This is a Bid Form for the Hogan Park - Quail Course Renovation project located in Midland, Texas, dated July 17, 2025. The comprehensive bid document details a complete golf course renovation spanning multiple construction schedules including mobilization, clearing, site preparation, mass grading, drainage, feature construction, water feature expansion, hardscape, soil preparation, grassing, tree planting, irrigation, and project finish-out. The project involves extensive work such as tree removal, cart path reconstruction, drainage pipe installation, green and bunker construction, pond expansion, irrigation system upgrades, tree planting, and comprehensive landscaping across approximately 52.25 acres.
The bid form is structured with nine distinct schedules (A through J), each representing a different aspect of the renovation, with all line items currently showing $0.00 for unit costs. The project includes significant infrastructure improvements like installing drainage pipes ranging from 4" to 12" in diameter, constructing new greens and tees, planting various tree species including Bur Oak, Monterey Oak, and Cedar Elm, and implementing a complex irrigation system that includes new pump stations and a reverse osmosis filter system. The bid also covers environmental protections, such as silt fence installation and storm water pollution prevention planning, indicating a comprehensive approach to the golf course renovation.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hogan Park - Quail Course Renovation
BID FORM
Midland, Texas July 17,2025
Description Quantity Unit Unit Cost Amount
SCHEDULE A
1. Staging Area
a. Mobilization 1 LS $0.00
2. Staking of Features and Grades 1 LS $0.00
3. Clearing and Grubbing
a. Tree Removal 85 EA $0.00
b. Rototill Fairways, Greens Surrounds, Tee Surrounds 52.25 AC $0.00
4. Environmental Protection
a. Silt Fence 5,000 LF $0.00
b. Basin Silt Protection 17 EA $0.00
c. SWPPP 1 LS $0.00
5. Demolition
a. Cart Path Removal 15,200 SF $0.00
Total Schedule A $0.00 SCHEDULE B MASS GRADING (Furnish & Install Complete)
1. Cut and Fill (Bank Yards) 18,000 CY $0.00
2. Remove Existing Greensmix and use on Tees/Fairways 95,000 SF $0.00
3. Feature Shaping 1 LS $0.00
Total Schedule B $0.00
SCHEDULE C GOLF COURSE DRAINAGE (Furnish & Install Complete)
1. Drainage Pipe - corrugated plastic smooth wall (CPP)
a. 4" Diameter 5,600 LF $0.00
b. 6" Diameter 430 LF $0.00 c .8" Diameter 380 LF $0.00
e. 12" Diameter 85 LF $0.00
2. Drainage Structures
a. 12" Round Grate 14 EA $0.00
b. 18" Round Grate 3 EA $0.00
c. Sump 29 EA $0.00
Total Schedule C $0.00
SCHEDULE D FEATURE CONSTRUCTION (Furnish & Install Complete)
1. Green Drainage
a. 4" Perforated Pipe 12,600 LF $0.00
b. Vents/Cleanouts/Markers 76 EA $0.00
Company Name:_________________________________________________________________
MOBILIZATION, CLEARING AND SITE PREPARATION (Furnish & Install Complete)
Description Quantity Unit Unit Cost Amount
2. USGA Greens Construction
a. Mix 125,915 SF $0.00
b. Pea Gravel 125,915 SF $0.00
c. Tracer Wire 5,500 LF $0.00
3. Bunker Construction
a. 4" Perforated Pipe 1,430 LF $0.00
b. Bunker Sand - (4" compacted) 14,300 SF $0.00
c. Bunker Liner - Better Billy Bunker 14,300 SF $0.00
d. Hand Edging 9 EA $0.00
4. Tee Construction
a. Use 4" layer of mix from old greens for tee tops) 98,500 SF $0.00
Total Schedule D $0.00
SCHEDULE E
1. Expand Pond - Hole 12
a. HDPE Liner (40 Mil.) w/12" soil cover 40,000 SF $0.00
Total Schedule E $0.00
SCHEDULE F HARDSCAPE (Furnish & Install Complete)
1. Cart Path Construction (No. 3 Rebar Reinforcement)
a. Concrete Cart Path 23,130 SF $0.00
b. Concrete Roll Curb 1,100 LF $0.00
Total Schedule F $0.00 SCHEDULE G SOIL PREPARATION AND GRASSING (Furnish & Install Complete)
1. Soil Preparation - Fine debris removal, fine grade and fertilize
a. Greens 125,915 SF $0.00
b. Tees 98,500 SF $0.00
c. Fairways - Sprigged Areas 33.25 AC $0.00
d. Green Surrounds - Sodded Areas 10 AC $0.00
e. Tee Surrounds - Sodded Areas 5.5 AC $0.00
f. Native Grass - Seeding 3.5 AC $0.00
2. Grassing - Sod
a. Tee Tops - TifTuf Bermudagrass 98,500 SF $0.00
b. Green Surrounds - TifTuf Bermudagrass 10.0 AC $0.00
c. Tee Surrounds - TifTuf Bermudagrass 5.5 AC $0.00
3. Grassing - Sprigging
a. TifTuf Bermudagrass 33.25 AC $0.00
3. Grassing - Seeding
a. Greens (007 Bentgrass) 125,915 SF $0.00
b. Native Grass Blend 3.5 AC $0.00
Total Schedule G $0.00
WATER FEATURE CONSTRUCTION (Furnish & Install Complete)
Description Quantity Unit Unit Cost Amount SCHEDULE H TREE PLANTING (Furnish & Install Complete)
1. Tree Planting
a. 45 Gallon Bur Oak 10 EA $0.00
b. 45 Gallon Monterey Oak 10 EA $0.00
c. 45 Gallon Cedar Elm 10 EA $0.00
d. 30 Gallon Afghan Pine 10 EA $0.00
f. 30 Gallon Vitex 12 EA $0.00
g. 30 Gallon "Bubba" Desert Willow 12 EA $0.00
h. 30 Gallon 'Desert Museum' Palo Verde 12 EA $0.00
Total Schedule H $0.00 SCHEDULE I IRRIGATION (From Rodgers Design Group Bid Form)
Part 1: For mobilization, field verification of existing conditions, warranty, field staking assistance, central programming assistance, creating final as-built documents, project superintendent and administrative services, the total sum of: 1 LS $0.00 Part 2: For materials and supplies necessary to complete the project, the total sum of: 1 LS $0.00 Part 3: For labor, equipment, trenching and installation of all irrigation components, sprinkler heads, field controllers, valves, central computer, piping, zone valves and related products, the total sum of: 1 LS $0.00 Part 4: For labor, equipment and material for the construction for the new 5,500 GPM pump station, concrete slab, footings and wetwell construction, electrical services from the meter to the pump controls, and other related equipment and services near Road Runner Hole #2: the total sum of: 1 LS $0.00 Part 5: For labor, equipment and material for the construction for the new 1,250 GPM pump station, using existing concrete slab at parking lot lake and existing wetwell construction, electrical services from the meter to the pump controls, and other related equipment and services near the parking lot lake:
the total sum of: 1 LS $0.00 Part 6: For labor, equipment and material for the construction for the new “WET/MCI” 320,000 GPD Reverse Osmosis filter system in 40’ container, concrete slab at parking lot lake, electrical services from the meter to the pump controls, and other related equipment, 6” Brine disposal line from the filter to the pond south of the parking lot and services near the parking lot lake: 1 LS $0.00
Total Schedule I $0.00 SCHEDULE J FINISH OUT (Furnish & Install Complete)
1. Clean up, equipment removal 1 LS $0.00
2. As-Built 1 LS $0.00
Total Schedule J $0.00
PROJECT SUBTOTAL $0.00
Bid Bond 1 LS $0.00 Performance & Payment Bond 1 LS $0.00
PROJECT TOTAL $0.00