This document provides specifications for the overhaul and repair of hydraulic cylinders. The specifications outline requirements for tagging, disconnecting, and removing hydraulic cylinders; disassembling, cleaning, preserving, and reassembling cylinder parts using new seals, gaskets, and piston rings; reinstalling cylinders and purging air from hydraulic systems; and inspecting and testing repaired cylinders. The work described in the specifications is for hydraulic cylinder repairs on NOAA vessels.

The related federal contract opportunity is a request for quote for drydock repairs to the NOAA Ship RONALD H. BROWN from the Department of Commerce National Oceanic and Atmospheric Administration. The opportunity includes drydocking the vessel for inspection and repairs as outlined in the technical specifications. Quotes are requested to complete this work for Fiscal Year 2022.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Attachment D.3 Past Performance Questionnaire REV 1.docx DOCX document
Amendment 0001.pdf PDF
Attachment D.2 Past Performance Information Form REV 1.docx DOCX document
RFQ RONALD H. BROWN DRYDOCK REPAIRS REVISION 1.pdf PDF
073-6932898.pdf PDF
BROWN Register of Lifting Appliances and Loose Gear_2020.pdf PDF
Portable Fire Extinguisher List.pdf PDF
Attachment D.1 RONALD H. BROWN FY 22 DRYDOCK SPEC PACKAGE.pdf PDF
RB Ventilation Manual Closure List.pdf PDF
TM RB 573-02.pdf PDF
RB-245 Vol I.pdf PDF
AIRMAR 12Hz Transducer Drawing.pdf PDF
RB-461A-07 Multibeam Fairing Construction REV Ar.pdf PDF
Righting Device Inspection Form Blank.pdf PDF
181-6932834.pdf PDF
Alfa Laval PureBallast Technical Manual.pdf PDF
101-6932801.pdf PDF
183-6932837.pdf PDF
RB-245 Vol II.pdf PDF
528-6932928.pdf PDF
101-6932805.pdf PDF
573-6932840.pdf PDF
Tech Manual RB-573-05 Sect. 1_2.pdf PDF
997-1A.pdf PDF
NOAA_RHB_480VAC_SWBD_ONLY_RED.pdf PDF
RB-085-001.pdf PDF
000-1F.pdf PDF
RB-568-00_Bow Thruster Tech Man Sect 2.pdf PDF
00-631-001 PAINT SCHEDULE.pdf PDF
501-6932918.pdf PDF
Attachment D.5 Price Schedule.xlsx XLSX spreadsheet
Tech Manaul 167-00.pdf PDF
101-6932815.pdf PDF
Motor Inventory_NOAA Ship BROWN.xls XLS spreadsheet
101-6932819.pdf PDF
573-1C.pdf PDF
Attachment D.3 Past Performance Questionnaire.docx DOCX document
573-6932841.pdf PDF
RB-529-002.pdf PDF
101-6932804.pdf PDF
171-6932832.pdf PDF
Attachment D.6 NOAA AIRS PROCESS.pdf PDF
Tank Capacity Summary.pdf PDF
631-3B.pdf PDF
101-6932813.pdf PDF
635-2.pdf PDF
300-6932772 One Line.pdf PDF
000-2C.pdf PDF
Switchboard Breakers Info.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-573-2

September 2000

National Oceanic and Atmospheric Administration Marine Operation Center

Standard Specification MOC-573-2

OVERHAUL/REPAIR OF HYDRAULIC CYLINDERS

1. SCOPE: This specification provides the minimum requirements for the overhaul and/or repair of hydraulic cylinders.

2. REFERENCES

None

3. REQUIREMENTS

3.1 Tag out system controllers and actuators to preclude

inadvertent operation and secure the movable member to prevent movement while cylinder is removed.

3.1.1 Disconnect and cap hydraulic lines from the cylinder.

Ensure containment is provided to prevent spillage of oil.

Hydraulic lines and inlet/outlet ports shall be capped or plugged with threaded fittings to prevent leakage or contamination of the system.

3.1.2 Remove the cylinder from the ship and transport to

repair facility.

3.2 Perform the following work on the removed cylinder:

3.2.1 Completely disassemble the cylinder and clean all

parts.

3.2.2 Prepare and preserve the external painted surfaces in

accordance with the identified painting specification or as original.

3.2.3 Reassemble the cylinder under clean conditions using

new "O" rings, seals, gaskets, packing, and piston rings.

Materials used shall meet or exceed original manufacturers specifications. During reassembly lubricate the above with a product equal to Hilton's Hyper-Lube, that is compatible with the system fluid.

3.2.4 Provide and install new nuts, washers, bolts, studs and inlet and outlet fittings.

3.3 Reinstall the cylinder in its original location.

MOC-573-2

September 2000

3.4 Top off hydraulic reservoir to full mark and purge all air from the system taking care to contain any fluid bled off.

3.5 Remove tag outs.

4. QUALITY ASSURANCE

4.1 After disassembly, inspect all components for trueness of bore and rod, wear, damage, corrosion or pitting. Provide a Condition Report detailing the inspection results, contractor's corrective action recommendations, and list of additional parts, material and labor not covered by this specification, required to restore the cylinder to the manufacturers specifications.

4.2 After reassembly, bench test the assembly at system working pressure to prove smoothness of operation and tightness of sealing surfaces.

4.3 Cycle the cylinder through a minimum of four evolutions to demonstrate operation and tightness of all disturbed fittings and connections. Upon satisfactory demonstration of operation and tightness apply "Denso tape" to all connections.

END OF SPECIFICATION