This document is a set of construction drawings and architectural documents for a project to prepare a site for Choice Dining Equipment at Robert J. Dole VA Medical Center in Wichita, Kansas.

The project involves renovation and site preparation of the nutrition and food services area on the first floor of the facility, encompassing approximately 6,838 square feet. The work is organized into three construction phases: Phase 1 includes partial demolition of the entry area into hot production/tray assembly line with temporary kitchen setup; Phase 2 involves demolition and renovation of the remaining hot production/tray assembly line and cold food prep areas; and Phase 3 covers demolition and renovation of the administration area. The project is classified as Type III-B construction (fully sprinklered) with an occupancy load of 30 persons in business/ambulatory care areas. Key renovation areas include kitchen/dietetics spaces, a dish washer room, walk-in refrigerator and freezer, office spaces, staff facilities, and support areas. The contractor is responsible for coordinating all MEP (mechanical, electrical, plumbing) systems, fire suppression and alarm systems, hazardous materials abatement, temporary construction barriers, and temporary kitchen equipment installation. The temporary kitchen equipment includes four countertop induction ranges (Avantco 177ID1800), one double-deck electric convection oven (Southbend BES/27SC), and one ventless hood (Wells WVU-96). The project requires compliance with VA design standards, NFPA 101 Life Safety Code, International Building Code 2021, and applicable federal accessibility standards. Construction documents were issued May 17, 2024, and prepared by Alesia Architecture P.C. of Elkhorn, Nebraska.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CONSTRUCTION

DOCUMENTS

PREPARE SITE FOR CHOICE

DINING EQUIPMENT

589A7-23-305

5500 E KELLOGG AVE, WICHITA, KS

A

B

C

D

E

F

A u to d e s k D o c s /1

A -2

-3

P re p a re

S it e f o r C h o ic e

D in in g /5

A -2

-3

.B

.A rc h

R

-E x is ti n g

.r v t

/2

/2

:4

:1

P

M

GI001

COVER SHEET

RJO JJG05/17/2024

ROBERT J. DOLE VA MEDICAL

CENTER

P R

E P

A R

E S

IT

E

F O

R C

H O

IC

E

D

IN

IN

G

E Q

U

IP

M E

N T

C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

5/

/2

PREPARE SITE FOR CHOICE DINING EQUIPMENT

5500 E KELLOGG AVENUE, WICHITA, KS 67218

GENERAL INFORMATION

GI001 COVER SHEET

GI002 ABBREVIATIONS, SYMBOLS, LEGENDS, AND NOTES

LIFE SAFETY

GI101 FIRST FLOOR - LIFE SAFETY PLAN

GI102 FIRST FLOOR - LIFE SAFETY PLAN PHASES 1 & 2

GI103 FIRST FLOOR - LIFE SAFETY PLAN PHASE 3

PHASING

GC101 FIRST FLOOR - PHASING PLAN

GENERAL INFORMATION

GR101 FIRST FLOOR - GENERAL RESOURCE PLAN

GR101A FIRST FLOOR - GENERAL RESOURCE PLAN

GR101B FIRST FLOOR - GENERAL RESOURCE PLAN

GR101C FIRST FLOOR - GENERAL RESOURCE PLAN

GR101D FIRST FLOOR - GENERAL RESOURCE PLAN

ARCHITECTURAL

A-001 ARCHITECTURAL GENERAL NOTES AND KEYNOTES

A-002 PARTITION DETAILS & DETAILS

AD101 FIRST FLOOR - DEMOLITION PLAN

AE101 FIRST FLOOR - FLOOR PLAN

AC101 FIRST FLOOR - REFLECTED CEILING PLAN

AE701 DOOR AND WINDOW TYPES, SCHEDULES, AND DETAILS

INTERIOR DESIGN

IN101 ARCHITECTURAL FINISH PLAN, SIGNAGE, & SCHEDULE

IN501 CASEWORK SECTIONS

EQUIPMENT

QH101 FIRST FLOOR - EQUIPMENT PLAN

QH601 EQUIPMENT SCHEDULE

QH901 EQUIPMENT ELEVATIONS

FIRE PROTECTION

FG101 FIRE SUPPRESSION SYMBOLS LEGEND AND GENERAL

NOTES

FD101 FIRE SUPPRESSION DEMOLITION PLAN

FA101 FIRST FLOOR FIRE ALARM PLAN

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN

PLUMBING

PG101 PLUMBING SYMBOLS LEGEND AND GENERAL NOTES

PD101 PLUMBING DEMOLITION PLAN

PL101 FIRST FLOOR PLUMBING PLAN

P-501 PLUMBING DETAILS

P-701 PLUMBING SCHEDULES

MECHANICAL

MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES

MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN

MH101 FIRST FLOOR HVAC PLAN

M-501 MECHANICAL DETAILS AND SCHEDULES

ELECTRICAL

EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES

ED101 ELECTRICAL DEMOLITION PLAN

EL101 FIRST FLOOR LIGHTING PLAN

EP101 FIRST FLOOR POWER PLAN

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL SCHEDULES

Mark Revisions: Date:

A

R C H I T E

C

T

S T A T E

O F N E B

R A S K A

05/17/2024

RICHARD

JOSEPH

ONKEN

A-5125

1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS.

CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE THE GOVT..

2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.

3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE THE GOVT.. CONTRACTOR MUST CONTACT

VA'S COR PRIOR TO ANY SHUTDOWNS.

4. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.

5. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED, UNLESS OTHERWISE NOTED.

6. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.

7. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND SATISFACTORY INSTALLATION.

8. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT RATED CONSTRUCTION (NEW OR EXISTING) OR SMOKE PARTITIONS:

A. REPLACE FIRE STOP AT ALL PENETRATIONS WHERE NEW DEVICES/LINES USE EXISTING PENETRATIONS OF RATED BARRIERS.

B. REPLACE FIRE STOP AT ALL EXISTING PENETRATIONS OF RATED BARRIERS WHERE EXISTING LINES HAVE BEEN MODIFIED OR RELOCATED.

C. FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE EXISTING FLOORS, CEILINGS AND OTHER RATED BARRIERS.

D. FIRE STOP ALL NEW PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE THROUGH NEWLY CONSTRUCTED RATED BARRIERS OR SMOKE PARTITIONS.

E. USE ONLY APPROVED FIRE CAULKING AND FIRE STOPS (SEE SPECIFICATIONS).

9. ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE DIMENSIONED TO THE OUTSIDE FINISH FACE OF WALL AND TO THE COLUMN GRID UNLESS OTHERWISE NOTED.

10. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD AND SHALL BE MOLD AND MOISTURE RESISTANT.

11. PROVIDE WOOD BLOCKING OR 16 GA. SHEET METAL BACKING PLATES IN ALL WALLS TO RECEIVE WALL HUNG ACCESSORIES, SUCH AS EQUIPMENT, GRAB BARS, MILLWORK, COAT

HOOKS, AND DOOR STOPS, ETC. IF WOOD BLOCKING IS USED, PROVIDE AS FIRE-RESISTANT.

12. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED, AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE GOVT.. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:

A. THE GOVT.'S EQUIPMENT REQUIREMENTS.

B. THE CEILING SUPPORT SYSTEM.

C. THE MECHANICAL DUCTWORK SYSTEM.

D. THE LIGHTING FIXTURES.

E. ELECTRICAL WIRING AND CONDUIT SYSTEMS.

F. THE PLUMBING AND PIPING SYSTEMS.

G. FIRE PROTECTION SYSTEMS

H. THE COMMUNICATIONS AND SPECIAL SYSTEMS.

13. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL NOT BE ALLOWED EXTRA

COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.

14. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.

15. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, THE HIGHEST RATED PARTITION TAKES PRECEDENT. MAINTAIN RATING BEHIND RECESSED AREAS IN WALLS.

16. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT, WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND AT LEAST THE CORRIDOR SIDE OF NON-RATED CORRIDOR

WALLS TO STRUCTURE, UNLESS NOTED OTHERWISE, SEE WALL TYPES.

17. COORDINATE CONSTRUCTION REQUIREMENTS WITH CIVIL, STRUCTURAL, MECHANICAL, FIRE PROTECTION, PLUMBING AND ELECTRICAL DRAWINGS.

18. FURNITURE SHOWN IS N.I.C., UNLESS NOTED OTHERWISE.

19. EQUIPMENT SHALL BE PROVIDED BY THE GOVT. AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.

20. VA EQUIPMENT ACQUISTION CODES: CC - CONTRACTOR FURNISHED CONTRACTOR INSTALLED; VC - GOVERNMENT FURNISHED, CONTRACTOR INSTALLED; VV - GOVERNMENT

FURNISHED AND INSTALLED.

21. THIS PROJECT REQUIRES DEDUCT ALTERNATES PER THE CONTRACT WITH THE VA. BASE BID INCLUDES ALL SCOPE COMMUNICATED IN THE DRAWINGS AND SPECIFICATIONS.

DEDUCT ALT #1: ALL WORK IN BASE BID WITH THE FOLLOWING EXCEPTIONS / DEDUCTIONS:

• REMOVAL OF THE MULTIPURPOSE ROOM.

DEDUCT ALT # 2: ALL WORK IN BASE BID WITH THE FOLLOWING EXCEPTIONS / DEDUCTIONS:

• REMOVAL OF THE EPOXY FLOORING IN THE ADMIN AREA.

DEDUCT ALT # 3: ALL WORK IN BASE BID WITH THE FOLLOWING EXCEPTIONS / DEDUCTIONS:

• REMOVAL OF THE CASEWORK IN THE NEW BREAK ROOM.

GENERAL ARCHITECTURAL NOTES

FRONT APPROACH, PULL SIDE FRONT APPROACH, PUSH SIDE

NOTE: X=12" MINIMUM IF DOOR HAS

BOTH A CLOSER AND LATCH

HINGE SIDE APPROACHES - SWINGING DOORS

LATCH SIDE APPROACHES - SWINGING DOORS

NOTE:

1. ALL DOORS IN ALCOVES SHALL COMPLY WITH CLEARANCES FOR FRONT APPROACHES.

HINGE APPROACH, PULL SIDE HINGE APPROACH, PUSH SIDE

LATCH APPROACH, PULL SIDE LATCH APPROACH, PUSH SIDE

NOTE: X=36" MINIMUM IF Y=60"; X=42"

MINIMUM IF Y=54".

NOTE: Y=48" MINIMUM IF DOOR HAS

BOTH A LATCH AND CLOSER.

NOTE: Y=54" MINIMUM IF DOOR HAS

CLOSER.

NOTE: Y=48" MINIMUM IF DOOR HAS

CLOSER.

FRONT APPROACHES - SWINGING DOORS

MIN.

18"

M

IN

M

IN

X

54" MIN.

M

IN

.60

X

MIN.

24"

M

IN

M

IN

MIN.

24" X X

Y

Y

Y

PULL SIDE PUSH SIDE

POCKET OR HINGE APPROACH - SLIDING BARN DOORS

POCKET OR HINGE APPROACH STOP OR LATCH APPROACH

FRONT AND SIDE APPROACHES - NO DOORS

M

IN

M

IN

24"42

M

IN

22" MIN. 42

M

IN

GENERAL SYMBOLS

A101

SIM

A101

SIM

1i

A101

SIM

D

SCALE:1

View Name

1/8" = 1'-0"

A

NTRUE

NORTH

A

B

EARTH

EARTH GRAVEL

CONCRETE

METALS

BRICK

CMU

TILE

STONE

WOOD

GYPSUM

GLASS

INSULATION

REGULAR

STEEL ALUMINUM

FACE COMMON

CMU

CERAMIC

MARBLE LIMESTONE

FINISH BLOCKING

PLASTER OR GWB

LARGE SCALE SMALL SCALE

BATT OR LOOSE RIGID

SURFACE

ACTUAL SQ. FT.

PROGRAMMED SQ. FT.

ROOM NUMBER

DOOR NUMBER

KEYNOTE

WALL TYPE

REVISION NUMBER

ELEVATION INDICATION

COLUMN GRID

IDENTIFICATION

NORTH ARROW

XXX WINDOW NUMBER

DETAIL TITLE

BUILDING SECTION

WALL SECTION

EXTERIOR/INTERIOR

ELEVATION

INTERIOR MULTI-VIEW

ELEVATION

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

MATERIALS REFERENCE

Room Name

150 PSF / 150 SF

PROPERTY CORNER

PROPERTY LINE

4" UNDERGROUND COMMUNICATION

(NO. INDICATES NO. OF DUCTS)

4" UNDERGROUND DUCT

(NO. INDICATES NO. OF DUCTS)

TELEPHONE LINE OH

UNDERGROUND ELECTRICAL

CONDUIT

OVERHEAD POWER LINE

ELECTRICAL MANHOLE

P/T = POWER & TELEPHONE

W/ STREET LIGHT

W/ DOWN GUY (NO. INDICATES LENGTH, CLASS

GUY & ANCHOR STRENGTH)

POWER POLE (NO. INDICATES LENGTH &

CLASS)

REMOVE OR ABANDON LINE

VALVE

GAS LINE

IRRIGATION WATER MAIN

FIRE WATER LINE

WATER LINE

STORM SEWER

SANITARY SEWER FORCE MAIN

SANITARY SEWER

CURB LINE

STREET CENTER LINE

BUILDING

EXISTING NEW

SITE

EXISTING NEW

S

MH CO

SFM

SS SS

MH

CLAL

Y.D.

F.H.

W

F

IRM

G

4M

P T

P T

P

UG

T

2-T

P

UG

T

2-T

POLE

4M

45-2

45-2

G

IRM

F

Y.D.

F.H.

W

AL

SS SS

MH

SFM

S

MH CO

GRID COORDINATES

SECTION LINE

CONTOURS

SPOT ELEVATIONS

DRAINAGE DITCH OR SWALE

CONCRETE PAVEMENT (SECTION)

BITUMINOUS PAVEMENT (SECTION)

CONTRACTION JOINT FOR PAVEMENT

BORINGS, TEXT

TREES, DECIDUOUS - WITH

DIAMETER

EVERGREEN - WITH HEIGHT

SHRUBS

CHAIN-LINK FENCE

BARBED WIRE FENCE

SECURITY FENCE XX XX

XX

XX XX

XX

12"

10'

HIGH

12" (TO BE REMOVED)

10' (TO BE REMOVED)

HOLE #3

90 X 10W 90 X 10 W (TOP OF WALL)

90 X 10C 90 X 10 C (TOP OF CURB)

90 X 10P 90 X 10 P (TOP OF PAVEMENT)

90 X 10 90 X 10

SEC 24

SEC 25

290 N

90 W

09 20 00.A1

A101

SIM

DETAIL SECTION

AE201

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CONSTRUCTION

DOCUMENTS

PREPARE SITE FOR CHOICE

DINING EQUIPMENT

589A7-23-305

5500 E KELLOGG AVE, WICHITA, KS

A

B

C

D

E

F

A u to d e s k D o c s /1

A -2

-3

P re p a re

S it e f o r C h o ic e

D in in g /5

A -2

-3

.B

.A rc h

R

-E x is ti n g

.r v t

/2

/2

:4

:1

P

M

GI002

ABBREVIATIONS, SYMBOLS, LEGENDS,

AND NOTES

RJO JJG05/17/2024

A

A/C AIR CONDITIONING

AB ANCHOR BOLT / AIR BLENDER

ABS ACRYLONITRILE-BUTADIENE-STYRENE

AC ALTERNATING CURRENT / AIR COMPRESSOR

ACP ASBESTOS CEMENT PIPE

ACU AIR CONDITIONING UNIT

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJACENT / ADJUSTABLE

ADR ACCESS DOOR

AFF ABOVE FINISH FLOOR

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

APPROX APPROXIMATELY

APT APARTMENT

ARCH ARCHITECT(URAL)

ASPH ASPHALT

AT ACOUSTICAL PANEL CEILING

ATB AIR TERMINAL BOX

ATD AIR TRANSFER DUCT

ATU AIR TERMINAL UNIT

AUX AUXILIARY

AVG AVERAGE

AWC ACOUSTICAL WALLCOVERING

AZ AZIMUTH

B

BB BALLED AND BURLAPPED

BD BOARD

BDD BACK DRAFT DAMPER

BE BOTTOM ELEVATION

BL BUILDING LINE

BLDG BUILDING

BLKG BLOCKING

BM BENCH MARK / BEAM

BR BARE ROOT

BRG BEARING

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C

C/C CENTER TO CENTER

CAB CABINET

CB CIRCUIT BREAKER / CATCH BASIN

CC COOLING UNIT

CE COVER ELEVATION

CEM CEMENT

CFM CUBIC FEET PER MINUTE

CFS CONCRETE FLOOR SEALER

CG CORNER GUARD

CH CHILLER

CI CURB INLET / CAST IRON

CIP CAST IRON PIPE

CJ CONTROL JOINT OR CONTRACTION JOINT

CKT CIRCUIT

CL CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CM CENTIMETER

CMH CUBIC METER PER HOUR

CMP CORRUGATED METAL PIPE

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT / CARBON MONOXIDE

CO2 CARBON DIOXIDE

COL COLUMN

COMB COMBINATION / COMBINE

COMP COMPRESSIBLE

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS / CONTINUATION

CONTR CONTRACTOR

CORR CORRIDOR

CP CEMENT PIPE

CPT CARPET

CSF CUBIC FEET PER SECOND

CT CERAMIC TILE / COOLING TOWER

CTR CENTER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CUYD CUBIC YARD

CW COLD WATER

D

D DRAIN / DIFFUSER

DA DENTAL AIR

DBL DOUBLE

DEPR DEPRESSED

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIP DUCTILE IRON PIPE

DISC DISCONNECT

DISP DISPENSER

DIST DISTRIBUTION

DK DECK

DL DEAD LOAD

DN DOWN

DO DITTO

DPR DAMPER

DR DOOR

DS DOWNSPOUT

DV DENTAL VACUUM

DWG DRAWING

DWL DOWEL

DWP DOMESTIC WATER PUMP

ABBREVIATIONS

K

KC MIL THOUSAND CIRCULAR MILS

KCJ KEYED CONSTRUCTION JOINT

KIT KITCHEN

KPA KILOPASCALS

KS KITCHEN SINK

KV KILOVOLT

KVA KILOVOLT AMPERE

KW KILOWATTS

L

L LITER

LA LABORATORY AIR

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUNDS

LF LINEAR FEET

LIN LINEAR

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMU LIGHTWEIGHT MASONRY UNITS

LONG LONGITUDINAL

LPM LITERS PER MINUTE

LT LIGHT

LT WT LIGHT WEIGHT

LTG LIGHTING

LV LABORATORY VACUUM

LVL LEVEL

LVT LUXURY VINYL TILE

M

M METER

M2 SQUARE METER

M3 CUBIC METER

MA MEDICAL AIR

MAINT MAINTENANCE

MAR MARBLE

MAS MASONRY

MAT MATERIAL / ENTRY CARPET

MAX MAXIMUM

MBH 1000 BTUH

MDO MEDIUM DENSITY OVERLAY

MECH MECHANICAL

MET METAL

MFR MANUFACTURER

MG MOTOR GENERATOR / MEDICAL GAS

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MM MILLIMETER

MO MASONRY OPENING

MTD MOUNTED

MTG MOUNTING

MULL MULLION

MV MEDICAL VACUUM

N

N NITROGEN

N2O NITROUS OXIDE

NEC NATIONAL ELECTRICAL CODE

NFPA NATIONAL FIRE PROTECTION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O/S OFFSET

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE

OX OXYGEN

OZ OUNCE

P

P PAINT / PUMP / PENDANT

PA PASCAL

PART PARTITION

PAVT PAVEMENT

PC POINT OF CURVATURE

PCF POUNDS PER CUBIC FOOT

PED PEDESTAL

PERP PERPENDICULAR

PHC PREHEAT COIL

PHVAC PLUMBING, HEATING, VENTILATING AND AIR

CONDITIONING

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PKG PARKING

PL PLASTIC LAMINATE / PROPERTY LINE / PLATE

PLAS PLASTER

PLBG PLUMBING

PLF POUNDS PER LINEAR FOOT

PLYWD PLYWOOD

PNL PANEL

PR PAIR

PROJ PROJECTION

PRV PRESSURE REGULATING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENCY / PORCELAIN TILE

PTVC POINT OF VERTICAL CURVATURE

PVC POLYVINYL CHLORIDE

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENCY

Q

QT QUARRY TILE

E

E EPOXY

EA EACH / EXHAUST AIR

EF EACH FACE / EXHAUST FAN

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMBED EMBEDMENT

EMD ESTIMATED MAXIMUM DEMAND

EMT ELECTRICAL METAL TUBING

EQ EQUAL

EQUIP EQUIPMENT

ET EXPANSION TANK

EVAC MEDICAL GAS EVACUATION

EW EACH WAY

EWC ELECTRICAL WATER COOLER

EWH ELECTRICAL WATER HEATER

EXH EXHAUST

EXIST EXISTING

EXP EXPOSED

EXPN EXPANSION

EXT EXTERIOR

F

F FIRE MAIN

FA FIRE ALARM

FCU FAN COIL UNIT

FD FLOOR DRAIN / FIRE DAMPER

FD / SD COMBINATION FIRE AND SMOKE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FDR FEEDER

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIN FINISH

FIX FIXTURE

FL FLOOR

FM FORCE MAIN / FACTORY MUTUAL

FP FIREPROOFING / FIRE PUMP

FPM FEET PER MINUTE

FR FIRE RATED

FRP FIBERGLASS REINFORCED PLASTIC

FS FLOW SWITCH

FT FEET

FTG FOOTING

FVC FIRE VALVE CABINET

G

G GAS / GRILLE

GA GAGE

GALV GALVANIZED

GB GRAB BAR

GBD GRAVITY BACKDRAFT DAMPER

GEN GENERATOR

GFRC GLASS FIBER REINFORCED CONCRETE

GI GALVANIZED IRON

GL GLASS

GLB GLASS BLOCK

GP GLAZED PAINT

GPM GALLONS PER MINUTE

GR GRADE

GRV GRAVITY ROOF VENTILATOR

GWB GYPSUM WALLBOARD

GYP GYPSUM

H

HB HOSE BIBB

HC HEATING COIL

HDNR HARDENER

HDW HARDWARE

HDWD HARDWOOD

HK1E HOOK ONE END

HK2E HOOK TWO ENDS

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HORSEPOWER

HPT HIGH POINT

HR HOUR

HS HIGH STRENGTH

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

HW HOT WATER

HWC HOT WATER CIRCULATING

HZ HERTZ

I

IA INSTRUMENT AIR

IC INTERCOM

ICB INTEGRAL COVE BASE

ID INSIDE DIAMETER

IE INVERT ELEVATION

IF INSIDE FACE

IN INCH

INSUL INSULATION

INT INTERIOR

J

JAN JANITOR

JB JUNCTION BOX

JP JOCKEY PUMP

JST JOIST

JT JOINT

R

R RADIUS / REGISTER

RA RETURN AIR

RB RESILIENT BASE

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

REF REFERENCE

REFL REFLECTED

REG REGISTER

REINF REINFORCED

REQD REQUIRED

REV REVERSE / REVISION

RF RETURN FAN

RGS RIGID GALVANIZED STEEL

RH ROOF HOOD / RELATIVE HUMIDITY / REHEAT

RHC REHEAT COIL

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RT RESILIENT TILE

RWC RIGID WALLCOVERING

S

S STAIR / STAIN / SURFACE / SANITARY

SA SUPPLY AIR / SOUND ATTENUATOR

SAN SANITARY

SCH SCHEDULE

SD SMOKE DAMPER / SUB DRAIN

SECT SECTION

SF SUPPLY FAN

SHT SHEET

SIM SIMILAR

SOG SLAB-ON-GRADE

SP SUMP PUMP

SPEC SPECIFICATIONS

SPF SPRAY POLYURETHANE FOAM

SQ SQUARE

SS SERVICE SINK / STORM SEWER

SSO STORM SEWER OVERFLOW

SSTL STAINLESS STEEL

ST STAIR TREAD

STA STATION

STD STANDARD

STE STANDARD TAPERED END

STIFF STIFFENER

STIR STIRRUP

STL STEEL

STOR STORAGE

STR STRUCTURAL

SUSP SUSPENDED

SW SWITCH

SWGR SWITCHGEAR

SYM SYMMETRICAL

T

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TC TOP OF CURB

TE TOP ELEVATION

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

TLT TOILET

TOPO TOPOGRAPHY

TOS TOP OF STEEL

TOW TOP OF WALL

TP TOP OF PAVEMENT

TRANS TRANSVERSE

TYP TYPICAL

U

UC UNDERCUT

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UR URINAL

UV UNIT VENTILATOR

V

V VOLT

VAV VARIABLE AIR VOLUME

VB VINYL BASE

VC VERTICAL CURVE

VCP VITRIFIED CLAY PIPE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W

W WATT / WATER

W/ WITH

W/O WITHOUT

WAGD WASTE ANESTHESIA GAS DISPOSAL

WC WATER CLOSET

WD WOOD

WDW WINDOW

WH WATER HEATER / WALL HYDRANT

WP WEATHERPROOF

WPFG WATERPROOFING

WS WATER STOP

WT WEIGHT

WWF WELDED WIRE FABRIC

X

XFMR TRANSFORMER

Y

YD YARD

YH YARD HYDRANT

HAZARDOUS MATERIALS

1. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE GOVERNMENT

IMMEDIATELY FOR DIRECTION.

GENERAL FIREPROFFING NOTES

1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL PENETRATIONS, (CONSTRUCTION TO CONFORM TO MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.

2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS / PARTITIONS AND FLOORS. CONFORM WITH THE TESTED / SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL WITH U.L. DESIGN NUMBER. FIRE RATED WALLS SHOWN ON PLAN.

3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND

THAT WHICH IS DISTURBED DURING CONSTRUCTION.

1/4" = 1'-0"1

GUIDE FOR CLEARANCES AT DOORS

Mark Revisions: Date:

A

R C H I T E

C

T

S T A T E

O F N E B

R A S K A

05/17/2024

RICHARD

JOSEPH

DN

DN

S S S S S S S S S S S S

S S

S

SS

S S

S S

S S

S

S S S S S S S

SMOKE PARTITION

SYMBOL

LIFE SAFETY PLAN LEGEND:

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

3-HOUR FIRE BARRIER

SMOKE RATED WALL

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

3-HOUR SMOKE BARRIER

4-HOUR FIRE BARRIER

4-HOUR SMOKE BARRIER

30-MINUTE SMOKE BARRIER

30-MINUTE FIRE BARRIER

S S

S

S

S

S

S

S

S

S

S S

EGRESS PATH

STARTING

LOCATION

TRAVEL

DISTANCE

100'

TRAVEL PATH

FEC FIRE EXTINGUISHER CABINET

EXIT MARKER

S-1 S-2 S-3 S-4

A. BUILDING CODES AND REGULATIONS (LATEST EDITIONS)

1. GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HYPERLINK "HTTP://WWW.CFM.VA.GOV/TIL/" HTTP://WWW.CFM.VA.GOV/TIL/).

a. VA DIRECTIVE, DESIGN MANUALS AND DESIGN GUIDES

1) PG-18-9 SPACE PLANNING CRITERIA CHAPTER 240 PATHOLOGY AND LABORATORY SERVICE, MARCH 2022.

b. VA NATIONAL CAD STANDARD APPLICATION GUIDE AND BIM GUIDE

c. DESIGN AND CONSTRUCTION PROCEDURES, PG-18-3

d. STANDARD DETAILS, PG-18-4

e. EQUIPMENT REFERENCE MANUAL, PG-18-6

f. EQUIPMENT GUIDE LIST, PG-18-5

g. MASTER CONSTRUCTION SPECIFICATIONS, PROGRAM GUIDE, PG-18-1

h. VA DESIGN ALERTS

i. VA QUALITY ALERTS

j. VA DRAWING TITLE BOX LAYOUT

k. TECHNICAL SUMMARIES

l. MANUAL FOR PREPARATION AND ISSUANCE OF CONSTRUCTION SOLICITATION AND CONTRACT DOCUMENTS

m. STEAM GENERATION SYSTEMS DESIGN MANUAL

n. MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS" FOR MINOR AND MINOR MISCELLANEOUS PROJECTS, HANDBOOK H-18-15 VOLUME C

o. NATIONAL CODES AND STANDARDS (NFPA, NEC, NATL. PLUMBING CODE, EPA, OSHA, ETC.)

p. UNIFORM ACCESSIBILITY STANDARDS

q. ASBESTOS ABATEMENT DESIGN MANUAL

r. ELECTRICAL DESIGN MANUAL FOR HOSPITAL PROJECT

s. VA FIRE PROTECTION DESIGN MANUAL

t. ESTIMATING MANUAL

u. SEISMIC REQUIREMENTS

2. NFPA 101 LIFE SAFETY CODE: ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES.

a. INTERNATIONAL BUILDING CODE (IBC) 2021: ITEMS NOT ADDRESSED IN NFPA 101, INCLUDING STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION.

3. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

4. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

5. JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JCAHO) REQUIREMENTS.

6. NATIONAL ELECTRICAL CODE (NEC)

7. INTERNATIONAL MECHANICAL CODE (IMC) AND PLUMBING CODE (IPC)

8. ASME BOILER AND PRESSURE VESSEL CODE

9. ASME CODE FOR PRESSURE PIPING

10. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS), INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

CODES AND REGULATIONS:

11. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

12. VA SUSTAINABLE DESIGN GUIDE

13. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER

CONSTRUCTION SPECIFICATION.

14. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.

15. SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

16. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD 90.1-2010, EXCEPT WHERE 90.1-2004 OR 90.1-2007 ARE REFERENCED OR ADOPTED BY SPECIFIC VETERANS AFFAIRS DESIGN AND CONSTRUCTION PROCEDURES.

17. ENERGY POLICY ACT OF 2005 (EPACT) AND AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD

90.1-2004 APPENDIX G.

18. EXTENDED INDUSTRY- STANDARD ARCHITECTURE (EISA) 2007 FOR NEW FACILITY FOSSIL FUEL GENERATED ENERGY CONSUMPTION REDUCTION.

19. VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ). VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES.

B. BUILDING SQUARE FOOTAGES - BUILDING 1:

LEVEL AREA

FIRST FLOOR LEVEL AREA 6,838 SF

C. BUILDING CLASSIFICATION

1. OCCUPANCY CLASSIFICATION:

a. EXISTING BUILDING: AMBULATORY HEALTH CARE (NFPA 101 CHAPTER 21)

BUSINESS, AMBULATORY CARE (IBC SECTION 304.1)

b. OCCUPANCY LOAD:

1) FIRST FLOOR: 30 OCCUPANTS - (150 SF/ OCCUPANT) BUSINESS AREAS

c. COMMON PATH LIMIT: 100FT.

d. DEAD END LIMIT: 50FT.

e. TRAVEL DISTANCE LIMIT: 300FT.

f. FIRE DOOR AND GLAZING IN 1 HOUR WALL: 45 MIN. IN 2 HOUR WALL: 90 MIN.

g. RAMPS: 1:20 SLOPE, 30” MAX RISE BETWEEN LANDINGS, 44” MIN WIDTH. GUARDRAIL REQUIRED AT 30” DROP.

2. CONSTRUCTION TYPE - BUILDING 2:

a. CONSTRUCTION TYPE FOR A MULTI-STORY FULLY SPRINKLED BUILDING:

1) TYPE III-B (222) (NFPA 101, PARA. 8.2.1.2)

b. BUILDING ELEMENTS:

1) EXTERIOR BEARING 2 HOUR

1) INTERIOR BEARING 0 HOUR

2) COLUMNS 0 HOUR

3) ROOF-CEILING 0 HOUR

4) INTERIOR NON-LOAD BEARING WALLS 0 HOUR

SUPERVISORS

OFFICE

MULTIPURPOSE

ROOM

STAFF

BREAKROOM

STAFF

WORKROOM

KITCHEN

MANAGER

107A

HOT

PRODUCTION/TRAY

ASSEMBLY

LINE

COLD FOOD

PREP

103A

S-1

EP.01

EP.02

EP.03

EP.04

S-2

S-3

S-4

OFFICE

100B

STAFF

TOILET

105A

KITCHEN/DIETETICS

KITCHEN/DIETETICS

KITCHEN/DIETETICS

STAIR

1STAIR

TELEPHONE

CLOSET

CONFERENCE

ROOM

STORAGE

GENERAL

105C

ELEVATOR

1ELEV

CORRIDOR

1CORR-DIET

CORRIDOR

1CORR

DISH

WASHER

WALK-IN

REFRIGERATOR

KITCHEN/DIETETICS

104A

KITCHEN/DIETETICS

FREEZER

OFFICE

100A

PHYSICIAN

OFFICE

TRUE

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CONSTRUCTION

DOCUMENTS

PREPARE SITE FOR CHOICE

DINING EQUIPMENT

589A7-23-305

5500 E KELLOGG AVE, WICHITA, KS

A

B

C

D

E

F

A u to d e s k D o c s /1

A -2

-3

P re p a re

S it e f o r C h o ic e

D in in g /5

A -2

-3

.B

.A rc h

R

-E x is ti n g

.r v t

/2

/2

:4

:2

P

M

GI101

FIRST FLOOR - LIFE SAFETY PLAN

RJO JJG05/17/2024

EGRESS PATH INFORMATION

EGRESS PATH

NAME EGRESS PATH LENGTH EGRESS PATH MAXIMUM PERMITTED

EP.01 86' 300'

EP.02 81' 300'

EP.03 95' 300'

EP.04 67' 300'

EXIT CAPACITY COMPARISON

EGRESS PATH

NAME

EGRESS COMPLETE CLEAR

WIDTH

EGRESS

CAPACITY

FACTOR

EGRESS COMPONENT

OCCUPANT LOAD CAPACITY EXPECTED OCCUPANT LOAD

S-1 48" 0.2 150 8

S-2 36" 0.2 150 7

S-3 48" 0.2 150 8

S-4 52" 0.2 150 7

OCCUPANT LOAD CALCULATION

ZONE AREA OCCUPANCY LOAD FACTOR OCCUPANT LOAD

NUTRITION FOOD SERVICES 6838 SF 150 46

3/16" = 1'-0"1

FIRST FLOOR - LIFE SAFETY PLAN

Mark Revisions: Date:

A

R C H I T E

C

T

S T A T E

O F N E B

R A S K A

05/17/2024

RICHARD

JOSEPH

S S S S S S S S S S S S

S

S

SS

S S

S S

S S

S

S S S S S S S

DN

DN

SMOKE PARTITION

SYMBOL

LIFE SAFETY PLAN LEGEND:

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

3-HOUR FIRE BARRIER

SMOKE RATED WALL

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

3-HOUR SMOKE BARRIER

4-HOUR FIRE BARRIER

4-HOUR SMOKE BARRIER

30-MINUTE SMOKE BARRIER

30-MINUTE FIRE BARRIER

S S

S

S

S

S

S

S

S

S

S S

EGRESS PATH

STARTING

LOCATION

TRAVEL

DISTANCE

100'

TRAVEL PATH

FEC FIRE EXTINGUISHER CABINET

EXIT MARKER

S-1 S-2 S-3 S-4

A. BUILDING CODES AND REGULATIONS (LATEST EDITIONS)

1. GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HYPERLINK "HTTP://WWW.CFM.VA.GOV/TIL/" HTTP://WWW.CFM.VA.GOV/TIL/).

a. VA DIRECTIVE, DESIGN MANUALS AND DESIGN GUIDES

1) PG-18-9 SPACE PLANNING CRITERIA CHAPTER 240 PATHOLOGY AND LABORATORY SERVICE, MARCH 2022.

b. VA NATIONAL CAD STANDARD APPLICATION GUIDE AND BIM GUIDE

c. DESIGN AND CONSTRUCTION PROCEDURES, PG-18-3

d. STANDARD DETAILS, PG-18-4

e. EQUIPMENT REFERENCE MANUAL, PG-18-6

f. EQUIPMENT GUIDE LIST, PG-18-5

g. MASTER CONSTRUCTION SPECIFICATIONS, PROGRAM GUIDE, PG-18-1

h. VA DESIGN ALERTS

i. VA QUALITY ALERTS

j. VA DRAWING TITLE BOX LAYOUT

k. TECHNICAL SUMMARIES

l. MANUAL FOR PREPARATION AND ISSUANCE OF CONSTRUCTION SOLICITATION AND CONTRACT DOCUMENTS

m. STEAM GENERATION SYSTEMS DESIGN MANUAL

n. MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS" FOR MINOR AND MINOR MISCELLANEOUS PROJECTS, HANDBOOK H-18-15 VOLUME C

o. NATIONAL CODES AND STANDARDS (NFPA, NEC, NATL. PLUMBING CODE, EPA, OSHA, ETC.)

p. UNIFORM ACCESSIBILITY STANDARDS

q. ASBESTOS ABATEMENT DESIGN MANUAL

r. ELECTRICAL DESIGN MANUAL FOR HOSPITAL PROJECT

s. VA FIRE PROTECTION DESIGN MANUAL

t. ESTIMATING MANUAL

u. SEISMIC REQUIREMENTS

2. NFPA 101 LIFE SAFETY CODE: ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES.

a. INTERNATIONAL BUILDING CODE (IBC) 2021: ITEMS NOT ADDRESSED IN NFPA 101, INCLUDING STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION.

3. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

4. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

5. JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JCAHO) REQUIREMENTS.

6. NATIONAL ELECTRICAL CODE (NEC)

7. INTERNATIONAL MECHANICAL CODE (IMC) AND PLUMBING CODE (IPC)

8. ASME BOILER AND PRESSURE VESSEL CODE

9. ASME CODE FOR PRESSURE PIPING

10. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS), INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

CODES AND REGULATIONS:

11. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

12. VA SUSTAINABLE DESIGN GUIDE

13. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER

CONSTRUCTION SPECIFICATION.

14. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.

15. SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

16. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD 90.1-2010, EXCEPT WHERE 90.1-2004 OR 90.1-2007 ARE REFERENCED OR ADOPTED BY SPECIFIC VETERANS AFFAIRS DESIGN AND CONSTRUCTION PROCEDURES.

17. ENERGY POLICY ACT OF 2005 (EPACT) AND AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD

90.1-2004 APPENDIX G.

18. EXTENDED INDUSTRY- STANDARD ARCHITECTURE (EISA) 2007 FOR NEW FACILITY FOSSIL FUEL GENERATED ENERGY CONSUMPTION REDUCTION.

19. VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ). VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES.

B. BUILDING SQUARE FOOTAGES - BUILDING 1:

LEVEL AREA

FIRST FLOOR LEVEL AREA 6,838 SF

C. BUILDING CLASSIFICATION

1. OCCUPANCY CLASSIFICATION:

a. EXISTING BUILDING: AMBULATORY HEALTH CARE (NFPA 101 CHAPTER 21)

BUSINESS, AMBULATORY CARE (IBC SECTION 304.1)

b. OCCUPANCY LOAD:

1) FIRST FLOOR: 30 OCCUPANTS - (150 SF/ OCCUPANT) BUSINESS AREAS

c. COMMON PATH LIMIT: 100FT.

d. DEAD END LIMIT: 50FT.

e. TRAVEL DISTANCE LIMIT: 300FT.

f. FIRE DOOR AND GLAZING IN 1 HOUR WALL: 45 MIN. IN 2 HOUR WALL: 90 MIN.

g. RAMPS: 1:20 SLOPE, 30” MAX RISE BETWEEN LANDINGS, 44” MIN WIDTH. GUARDRAIL REQUIRED AT 30” DROP.

2. CONSTRUCTION TYPE - BUILDING 2:

a. CONSTRUCTION TYPE FOR A MULTI-STORY FULLY SPRINKLED BUILDING:

1) TYPE III-B (222) (NFPA 101, PARA. 8.2.1.2)

b. BUILDING ELEMENTS:

1) EXTERIOR BEARING 2 HOUR

1) INTERIOR BEARING 0 HOUR

2) COLUMNS 0 HOUR

3) ROOF-CEILING 0 HOUR

4) INTERIOR NON-LOAD BEARING WALLS 0 HOUR

SUPERVISORS

OFFICE

MULTIPURPOSE

ROOM

STAFF

BREAKROOM

STAFF

WORKROOM

KITCHEN

MANAGER

107A

HOT

PRODUCTION/TRAY

ASSEMBLY

LINE

COLD FOOD

PREP

103A

S-1

EP.01

EP.02

EP.03

S-2

S-3

OFFICE

100B

STAFF

TOILET

105A

KITCHEN/DIETETICS

KITCHEN/DIETETICS

KITCHEN/DIETETICS

STAIR

1STAIR

TELEPHONE

CLOSET

CONFERENCE

ROOM

STORAGE

GENERAL

105C

ELEVATOR

1ELEV

CORRIDOR

1CORR-DIET

CORRIDOR

1CORR

DISH

WASHER

WALK-IN

REFRIGERATOR

KITCHEN/DIETETICS

104A

KITCHEN/DIETETICS

FREEZER

OFFICE

100A

PHYSICIAN

OFFICE

TRUE

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CONSTRUCTION

DOCUMENTS

PREPARE SITE FOR CHOICE

DINING EQUIPMENT

589A7-23-305

5500 E KELLOGG AVE, WICHITA, KS

A

B

C

D

E

F

A u to d e s k D o c s /1

A -2

-3

P re p a re

S it e f o r C h o ic e

D in in g /5

A -2

-3

.B

.A rc h

R

-E x is ti n g

.r v t

/2

/2

:4

:3

P

M

GI102

FIRST FLOOR - LIFE SAFETY PLAN

PHASES 1 & 2

RJO JJG05/17/2024

EGRESS PATH INFORMATION

EGRESS PATH

NAME EGRESS PATH LENGTH EGRESS PATH MAXIMUM PERMITTED

EP.01 86' 300'

EP.02 81' 300'

EP.03 95' 300'

EP.04 67' 300'

EXIT CAPACITY COMPARISON

EGRESS PATH

NAME

EGRESS COMPLETE CLEAR

WIDTH

EGRESS

CAPACITY

FACTOR

EGRESS COMPONENT

OCCUPANT LOAD CAPACITY EXPECTED OCCUPANT LOAD

S-1 48" 0.2 150 8

S-2 36" 0.2 150 7

S-3 48" 0.2 150 8

S-4 52" 0.2 150 7

OCCUPANT LOAD CALCULATION

ZONE AREA OCCUPANCY LOAD FACTOR OCCUPANT LOAD

NUTRITION FOOD SERVICES 6838 SF 150 46

3/16" = 1'-0"1

FIRST FLOOR - LIFE SAFETY PLAN

Mark Revisions: Date:

A

R C H I T E

C

T

S T A T E

O F N E B

R A S K A

05/17/2024

RICHARD

JOSEPH

S

S

SS

S S

S S

S S

S

S S S S S S S

DN

DN

SMOKE PARTITION

SYMBOL

LIFE SAFETY PLAN LEGEND:

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

3-HOUR FIRE BARRIER

SMOKE RATED WALL

1-HOUR SMOKE BARRIER

2-HOUR SMOKE BARRIER

3-HOUR SMOKE BARRIER

4-HOUR FIRE BARRIER

4-HOUR SMOKE BARRIER

30-MINUTE SMOKE BARRIER

30-MINUTE FIRE BARRIER

S S

S

S

S

S

S

S

S

S

S S

EGRESS PATH

STARTING

LOCATION

TRAVEL

DISTANCE

100'

TRAVEL PATH

FEC FIRE EXTINGUISHER CABINET

EXIT MARKER

S-1 S-2 S-3 S-4

A. BUILDING CODES AND REGULATIONS (LATEST EDITIONS)

1. GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HYPERLINK "HTTP://WWW.CFM.VA.GOV/TIL/" HTTP://WWW.CFM.VA.GOV/TIL/).

a. VA DIRECTIVE, DESIGN MANUALS AND DESIGN GUIDES

1) PG-18-9 SPACE PLANNING CRITERIA CHAPTER 240 PATHOLOGY AND LABORATORY SERVICE, MARCH 2022.

b. VA NATIONAL CAD STANDARD APPLICATION GUIDE AND BIM GUIDE

c. DESIGN AND CONSTRUCTION PROCEDURES, PG-18-3

d. STANDARD DETAILS, PG-18-4

e. EQUIPMENT REFERENCE MANUAL, PG-18-6

f. EQUIPMENT GUIDE LIST, PG-18-5

g. MASTER CONSTRUCTION SPECIFICATIONS, PROGRAM GUIDE, PG-18-1

h. VA DESIGN ALERTS

i. VA QUALITY ALERTS

j. VA DRAWING TITLE BOX LAYOUT

k. TECHNICAL SUMMARIES

l. MANUAL FOR PREPARATION AND ISSUANCE OF CONSTRUCTION SOLICITATION AND CONTRACT DOCUMENTS

m. STEAM GENERATION SYSTEMS DESIGN MANUAL

n. MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS" FOR MINOR AND MINOR MISCELLANEOUS PROJECTS, HANDBOOK H-18-15 VOLUME C

o. NATIONAL CODES AND STANDARDS (NFPA, NEC, NATL. PLUMBING CODE, EPA, OSHA, ETC.)

p. UNIFORM ACCESSIBILITY STANDARDS

q. ASBESTOS ABATEMENT DESIGN MANUAL

r. ELECTRICAL DESIGN MANUAL FOR HOSPITAL PROJECT

s. VA FIRE PROTECTION DESIGN MANUAL

t. ESTIMATING MANUAL

u. SEISMIC REQUIREMENTS

2. NFPA 101 LIFE SAFETY CODE: ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES.

a. INTERNATIONAL BUILDING CODE (IBC) 2021: ITEMS NOT ADDRESSED IN NFPA 101, INCLUDING STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION.

3. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

4. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

5. JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JCAHO) REQUIREMENTS.

6. NATIONAL ELECTRICAL CODE (NEC)

7. INTERNATIONAL MECHANICAL CODE (IMC) AND PLUMBING CODE (IPC)

8. ASME BOILER AND PRESSURE VESSEL CODE

9. ASME CODE FOR PRESSURE PIPING

10. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS), INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

CODES AND REGULATIONS:

11. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

12. VA SUSTAINABLE DESIGN GUIDE

13. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER

CONSTRUCTION SPECIFICATION.

14. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.

15. SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

16. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD 90.1-2010, EXCEPT WHERE 90.1-2004 OR 90.1-2007 ARE REFERENCED OR ADOPTED BY SPECIFIC VETERANS AFFAIRS DESIGN AND CONSTRUCTION PROCEDURES.

17. ENERGY POLICY ACT OF 2005 (EPACT) AND AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE) STANDARD

90.1-2004 APPENDIX G.

18. EXTENDED INDUSTRY- STANDARD ARCHITECTURE (EISA) 2007 FOR NEW FACILITY FOSSIL FUEL GENERATED ENERGY CONSUMPTION REDUCTION.

19. VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ). VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES.

B. BUILDING SQUARE FOOTAGES - BUILDING 1:

LEVEL AREA

FIRST FLOOR LEVEL AREA 6,838 SF

C. BUILDING CLASSIFICATION

1. OCCUPANCY CLASSIFICATION:

a. EXISTING BUILDING: AMBULATORY HEALTH CARE (NFPA 101 CHAPTER 21)

BUSINESS, AMBULATORY CARE (IBC SECTION 304.1)

b. OCCUPANCY LOAD:

1) FIRST FLOOR: 30 OCCUPANTS - (150 SF/ OCCUPANT) BUSINESS AREAS

c. COMMON PATH LIMIT: 100FT.

d. DEAD END LIMIT: 50FT.

e. TRAVEL DISTANCE LIMIT: 300FT.

f. FIRE DOOR AND GLAZING IN 1 HOUR WALL: 45 MIN. IN 2 HOUR WALL: 90 MIN.

g. RAMPS: 1:20 SLOPE, 30” MAX RISE BETWEEN LANDINGS, 44” MIN WIDTH. GUARDRAIL REQUIRED AT 30” DROP.

2. CONSTRUCTION TYPE - BUILDING 2:

a. CONSTRUCTION TYPE FOR A MULTI-STORY FULLY SPRINKLED BUILDING:

1) TYPE III-B (222) (NFPA 101, PARA. 8.2.1.2)

b. BUILDING ELEMENTS:

1) EXTERIOR BEARING 2 HOUR

1) INTERIOR BEARING 0 HOUR

2) COLUMNS 0 HOUR

3) ROOF-CEILING 0 HOUR

4) INTERIOR NON-LOAD BEARING WALLS 0 HOUR

SUPERVISORS

OFFICE

MULTIPURPOSE

ROOM

STAFF

BREAKROOM

STAFF

WORKROOM

KITCHEN

MANAGER

107A

HOT

PRODUCTION/TRAY

ASSEMBLY

LINE

COLD FOOD

PREP

103A

EP.03

EP.04

S-3

S-4

78'

OFFICE

100B

STAFF

TOILET

105A

KITCHEN/DIETETICS

KITCHEN/DIETETICS

KITCHEN/DIETETICS

STAIR

1STAIR

TELEPHONE

CLOSET

CONFERENCE

ROOM

STORAGE

GENERAL

105C

ELEVATOR

1ELEV

CORRIDOR

1CORR-DIET

CORRIDOR

1CORR

DISH

WASHER

WALK-IN

REFRIGERATOR

KITCHEN/DIETETICS

104A

KITCHEN/DIETETICS

FREEZER

OFFICE

100A

PHYSICIAN

OFFICE

TRUE

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CONSTRUCTION

DOCUMENTS

PREPARE SITE FOR CHOICE

DINING EQUIPMENT

589A7-23-305

5500 E KELLOGG AVE, WICHITA, KS

A

B

C

D

E

F

A u to d e s k D o c s /1

A -2

-3

P re p a re

S it e f o r C h o ic e

D in in g /5

A -2

-3

.B

.A rc h

R

-E x is ti n g

.r v t

/2

/2

:4

:3

P

M

GI103

FIRST FLOOR - LIFE SAFETY PLAN

PHASE 3

RJO JJG05/17/2024

EGRESS PATH INFORMATION

EGRESS PATH

NAME EGRESS PATH LENGTH EGRESS PATH MAXIMUM PERMITTED

EP.01 86' 300'

EP.02 81' 300'

EP.03 95' 300'

EP.04 67' 300'

EXIT CAPACITY COMPARISON

EGRESS PATH

NAME

EGRESS COMPLETE CLEAR

WIDTH

EGRESS

CAPACITY

FACTOR

EGRESS COMPONENT

OCCUPANT LOAD CAPACITY EXPECTED OCCUPANT LOAD

S-1 48" 0.2 150 8

S-2 36" 0.2 150 7

S-3 48" 0.2 150 8

S-4 52" 0.2 150 7

OCCUPANT LOAD CALCULATION

ZONE AREA OCCUPANCY LOAD FACTOR OCCUPANT LOAD

NUTRITION FOOD SERVICES 6838 SF 150 46

3/16" = 1'-0"1

FIRST FLOOR - LIFE SAFETY PLAN

Mark Revisions: Date:

A

R C H I T E

C

T

S T A T E

O F N E B

R A S K A

05/17/2024

RICHARD

JOSEPH

S

S

SS

S S

S S

S S

S

S S S S S S S

DN

DN

SUPERVISORS

OFFICE

MULTIPURPOSE

ROOM

STAFF

BREAKROOM

STAFF

WORKROOM

KITCHEN

MANAGER

107A

HOT

PRODUCTION/TRAY

ASSEMBLY

LINE

COLD FOOD

PREP

103A

PHASING NOTES & LEGEND

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR

PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE

INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE

SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE

CONTRACTOR SHALL UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED

HEREIN AND WORK WITH THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR)

THROUGHOUT THE CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR

APPROACHING THE VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT

NOT LIMITED TO): TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF

TEMPORARY WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION

CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION

PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.

HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL

PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING

INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND LEAD-BASE PAINT

REPORT ARE TO BE OBTAINED FROM THE COR.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY

ADJACENT TO WORKING AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR TO

COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN SUCH A WAY AS TO

MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE

PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO

DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN

SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR

SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE

POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

PHASE 1 - PARTIAL DEMOLITION OF ENTRY AREA INTO HOT PRODUCTION/TRAY ASSEMBLY

LINE.

A. VA KITCHEN STAFF WILL CONTINUE TO OPERATE WITH SETUP OF TEMPORARY

COOKING AREA. TEMPORARY KITCHEN EQUIPMENT IS TO BE PURCHASED AND

INSTALLED BY THE CONTRACTOR. SEE TEMPORARY KITCHEN EQUIPMENT

SCHEDULE FOR EQUIPMENT INFO.

B. ALL KITCHEN EQUIPMENT WILL BE REMOVED FROM EXISTING MAIN KITCHEN AREA

BY THE CONTRACTOR BEFORE START OF WORK. (COORDINATE WITH VA COR)

C. CONTRACTOR SHALL GET TEMPORARY CONSTRUCTION BARRIERS W/ ACCESS

DOOR SETUP TO DEMO EXISTING FLOOR FINISH AS SHOWN.

D. TEMPORARY TRANSITION PAD WILL NEED TO BE PUT IN PLACE ONCE FLOOR FINISH

DEMOLITION HAS BEEN COMPLETED AND IS READY FOR NEW FINISHES.

PHASE 2 - DEMOLITION AND RENOVATION OF REMAINING HOT PRODUCTION/TRAY ASSEMBLY

LINE AND COLD FOOD PREP.

A. PHASE 1 AREA WILL BE READY FOR KITCHEN STAFF TO UTILIZE FOR PATH OF

TRAVEL TO CONTINUE DAY TO DAY OPERATIONS.

B. CONTRACTOR SHALL FULLY DEMO AND RENOVATE PHASE 2 AREA AS SHOWN.

C. CONTRACTOR TO FINISH PHASE 1 AREA ONCE ALL OF THE WORK NEEDED TO

COMPLETE PHASE 2 HAS BEEN COMPLETED.

PHASE 3 - DEMOLITION AND RENOVATION OF ADMINISTRATION AREA.

A. VA KITCHEN STAFF CAN MOVE BACK INTO HOT PRODUCTION/TRAY ASSEMBLY LINE

AND COLD FOOD PREP WORK AREA.

B. TEMPORARY KITCHEN AND ASSOCIATED EQUIPMENT NEEDS TO BE REMOVED

FROM TEMPORARY KITCHEN AREA.

C. ALL KITCHEN STAFF EQUIPMENT NEEDS TO BE REMOVED FROM THE

CONSTRUCTION AREA.

D. CONTRACTOR TO FULLY DEMO AND RENOVATE PHASE 3 AREA.

PHASE 1 PHASE 2 PHASE 3

TRUE

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941 o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CONSTRUCTION

DOCUMENTS

PREPARE SITE FOR CHOICE

DINING EQUIPMENT

589A7-23-305

5500 E KELLOGG AVE, WICHITA, KS

A

B

C

D

E

F

A u to d e s k D o c s /1

A -2

-3

P re p a re

S it e f o r C h o ic e

D in in g /5

A -2

-3

.B

.A rc h

R

-E x is ti n g

.r v t

/2

/2

:4

:3

P

M

GC101

FIRST FLOOR - PHASING PLAN

RJO JJG05/17/2024

1/4" = 1'-0"1

FIRST FLOOR - PHASING PLAN

Temporary Kitchen Equipment

JSN QTY ACQ CODE DESCRIPTION MANUFACTURER MODEL

U0021 4 CC Countertop Induction Range Avantco 177ID1800

U0022 1 CC Convection Oven, Electric, Double Deck

Southbend BES/27SC

U0023 1 CC Universal Ventless Hood Wells WVU-96

Mark Revisions: Date:

A

R C H I T E

C

T

S T A T E

O F N E B

R A S K A

05/17/2024

RICHARD

JOSEPH