36C25821B0004.pdf

PDF 880 KB Posted

Attached to
Replace Linear Accelerator at Greater Los Angeles VAHCS Federal contract opportunity
Solicitation number
36C25821B0004
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This solicitation is for construction services to replace a linear accelerator at the Greater Los Angeles VA Health Care System. The contractor shall completely prepare the site for building operations including demolition and shall coordinate with the equipment provider to install the new linear accelerator. The work includes renovating rooms, adding a mechanical room and server room, replacing ceiling and flooring, and installing a ceiling-mounted patient lift. The contractor must provide all necessary labor, equipment, and materials. The performance period is 180 calendar days from notice to proceed. Proposals are due on February 4, 2021. This procurement is set aside for verified Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Linear Accelerator at Greater Los Angeles VAHCS, newest first.
File Type Posted
Sign in Sheet for 11 Jan Site Walk Linear Accelerator.pdf PDF
36C25821B0004 0002.pdf PDF
36C25821B0004 0001 RFI Amendment.pdf PDF
Self Certification of Continuous Service.pdf PDF
Fingerprint Record Prep Sheet BLANK.PDF PDF
Wage Rate Determination CA20200022.docx DOCX document
Atch 1 Self Performance Calculations.pdf PDF
6 4Radixact Full Set.pdf PDF
Contractor Background Investigation Request Form (May 2019).pdf PDF
6 2 Drawings 2 of 2.pdf PDF
6 3Specification CSI 121.pdf PDF
6 1 Drawings1 of 2.pdf PDF
6 8Infection Control Permit_revised.pdf PDF
of0306.pdf PDF
VA0710.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25821B0004 X 01-04-2021

691-CSI-121

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014

Department of Veterans Affairs Phoenix VA Healthcare System 777 E. Missouri, Suite 300 Phoenix AZ 85014

Leon S. Woodard 602-795-4506

Contractor shall completely prepare site for building operations, including demolition. Coordinate with the Governments equipment provider and furnish all labor and materials necessary in order to perform work to replace the Linear Accelerator as IAW the SOW, supplied drawings and specifications. The contractor shall provide all necessary work including the renovation of the linear accelerator room, the conversion of a room into a control room, the addition of a mechanical room, the addition of a data server room, replace ceiling, flooring and rewiring as needed. Provide new lead as required, install new air compressor, air dryer system, and piping, install (2) 2-ton HVAC units, (1) new dedicated fan coil unit for gantry cooling, new duct work, install new drywall, finishes, casework and paint.

Install ceiling mounted patient lift system with a minimum carry capacity of 770lbs. A Davis-Bacon wage rate determination is applicable to this work and incorporated by attachment. The contractor shall be responsible for the correct title and classification of all workers and be in compliance with all applicable wage hours and laws

NAICS code: 236220; size standard is $39.5 million The magnitude for this project is between $1,000,000 and $5,000,000 RFI's are due by 19 January 2021 with responses being posted NLT 29 January 2021 An organized site walk is scheduled for: 11 January 2021 at 9:00 am and 2:00 pm All vendors will meet at the following location for the site walk: BLDG 218 Parking Lot 7 Due to COVID-19 restrictions there will be 2 organized site walks at the date and times listed above. Also all vendors will be required to have their temperature taken as well as wear a mask prior to entering the hospital.

All proposals are due on 4 February 2021 at 1:00 p.m. Pacific Standard Time.

This procurement is 100% set aside for Service Disabled Veteran Owned Small Businesses (SDVOSB) in accordance with Public Law (PL) 109-461, 28 United States Cod (U.S.C.) Section 8127. To be eligible to participate in this procurement, the contractor shall be registered/enrolled in the following databases at the time of proposal submission and award:

System for Award Management (SAM) https://sam.gov/SAM/pages/public/searchRecords/search.jsf VETS 4212 (DoL) https://www.dol.gov/agencies/vets/programs/vets412#overview Vendor Information Pages VIP; https://www.vip.vetbiz.va.gov/

Contractor shall include its company DUNS number and CAGE code in Section14 on page 2 of this SF 1442

10 180

X 52.211-10

X 10

1 2:00 P.M. PST

02-04-2021

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

36C25821B0004

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PRICE/COST SCHEDULE

ITEM INFORMATION

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

B.1 INTRODUCTION:

B.2 BACKGROUND / DESCRIPTION OF WORK:

B.3 CONSTRUCTION DOCUMENT:

B.4 SPECIFICATIONS

B.5 SPECIFIC REQUIREMENTS

B.6 CONFORMANCE STANDARDS:

B.7 HOURS OF COVERAGE:

B.8 IDENTIFICATION, PARKING, NO SMOKING, & VA REGULATIONS:

B.9 INFORMATION SECURITY:

B.10 POINTS OF CONTACT AND PHYSICAL LOCATION:

B.11 PERIOD OF PERFORMANCE:

B.12 SUBMITTALS:

B.13 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:

B.14 MODIFICATIONS:

B.15 SECURITY PROCEDURES:

SECTION D - PACKAGING AND MARKING

[For this Solicitation, there are NO clauses in this Section]

SECTION E - INSPECTION AND ACCEPTANCE

SECTION F - DELIVERIES OR PERFORMANCE

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984) ALTERNATE I (APR 1984)

SECTION G - CONTRACT ADMINISTRATION DATA

[For this Solicitation, there are NO clauses in this Section]

SECTION H - SPECIAL CONTRACT REQUIREMENTS

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I.1 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

I.2 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (JUN 2020)

I.3 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

I.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

I.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(MAY 2020)

I.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

I.7 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN

2020)

I.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

I.9 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)

I.10 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

I.11 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) . 32

I.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)

I.14 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND

COMPLIANCE (JUL 2018)

I.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

I.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

I.17 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR

2019)

I.18 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

I.19 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

I.20 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

I.21 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN

2008)

I.22 SUPPLEMENTAL INSURANCE REQUIREMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - LIST OF ATTACHMENTS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF

OFFERORS

K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) . 45

K.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)

K.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

K.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (JUL 2020)

K.5 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)54

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

L.2 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED

BY REFERENCE (JAN 2008)

L.3 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX

OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM

DESCRIPTIONS (JUN 1988)

L.4 52.216-1 TYPE OF CONTRACT (APR 1984)

L.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

L.6 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

L.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

L.8 52.228-1 BID GUARANTEE (SEP 1996)

L.9 52.233-2 SERVICE OF PROTEST (SEP 2006)

L.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

L.11 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

SECTION M - EVALUATION FACTORS FOR AWARD

[For this Solicitation, there are NO provisions in this Section]

36C25821B0004 Section B

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVI

CES

QUANTI

TY

UNI

T UNIT PRICE AMOUNT

1.00 JB _______________

Contractor shall completely prepare the site to remove/demolish the existing Linear Accelerator.

Coordinate with Accuray Radixact on the new Linear Accelerator being furnished by them for installation. In addition contractor shall furnish and install ceiling mounted patient lift as required by the furnished drawings and specifications. The contractor shall provide all necessary work including the renovation of linear accelerator room, the conversion of a room into a control room the addition of a mechanical room, the addition of a data server room.

Contract Period: Base POP Begin:

POP End:

GRAND TOTAL _______________

36C25821B0004 Section C

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Statement of Work Replace Linear Accelerator at B500

Construction

24 NOVEMBER 2020

Greater Los Angeles, California VA Health Care System (691) West Los Angeles

B.1 INTRODUCTION:

This requirement is for construction services to necessary to provide construction including select demolition, and new construction for project no. 691-CSI-121 Replace Linear Accelerator B500 in the Greater Los Angeles VA Health Care System (GLAVAHCS). This requirement is classified under construction as it calls for the alteration of real property.

B.2 BACKGROUND / DESCRIPTION OF WORK:

The Veterans Affairs Healthcare System located in Greater Los Angeles, California

(691) requires construction services for renovations in support of replacing the Linear Accelerator located in Building 500. This project was designed through awarded government contract VA262-16-D-0155 | 36C25818N0663 to the AE firm Triple C- The A&E Group, LLC.

B.3 CONSTRUCTION DOCUMENT:

Contractor shall furnish all labor, equipment, certification, supervision, and materials necessary to perform all operations in connections with this order. Contractor shall perform work in strict accordance with the General Specifications, Statement of Work, schedule, and all other supporting documents for this contract to include, but not limited to the following documents:

B.4 SPECIFICATIONS

A. The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements. Whenever possible, the Master Construction Specifications must be used as the basis for project designs.

B.5 SPECIFIC REQUIREMENTS

A. Scope of Work

1. Contractor shall completely prepare site for building operations, including demolition coordinate with Government’s equipment provider, and furnish labor and materials and perform work for Project 691-CSI-121 Replace Linear Accelerator – Building 500 (note: GC shall provide the rooms Site-preparation, remove/ demolish the Existing Linear Accelerator, and assist/ coordinate with Accuray contractor to install the new linear accelerator/ Accuray Radixact; the new linear accelerator/ Accuray Radixact shall be furnished and installed by Accuray Radixact contractor; in addition, GC shall furnish and install ceiling mounted patient lift) as required by drawings and specifications. The contractor shall provide all necessary work including the renovation of linear accelerator room, the conversion of a room into a control room, the addition of a mechanical room, the addition of a data server room, replace ceiling and flooring, rewire, provide new lead as required, install new air compressor, air dryer system, and piping, install (2) 2-ton HVAC units, (1) new dedicated fan coil unit for gantry cooling, new duct work, install new drywall, finishes and casework and paint, revise fire protection as required, install ceiling mounted lift system with a minimum carrying capacity of 770 lbs., provide structural bracing, foundation, and supports, including those based on VA, City of Los Angeles, and State of California seismic requirements. Provide electrical power requirements for lift motor, PDU, linear accelerator and associated equipment. Provide new controls and signaling systems for communications and security scope associated with this project.

Contractor shall coordinate with equipment providers and existing equipment shall be removed by the contractor. Contractor shall also coordinate with equipment provider and install new equipment per manufacturer's requirements.

The pre-manufactured modular demountable partitions construction barricades/ Mccain wall to the underside of the existing ceiling assembly shall be used as temporary walls.

2. The Contractor shall provide all necessary due diligences work including site survey to verify as-built conditions for this project in building 500 at the Greater Los Angeles Healthcare System - West LA Campus in accordance with items herein specified.

3. The work shown on the included drawings and specifications includes:

a. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, renovations, infrastructure, necessary removal of existing structures and construction and certain other items. Work includes renovation of the existing rooms (treatment rooms/0687, storage/ 0688, corridor 23, waiting room 0689, and utility closet room/ 0690A) and the conversion of a room into a control room, the addition of a mechanical room, and the addition of a data server room. The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections, and commissioning.

Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections: 01

91 00 – GENERAL COMMISSIONING REQUIREMENTS; 23 08

00 – COMMISSIONING OF HVAC SYSTEMS; 26 08 00 –

COMMISSIONING OF ELECTRICAL SYSTEMS; and 27 08 00 –

COMMISSIONING OF COMMUNICATIONS SYSTEMS. A

detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.

b.ITEM II, ELECTRICAL AND COMMUNICATIONS: Work includes all labor, material, equipment, and supervision to perform the required electrical construction work on this project including removing existing and providing new electric service for the new Linear Accelerator/ Accuray Radixact system, all associated equipment, and all new equipment. Scope includes providing wiring, conduits & devices for power distribution and lighting, and conduit and all communications cabling and devices for the work area. Electrical work furnished and installed by General contractor shall include, but is not limited, to emergency stop buttons, door switch and reset, system status indicators, thermostats, temperature sensors, junction boxes, receptacles, lasers, power and signal conduits, electrical trenches, lighting, fire safety equipment, physics conduit, power for CCTV and intercom system. The Contractor will provide communications, IT and security systems, detection and alarm systems, access and surveillance systems, and automation and control systems and wiring.

c. ITEM III, MECHANICAL AND PLUMBING: Work includes all labor, material, equipment, and supervision to perform the required Mechanical and Plumbing construction work on this project including (but not limited to): modify the existing fire sprinkler system as required; provide new plumbing fixtures, piping and drains; provide new air compressor, dryer, receiver, piping, valves and associated devices; provide (2) dedicated 2 ton HVAC units for the Radixact server and mechanical rooms; provide new dedicated HVAC system serving the new Linear Accelerator gantry and ductwork in the vault and other renovated areas. New and existing HVAC units shall have 24/7 monitors and shall integrate with the existing Facility Management System.

Contractor is required to Test and Balance (TAB) and commission new and existing HVAC systems per 23 05 93 and 01 91 00. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems serving the space and TAB readings for all new CRAC units and new Air Handling Unit. Existing systems shall be rebalanced to preconstruction readings. For fire suppression, contractor shall reconfigure and provide additional sprinkler heads to the existing building automatic sprinkler system as required. Contractor shall coordinate sprinkler coverage requirements with all temporary ICRA barriers to ensure all areas are properly protected during construction.

d.DEDUCT ALTERNATE NO.1: Eliminate patient lift scope of work.

e. The work shall be performed a maximum of 180 days.

f. The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections, and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01

32 16.15 PROJECT SCHEDULES (SMALL PROJECTS).

Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections: 01 91 00 – GENERAL

COMMISSIONING REQUIREMENTS; 23 08 00 –

COMMISSIONING OF HVAC SYSTEMS; 26 08 00 –

COMMISSIONING OF ELECTRICAL SYSTEMS; and 27 08 00 –

COMMISSIONING OF COMMUNICATIONS SYSTEMS. A

detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.

4. Follow VA standards and guidelines on https://www.cfm.va.gov/til/dManual.asp and all governing codes and standards.

5. Verify as-built drawings provided by VA with site investigation in field.

6. Contractor must bring to the VA’s contracting officer’s attention any discrepancy he may find in the drawings and specs before bidding.

7. Work shall be in compliance with OSHA and all applicable standards and codes described in VA Program Guides and design materials located at the VA Facility Management web site.

8. A copy of the GLA Safety Polices and Permits is included with the bid documents that describe GLA specific safety requirements and all the permits and forms that the contractor shall need during construction.

9. General Requirements 01 00 00 also includes a list of violations with applicable fines enforced by VA’s Safety department.

B. Staging Area

1. The project is on Ground floor of Building 500’s Northwest quadrant.

Contractor shall use VA designated space for staging, if available at the time of construction of this project. Since this is a small project, staging might not be necessary. Verify with VA’s COR for availability. See spec section 01 00 00 for more information.

C. Proposed Timeline

1. The construction timeline must be strictly adhered to as the treatment rooms are a critical area of the hospital and the construction period affects schedules of patients.

https://www.cfm.va.gov/til/dManual.asp

2. The contractor is expected to organize adequate labor force to work efficiently to ensure timely completion of project.

B.6 CONFORMANCE STANDARDS:

A. All design and construction accomplished pursuant to this contract shall comply with the latest edition of the following documents unless the contractor is directed otherwise by the Contracting Officer. Any exceptions must be approved in writing by the Contracting Officer prior to construction startup.

1. VA Master Construction Specifications

a. https://www.cfm.va.gov/til/spec.asp # 01

2. VA Construction Standards

3. VA Seismic Design Handbook

4. VA Space Planning Criteria

5. VA Design Manuals

6. VA CADD Standards

7. NFPA 101, Life Safety Code

8. NFPA 70, National Electric Code

9. NFPA 99, Health Care Facilities

10. NFPA 12, Installation of Sprinkler Systems

11. Accessibility Standards (ADAAG, ABAAS, Barrier Free Design Guide)

12. AIA Guidelines for Construction and Equipment of Hospital and Medical

Facilities

13. International Building Codes

14. State and Local codes and guidelines (as applicable)

B.7 HOURS OF COVERAGE:

A. All construction is to be performed in one phase during normal working hours as much as feasible. Off-hours premium time is included for noise abatement and utility shutdowns only. Any item(s) to be salvaged by the owner are to be removed by the owner from the site before construction begins. contractor to provide dumpsters for disposal of construction debris and materials. The construction contractor will be required to submit construction waste debris reports to include weight of construction waste, weight of any recycled materials and the cost for removing construction waste. The construction contractor shall comply with VA and Medical Center guidance to ensure infection controls during the construction.

a. Normal Working Hours are 0630 to 1530, Monday to Friday. Please coordinate with COR if the General contractor requests a different working schedule.

b. For working outside these hours requires prior written approval from the COR. Due to the work site location, it is anticipated that off-hours work (including nights, Saturdays, Sundays, and Holidays) will be required to perform at no at additional cost to the government.

B. Before commencement of work, the Contractor shall confer with the VA COR and

Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and https://www.cfm.va.gov/til/spec.asp#%2001 equipment, shall be made with minimal interference to Government operations and personnel.

C. Work performed outside the normal hours of coverage must be approved by the

Contract Specialist or COR

D. Utility shutdowns will be coordinated through the COR and require 15-day lead time in order to be scheduled correctly.

E. Federal Holidays observed by GLAVAHCS are:

New Years' Day Labor Day Martin Luther King Day Columbus Day Presidents' Day Veterans' Day Memorial Day Thanksgiving Day Independence Day Christmas Day

B.8 IDENTIFICATION, PARKING, NO SMOKING, & VA REGULATIONS:

A. The Contractor's FSEs shall wear visible identification issued by VAHCS Police Section at all times while on the premises of VAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. VAHCS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is strictly prohibited anywhere on the Veterans Affairs Health Care Facilities, to include main facility, and any other buildings at on the premises. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

B.9 INFORMATION SECURITY:

A. In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.

B.10 POINTS OF CONTACT AND PHYSICAL LOCATION:

A. Access to worksite shall be coordinated through:

Point of Contact – COR Mr. Tom Phan

(310) 478-3711 ext. 44793

GREATER LOS ANGELES VA HEALTH CARE SYSTEM,

WEST LA (GLA-West):

11301 Wilshire Boulevard, Los Angeles, CA 90073

B.11 PERIOD OF PERFORMANCE:

A. Commencement of work shall begin within 10 days after receipt of written Notice to Proceed (NTP) and should last no longer than a duration of 180 calendar days after date NTP is issued.

B.12 SUBMITTALS:

B. Contractor shall submit all required material/shop drawing submittals to the Contracting Officer within 10 calendar days of award, or as agreed to by the Contracting Officer for approval. No materials shall be installed prior to approval.

C. All material submittals and shop drawings shall contain, and have the Project Title, Project Number, and Contract number clearly indicated.

D. Material submittals and shop drawings shall be checked and signed by the Contractors Quality Control Manager prior to submission to the Government.

E. Submittals shall be legible and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes.

F. Contractors will utilize Material Approval Submittal for use as cover sheet when submitting to Government for approval. Forms will be provided to contractor at post-award, pre-construction conference

B.13 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:

A. The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period.

For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction.

B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Officer to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.

C. The Contractor will be paid monthly upon submission of proper invoices for work completed. If the performance period exceeds 30 days and a progress schedule (approved by the Government) has been submitted, partial payment(s) may be authorized. Final payment will be withheld until all discrepancies are corrected and as-built drawings are approved by the Government.

D. The contractor shall attend no less than monthly progress meetings with the COR and/or Contracting Officer to discuss at a minimum; progression of work, projected progress versus actual progress, action items due from the contractor, action items due from the government, and any other significant issues that require attention. The contractor also shall document the meeting minutes and forward a signed copy to the COR for concurrence of the documentation. Copies of all minutes will be forwarded to the Contracting Officer. In the event of any discrepancies the Contracting Officer will be notified immediately for clarification.

Contractor will use the Meeting Minutes form provided for use at the post-award, pre-construction conference.

B.14 MODIFICATIONS:

A. Modifications for this project must be submitted to the assigned COR who will then submit a formal request to the Contracting Officer (CO). New work is not allowed to commence prior to Contracting Officer’s signed and written approval via fully executed Standard Form (SF) 30 modification.

B.15 SECURITY PROCEDURES:

A. General contractor’s employees (Prime and sub) shall not enter the project site without appropriate badge. Documentation is provided and must be turned in completed prior to work beginning. They may also be subject to inspection of their personal effects when entering or leaving the project site. General Contractor’s employees request 6-month temporary badge after award. Daily badges can be given while waiting for the 6-month temporary badge. Please contact COR.

B. After receiving the NTP the Contractor shall send submittals and obtain PIV cards and security clearance for all the workers to be working in the building during construction.

C. In view of the time required to obtain this clearance the contractor is strongly encouraged to start the process as soon as possible after NTP

36C25821B0004 Section D

SECTION D - PACKAGING AND MARKING

[For this Solicitation, there are NO clauses in this Section]

SECTION E - INSPECTION AND ACCEPTANCE

FAR

Number

Title Date

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

SECTION F - DELIVERIES OR PERFORMANCE

FAR

Number

Title Date

52.242-14 SUSPENSION OF WORK APR 1984

52.247-34 F.O.B. DESTINATION NOV 1991

52.247-48 F.O.B. DESTINATION—EVIDENCE OF SHIPMENT FEB 1999

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ALTERNATE I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days after receipt of award. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by . The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of Clause)

SECTION G - CONTRACT ADMINISTRATION DATA

[For this Solicitation, there are NO clauses in this Section]

36C25821B0004 Section H

SECTION H - SPECIAL CONTRACT REQUIREMENTS

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

FAR

Number

Title Date

52.202-1 DEFINITIONS JUN 2020

52.203-3 GRATUITIES APR 1984

52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT

JUN 2020

52.203-7 ANTI-KICKBACK PROCEDURES JUN 2020

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF

FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY

MAY 2014

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR

IMPROPER ACTIVITY

MAY 2014

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS

JUN 2020

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS

AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS

JUN 2020

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS

JAN 2017

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON

POSTCONSUMER FIBER CONTENT PAPER

MAY 2011

I.1 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision—

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identif ier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that—

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certif ications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identif ication Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

36C25821B0004 Section I

(4) The Government has marked the record “Active”.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See http://www.sam.gov/ for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ‘‘Unique Entity Identifier’’ followed by the unique entity identifier that identif ies the Offeror’s name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.

(c) If the Offeror does not have a unique entity identif ier, it should contact the entity designated at http://www.sam.gov/ for establishment of the unique entity identifier directly to obtain one.

The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov/ for information on registration.

(End of Provision)

I.2 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (JUN 2020)

(a) Definitions. As used in this clause:

http://www.sam.gov/ http://www.sam.gov/ https://www.sam.gov/

“Executive” means officers, managing partners, or any other employees in management positions.

“First-tier subcontract” means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor’s supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor’s general and administrative expenses or indirect costs.

“Month of award” means the month in which a contract is signed by the Contracting Officer or the month in which a first-tier subcontract is signed by the Contractor.

“Total compensation” means the cash and noncash dollar value earned by the executive during the Contractor’s preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Financial Accounting Standards Board’s Accounting Standards Codification (FASB ASC) 718, Compensation-Stock Compensation.

(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds $10,000.

(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub.

L. 109–282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110–252), requires the Contractor to report information on subcontract awards.

The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.

(c) Nothing in this clause requires the disclosure of classified information.

(d)(1) Executive compensation of the prime contractor. As a part of its annual registration requirement in the System for Award Management (SAM) (Federal Acquisition Regulation (FAR) provision 52.204–7), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—

(i) In the Contractor’s preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal f inancial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal f inancial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

(To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.).

(2) First-tier subcontract information. Unless otherwise directed by the Contracting Officer, or as provided in paragraph (g) of this clause, by the end of the month following the month of award of a first-tier subcontract valued at or above the threshold specified in FAR 4.1403(a) on the date of subcontract award, the Contractor shall report the following information at http://www.fsrs.gov for that f irst-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)

(i) Unique entity identif ier for the subcontractor receiving the award and for the subcontractor’s parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) Subcontract number (the subcontract number assigned by the Contractor).

(vii) Subcontractor’s physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(viii) Subcontractor’s primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(ix) The prime contract number, and order number if applicable.

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) Treasury account symbol (TAS) as reported in FPDS.

http://www.sec.gov/answers/execomp.htm http://www.fsrs.gov/

(xiv) The applicable North American Industry Classification System code (NAICS).

(3) Executive compensation of the first-tier subcontractor. Unless otherwise directed by the Contracting Officer, by the end of the month following the month of award of a first-tier subcontract valued at or above the threshold specified in FAR 4.1403(a) on the date of subcontract award, and annually thereafter (calculated from the prime contract award date), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for that f irst-tier subcontractor for the first-tier subcontractor’s preceding completed fiscal year at http://www.fsrs.gov, if—

(i) In the subcontractor’s preceding fiscal year, the subcontractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal f inancial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal f inancial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

(To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(e) The Contractor shall not split or break down first-tier subcontract awards to a value below the threshold specified in FAR 4.1403(a), on the date of subcontract award, to avoid the reporting requirements in paragraph (d) of this clause.

(f) The Contractor is required to report information on a first-tier subcontract covered by paragraph (d) when the subcontract is awarded. Continued reporting on the same subcontract is not required unless one of the reported data elements changes during the performance of the subcontract. The Contractor is not required to make further reports after the first-tier subcontract expires.

(g)(1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.

(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards for that subcontractor.

(h) The FSRS database at http://www.fsrs.gov will be prepopulated with some information from SAM and the FPDS database. If FPDS information is incorrect, the contractor should notify the contracting officer. If the SAM information is incorrect, the contractor is responsible for correcting this information.

(End of Clause) http://www.fsrs.gov/ http://www.sec.gov/answers/execomp.htm

FAR

Number

Title Date

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018

52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS OCT 2016

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE

AUG 2020

I.3 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014)

The Contractor's representations and certif ications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause)

FAR

Number

Title Date

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE,

SOFTWARE, AND SERVICES DEVELOPED OR

PROVIDED BY KASPERSKY LAB AND OTHER COVERED

ENTITIES

JUL 2018

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN

TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT

AUG 2020

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED,

SUSPENDED, OR PROPOSED FOR DEBARMENT

JUN 2020

I.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (OCT 2018)

(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management via https://www.sam.gov.

(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111- 212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments—

(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by—

(i) Government personnel and authorized users performing business on behalf of the Government; or

(ii) The Contractor, when viewing data on itself; and

(2) The publicly-available segment, to which all data in the non-public segment of FAPIS is automatically transferred after a waiting period of 14 calendar days, except for—

(i) Past performance reviews required by subpart 42.15;

https://www.sam.gov/

(ii) Information that was entered prior to April 15, 2011; or

(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.

(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.

(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the nonpublic segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.

(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.