42-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf

PDF 63 KB Posted

Attached to
1121 Horsham Road Demolition (26-01054)
Solicitation number
US.258594
Issued by
Pennsylvania

About this file

This is a Public Works Employment Verification Form issued by the Commonwealth of Pennsylvania for use by contractors and subcontractors on public works projects. The form is required for the 1121 Horsham Road Demolition project (Contract No. 26-01054), a residential demolition project in Pennsylvania involving the abandonment of existing water and sanitary services at the mains, with subsequent grading and permanent stabilization of disturbed areas.

By submitting this form, contractors and subcontractors affirm compliance with Pennsylvania's Public Works Employment Verification Act through participation in the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. The form requires verification that all employees hired after January 1, 2013, are authorized to work in the United States. Contractors must utilize the federal E-Verify Program to verify employment eligibility for each new hire within five business days of the employee's start date throughout the duration of the public works contract, and documentation confirming such verification must be maintained for potential investigations or audits. The authorized representative of the contracting company must attest under penalty of law that the information provided is true and correct.

View the file

Other files

File Type Posted
10-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf PDF
12-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
41-Doc 00 73 00 02 - Appendix A - cover sht.pdf PDF
56-Horsham Road Demo Plans 2026-11-03.pdf PDF
15-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
1-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
54-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
20-Doc 00 52 00 - AGREEMENT.pdf PDF
52-x1 - Horsham Road Demo Plans 2026-10-14.pdf PDF
27-Doc 00 91 13 - ADDENDA.pdf PDF
44-Doc 00 73 00 08 - Appendix D - cover sht.pdf PDF
33-Doc 00 62 76 - Application for Payment.pdf PDF
43-Doc 00 73 00 06 - Appendix C - cover sht.pdf PDF
34-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
26-Doc 00 41 00 - BID FORM - EBID.pdf PDF
47-Doc 00 73 00 10 - Appendix E - cover sht.pdf PDF
17-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
9-Doc 00 21 13.1-Instr for Electronic Bidding.pdf PDF
46-Doc 00 73 00 04 - Appendix B - cover sht.pdf PDF
24-Doc 00 65 19.16 - SUBCONTRACTORS RELEASE OF LIENS.pdf PDF
40-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - 1121 Horsham Road Demo.pdf PDF
48-Doc 00 73 00 07 - Appendix C - ACM Survey Rpt final.pdf PDF
38-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
49-Doc 00 73 00 09 - Appendix D - lead rpt final.pdf PDF
8-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
31-Sec 02 41 16 - DEMOLITION.pdf PDF
5-Sec 01 33 00 - SUBMITTALS.pdf PDF
6-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
29-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
32-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
18-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
4-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
25-Sec 31 23 33 - Excavation, Backfill and Compaction.pdf PDF
21-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
13-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
2-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
7-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
3-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
28-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
51-Doc 00 73 00 03 - Appendix A - Prevailing Wage Determination (SN 26-09095).pdf PDF
37-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
19-Doc 00 63 63 - Change Order.pdf PDF
22-Doc 00 43 13 - BID BOND.pdf PDF
50-Doc 00 73 00 01 - SUPPLEMENTARY CONDITIONS.pdf PDF
36-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
45-Doc 00 73 00 11 - Appendix E - Universal Waste Report final.pdf PDF
35-Doc 00 65 19.13 - SUBCONTRACTORS AFFIDAVIT.pdf PDF
55-Attendance List.pdf PDF
53-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF PENNSYLVANIA

PUBLIC WORKS EMPLOYMENT VERIFICATION FORM

Date _______________________

Business or Organization Name (Employer)_________________________________________________

Address _____________________________________________________________________________

City _____________________________________ State_____________ Zip Code ________________

Contractor {dzōŎƻƴǘNJŀŎǘƻNJ όŎƘŜŎƪ ƻƴŜύ

Contracting Public Body _______________________________________________________________

Contract/Project No ___________________________________________________________________

Project Description ____________________________________________________________________

Project Location ______________________________________________________________________

As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act

(‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States

Department of Homeland Security. To the best of my/our knowledge, all employees hired post

January 1, 2013 are authorized to work in the United States.

It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.

I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.

Authorized Representative Signature

Date:
Address:
City:
State:
Zip Code:
Contracting Public Body:
ContractProject No:
Project Description:
Project Location:
Name:
Business or Organization Name - Employer:
Signature:
Check Box1: Off
Check Box2: Off

File details come from the government source that posted it. Updated .