56D1E25C-D6F7-A070-782594700401C348.docx

DOCX document 19 KB Posted

Attached to
Mediation Services
Solicitation number
2026-46-06
Issued by
Franklin County, Ohio

About this file

This is a vendor questionnaire for an audio-visual (AV) system installation project. The document outlines evaluation criteria across three primary categories: vendor experience and qualifications, project management and approach, and training, support, and warranty provisions. Vendors must demonstrate a minimum of three years in business and provide evidence of at least three comparable projects completed within the past three years. The questionnaire requires detailed submissions regarding proposed AV system design, user interface specifications, comprehensive project timelines covering design through training phases, and quality control methodologies. Vendors must address scope change management procedures, on-site installation standards, and provision of technical deliverables including drawings, signal flow diagrams, and ceiling reflection plans. Additionally, vendors must articulate their safety protocols, subcontractor qualifications if applicable, and compliance capabilities with all federal, state, and local regulations.

The questionnaire mandates comprehensive post-installation support documentation, including user guides and as-built specifications, along with defined warranty policies and service level agreements (SLAs) for technical support calls. Vendors must describe their staff training programs, troubleshooting response times, and ongoing support mechanisms. All respondents must affirm full compliance with scope of work requirements, contractual terms and conditions, billing procedures, and insurance requirements, with submission of a current Certificate of Insurance required as specified in the draft contract's insurance provisions. The questionnaire serves as the primary evaluation instrument for vendor selection and does not specify pricing terms, award dates, or contract duration within this document.

View the file

Other files

File Type Posted
44A3FAEC-97F9-FAD6-B54F90D5CEDD52DA.xlsx XLSX spreadsheet
4ADC244E-B24C-BEC2-4654E43F7ACFB8A4.xlsx XLSX spreadsheet
8B00ECA9-D368-AD09-80DA20EDC1915543.pdf PDF
E99082A3-014B-96AB-48063D8559F32599.pdf PDF
C0135AC1-FF9D-F3AC-BDB7FB4697056E65.pdf PDF
39A8A9E3-F569-C6B6-B9E7BF50CFDC4F51.pdf PDF
44F2A935-093F-1234-3F0F06EFB73CE154.xlsx XLSX spreadsheet
58DCD716-9EAC-9E14-6719EE5FDA607EE3.pdf PDF
1FF81613-C943-E907-903208614AFFB273.pdf PDF
471F2B18-FADB-16E3-6A13A124C82D15B3.pdf PDF
455CA489-AF8F-CF71-6FFA3A68482AEF22.pdf PDF
76154B86-0D35-C013-E46368EB2B8F2266.pdf PDF
36771012-968A-47BA-49FB1CC4DFFFEC63.pdf PDF
B867E43E-FCA2-ABC6-686473D3D551080B.docx DOCX document
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
451D7EC8-9FAF-B01F-15E5F86D68AB3D4B.xlsx XLSX spreadsheet
48C544C3-FCC4-F4ED-99FB5E91E5744B30.pdf PDF
F13E338C-C030-4C55-2FE32EE64813CA9E.docx DOCX document
9188FC82-07E6-2A24-E7927A56369C067A.pdf PDF
471F0983-EB69-959C-3B62A289547CA11E.xlsx XLSX spreadsheet
600AF88E-C800-4399-20BE9FDE4A50714B.docx DOCX document
FAFB33F1-A49E-7354-6799AC07E5D29DA0.pdf PDF
47ADF7AD-983F-9719-2E5C720D20F03E5A.xlsx XLSX spreadsheet
8BD45E27-AD3D-2A81-9DC34421F6415618.pdf PDF
8CFF3838-EA7E-33CD-42D86D9937F5AFDB.pdf PDF
48C71F36-F14E-8501-2A85945F358C6068.xlsx XLSX spreadsheet
441CA1BC-A59E-E520-9F472E421C5515A7.pdf PDF
CCC737E4-C815-7DA9-BAFDD4D8BCA83EAE.pdf PDF
BEA8591A-F056-8D68-013C92A00C2DA843.pdf PDF
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
4764BD72-A4C9-CB3B-C1392F63B1D7AA28.pdf PDF
BCCA0BAC-C5BA-CDB6-49D2EFF559EDAF11.pdf PDF
451DAC14-D169-2A9F-1266443CD504A357.xlsx XLSX spreadsheet
9AEA49E5-D258-E830-CAAB03DD9BBE7883.pdf PDF
D1C75C4E-ACBE-A700-94A3260C246A50BF.pdf PDF
9CF27992-010C-8CAD-3D1BE0F71396D62B.pdf PDF
600ACEFD-D8A4-EF86-6746123A35214FBD.pdf PDF
D465A6BC-B38E-009F-4BA8EFA38CE55315.pdf PDF
E99102BF-B146-146D-35DFAF9763C1170B.pdf PDF
455CC78D-B78A-EC66-F7D6D71B8AF36042.pdf PDF
6D302278-A5F3-8508-AEC851283D91EF01.pdf PDF
5FEA932D-A443-F834-C369AEC7AD13A552.pdf PDF
8BE999EA-C1F3-6CAA-1ED2B57E621612FB.pdf PDF
4540076D-DA44-888C-413CAB868FEC6141.xlsx XLSX spreadsheet
477EEBB5-9B64-4073-39F4D92B43E61BB0.pdf PDF
47647B12-EF69-CBAE-3877E615229CE346.pdf PDF
379F0AFD-BC67-5833-47CED9B9F8A77644.pdf PDF
8F33C1D9-B606-E1D0-F77CFF24E442EF1B.pdf PDF
4491B391-0B2C-57F1-169E865F334A5FAD.xlsx XLSX spreadsheet
4703BAFF-A637-A4BC-D31224A6D85981B6.pdf PDF
Show 40 more

Latest 50 of 147 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONNAIRE

Vendor Experience & Qualifications

1. Provide a brief history of your company.

2. Has the company been in business for at least 3 years?

3. Describe at least 3 projects of similar size, scope, and complexity completed within the past 3 years.

Project Management & Approach

4. Describe your proposed AV system design, including how it meets the functional requirements of the scope of work.

5. Provide detailed information on the proposed user interface.

6. Provide a detailed project timeline, including design, installation, commissioning, and training.

7. How do you manage scope changes and technical issues during installation?

8. Describe your on-site installation standards and how you ensure quality control.

9. Will you provide drawings, signal flow diagrams, and ceiling reflection plans?

10. What is your approach to safety during installation?

11. Will you use subcontractors, and if so, what are their qualifications?

Training, Support & Warranty

12. Describe the training program for staff/users upon completion of the installation.

13. What documentation (user guides, as-builts) will you provide?

14. What is your warranty policy, and what are your SLA terms for service calls?

15. Describe your Post-Installation Support. What is your troubleshooting response time?

16. Is the Vendor able to comply with all federal, state, and local regulations? Please answer yes or no. If not, please explain why.

17. Vendor affirms compliance with all Scope of Work Requirements, Terms and Conditions, Billing, and Insurance requirements (for the duration of the Contract and has attached a Certificate of Insurance (COI) as per Section 4.08 Insurance Requirements of Draft Contract and all contractual requirements.

File details come from the government source that posted it. Updated .