This is a Measurement and Payment section from a construction contract for the demolition of an existing residential home located at 1121 Horsham Road in Pennsylvania. The project scope includes demolition of all buildings, foundation slabs, concrete patio, and paver patio; abandonment of domestic water service and sanitary lateral at the mains in accordance with Horsham Water and Sewer Authority Standards; lead abatement and hazardous waste abatement as determined by field reporting; and permanent stabilization and grading of all disturbed areas to match surrounding topography. The contract utilizes a unit price payment method with a lump sum structure for the primary work items, with all measurements to be performed by the Resident Project Representative in accordance with the Drawings and Project Manual.
Payment will be made at contract unit prices as determined in the Bid Schedule for each line item: Demolition (lump sum covering all materials, labor, and equipment); Domestic Water Service and Sanitary Lateral Abandonment (lump sum); and Lead Abatement and Hazardous Waste Abatement (lump sum based on field-determined quantities). The contract specifies that clean fill placement, final stabilization including the top six inches of stone and topsoil seeding, and all hauling and disposal of demolition and waste materials are incidental costs included within other work items and will not receive separate payment. The contractor is fully responsible for proper disposal of all demolished and waste materials at a permitted facility, as the owner has not arranged a disposal site. Backfill must be compacted and free of debris and voids to prevent settlement.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEASUREMENT AND PAYMENT
01 22 00-1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.01. SECTION INCLUDES
A. Measurement and payment criteria applicable to the Work performed under a unit price payment method.
1.02. PROCEDURE
A. All measurements for payment will be based on completed work, performed in strict accordance with the Drawings and Project Manual, and with the Agreement’s “Schedule of Bid Items”.
B. The Resident Project Representative shall take all measurements and compute quantities relative to all work completed under the Agreement in accordance with the methods included in this section. CONTRACTOR shall assist by providing necessary equipment and personnel as required.
C. In cases where the payment clause for an item in this section relating to any unit or lump sum price requires that the said unit or lump sum price cover and be considered compensation for certain work or material essential to the item, this same work or material shall not be measured or paid for under any other item which may appear elsewhere in this section.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
3.01. DEMOLITION
A. Measurement is lump sum and constitutes furnishing all materials and equipment necessary to complete the work associated with this contract.
B. Payment shall be made at the contract unit price as determined in the Bid Schedule and in accordance with the schedule specified in Section 02 41 16 “Demolition”. This is a lump sum item for the entire contract. This price shall include furnishing all materials, labor and equipment necessary to complete the work associated with this contract. This item shall include demolition, removal and disposal of all buildings, including foundation slabs, concrete patio, and paver patio, as necessary to complete the work. Backfill shall be free of debris, compacted, and free of voids so that settlement doesn’t occur.
3.02. DOMESTIC WATER SERVICE AND SANITARY LATERAL ABANDONMENT
A. Measurement will be lump sum and constitutes furnishing all materials and equipment necessary to complete the work associated with this contract.
B. Payment shall be made at the contract unit price listed in the Bid Schedule. This is a lump sum item for the entire contract. This price shall include furnishing all materials, labor and equipment necessary to complete the work associated with this contract. This item shall include abandoning the services at the mains per Horsham Water and Sewer Authority Standards.
MEASUREMENT AND PAYMENT
01 22 00-2
3.03. LEAD ABATEMENT AND HAZARDOUS WASTE ABATEMENT
A. Measurement will be determined in the field per supplied reporting of lead and hazardous waste. This constitutes furnishing all materials, labor and equipment necessary to complete the work associated with this contract.
B. Payment shall be made at the contract unit price as determined in the Bid Schedule. This is a lump sum item for the entire contract. This price shall include furnishing all materials, labor and equipment necessary to complete the work associated with this contract. This item shall include all necessary reporting and disposal of materials.
3.04. CLEAN FILL
A. There will be no separate line item for clean fill. The clean fill is to be placed in all areas of existing basements. Clean fill shall be placed and compacted to within 6” of the surface. This shall be for furnishing all labor, materials, and equipment necessary for the installation of clean fill. Clean fill shall be in accordance with Section 32 92 00. All clean fill required to compete the work shall be included. Payment for clean fill will not be made as it will be made incidental to all other work.
3.05. PERMANENT STABILIZATION
A. There will be no separate line item for final 6” stone layer or minor areas of topsoil/grading.
This shall constitute furnishing all labor, materials, equipment, to place final stone on all disturbed areas and as directed by the Engineer and placement of topsoil and seed on any disturbed lawn areas. Payment for all final restoration will not be made as it will be made incidental to all other work.
3.06. HAULING AND DISPOSAL OF MATERIAL
A. There will be no separate line item for hauling of demolished and/or waste material from the site. There will be no separate line item for disposal of demolished and/or waste material.
Hauling and disposal includes all labor, materials, equipment, fees and permits to remove all demolished and/or waste material from the site and for proper disposal at a permitted facility.
The OWNER has not arranged a facility for disposal. Contractor shall be responsible for proper disposal of all demolished and/or waste materials. No demolished and/or waste material shall remain on the project site. Payment for hauling and disposal of material will not be made as hauling and disposal of material will be made incidental to all other work.
END OF SECTION
| PART 1 - GENERAL |
| 1.01. SECTION INCLUDES |
| 1.02. PROCEDURE |
| PART 2 - PRODUCTS |
| PART 3 - EXECUTION |
| 3.01. Demolition |
| 3.02. DOMESTIC WATER Service and sanitary lateral abandonment |
| 3.03. lead abatement and hazardous Waste abatement |
| 3.04. CLEAN FILL |
| 3.05. PERMANENT STABILIZATION |
| 3.06. HAULING AND DISPOSAL OF MATERIAL |