA BE ADDED TO THE END AND/OR
THE LINE BELOW TO INDICATE ADDITIONAL CHARACTERISTICS WITHIN THE
WALL REFER TO CHART BELOW FOR MODIFIER DEFINITIONS
IF NO PARTITION TAG OR NUMERIC SECOND CHARACTER EXISTS, THE STUD
SIZE WILL BE 3 5/8" TYPICAL, U.N.O.
PARTITION TAGGING LEGEND:
PARTITION
MODIFIER MODIFIER DESCRIPTION
L
S
T
P
M
PARTION
MODIFIER
II
PROVIDE 1/4" LEAD SHIELDING ON RADIOGRAPHIC
SIDE OF ROOM.
PROVIDE SECURITY MESH AT GWB.
PROVIDE STAGGERED STUDS WITHIN A SINGLE TRACK,
SNAKE SOUND ATTENUATION BATTS AROUND
STAGGERED STUDS.
PROVIDE ADDITIONAL FINISH PANEL TO BASE
PARTITION (WOOD, FRP, PHENOLIC, ACOUSTIC STONE
PANELS, ETC.)
PROVIDE CONCRETE OR MASONRY CURB AT BASE OF PARTITION (CAN
BE UTILIZED AT A KITCHEN OR MECHANICAL ROOM)
X X
S MBOL INDICATES ARTITION T E
NO SO ND
ATTEN ATION ST D/CM WIDTH
ARTITION MODIFIER II ARTITION MODIFIER
SEE CHART BELOW SEE CHART BELOW
N MERIC ST D CM
CHARACTER WIDTH WIDTH
1 1 5/8" 2 2 1/2"
3 5/8" 4 4" 3 5/8" 6 6" 5 5/8" 8 8" 7 5/8" 12 11 5/8"
X
NOT USED
A PROVIDE AS A LAYER OF 5/8 TYPE X ACOUSTICALLY ENHANCED
GYPSYM WALBOARD COMPOSITE TO EXISTING WALL SYSTEM.
L1 PROVIDE 1" LEAD SHIELDING 2'-6" WIDE BY 8'-0"
HIGH ON RADIOGRAPHIC SIDE OF ROOM.
L2 PROVIDE 2" LEAD SHIELDING 8'-0" WIDE BY 8'-0" ON
RADIOGRAPHIC SIDE OF ROOM.
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
MINERAL WOOLMINERAL WOOL
1 1 /2"
1/2 " M
IN
MINERAL WOOL
3/4
5/8" GWB
SLOTTED TO TRAC
MINERAL WOOL5/8" GWB
SLOTTED TO TRAC
SLOTTED TO TRAC
3/4
FIRE STO OINT S RAFIRE STO OINT S RA
1/2 " M
IN
1 1 /2"
FIRE STO OINT S RAFIRE STO OINT S RA
3/4
1 1 /2"
1/2 " M
IN
SLOTTED TO TRACSLOTTED TO TRAC
3/4
1" 1"
SEALANTSEALANT
5/8" GWB
5/8" GWB 5/8" GWB
3/4
3/4
SLOTTED TO TRACSLOTTED TO TRAC
3/4
3/4
1" 1"
3/4
SLOTTED TO TRAC
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
20 GA. CLIP ANGLE
FOR 3 5/8" STUDS. 1 1/2" x 5" FOR 6" STUDS
TYPE AMO
UN
TI
NG
H
EI
GH
TS
RE
F
T
PI
CA
L
TYPE B
MO
UN
TI
NG
H
EI
GH
TS
RE
F
T
PI
CA
L
TYPE C
MO
UN
TI
NG
H
EI
GH
TS
RE
F
T
PI
CA
L
4' - 6" MAX 8' - 6" MAX 4' - 6" MAX 8' - 6" MAX
ALL STUDS ARE TO BE 30 MIL
IF GREATER THAN 8' - 6"
8' - 6" MAX 8' - 6" MAX
4' - 6" MAX
STONE VENEER WALLS
54 MIL MIN STUDS AT 30 MIL MIN STUDS AT
D3 A-722
D3 A-722
D1 A-722
D1 A-722
D5 A-722
D5 A-722
D3 A-722
D3 A-722
D1 A-722
D6 A-722
D6 A-722
D6 A-722
D6 A-722
D6 A-722
D6 A-722
D8 A-722
D3 A-722
SEE F8/A-722
INTERSECTION AT RATED
PARTITION AND EXTERIOR WALL
INTERSECTION OF RATED
PARTITION AND CONCRETE
INTERSECTION AT RATED
PARTITION AND CONCRETE
INTERSECTION OF CROSS CORRIDOR
DOOR IN RATED PARTITION
MI
N3"
MI
N3"
2 5/8"
2"2"
2" 2"
2"
2"
INTERSECTION AT VARIOUS WALL
PRIORITY CONFIGURATIONS
2"
2"
HOLLOW METAL FRAME
FRAMING AT PENETRATION IN 1-HR FIRE RATED WALL
FRAMING AT PENETRATION IN RATED WALL
FRAMING AT PENETRATION IN NON-RATED WALL
FRAMING AT PENETRATION IN NON-RATED CHASE
FRAMING AT PENETRATION IN NON-RATED WALL
CONTROL JOINT IN
GWB PARTITION
1/2" MAX
MAX
24'-0
CONTROL JOINT IN 1 HR
FIRE RATED PARTITION
1/2" MAX
MAX
24'-0
1 1/2"
CONTROL JOINT IN 2 HR
FIRE RATED PARTITION
1/2" MAX
MAX
24'-0
1 1/2"
MAX
24'-0MAX
24'-0
CONTROL JOINT AT PARTITION INTERSECTION OR
CHANGE IN CONSTRUCTION
1/2" MAX
CONTROL JOINT IN PARTITION AT
NON-EXPOSED EDGE
1/2" MAX
CONTROL JOINT IN GYPSUM
BOARD CEILING
MAX
24'-0
MAX
24'-0
1/2" MAX
20 GA. CLIP ANGLE
FOR 3 5/8" STUDS. 1 1/2" x 5" FOR 6" STUDS
20 GA. CLIP ANGLE
FOR 3 5/8" STUDS. 1 1/2" x 5" FOR 6" STUDS
20 GA. CLIP ANGLE
FOR 3 5/8" STUDS. 1 1/2" x 5" FOR 6" STUDS
20 GA. CLIP ANGLE
FOR 3 5/8" STUDS. 1 1/2" x 5" FOR 6" STUDS
NTSF8
METAL BAC ING DETAILS
FOR ACCESSORIES AND E UIP.
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
F2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULL SPRIN LERED
O C
F M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ELECTRICAL:
NOT FOR CONSTRUCTION
MECHANICAL:
P2S ENGINEERING, INC.
5000 E. SPRING STREET, 8TH FLOOR
LONG BEACH, CA 90815-5218
562.497.2999 A-900
ARCHITECTURAL RENDERINGS
TRIPLE C - THE A/E GROUP
4401 ATLANTIC AVENUE, SUITE 200
LONG BEACH, CA 90807
562.452.7175
MAT PERKINS
REPLACE LINEAR ACCELERATOR
11301 Wilshire Blvd, West Los Angeles, CA 90073
691-CSI-121
10/29/2020 M. PERKINS N.
BLANCHARD
100 CONSTRUCTION
DOCUMENTS
Revisions: Date:
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
0688B
0688A06
B500 KEY PLANNTSF3 FINISH BOARD
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
X1415
F0535MF0535M
F2020
F0110
X8700-1
X8700
M2055 F0535 K4665
F0280 F0425F0425F0425
F0205
F0205 F0795
F0205
F0205
F0205
F0535
F0205F0205
M4255
F0400
M4665
A5077
A6
F2
B500 KEY PLAN
EQUIPMENT LIST (MILSTD 1691) EXISTING
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
F0205 F0205 F0795
F0205
K4665
F0535
F0425 F0425 F0425 F0425X1170
R7000
A0925M
F2
X4112
A6330
A1015
M1801
M1825C06M0
CT020
F0275
X1415
F0
A5106
M3072 M4255
A1203
CT020
CS140
CT050
A5082A5106
X1415
F2020
A5077
X8700X1415
A5082 A5075
X1415
A5145 A5145
M1801 F0275 F0275
M1801
F2
A1000
B500 KEY PLAN
REVISION 1 11/02/20
Expires 6.30.16Expires: 6/30/1821
7/2 9/2
E
F
SYMBOL DESCRIPTION
NOTE CALLOUT
DETAIL CALLOUT
- NUMBER ON TOP DENOTES DETAIL NUMBER
- NUMBER ON BOTTOM DENOTES SHEET DETAIL IS
SHOWN
PIPE CALLOUT
NODE USED IN CALCULATION
SECTION CALLOUT
POINT OF CONNECTION
POINT OF DISCONNECTION
CHANGING PIPE SIZE
NEW PIPE
EXISTING PIPE
DEMOLISHED PIPE/EQUIPMENT
THRUST BLOCK
RISER
DRAIN VALVE
POST-INDICATOR VALVE
OS&Y VALVE (OUTSIDE SCREW AND YOKE, RISING STEM)
INDICATING BUTTERFLY VALVE
CHECK VALVE
CHECK VALVE WITH BALL DROP
BUTTERFLY VALVE
BACKFLOW PREVENTER - REDUCED PRESSURE ZONE (RPZ) TYPE
PUBLIC FIRE HYDRANT, TWO HOSE OUTLETS
PUBLIC FIRE HYDRANT, TWO HOSE OUTLETS AND PUMPER
CONNECTION
SIAMESE FIRE DEPARTMENT CONNECTION
FREESTANDING SIAMESE FIRE DEPARTMENT CONNECTION
FIRE PUMP WITH DRIVES
UPRIGHT SPRINKLER
PENDENT SPRINKLER
CONCEALED SPRINKLER
PENDENT SPRINKLER; ON DROP NIPPLE
SPRINKLER, WITH GUARD
LATERAL BRACE
LONGITUDINAL BRACE
FOUR-WAY BRACE
WIRE, SURGE RESTRAINER
WALL PENETRATION
PIPE HANGER
MECHANICAL PIPE COUPLING
GROOVED ELBOW
CHANGE IN PIPE ELEVATION
ELBOW FACING AWAY FROM VIEWER
ELBOW FACING TOWARD VIEWER
TEE FACING AWAY FROM VIEWER
TEE FACING TOWARD VIEWER
THREADED CAP
ONE HOUR FIRE RATED WALL
FIRE STOP SYMBOL
[ +11'-0" ] FIRE SPRINKLER PIPE ABOVE FINISHED FLOOR. SEE PLAN FOR
ELEVATION.
CEILING HEIGHT11'-0"
1. TO REMOVE ALL EXISTING SPRINKLER HEADS WITHIN AREA OF WORK IN
THE BASEMENT LEVEL OF BUILDING 500, AND PROVIDE NEW SPRINKLER
HEADS WITH ARMOVERS AND DROPS TO PROTECT THE REMODELED
AREAS. ALL THE EXISTING MAINS, BRANCH LINES, SPRINKLER RISER AND
CONTROL VALVE ASSEMBLY, AND SEISMIC BRACING IS TO REMAIN.
225 SQFT MAX COVERAGE PER HEAD-HEAD SPACING=
1,500 SF-DESIGN AREA=
0.10 GPM/SF-DESIGN DENSITY=
-LIGHT HAZARD (LH)-CLASSIFICATION OF OCCUPANCY=
TREATMENT AND CONTROL ROOM, AND
CORRIDOR
SPRINKLER DESIGN CRITERIA -
2016 NFPA 13-GOVERNING STANDARDS=
998 SF (SPRINKLERED AREA) -BUILDING AREA=
TYPE I (332)-CONSTRUCTION TYPE=
HEALTHCARE-BUILDING OCCUPANCY=
2019 EDITIONS OF CAC, CBC, CPC, CMC.-GOVERNING CODES=
BUILDING DESIGN INFORMATION:
LEGEND
BUILDING DESIGN INFORMATION
SCOPE OF WORK
ABBREVIATIONS OVERHEAD FIRE SPRINKLER SYSTEM NOTES
SHEET INDEX
GENERAL NOTES
130 SQFT MAX COVERAGE PER HEAD-HEAD SPACING=
1,500 SF-DESIGN AREA=
0.15 GPM/SF-DESIGN DENSITY=
-ORDINARY HAZARD I (OH-I)-CLASSIFICATION OF OCCUPANCY=
MECHANICAL, DATA SERVER AND
STORAGE ROOM
SPRINKLER DESIGN CRITERIA -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
O C
F M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
F-001
GENERAL NOTES LEGEND
ABBREVIATIONS AND SHEET INDEX
TRIPLE C - THE A/E GROUP
4401 ATLANTIC AVENUE, SUITE 200
LONG BEACH, CA 90807
562.452.7175
MAT PERKINS
REPLACE LINEAR ACCELERATOR
11301 Wilshire Blvd, West Los Angeles, CA 90073
691-CSI-121
07/29/2020 Checker Author
100 CONSTRUCTION
DOCUMENTS
ABBREVIATION DESCRIPTION
(N) NEW
AFF ABOVE FINISHING FLOOR
BFV BUTTERFLY VALVE
DCDA DOUBLE CHECK DETECTOR ASSEMBLY
DI DUCTILE IRON PIPE
EXIST / (E) EXISTING
FDC FIRE DEPARTMENT CONNECTION
FH FIRE HYDRANT
PIV POST INDICATOR VALVE
POC POINT OF CONNECTION
PVC POLYVINYL CHLORIDE
UG UNDERGROUND
SHEET DESCRIPTION
1. THE SUCCESSFUL C-16 LICENSED CONTRACTOR SHALL COORDINATE WITH ALL ENGINEER DISCIPLINE & ARCHITECT FOR THE INSTALLATION FIRE SPRINKLER SYSTEM FOR ALL CONCEALED AND UNCONCEALED
AREAS OF THE BUILDINGS AS REQUIRED.
2. CONTRACTOR SHALL INSTALL, ROUTE AND SUPPORT AUTOMATIC SPRINKLER SYSTEM PER REQUIREMENTS OF THE CURRENT NATIONAL FIRE PROTECTION ASSOCIATION CODE (NFPA), 2016 NFPA 13, NFPA 14, NFPA 24, CALIFORNIA BUILDING CODE / CALIFORNIA FIRE CODE (CBC/CFC) CHAPTER 9, CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA PLUMBING CODE (CPC) AND INSURANCES UNDER WRITER'S REQUIREMENTS.
3. THE DESIGN COORDINATION AND APPROVALS OF ALL MAINS AND BRANCHE LINES TO SERVE SPRINKLERS
SHALL BE DONE BY A LICENSED FIRE PROTECTION CONTRACTOR.
4. SUBMIT SHOP DRAWINGS FOR APPROVAL. SHOP DRAWINGS SHALL BE APPROVED BY THE AUTHORITY
HAVING JURISDICTION (VA) PRIOR TO COMMENCING.
5. EXISTING WORK DAMAGED OR CUT INTO DURING CONSTRUCTION SHALL BE PATCHED OR REPAIRED, PAINTED AND FINISHED TO MATCH EXISTING ADJACENT SURFACES IN TEXTURE, FINISH AND COLOR.
6. LOCATION OF SPRINKLER HEADS SHALL BE DONE BY THE FIRE PROTECTION CONTRACTOR USING THE
CRITERIA AS NOTED BELOW:
A. IN LOCATIONS WITH SUSPENDED CEILING, THE SPRINKLER HEADS SHALL BE LOCATED IN THE CENTER OF THE INDIVIDUAL CEILING TILES. THE SPRINKLER HEADS PATTERN SHALL BE SYMMETRICAL ABOUT ROOM CENTER LINES AS MUCH AS POSSIBLE. IN PANELS HAVING A FACTORY-MADE REVEAL, SPRINKLER
HEADS SHALL BE LOCATED IN THE CENTER OF AN INDIVIDUAL SEGMENT.
B. IN LOCATIONS WITH PLASTERED OR GYPSUM BOARD CEILINGS, THE SPRINKLER HEAD PATTERN SHALL
BE SYMMETRICAL ABOUT ROOM CENTER LINES AS MUCH AS POSSIBLE.
C. FOR LOCATIONS OF CEILING TILES, DIFFUSERS AND LIGHTS, SEE ARCHITECTURAL REFLECTED CEILING
PLANS.
7. ALL NEW EQUIPMENT AND MATERIAL TO BE INSTALLED AS PART OF RENOVATION / NEW CONSTRUCTION SHALL BEAR AN UNDERWRITERS LABORATORIES LABEL (UL), AND INSTALLED IN SUCH A MANNER FOR
WHICH THEY ARE DESIGNED AND APPROVED.
8. NO HOLES SHALL BE DRILLED OR CUT IN OR THROUGH ANY STRUCTURAL ELEMENT WITHOUT WRITTEN
APPROVAL OF THE ARCHITECT AND THE STRUCTURAL ENGINEER.
9. SLEEVE AND GROUT ALL PIPE PENETRATIONS THROUGH FLOORS OR WALLS UNLESS PENETRATION IS FIRE RATED. WHEN PENETRATING A FIRE RATED FLOOR OR WALL, USE SLEEVE WITH 1" MIN. ANNULAR SPACE AROUND PIPE O.D. FILL ANNULAR SPACE WITH FIBERGLASS FILL TO 1" FROM END OF SLEEVE. ADD APPROVED FIRE PROOF SEALANT FOR THE HOUR RATING OF THE FLOOR OR WALL PENETRATION IN THE
REMAINING SPACE.
10. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED TEMPORARY AND PERMANENT PERMITS, INCLUDING LICENSES, CERTIFICATES, INSPECTIONS AND TESTS.
11. SEE DIVISION 21 SPECIFICATION FOR ADDITIONAL REQUIREMENTS.
12. ALL PIPE PENETRATION THRU WALLS, RATED OR OTHERWISE SHALL BE COVERED WITH A SPLIT
ESCUTCHEON PLATE.
13. FIELD OBSERVATION AND SUPPORT SERVICES PERFORMED BY THE ENGINEER PRIOR TO, DURING, OR AFTER CONSTRUCTION IS PERFORMED FOR THE PURPOSE OF ACHIEVING QUALITY CONTROL AND SHALL
NOT BE CONSTRUED AS SUPERVISION OF CONSTRUCTION.
14. PHASING: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH GENERAL CONTRACTOR
CONSTRUCTION SCHEDULE AND BASED UPON MINIMIZING DISRUPTIONS TO EXISTING OPERATION.
PHASING SHALL BE APPROVED BY ARCHITECT PRIOR TO CONSTRUCTION OR DEMOLITION.
15. ALL DEMOLISHED MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR WHO SHALL BE RESPONSIBLE FOR PROMPT DAILY REMOVAL FROM THE SITE. THE CONTRACTOR SHALL REMOVE ALL DEBRIS FROM THE SITE RESULTING FROM THE WORK AT THE CONCLUSION OF THE DAY'S CONSTRUCTION.
THE AREA OF THE SITE SHALL BE LEFT BROOM CLEAN. IF NOT, UPON NOTIFICATION, THE GENERAL
CONTRACTOR WILL PERFORM ALL NECESSARY CLEAN-UP WORK AND BACK CHARGE THE SUB
CONTRACTOR FOR THE EXPENSE THUS INCURRED.
16. ALL DEVICES AND COMPONENTS TO BE EITHER LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY FOR FIRE PROTECTION SERVICE OR APPROVED BY THE AUTHORITY HAVING JURISDICTION. IT
SHALL BE PER OPM-0052-13 (B-LINE/TOLCO).
17. FITTINGS FOR HOLE-CUT CONNECTIONS, SUCH AS VICTAULIC "HOOKER" OR EQUIVALENT, ARE NOT
ACCEPTABLE AND SHALL NOT BE USED.
18. ALL CONTROL VALVES AND DRAIN VALVES SHALL HAVE A SIGN AFFIXED FOR IDENTIFICATION.
19. ALL MECHANICALLY JOINED PIPING SHALL BE SCHEDULE 10 WITH ROLL GROOVED ENDS AND MECHANICAL
FITTINGS. COUPLINGS SHALL BE RIGID TYPE, UNLESS OTHERWISE NOTED.
20. ALL THREADED PIPING SHALL BE SCHEDULE 40 WITH CUT THREADS AND CLASS 125 CAST IRON FITTINGS.
21. THE FIRE SPRINKLER SYSTEM SHALL BE MONITORED BY AN APPROVED LISTED CENTRAL MONITORING
STATION.
22. HANGER LOCATION FOR ALL PIPING SHALL BE IN ACCORDANCE WITH NFPA 13, SECTION 9.2 THROUGH
9.2.6.3 SEE HANGER SCHEDULE AND/OR DETAILS FOR TYPES OF HANGERS USED. ALTERNATE UL AND
FMHANGER METHODS ACCEPTABLE AT NO ADDITIONAL COST TO THE OWNER PROVIDE UL AND FM
LITERATURE TO INSPECTOR OF RECORD AND ENGINEER FOR APPROVAL PRIOR TO INSTALLATION.
PROVIDE RIGID COUPLING THROUGHOUT, EXCEPT FLEXIBLE COUPLING SHAL BE PROVIDE AS FOLLOWING:
A. WITHIN 24" OF THE TOP AND BOTTOM OF AL RISERS.
B. ON BOTH SIDES OF CONCRETE OR MASONARY WALLS WITHIN 3' OF THE WALL SURFACE
C. WITHIN 24" OF BUILDING EXPANSION JOINTS.
D. WITH24' OF THE TOP OF DROPS EXCEEDING 15' IN LENGTH TO PORTIONS OF SYSTEM SUPPLYING MORE
THAN ONE SPRINKLER, REGARDLESS OF PIPE SIZE.
E. ABOVE AND BELOW ANY INTERMEDIATE POINTS OF SUPPORT FOR A RISER OR OTHER VERITCAL PIPE.
23. BRANCHLINE SHALL BE LATERALLY RESTRAINED AT INTERVALS NOT EXCEEDING THOSE SPECIFIED IN NFPA TABLE 13 TABLE 9.3.6.4(a) OR (b) BASED ON BRANCHLINE DIAMETERS AND THE VALUE OF Cp.
24. ALL WELDING TO BE DONE BY CERTIFIED WELDERS.
25. SPRINKLER CONTRACTOR TO COORDINATE AND ADJUST SPRINKLERS TO ELECTRICAL, MECHANICAL, STRUCTURE AND ALL OTHER TRADES AT NO ADDITIONAL COST TO THE OWNER.
26. OWNER TO BE PROVIDED WITH TEST CERTIFICATES, CARE & MAINTENANCE BOOK (NFPA 25 - CALIFORNIA
AMENDED) AND A SPARE HEAD CABINET WITH SPRINKLERS AND A WRENCH PER NFPA 13.
27. DELIVERY OF ALL MATERIALS AND EQUIPMENT TO THE JOB SITE SHALL BE SCHEDULED TO ASSURE
COMPLIANCE WITH THE PREDETERMINED CONSTRUCTION SCHEDULE. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR STORAGE AND HANDLING ALL MATERIALS AND EQUIPMENT ON THE JOB SITE, INCLUDING FURNISHING OF ANY STORAGE FACILITIES OR STRUCTURE REQUIRED.
28. SPRINKLER CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND COORDINATE WITH OTHER TRADES
PRIOR TO INSTALLATION.
29. REFER TO THE ARCHITECTURAL DRAWING FOR ACTUAL BUILDING DIMENSIONS AND DETAILS. DO NOT
SCALE "F" DRAWINGS FOR CONSTRUCTION PURPOSES.
30. INSTALLATION OF SPRINKLER SYSTEM SHALL NOT BE STARTED UNTIL DRAWINGS, SPECIFICATIONS, CALCULATIONS, ETC. HAVE BEEN APPROVED BY VA AND EOR.
31. LENGTHS OF PIPE SHOWN ON PLANS ARE EDGO OF FITTING TO EDGE OF FITTING DIMENSIONS. FIELD FABRICATION OF PIPE LENGTHS IS NOT ALLOWED UNTIL SHOP DRAWINGS HAVE BEEN REVIEWD AND
APPROVED.
1. 2016 NFPA 13 SEC. 10.10.2.1.1 UNDERGROUND MAINS AND LEAD-IN CONNECTIONS TO SYSTEM RISERS SHALL BE COMPLETELY FLUSHED BEFORE CONNECTION IS MADE TO OVERHEAD SPRINKLER PIPING.
WHERE UNDERGROUND PIPING IS FLUSHED AND NOT IMMEDIATELY CONNECTED TO THE OVERHEAD PIPING, THE RISER SHALL BE CAPPED OR OTHERWISE PROTECTED TO PREVENT DEBRIS, DIRT, OR ANIMALS
FROM ENTERING INTO THE UNDERGROUND PIPING (WITNESSED BY THE PROJECT INSPECTOR).
2. ARCHITECT OF RECORD & FIRE PROTECTION SHALL AFFIX THEIR SEAL AND STAMP & SIGN ALL SUBMITTAL
DRAWINGS, OR PROVIDE DOCUMENTATION PER DSA IR A-18.
3. 2016 NFPA 13 SEC. 6.2.9: PROVIDE SPARE SPRINKLER HEAD CABINET, SPRINKLER WRENCH, AND NO FEWER THAN 6 SPARE HEADS MATCHING THE TYPES AND TEMPERATURE RATINGS AT EACH SYSTEM RISER.
4. 2016 NFPA 13 SEC. 9.3.6.3: THE END SPRINKLER ON EACH LINE SHALL BE RESTRAINED AGAINST EXCESSIVE
VERTICAL AND LATERAL MOVEMENT.
5. 2019 CBC 903.4.2: THE INSPECTOR'S TEST VALVE LOCATION SHALL BE INSTALLED AT THE END OF THE MOST HYDROSTATICALLY REMOTE SYSTEM WITH A PIPE SIZE OF NO LESS THAN 1 INCH, WITH A SMOOTH BORE, CORROSION-RESISTANT ORIFICE INSTALLED WITHIN THE SYSTEM. THE DISCHARGE SHALL BE TO THE
EXTERIOR OF THE BUILDING.
6. 2016 NFPA 72 SEC 17.12.2: THE SPRINKLER FLOW SWITCH SHALL BE TESTED TO CONFIRM THAT WHEN THE INSPECTOR'S TEST VALVE IS ACTIVATED AN ALARM WILL SOUND NO MORE THAN 90 SECONDS AFTER INITIAL
FLOW. (WITNESSED BY THE PROJECT INSPECTOR).
7. 2019 CBC 904.4.3: CONNECTIONS TO PROTECTED PREMISES AND SUPERVISING STATION FIRE ALARM SYSTEMS SHALL BE TESTED TO VERIFY PROPER IDENTIFICATION AND TRANSMISSION OF ALARMS FROM
AUTOMATIC FIRE EXTINGUISHING SYSTEMS.
8. 2016 NFPA 13 SEC. 7.7.1.5: SIGNAGE SHALL BE PROVIDED AS REQUIRED.
9. 2019 CBC SEC. 903.4.1: ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER
SYSTEMS AND WATER FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL BE SUPERVISED.
10. 2016 NFPA 13 SEC. 6.9 AND 2010 CBC 903.4.2: FLOW SWITCH SHALL BE CONNECTED TO A 10 INCH OUTSIDE ALARM BELL AT EACH RISER. APPROVED IDENTIFICATION SIGNS SHALL BE PROVIDED TO OUTSIDE ALARM
BELL "SPRINKLER FIRE ALARM - WHEN BELL RINGS CALL 911 / FIRE DEPARTMENT."
11. TITLE 19 ARTICLE 6 SECTION 906(A): A LABEL OF THE SELF-ADHESIVE TYPE SHALL BE PLACED ON THE FIRE DEPARTMENT CONNECTION OR ON THE RISER FOR FIRE SPRINKLER SYSTEM WITH THE DATE OF SERVICE AND/OR DATE OF INSTALLATION WAS PERFORMED AND LICENCE NUMBER OF PERSON PERFORMING
SERVICE WORK.
12. 2016 NFPA 13 FIGURE 24.1: SPRINKLER CONTRACTOR SHALL COMPLETE AND SIGN CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR THE ABOVEGROUND PIPING. THIS FORM SHALL BE GIVEN TO THE
PROJECT INSPECTOR WHO WILL FORWARD TO DSA FOR FILING IN PROJECT RECORDS.
13. ALL SPRINKLER FITTERS WORKING ON THIS PROJECT MUST BE AES CERTIFIED THROUGH CSFM & MUST
CARRY CERTIFICATION CARD WITH THEM ON JOB SITE.
38. REFER TO THE ARCHITECTURAL DRAWING FOR ACTUAL BUILDING DIMENSIONS AND DETAILS. DO NOT
SCALE "FP" DRAWINGS FOR CONSTRUCTION PURPOSES.
39. INSTALLATION OF SPRINKLER SYSTEM SHALL NOT BE STARTED UNTIL DRAWINGS, SPECIFICATIONS, CALCULATIONS, ETC. HAVE BEEN APPROVED BY DSA AND EOR.
40. LENGTHS OF PIPE SHOWN ON PLANS ARE EDGE OF FITTING TO EDGE OF FITTING DIMENSIONS. FIELD FABRICATION OF PIPE LENGTHS IS NOT ALLOWED UNTIL SHOP DRAWINGS HAVE BEEN REVIEWED AND
APPROVED.
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/201906/30/2021
1 1
1"
5'
5" 1"
0'
1"
2'
7"
1"
1'
4"
1"
0'
5"
1"
0'
4"1"
0'
4"
1"0' - 10" 1"
0'
- 8"
1"
0'
9"
1"
0'
8"
1"
0'
2"
1"
0'
2"
1"
1'
0"
1"
1' - 2"
1"
1'
0"
LH
LH
OH-1
OH-I
OH-I
LH
1"
0' - 8"
B500 KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
F-100-0
FIRE PROTECTION RENOVATION
PLAN - GROUND FLOOR
TRIPLE C - THE A/E GROUP
4401 ATLANTIC AVENUE, SUITE 200
LONG BEACH, CA 90807
562.452.7175
MAT PERKINS
REPLACE LINEAR ACCELERATOR
11301 Wilshire Blvd, West Los Angeles, CA 90073
691-CSI-121
07/29/2020 MF AH
100 CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 GROUND FLOOR RENOVATION PLAN
1 CONNECT NEW 1" ARMOVER TO (E) BRANCH, DROP DOWN AND
CONNECT TO SPRINKLER HEAD.
NEW 1" RISER NIPLE AND ARMOVER. DROP DOWN AND
CONNECT TO SPRINKLER HEAD.
THE HATCHED AREA IS NOT IN SCOPE.
1. ALL EXISTING BRANCH PIPES, MAINS, SEISMIC BRACING
AND HANGERS TO REMAIN.
2. SPRINKLER HEADS ARE ADDED ON ONE-TO-ONE BASIS.
ALL BRANCH LINES TO REMAIN.
3. INSTALLATION OF SPRINKLER HEADS AND NEW HANGERS
SHALL COMPLY WITH REQUIREMENTS OF THE LATES EDITION
OF NFPA 13.
4. PIPE MATERIAL FOR ALL NEW PIPING SHALL MATCH THE
EXISTING PIPING.
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/201906/30/2021
LH
LH
OH-1
OH-1
OH-1
LH
B500 KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
F-100-1
FIRE PROTECTION RENOVATION
RCP PLAN - GROUND FLOOR
TRIPLE C - THE A/E GROUP
4401 ATLANTIC AVENUE, SUITE 200
LONG BEACH, CA 90807
562.452.7175
MAT PERKINS
REPLACE LINEAR ACCELERATOR
11301 Wilshire Blvd, West Los Angeles, CA 90073
691-CSI-121
07/29/2020 Checker Author
100 CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 GROUND FLOOR RENOVATION RCP PLAN
1 NEW PENDENT SPRINKLER HEAD (TYP.).
LIGHT FIXTURES (TYP.) SHOWN FOR REFERENCE ONLY AND
COORDINATION OF CEILING.
THE HATCHED AREA IS NOT IN SCOPE.
1. ALL NEW SPRINKLER HEADS SHALL BE CENTER OF CEILING
TILES.
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/201906/30/2021
RISER NIPPLE WITH GROOVED FITTINGS
RISER NIPPLE WITH THREADED FITTINGS ARMOVER TO RECESSED ESCUTCHEON
PENDANT UNDER OBSTRUCTION
PIPE HANGER DETAIL
NOTES
STANDARD SPRAY GLASS BULB PENDENT SPRINKLER. 1" DROP.
RECESSED ESCUTCHEON. 90 DEGREE ELBOW.
SUSPENDED CEILING TILE. ARMOVER. PROVIDE HANGER SUPPORT FOR ARMOVER
LENGTHS OVER 24" PER 2016 NFPA 13 9.2.3.5.
PROVIDE 1" ANNULAR CLEARANCE AS REQUIRED BY DSA
IR 25-2.13, 2.6c. TYPICAL BRANCHLINE.
1" x 1_
" REDUCER.
1 6
2 7
3 8
4 9
1" MIN.
1" MIN.
1 1/2"
1 1/4"
1" ............................... 10'-0"
12'-0"
15'-0"
MAXIMUM HANGER SPACING FOR STEEL PIPE
PIPE SIZE
2"................................ 15'-0"
HANGER
SPACING
2 1/2"......................... 15'-0"
3"............................... 15'-0"
4"............................... 15'-0"
ROD
(ATS)
DIA.
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
5" & LARGER ............ 15'-0" 1/2"
NOTES
BAR JOIST OR STEEL MEMBER BY STRUCTURAL (TYP). ALL THREADED ROD, TOLCO FIG. 100 (TYP).
REVERSIBLE BEAM CLAMP, TOLCO FIG. 65 (TYP). PIPE RING HANGER, TOLCO FIG. 200 (TYP).
RESTRAINING STRAP, TOLCO FIG. 69/69R (TYP). SPRINKLER PIPE PER PLAN (TYP).
1 4
2 5
3 6
NOTES
HILTI "KWIK BOLT TZ" CONCRETE EXPANSION ANCHOR
WITH 3" EMBEDMENT (ICC ESR-1917) ANCHOR SIZE PER
HANGER SPACING TABLE.
ALL THREADED ROD TOLCO FIG. 100 SIZE PER HANGER
SPACING TABLE.
CONCRETE FLOOR OR DECK. PIPE RING HANGER TOLCO FIG. 200.
19" MAX. - FOR A LONGER ROD, USE STIFFENER TOLCO
FIG. 98. SPRINKLER PIPE PER PLAN.
ROD COUPLING AS REQUIRED.
1 5
2 6
3 7
1 1/2"
1 1/4"
1" ............................... 10'-0"
12'-0"
15'-0"
MAXIMUM HANGER SPACING FOR STEEL PIPE
PIPE SIZE
2"................................ 15'-0"
HANGER
SPACING
2 1/2"......................... 15'-0"
3"............................... 15'-0"
4"............................... 15'-0"
ROD
(ATS)
DIA.
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
5" & LARGER ............ 15'-0" 1/2"
NOTES
SPRINKLER BRANCHLINE PER PLAN. SPRINKLER HEAD PER PLAN.
STRUCTURE. 2'-0" MAX. W/O SUPPORT.
1" TEE, PIPE AND CAP. CAP EXTEND TO HANGER (AS
REQUIRED). DUCT.
1" ARMOVER.
1 5
2 6
3 7
NOTES
TYPICAL RISER NIPPLE (90 DEG ELBOW)
TYPICAL MAIN
TYPICAL RISER NIPPLE (TEE)
TYPICAL BRANCH LINE
NOTES
TYPICAL RISER NIPPLE (90 DEG ELBOW)
TYPICAL MAIN
TYPICAL RISER NIPPLE (TEE)
TYPICAL BRANCH LINE
NO SCALE5
NO SCALE4 NO SCALE2
NO SCALE3
NO SCALE1
SYMBOL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
F-501
DETAILS
TRIPLE C - THE A/E GROUP
4401 ATLANTIC AVENUE, SUITE 200
LONG BEACH, CA 90807
562.452.7175
MAT PERKINS
REPLACE LINEAR ACCELERATOR
11301 Wilshire Blvd, West Los Angeles, CA 90073
691-CSI-121
07/29/2020 Checker Author
100 CONSTRUCTION
DOCUMENTS
Revisions: Date:
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
EFORP
DE
R E
T
SI
G E
R R E
E
NI
G
NE
LANOISS
C A L I F ORN
I AS
T A
T E O F
No. M35363
M
I K H A I L F U K
S
ME C H A N I C A L
06/30/201906/30/2021
B500 KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
FD-100-0
FIRE PROTECTION DEMO PLAN -
GROUND FLOOR
TRIPLE C - THE A/E GROUP
4401 ATLANTIC AVENUE, SUITE 200
LONG BEACH, CA 90807
562.452.7175
MAT PERKINS
REPLACE LINEAR ACCELERATOR
11301 Wilshire Blvd, West Los Angeles, CA 90073
691-CSI-121
07/29/2020 Checker Author
100 CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"
1 GROUND FLOOR DEMOLITION PLAN
1 (E) PENDENT SPRINKLER HEAD TO BE DEMOLISHED.
(E) SIDE WALL SPRINKLER HEAD TO BE DEMOLISHED.
THE HATCHED AREA IS NOT IN SCOPE.
1. ALL…