635-2.pdf

PDF 24 KB Posted

Attached to
FY 22 RFQ NOAA SHIP RONALD H. BROWN Drydock Repairs
Solicitation number
1305M222QNMAN0008
Issued by

About this file

This document provides specifications for thermal insulation installation and renewal aboard NOAA ships. Requirements include removing existing asbestos-containing insulation according to standards and installing new fibrous glass-faced board, tape, and felt insulation secured with steel or aluminum studs and adhesive. Insulation must cover from six inches above decks to overheads, with edge metal buffers, and be fitted around protrusions. Seams and edges require taping and vapor coatings in designated spaces. Related solicitation number 1305M222QNMAN0008 seeks offers for drydock repairs including insulation work aboard the NOAA Ship RONALD H. BROWN, issued by the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Attachment D.3 Past Performance Questionnaire REV 1.docx DOCX document
Amendment 0001.pdf PDF
Attachment D.2 Past Performance Information Form REV 1.docx DOCX document
RFQ RONALD H. BROWN DRYDOCK REPAIRS REVISION 1.pdf PDF
073-6932898.pdf PDF
BROWN Register of Lifting Appliances and Loose Gear_2020.pdf PDF
Portable Fire Extinguisher List.pdf PDF
Attachment D.1 RONALD H. BROWN FY 22 DRYDOCK SPEC PACKAGE.pdf PDF
RB Ventilation Manual Closure List.pdf PDF
TM RB 573-02.pdf PDF
RB-245 Vol I.pdf PDF
AIRMAR 12Hz Transducer Drawing.pdf PDF
RB-461A-07 Multibeam Fairing Construction REV Ar.pdf PDF
Righting Device Inspection Form Blank.pdf PDF
181-6932834.pdf PDF
Alfa Laval PureBallast Technical Manual.pdf PDF
101-6932801.pdf PDF
183-6932837.pdf PDF
RB-245 Vol II.pdf PDF
528-6932928.pdf PDF
101-6932805.pdf PDF
573-6932840.pdf PDF
Tech Manual RB-573-05 Sect. 1_2.pdf PDF
997-1A.pdf PDF
NOAA_RHB_480VAC_SWBD_ONLY_RED.pdf PDF
RB-085-001.pdf PDF
000-1F.pdf PDF
RB-568-00_Bow Thruster Tech Man Sect 2.pdf PDF
00-631-001 PAINT SCHEDULE.pdf PDF
501-6932918.pdf PDF
Attachment D.5 Price Schedule.xlsx XLSX spreadsheet
Tech Manaul 167-00.pdf PDF
101-6932815.pdf PDF
Motor Inventory_NOAA Ship BROWN.xls XLS spreadsheet
101-6932819.pdf PDF
573-1C.pdf PDF
Attachment D.3 Past Performance Questionnaire.docx DOCX document
573-6932841.pdf PDF
RB-529-002.pdf PDF
101-6932804.pdf PDF
171-6932832.pdf PDF
Attachment D.6 NOAA AIRS PROCESS.pdf PDF
Tank Capacity Summary.pdf PDF
631-3B.pdf PDF
101-6932813.pdf PDF
300-6932772 One Line.pdf PDF
000-2C.pdf PDF
Switchboard Breakers Info.pdf PDF
99-141156-C_Installation Manual_Sea_Tel_TVHD.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-635-2

OCTOBER 1989

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-635-2

THERMAL INSULATION FOR COMPARTMENTS

1. SCOPE. This specification contains the general requirements for renewing and installing thermal insulation on shell plating, bulkheads, overheads, and other structure in compartments of NOAA ships.

2. REFERENCES.

a. NOAA Standard Specification AMC-000-1 (latest revision), General Requirements for Ship Repair Contract Work on NOAA Ships"

3. REQUIREMENTS.

3.1 Whenever removal or renewal of existing insulation is

necessary to accomplish the required work, the contractor shall remove and properly dispose of all existing insulation. If the existing insulation contains asbestos materials, comply with Section 4.11.7 of reference 2.a. All suspect materials shall be considered to contain asbestos unless proven to be otherwise.

The contractor may have samples analyzed by a qualified laboratory to prove or disprove the presence of asbestos.

3.2 Materials.

3.2.1 Fibrous glass faced thermal insulation board, complying with MIL-I-742, Type I, shall be used.

3.2.2 Fibrous glass tape shall comply with MIL-C-20079, Type II, Class 1.

3.2.3 Fibrous glass insulation felt shall comply with MIL-I-

22023, Type I, Class 6.

3.2.4 Epoxy adhesive shall comply with MIL-A-24456.

3.2.5 Latex adhesive shall comply with MIL-A-3316, Class 1, Grade A.

3.2.6 Vapor barrier coating compound shall comply with MIL-C- 19993.

3.3 Installation.

3.3.1 Secure insulation board to the specified surfaces using 3/16-inch diameter studs and press-fit metal caps. Aluminum studs shall be used if the specified surface is aluminum and cadmium-plated steel studs shall be used on steel surfaces.

3.3.2 In areas accessible for a stud gun, weld studs shall be used. In areas that are inaccessible for a stud gun, studs welded to a perforated pad may be bonded to ship's structure using epoxy adhesive. A maximum of 25-percent of the total number of studs required to secure insulation on each plane area bounded by stiffeners or bulkheads may be attached using adhesive.

3.3.3 Studs shall be spaced approximately 12 inches (maximum of 14 inches) apart on centers. Studs at the edges of each piece of insulation board shall be placed not more than 4 inches from the edge at maximum intervals of 12 inches. Sufficient studs must be used to hold the insulation board firmly and evenly against the surface.

3.3.4 Insulation on vertical surfaces shall extend from 6 inches above the deck to the overhead. Do not apply insulation to the vertical surface within 6 inchess of the deck. Along the lower edge of the insulation, install a metal buffer plate tack-welded to the surface and extending out from surface a distance equal to the insulation thickness.

3.3.5 Insulation board shall be cut and neatly fitted around

surface protrusions.

3.3.6 Install insulation on beams, frames, and stiffeners as

shown on attached Appendix A.

3.3.7 Cover all seams, joints, and edges of thermal insulation with fibrous glass tape using latex adhesive.

3.3.8 To all insulation installed in laundries, sculleries, galleys, drying rooms, and to all insulation installed on the warm side of refrigerated stores spaces, apply a vapor barrier consisting of three alternate brush coatings of white, orange, and white vapor barrier coating compound.

APPENDIX A

INSULATION INSTALLATION ON BEAMS, FRAMES AND STIFFENERS

THIS PAGE IS RESERVED FOR SKETCHES

SHOWING DETAILS FOR INSTALLING INSULATION.

IF YOUR COPY OF THIS SPECIFICATION DOES

NOT HAVE THE SKETCHES, CONTACT THE NOAA

ATLANTIC MARINE CENTER, MARINE ENGINEERING

DIVISION, TELEPHONE (804) 441-6201. FAILURE

TO OBTAIN THE SKETCHES DOES NOT RELIEVE THE

CONTRACTOR OF THE RESPONSIBILITY TO COMPLY

WITH THE REQUIREMENTS CONTAINED THEREON.

END OF SPECIFICATION

Page 1
Page 2
Page 3

File details come from the government source that posted it. Updated .