This is a construction document for the Wichita VA Medical Center project (VA Project No. 589A7-23-305) prepared by Alesia Architecture P.C., dated May 17, 2024. The project scope involves preparing a site for choice dining equipment installation in Wichita, Kansas.
The electrical systems work includes analysis and reuse of existing panels serving the kitchen area, with consideration for generator backup to critical kitchen loads as specified in the VA Electrical Design Manual, including kitchen hood supply, kitchen illumination, and minimum refrigeration equipment. All conductors will be single insulated copper (#12 AWG minimum) installed in continuous raceway, with THHN-2 insulation in dry locations and THWN-2 in wet locations. New wiring devices will be tamper-resistant hospital grade at 20-amp minimum, with red hospital grade devices and red cover plates designated for emergency power. A new electrical panel will be provided to serve new kitchen equipment loads since the existing equipment branch panel EM2 is at capacity. New receptacles will be added for reach-in coolers, gas range, and general appliances, with two stationary cord drops installed for the center cooking island. The lighting scope specifies all-LED installations throughout remodeled spaces, including 2'x2' or 2'x4' volumetric architectural troffers in breakroom and office areas, with occupancy sensors for energy efficiency and life safety emergency egress lighting connected to existing panels. Additional systems include CAT 6A telecommunications cabling to breakroom and workstations, new fire alarm devices integrated with the existing building system, a new card reader for kitchen exterior door access control, and no audiovisual systems. The design is complete with full layout and MEP work established on drawings.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS VA PROJECT NO. 589A7-23-305
WICHITA VA MEDICAL CENTER PREPARE SITE FOR CHOICE DINING EQUIPMENT
WICHITA, KS CONSTRUCTION DOCUMENTS: 05/17/2024
ALESIA ARCHITECTURE P.C. 9 ELKHORN, NE
E. All conductors will be single insulated conductors installed in continuous raceway. All conduits will be concealed in walls, underground, or in areas above suspended ceilings.
F. Conductors will be copper with minimum size #12 AWG. Conductor insulation will be
600-Volt type THHN-2 (in dry locations) and THWN-2 (in wet locations). All conductors will be color coded per NEC.
G. Wiring devices will be tamper-resistant hospital grade, 20-amp minimum for normal power. Wiring devices will be red, hospital grade, 20-amp minimum and have red cover plates for emergency power.
3. NEW SYSTEM DESCRIPTIONS
A. Electrical Systems:
• All existing panels serving the kitchen area will be analyzed for existing capacity and will be re-used for the new kitchen layout.
• The VA has indicated they would like to provide generator backup to some or all of the kitchen equipment because this is classified as a critical building. The VA
Electrical Design Manual states the following kitchen loads shall be on the equipment branch of the emergency system: kitchen hood supply, kitchen illumination, and minimum equipment to provide nourishments to patients during an extended outage (freezers and refrigerators). The VA Physical Security & Resiliency
Design Manual does not include any emergency backup requirements for kitchen equipment.
• It appears the majority of the kitchen electrical loads are fed from the two panels just outside the kitchen doors (panels 107-02-02 and 107-02-03) and the panel in the adjacent room (panel 104-02-01). Per the spreadsheets provided by the VA for the electrical distribution in building 2, these panels do not have generator backup.
• Based on information collected from the site investigation, panel 107-02-03 has walk-in refrigerator and freezer loads listed in the panel directory. However, existing drawings from the Dietetics Building #2 Refrigeration Replacement project show some walk-in equipment connected to panel EM2, which is on the equipment branch of the emergency generator system. The life safety panel in the basement, panel 016-
02-02, has kitchen lighting and hood lighting connected to it. So, it appears some of the emergency loads required by the VA Electrical Design Manual have generator backup. However, some may not, and many other kitchen loads do not either.
Further input from the VA is needed to determine which loads are desired to have generator backup.
• The existing equipment branch panel EM2 is full and does not have any spare circuit breakers. Thus, a new panel will be provided to serve the new equipment loads in the kitchen.
• New receptacles will be added for the relocated reach-in coolers. New receptacles with shunt trip will be added to serve the new gas range under the hood. New general receptacles will be placed to accommodate any relocated general plug-in appliances.
• The center cooking island will include two (2) new stationary cord drops for general power requirements. Relocated cooler will be powered from the column in the center of the kitchen.
DEPARTMENT OF VETERANS AFFAIRS VA PROJECT NO. 589A7-23-305
WICHITA VA MEDICAL CENTER PREPARE SITE FOR CHOICE DINING EQUIPMENT
WICHITA, KS CONSTRUCTION DOCUMENTS: 05/17/2024
ALESIA ARCHITECTURE P.C. 10 ELKHORN, NE
B. Lighting:
• All lighting throughout the remodeled spaces will be new LED type.
• Lighting in breakroom room and office shall consist of LED 2’x2’ or 2’x4’ volumetric architectural troffer luminaires.
• Life safety emergency egress lighting will be connected to existing life safety panels.
• Occupancy sensors will be used to control lighting to reduce energy consumption.
C. Telecommunications:
• The telecommunications needs for this new space will fed from existing infrastructure. No new telecommunication rooms are intended to be provided in this area.
• Telecommunications outlets will be provided for the breakroom and workstations.
• Horizontal cabling system shall consist of CAT 6A cabling to all hardwired network jacks.
D. Fire Alarm Systems:
• New fire alarm devices will be added to remodeled spaces. The devices will be connected to existing fire alarm system serving the building. This includes new notification devices in the new conference/office spaces.
E. Access Control System:
• New card reader will be provided for kitchen exterior door. No other changes will be made to access control system.
F. Audiovisual:
• No new audiovisual systems are anticipated for this scope of work.
4. DESIGN PROCESS
A. The full layout is complete and the MEP work has been established and shown on drawings. The design is now considered complete.